Converter control using reduced link capacitor
09954427 ยท 2018-04-24
Assignee
Inventors
Cpc classification
H02M7/53876
ELECTRICITY
International classification
Abstract
A controller selects a first switch vector based on a current, voltage, or power of a multi-phase load or power source. The first switch vector identifies a first state for each of a plurality of half-bridges of a converter as on or as off during a first interval. A second switch vector is selected based on the current, voltage, or power of the multi-phase load or power source. The second switch vector identifies a second state for each of the half-bridges as on or as off during a second interval. The first interval is computed based on the selected first switch vector. The second interval is computed based on the selected second switch vector. Each of the plurality of half-bridges is controlled as on or as off during the first interval based on the selected first switch vector and during the second interval based on the selected second switch vector.
Claims
1. A non-transitory computer-readable medium having stored thereon computer-readable instructions that when executed by a processor cause the processor to: select a first switch vector based on a current, a voltage, or a power of a multi-phase load or a multi-phase power source, wherein the first switch vector identifies a first state for each of a plurality of half-bridges of a converter as on or as off during a first interval; select a second switch vector based on the current, the voltage, or the power of the multi-phase load or the multi-phase power source, wherein the second switch vector identifies a second state for each of the plurality of half-bridges as on or as off during a second interval; compute the first interval based on the selected first switch vector; compute the second interval based on the selected second switch vector; control each of the plurality of half-bridges as on or as off during the first interval based on the selected first switch vector; and control each of the plurality of half-bridges as on or as off during the second interval based on the selected second switch vector, wherein the first interval and the second interval are selected for each switching period of the converter, wherein the switching period is less than one millisecond, wherein the first interval and the second interval are computed to either charge a link capacitor connected in parallel across the plurality of half-bridges to a predefined voltage from approximately zero or to discharge the link capacitor to approximately zero from the predefined voltage.
2. A conversion controller comprising: a processor; and a non-transitory computer-readable medium operably coupled to the processor, the computer-readable medium having computer-readable instructions stored thereon that, when executed by the processor, cause the processor to select a first switch vector based on a current, a voltage, or a power of a multi-phase load or a multi-phase power source, wherein the first switch vector identifies a first state for each of a plurality of half-bridges of a converter as on or as off during a first interval; select a second switch vector based on the current, the voltage, or the power of the multi-phase load or the multi-phase power source, wherein the second switch vector identifies a second state for each of the plurality of half-bridges as on or as off during a second interval; compute the first interval based on the selected first switch vector; compute the second interval based on the selected second switch vector; control each of the plurality of half-bridges as on or as off during the first interval based on the selected first switch vector; and control each of the plurality of half-bridges as on or as off during the second interval based on the selected second switch vector, wherein the first interval and the second interval are selected for each switching period of the converter, wherein the switching period is less than one millisecond, wherein the first interval and the second interval are computed to either charge a link capacitor connected in parallel across the plurality of half-bridges to a predefined voltage from approximately zero or to discharge the link capacitor to approximately zero from the predefined voltage.
3. A converter device comprising: a converter including a plurality of half-bridges, wherein a half-bridge is included for each phase of a multi-phase load or of a multi-phase power source; a link capacitor connected in parallel across the plurality of half-bridges; a processor connected to control each of the plurality of half-bridges as on or as off; and a non-transitory computer-readable medium operably coupled to the processor, the computer-readable medium having computer-readable instructions stored thereon that, when executed by the processor, cause the processor to select a first switch vector based on a current, a voltage, or a power ofthe multi-phase load or the multi-phase power source, wherein the first switch vector identifies a first state for each of the plurality of half-bridges as on or as off during a first interval; select a second switch vector based on the current, the voltage, or the power of the multi-phase load or the multi-phase power source, wherein the second switch vector identifies a second state for each of the plurality of half-bridges as on or as off during a second interval; compute the first interval based on the selected first switch vector; compute the second interval based on the selected second switch vector; control each of the plurality of half-bridges as on or as off during the first interval based on the selected first switch vector; and control each of the plurality of half-bridges as on or as off during the second interval based on the selected second switch vector, wherein the first interval and the second interval are selected for each switching period of the converter, wherein the switching period is less than one millisecond, wherein the first interval and the second interval are computed to either charge the link capacitor to a predefined voltage from approximately zero or to discharge the link capacitor to approximately zero from the predefined voltage.
4. The converter device of claim 3, further comprising computer-readable instructions that, when executed by the processor, cause the processor to: map a first current based on the selected first switch vector, wherein the first current is mapped to one of a plurality of currents of the multi-phase load or of the multi-phase power source; map a second current based on the selected second switch vector, wherein the second current is mapped to one of the plurality of currents of the multi-phase load or of the multi-phase power source excluding the mapped first current; compute a first power value based on the selected first switch vector and a first current value of the mapped first current; and compute a second power value based on the selected second switch vector and a second current value of the mapped second current, wherein the first interval is computed based on the computed first power value and the first current value, wherein the second interval is computed based on the computed second power value and the second current value.
5. The converter device of claim 4, wherein the first interval and the second interval are further computed based on a capacitance value of the link capacitor.
6. The converter device of claim 3, wherein a load to which the converter device is connected is the multi-phase load operating as an alternating current (AC) load and a source to which the converter device is connected is a direct current (DC) source, wherein the converter is configured to convert a DC source current output by the DC source to an AC load current input to the AC load.
7. The converter device of claim 6, wherein the first switch vector is selected to charge the link capacitor.
8. The converter device of claim 6, further comprising computer-readable instructions that, when executed by the processor, cause the processor to: map a first current based on the selected first switch vector, wherein the first current is mapped to one of a plurality of currents of the multi-phase load; map a second current based on the selected second switch vector, wherein the second current is mapped to one of the plurality of currents of the multi-phase load; compute a first power value based on the selected first switch vector and a first current value of the mapped first current; and compute a second power value based on the selected second switch vector and a second current value of the mapped second current, wherein the first interval is computed based on the computed first power value and the first current value, wherein the second interval is computed based on the computed second power value and the second current value.
9. The converter device of claim 8, wherein the first interval is computed
10. The converter device of claim 9, wherein the second interval is computed as
11. The converter device of claim 6, further comprising computer-readable instructions that, when executed by the processor, cause the processor to: compute a charging interval for the DC source; control a connection between the DC source and the link capacitor to charge the link capacitor during the computed charging interval; and control a disconnection of the DC source from the link capacitor after completion of the computed charging interval, wherein the charging interval is selected for each switching period of the converter to occur before the first interval and the second interval.
12. The converter device of claim 11, wherein the charging interval is computed as d.sub.CT.sub.s, where T.sub.sis the switching period, and
13. The converter device of claim 3, wherein a load to which the converter device is connected is a direct current (DC) load and a source to which the converter device is connected is the multi-phase source operating as an alternating current (AC) source, wherein the converter is configured to convert an AC source current output by the AC source to a DC load current input to the DC load.
14. The converter device of claim 13, wherein the second switch vector is selected to discharge the link capacitor.
15. The converter device of claim 13, further comprising computer-readable instructions that, when executed by the processor, cause the processor to: map a first current based on the selected first switch vector, wherein the first current is mapped to one of a plurality of currents of the multi-phase source; map a second current based on the selected second switch vector, wherein the second current is mapped to one of the plurality of currents of the multi-phase source; compute a first power value based on the selected first switch vector and a first current value of the mapped first current; and compute a second power value based on the selected second switch vector and a second current value of the mapped second current, wherein the first interval is computed based on the computed first power value and the first current value, wherein the second interval is computed based on the computed second power value and the second current value.
16. The converter device of claim 15, wherein the first interval is computed as
17. The converter device of claim 16, wherein the second interval is computed as
18. The converter device of claim 13, further comprising computer-readable instructions that, when executed by the processor, cause the processor to: compute a discharging interval for the DC load; control a connection between the DC load and the link capacitor to discharge the link capacitor during the computed discharging interval; and control a disconnection of the DC load from the link capacitor after completion of the computed discharging interval, wherein the discharging interval is selected for each switching period of the converter to occur after the first interval and the second interval.
19. The converter device of claim 18, wherein the charging interval is computed as
20. The converter device of claim 3, wherein a load to which the converter device is connected is the multi-phase load operating as an alternating current (AC) load and a source to which the converter device is connected is the multi-phase source operating as an alternating current (AC) source, wherein the converter is configured to convert an AC source current output by the AC source to a AC load current input to the AC load.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1) Illustrative embodiments of the disclosed subject matter will hereafter be described referring to the accompanying drawings, wherein like numerals denote like elements.
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
(16)
(17)
(18)
(19)
(20)
(21)
(22)
(23)
(24)
(25)
(26)
(27)
(28)
(29)
(30)
(31)
(32)
(33)
(34)
(35)
DETAILED DESCRIPTION
(36) Referring to
(37) Power source system 102 may include one or more alternating current (AC) and/or direct current (DC) source subsystems that provide electrical power. Load system 104 may include one or more AC and/or DC load subsystems that act as electrical loads. Some or all of power source system 102 and/or load system 104 may provide bidirectional power flow such that a power source subsystem and/or a load subsystem may act as a source during a first time period and as a load during a second time period.
(38) During normal operating conditions, a total power supplied by all of the subsystems acting as sources balance a total power consumed by all of the subsystems acting as loads. In the event that there is a mismatch between total source and load power levels, a storage subsystem may be added to power conversion system 100 to ensure overall power balance across link capacitor 110.
(39) Conversion controller 108 may be electrically connected to power source system 102 and load system 104 to receive voltage, current, and/or power values used to define the parameters that control the energy transfer between power source system 102 and load system 104 based on the current availability/demand across power conversion system 100. The voltage, current, and/or power values may be received for each switching frequency interval or may be received less frequently depending on the dynamic needs of power conversion system 100. As a result, conversion controller 108 may dynamically control converter 106 to act as an inverter, a rectifier, and/or a frequency converter.
(40) Conversion controller 108 is electrically connected to converter 106. Conversion controller 108 controls the supply of power by converter 106 from power source system 102 to load system 104 through command signals input to converter 106. The command signals are generated by conversion controller 108 based on the received voltage and current values or known voltage, current, and/or power values for power source system 102 and load system 104.
(41) Conversion controller 108 may include an input interface 112, an output interface 114, a computer-readable medium 116, a processor 118, and a control application 120. Fewer, different, and additional components may be incorporated into conversion controller 108.
(42) Input interface 112 provides an interface for receiving information from a user or from other devices for entry into conversion controller 108 as understood by those skilled in the art. Input interface 112 may interface with various input technologies including, but not limited to, a keyboard, a mouse, a display, a track ball, a keypad, one or more buttons, etc. to allow the user to enter information into conversion controller 108 or to make selections in a user interface displayed on the display. The same interface may support both input interface 112 and output interface 114. Conversion controller 108 may have one or more input interfaces that use the same or a different input interface technology. Additional inputs to conversion controller 108 may be the voltage, current, and/or power values received from power source system 102 and/or load system 104.
(43) Output interface 114 provides an interface for outputting information for review by a user of conversion controller 108 and for input to another device. For example, output interface 114 may interface with various output technologies including, but not limited to, the display and a printer, etc. Conversion controller 108 may have one or more output interfaces that use the same or a different interface technology. Additional outputs from conversion controller 108 may be the command signals to converter 106.
(44) Computer-readable medium 116 is an electronic holding place or storage for information so the information can be accessed by processor 118 as understood by those skilled in the art. Computer-readable medium 116 can include, but is not limited to, any type of random access memory (RAM), any type of read only memory (ROM), any type of flash memory, etc. such as magnetic storage devices (e.g., hard disk, floppy disk, magnetic strips, . . . ), optical disks (e.g., compact disc (CD), digital versatile disc (DVD), . . . ), smart cards, flash memory devices, cache memory, etc. Conversion controller 108 may have one or more computer-readable media that use the same or a different memory media technology. Conversion controller 108 also may have one or more drives that support the loading of a memory media such as a CD or DVD.
(45) Processor 118 executes instructions as understood by those skilled in the art. The instructions may be carried out by a special purpose computer, logic circuits, or hardware circuits. Processor 118 may be implemented in hardware and/or firmware, or any combination of these methods. The term execution is the process of running an application or the carrying out of the operation called for by an instruction. The instructions may be written using one or more programming language, scripting language, assembly language, etc. Processor 118 executes an instruction, meaning it performs/controls the operations called for by that instruction. Processor 118 operably couples with input interface 112, with output interface 114, and with computer-readable medium 116 to receive, to send, and to process information. Processor 118 may retrieve a set of instructions from a permanent memory device and copy the instructions in an executable form to a temporary memory device that is generally some form of RAM. Conversion controller 108 may include a plurality of processors that use the same or a different processing technology.
(46) Control application 120 performs operations associated with implementing some or all of the control of converter 106 as described with reference to
(47) Referring to
(48) First half-bridge 230 includes a first switch-diode circuit and a second switch-diode circuit. The first switch-diode circuit includes a first top switch 200 and a first top diode 212 connected anti-parallel across first top switch 200. Referring to
(49) Referring again to
(50) Link capacitor 110 is connected in parallel with first converter 106a between top line 236 and bottom line 238. A half-bridge is included for each phase current output from converter 106. Second half-bridge 232 is identical to first half-bridge 230 and includes a third switch-diode circuit and a fourth switch-diode circuit. The third switch-diode circuit includes a second top switch 204 and a second top diode 216 connected anti-parallel across second top switch 204. The fourth switch-diode circuit includes a second bottom switch 206 and a second bottom diode 218 connected anti-parallel across second bottom switch 206. Again, second top switch 204 and second bottom switch 206 may be implemented as transistor switch 300 and connected in an identical manner to that described for first top switch 200 and first bottom switch 202.
(51) Gate 304 of transistor switch 300 of the third switch-diode circuit and gate 304 of transistor switch 300 of the fourth switch-diode circuit are connected to conversion controller 108 to receive gating signals to control a state of second top switch 204 and second bottom switch 206, respectively. At any point in time, only one of second top switch 204 and second bottom switch 206 is effectively closed. A second-phase line 226 is connected between source 306 of transistor switch 300 of the third switch-diode circuit and drain 302 of transistor switch 300 of the fourth switch-diode circuit. A direction of current flow from second-phase line 226 to top line 236 through second top switch 204 indicates second half-bridge 232 is charging link capacitor 110, and a direction of current flow from top line 236 to second-phase line 226 through second top switch 204 indicates second half-bridge 232 is discharging link capacitor 110. When second top switch 204 is effectively closed, second half-bridge 232 is On or in a one 1 state. When second bottom switch 206 is effectively closed, second half-bridge 232 is Off or in a zero 0 state.
(52) Third half-bridge 234 is identical to first half-bridge 230 and includes a fifth switch-diode circuit and a sixth switch-diode circuit. The fifth switch-diode circuit includes a third top switch 208 and a third top diode 220 connected anti-parallel across third top switch 20. The sixth switch-diode circuit includes a third bottom switch 210 and a third bottom diode 222 connected anti-parallel across third bottom switch 210. Again, third top switch 208 and third bottom switch 210 may be implemented as transistor switch 300 and connected in an identical manner to that described for first top switch 200 and first bottom switch 202.
(53) Gate 304 of transistor switch 300 of the fifth switch-diode circuit and gate 304 of transistor switch 300 of the sixth switch-diode circuit are connected to conversion controller 108 to receive gating signals to control a state of third top switch 208 and third bottom switch 210, respectively. At any point in time, only one of third top switch 208 and third bottom switch 210 is effectively closed. A third-phase line 228 is connected between source 306 of transistor switch 300 of the fifth switch-diode circuit and drain 302 of transistor switch 300 of the sixth switch-diode circuit. A direction of current flow from third-phase line 228 to top line 236 through third top switch 208 indicates third half-bridge 234 is charging link capacitor 110, and a direction of current flow from top line 236 to third-phase line 228 through third top switch 208 indicates third half-bridge 234 is discharging link capacitor 110. When third top switch 208 is effectively closed, third half-bridge 234 is On or in a one 1 state. When third bottom switch 210 is effectively closed, third half-bridge 234 is Off or in a zero 0 state.
(54) Referring to
(55)
In an illustrative embodiment, f.sub.s is much higher than a frequency of a power supplied f.sub.p by power conversion system 100. For illustration, f.sub.s is at least 1 kilohertz (kHz) resulting in a switching period of less than one millisecond while f.sub.p may be 60 Hz. f.sub.s can be at least 100 times f.sub.p and can be variable.
(56) Referring to
(57) In the illustrative embodiment of
(58) Referring again to
(59)
where V.sub.in is an input voltage provided by DC power source 500, C is a capacitance of link capacitor 110, and P.sub.in=V.sub.inI.sub.in where I.sub.in is an input current provided by DC power source 500. The charge interval C.sub.i determines a net power that can be delivered to load system 104. A discharge interval D.sub.i is defined as d.sub.DT.sub.s where d.sub.D is a discharge duty ratio provided by controlling a duty ratio of first top switch 200, second top switch 204, and third top switch 208, which are the inverse of a duty ratio of first bottom switch 202, second bottom switch 206, and third bottom switch 210, respectively. First top switch 200, second top switch 204, and third top switch 208 may be referred to as positive throws, and first bottom switch 202, second bottom switch 206, and third bottom switch 210 may be referred to as negative throws herein.
(60) The operation of converter 106 within each switching period T.sub.s follows a predetermined energy charge-discharge pattern through link capacitor 110. For example, during the charge interval C.sub.i, the DC-DC boost chopper transfers energy to link capacitor 110 while first converter 106a is held in a zero state with each of the first switch-diode circuit, the second switch-diode circuit, and the third switch-diode circuit held in the same state. Therefore, load system 104 does not receive any power through link capacitor 110 during the charge interval C.sub.i. The link capacitor voltage across link capacitor 110 increases approximately linearly from zero to V.sub.c as shown by charging curve 400. Soon after the energy stored in link capacitor 110 reaches a sufficient and predetermined value, the DC-DC boost chopper is disconnected from link capacitor 110 by source control switch 504. The charge duty ratio can be independent of time as long as input voltage, power throughput, and switching frequency are maintained constant.
(61) During the discharge interval D.sub.i, first power source system 102a does not exchange power with link capacitor 110 and the first switch-diode circuit, the second switch-diode circuit, and the third switch-diode circuit are modulated by conversion controller 108 to provide a discharge path for the energy stored in link capacitor 110. The excess period when first converter 106a is not in either a discharge or a charge state, link capacitor 110 is in an idle state with the link capacitor voltage maintained either at zero, at its peak V.sub.c, or at an intermediate value.
(62) To define the modulation of the first switch-diode circuit, the second switch-diode circuit, and the third switch-diode circuit by conversion controller 108, consider a three-phase balanced set of sinusoidal voltage waveforms desired at the output as shown in
(63) A time interval of one period of the three-phase output waveforms can be divided into 6 sectors, depending on which of the phase voltages is the most positive and which of the phase voltages is the most negative. Each of the 6 sectors may be further classified into 2 sub-sectors each, depending on either having two of the phase voltages positive or having two of the phase voltages negative, which are labeled NP and PN, respectively.
(64) Referring to
(65) The discharge interval duty ratio d.sub.D and its distribution among the positive and negative throws of converter 106 is a function of the instantaneous output voltages of the three-phases. A first switching period discharge cycle 712 illustrates a switching for Sector 1 shown referring to
(66) Referring to
(67) Second half-bridge 232 is toggled between second top switch 204 and second bottom switch 206 during the discharge interval for first switching period discharge cycle 712 in a predetermined manner that synthesizes the desired output waveform. For example, second top switch 204 is operated at the duty ratio indicated by third duty ratio curve 704, and second bottom switch 206 is operated at a duty ratio indicated by an inverse of third duty ratio curve 704. In alternative embodiments, third duty ratio curve 704 may have a different shape that transitions the duty ratio between second top switch 204 and second bottom switch 206 from approximately zero at a start time of Sector 1 to approximately one at an end time of Sector 1. For example, third duty ratio curve 704 may be curved and may or may not include a discontinuity as shown in the illustrative embodiment.
(68) Referring to
(69) A first time interval 1010 shows charge interval C.sub.i. Discharge interval D.sub.i includes a second time interval 1012 and a third time interval 1014. Second time interval 1012 defines a time that second bottom switch 206 is closed when the output waveform is in Sector 1 and the second sub-sector (NP). Second time interval 1012 also defines a time that second top switch 204 is closed when the output waveform is in Sector 1 and the first sub-sector (PN). Third time interval 1014 defines a time that second top switch 204 is closed when the output waveform is in Sector 1 and the second sub-sector (NP). Third time interval 1014 also defines a time that second bottom switch 206 is closed when the output waveform is in Sector 1 and the first sub-sector (PN). A transition time 804 (shown referring to
(70) The expression for a duty ratio for second time interval 1012 during Sector 1 and the first sub-sector (PN) may be defined as
(71)
where V.sub.out is an output voltage, and is an electrical angle of the output voltage waveform.
(72) The expression for a duty ratio for second time interval 1012 during Sector 1 and the second sub-sector (NP) may be defined as
(73)
(74) Third time interval 1014 is defined as the instant at which the voltage V.sub.c across link capacitor 110 reaches zero. A fourth time interval 1016 defines an idle time between the discharge interval and the next charge interval and may be computed as T.sub.s minus first time interval 1010 minus second time interval 1012 minus third time interval 1014. After link capacitor 110 is completely discharged, power source system 102 remains in its idle state, and converter 106 is in a zero state until the next switching period begins. Fourth time interval 1016 may be distributed as a dead time between the charge and discharge intervals, and/or between second time interval 1012 and third time interval 1014 as desired without affecting waveform synthesis.
(75) The three-phase waveforms in successive sectors are either the same or mirror images of each other with only the phase arrangement different between sectors. Due to the waveform symmetry, the modulation developed for Sector 1 for the first sub-sector (PN) and the second sub-sector (NP) can be extended to the remaining sectors by mapping the solution through appropriate translations and sign reversals for the appropriate phase.
(76) First converter 106a is maintained in the zero state during charge interval C.sub.i and during any idle time. A zero state occurs when each throw of first half-bridge 230, second half-bridge 232, and third half-bridge 234 are in the same position, which occurs when first top switch 200, second top switch 204, and third top switch 208 are all closed (enabled) or when first bottom switch 202, second bottom switch 206, and third bottom switch 210 are all closed (enabled). The zero state may alternate between a Z.sub.+ position (first top switch 200, second top switch 204, and third top switch 208 all closed), and a Z.sub. position (first bottom switch 202, second bottom switch 206, and third bottom switch 210 all closed) every other switching period.
(77) The principle of operation of converter 106 further may be described using a simple power converter that transfers power between ideal current sources using ideal switches to interface between them and link capacitor 110. The topology of a simplified two subsystem power converter is illustrated in
(78) First switch 1102 and second switch 1106 operate in a repetitive manner with a regulated duty ratio each switching period T.sub.s. First switch 1102 and second switch 1106 may be realized using power semiconductors such as MOSFETs and IGBTs as appropriate, for example, as described above. For example, first switch 1102 and second switch 1106 may correspond to first half-bridge 230 that includes first top switch 200 and first bottom switch 202. Other switch configurations can be selected based on a direction of current flow as understood by a person of skill in the art.
(79) In every high frequency switching cycle, one current source supplies energy to link capacitor 110 during a first time interval d.sub.1 shown referring to
(80) As a convention, the current flowing into link capacitor 110 is considered negative while the current flowing out of link capacitor 110 is considered positive. Similarly, the power delivered into link capacitor 110 is considered negative while the power delivered by link capacitor 110 is considered positive.
(81) During first time interval d.sub.1,
(82)
where I.sub.1 is the current output from first ideal current source 1100, and P.sub.1 is an average net power transferred to link capacitor 110. It can be observed that both I.sub.1 and P.sub.1 are negative since current source I.sub.1 charges link capacitor 110.
(83) During a second time interval d.sub.2 shown referring to
(84) During second time interval d.sub.2,
(85)
where I.sub.2 is the current output from second ideal current source 1104, and P.sub.2 is an average net power transferred from link capacitor 110. It can be observed that both I.sub.2 and P.sub.2 are positive since current source I.sub.2, discharges link capacitor 110. For balanced power,
I.sub.1d.sub.1+I.sub.2d.sub.2=0.
(86) The topology of a simplified three subsystem power converter is illustrated in
(87) First switch 1102, second switch 1106, and third switch 1302 operate in a repetitive manner with a regulated duty ratio each switching period T.sub.s. Again, in every high frequency switching cycle, first ideal current source 1100 supplies energy to link capacitor 110 during a first time interval d.sub.1, shown referring to
(88) During second time interval d.sub.2, shown referring to
(89)
where I.sub.2 is the current output from second ideal current source 1104, V.sub.c2 is a remaining capacitor voltage at an end of d.sub.2, and P.sub.2 is an average net power transferred from link capacitor 110 to second ideal current source 1104. During third time interval d.sub.3, shown referring to
(90)
where I.sub.2 is the current output from second ideal current source 1104, and P.sub.3 is an average net power transferred from link capacitor 110 to third ideal current source 1300. It can be observed that since both the current sources I.sub.2 and I.sub.3 discharge the capacitor, currents I.sub.2 and I.sub.3 and powers P.sub.2 and P.sub.3 are positive. For balanced power,
I.sub.1d.sub.1+I.sub.2d.sub.2+I.sub.3d.sub.3=0.
(91) Determining the duty ratio of the positive throws of first switch 1102, second switch 1106, and third switch 1302 for the desired power transfer can be derived using Equations 2, 6, and 8 as
(92)
(93) In the topology of
(94) Again first switch 1102, second switch 1106, and third switch 1302 operate in a repetitive manner with a regulated duty ratio each switching period T.sub.s. In every high frequency switching cycle, first ideal current source 1100 and second ideal current source 1104 supply energy to link capacitor 110 during first time interval d.sub.1 and second time interval d.sub.2, shown referring to
(95) During first time interval d.sub.1,
(96)
where I.sub.1 is the current output from first ideal current source 1100, and P.sub.1 is an average net power transferred to link capacitor 110 from first ideal current source 1100. It can be observed that both I.sub.1 and P.sub.1 are negative since current source I.sub.1 charges link capacitor 110.
(97) During second time interval d.sub.2 of
(98)
here I.sub.2 is the current output from second ideal current source 1104, V.sub.c2 is a capacitor voltage at an end of d.sub.2, and P.sub.2 is an average net power transferred to link capacitor 110 from second ideal current source 1104.
(99) During third time interval d.sub.3, shown referring to
(100)
where I.sub.3 is the current output from third ideal current source 1104, and P.sub.3 is an average net power transferred from link capacitor 110 to third ideal current source 1300. It can be observed that since the current source I.sub.2 charges link capacitor 110, I.sub.2 and P.sub.2 are negative. Since the current source I.sub.3 discharges link capacitor 110, I.sub.3 and P.sub.3 are positive. For balanced power,
I.sub.1d.sub.1+I.sub.2d.sub.2+I.sub.3d.sub.3=0.
(101) Determining the duty ratio of the positive throws of first switch 1102, second switch 1106, and third switch 1302 for the desired power transfer of
(102)
(103) While the illustrations of
(104) A simplified equivalent of load system 104 implemented for a three-phase AC system interfaced to link capacitor 110 through converter 106 is shown in
(105) Furthermore, since the switching frequency of converter 106 is several orders of magnitude higher than the AC output frequency, an AC current can be assumed to be constant during each high frequency switching cycle, which forms a foundation for extending the DC subsystem modulation approach presented above to a multi-phase source or load system.
(106) Every multi-phase AC system operates at a particular power factor. For example, the resistive load of
(107) For illustration, a first-phase current curve 1700, a second-phase current curve 1702, and a third-phase current curve 1704 are shown in
(108) To visualize the selection of switch positions for first half-bridge 230, second half-bridge 232, and third half-bridge 234 to ensure an appropriate transfer of power to the three-phase AC system, it is convenient to view the three-phase voltage and current waveforms as being generated by space vectors rotating at a nominal angular frequency co of the three-phase AC system. Such representation is illustrated in
(109) The selection of a particular set of positive or negative throws of first half-bridge 230, second half-bridge 232, and third half-bridge 234 leads to application of a particular voltage to the three-phase AC system that is located along six particular directions that lie along the axes of the three phases in positive and negative directions. The labels of the switch vectors S.sub.ABC represent the positions of the throws of first half-bridge 230, second half-bridge 232, and third half-bridge 234 that correspond to a particular direction of voltage being applied to the three-phase AC system. For example, S.sub.101 indicates that first top switch 200 (positive throw) of first half-bridge 230 is closed (enabled, on), second bottom switch 206 (negative throw) of second half-bridge 232 is closed (enabled, on), and third top switch 208 (positive throw) of third half-bridge 234 is closed (enabled, on). As another example, S.sub.011 indicates that first bottom switch 202 (negative throw) of first half-bridge 230 is closed (enabled, on), second top switch 204 (positive throw) of second half-bridge 232 is closed (enabled, on), and third top switch 208 (positive throw) of third half-bridge 234 is closed (enabled, on). As still another example, S.sub.110 indicates that first top switch 200 (positive throw) of first half-bridge 230 is closed (enabled, on), second top switch 204 (positive throw) of second half-bridge 232 is closed (enabled, on), and third bottom switch 210 (negative throw) of third half-bridge 234 is closed (enabled, on).
(110) An axis perpendicular to the current vector bisects the ABC space vector plane into two half-planes. Selection of any of the three switch vectors that lie on the half-plane in which the current vector is located lead to discharging the link capacitor, while selection of the three switch vectors on the other half plane lead to charging the link capacitor. On this basis, switch vectors may be termed discharging and charging switch vectors.
(111) To ensure the right amount of power flow in the three-phases during each switching period, the state of the switches for the three-phases is determined and the corresponding switch vectors selected accordingly. There are multiple choices of switch vectors that may be selected to obtain the desired voltage vector. The choice of switch vector combinations may be made depending on the desired application requirements which may be limited by a peak voltage across link capacitor 110, to minimize losses in converter 106, by a duty ratio behavior, etc. The simplest choice of the switch vectors which will provides the desired voltage vector, and thus, the desired power throughput can be the two switch vectors that are nearest to the desired voltage vector in the space vector plane. For example, at first time instant 1718, t.sub.x, switch vectors S.sub.011 and S.sub.010 may be selected; at second time instant 1720, t.sub.y, switch vectors S.sub.101 and S.sub.001 may be selected; and, at third time instant 1722, t.sub.z, switch vectors S.sub.101 and S.sub.100 may be selected. The desired voltage vector may also be obtained from other non-nearest voltage vector choices.
(112) Let these vectors be designated as S.sub.XYZ and S.sub.LMN, respectively. These vectors complete the vector triangle desired to reach the output voltage vector at each time instant. The vector parallelogram corresponding to the choices are shown in
(113) Each of the six switch vectors can be defined.
(114) As another example, at the instant t.sub.y, third-phase voltage curve 1710 is the highest and second-phase voltage curve 1708 is the lowest, while first-phase voltage curve 1706 is in between. Correspondingly, the choices of vectors in this sector, S.sub.101 and S.sub.001, leads to third top switch 208 of third half-bridge 234 selected to be on throughout the modulation interval, second bottom switch 206 of second half-bridge 232 selected to be on throughout the modulation interval, while first half-bridge 230 is selected to alternate between first top switch 200 on and first bottom switch 202 on.
(115) As yet another example, at the instant t.sub.z, first-phase voltage curve 1706 is the highest and second-phase voltage curve 1708 is the lowest, while third-phase voltage curve 1710 is in between. Correspondingly, the choices of vectors in this sector, S.sub.100 and S.sub.101, leads to first top switch 200 of first half-bridge 230 selected to be on throughout the modulation interval, second bottom switch 206 of second half-bridge 232 selected to be on throughout the modulation interval, while third half-bridge 234 is selected to alternate between third top switch 208 on and third bottom switch 210 on.
(116) For an inverter mode of operation, the switch vectors, S.sub.XYZ and S.sub.LMN, may be two discharge vectors or one charge vector and one discharge vector. Similarly, in a rectifier mode of operation, the switch vectors, S.sub.XYZ and S.sub.LMN, may be two charge vectors or one may be a charge vector and the other a discharge vector. The sequence of selecting the switch voltage vectors, S.sub.XYZ and S.sub.LMN, may also vary. The choice of selecting the switch vectors and ordering their sequence may depend on a power factor of the AC subsystem, a duty ratio (may be too small or large), a rate of change of voltage vector, etc.
(117) The equivalent DC current during a first switch vector S.sub.XYZ can be represented by I.sub., which can take values I.sub.A, I.sub.B, or I.sub.C, depending on the switch combination represented by XYZ. Similarly, the equivalent DC current during a second switch vector S.sub.LMN can be represented by I.sub., which can take values I.sub.A, I.sub.B, or I.sub.C, depending on the switch combination represented by LMN. Similarly, the equivalent power transferred to or from the three-phase AC system can be designated as P.sub.XYZ and P.sub.LMN for switch vector selection S.sub.XYZ and S.sub.LMN, respectively, and calculated as
(118)
where P.sub. and P.sub. are the powers supplied or consumed by the corresponding and phases, respectively. Here, refers to a lone dissimilarly connected phase of the three phases XYZ, and refers to a lone dissimilarly connected phase of the three phases LMN.
(119) For example, at the instant of time t.sub.y, selection of XYZ to be 101 leads to =B, phase B being the dissimilarly connected phase, since the other phases A and C are connected together to the top throw. Similarly, selection of LMN to be 001 makes =C. Therefore
I.sub.=p|I.sub.B|(23)
I.sub.=p|I.sub.C|(24)
(120)
where p=1 for charging switch vectors, and p=1 for discharging switch vectors.
(121) Referring to
(122) Inductive filter 2300 is connected between first converter 106a and second load system 104b. Inductive filter 2300 includes first inductor 512, second inductor 514, and third inductor 516. First inductor 512 is connected on first-phase line 224 between first half-bridge 230 and first-phase AC load 2302. Second inductor 514 is connected on second-phase line 226 between second half-bridge 232 and second-phase AC load 2304. Third inductor 516 is connected on third-phase line 228 between third half-bridge 234 and third-phase AC load 2306.
(123) As stated previously if DC power source 500 is connected to link capacitor 110 of
(124)
After an optional idle interval of time, the energy in link capacitor 110 is directed to second load system 104b by sequentially selecting S.sub.XYZ and S.sub.LMN. As before, during these intervals, DC power source 500 is disconnected from link capacitor 110. Depending on the relative location of the current and voltage vectors at the particular instant of time, and the selection of S.sub.XYZ and S.sub.LMN, in the inverter mode of operation, one of the switch vectors, S.sub.XYZ and S.sub.LMN, may lead to charging or discharging link capacitor 110, while the other switch vector always leads to discharging link capacitor 110. The voltage across link capacitor 110 in each of these cases is illustrated in
(125) For example, in
(126) For example, in
(127) In the case illustrated in
(128) During the inverter mode of operation, the three-phase AC load discharges or charges link capacitor 110 before discharging link capacitor 110. The current, I.sub., can be an equivalent of current I.sub.2 described above. Therefore, an equation for the duty ratio for first switch vector S.sub.XYZ can be determined based on equations (10) and (19) as:
(129)
where I.sub. and P.sub.XYZ are positive for the discharge mode and negative for the charge mode. P.sub.XYZ can be substituted into equation (27) using Equation (21) to define the duty ratio as
(130)
(131) The current I.sub. can be an equivalent of current I.sub.3 described above. Therefore, an equation for the duty ratio for second switch vector S.sub.LMN can be determined based on equations (11) and (20) as:
(132)
where and I.sub. and P.sub.LMN are positive. P.sub.LMN can be substituted into equation (29) using Equation (22) to define the duty ratio as
(133)
(134) As the three-phase waveforms unfold through rotation of the current and voltage vectors in the space vector plane, first switch vector S.sub.XYZ and second switch vector S.sub.LMN and the duty ratio for each is determined for each high-frequency switching cycle.
(135)
(136) Referring to
(137) Referring to
(138) A first time interval 2708 shows the DC charge interval C.sub.i. A second time interval 2710 shows an optional idle time interval. A third time interval 2712 shows an AC charge interval for first switch vector S.sub.XYZ selected as S.sub.100. A fourth time interval 2714 shows an AC discharge interval for second switch vector S.sub.LMN selected as S.sub.001. A fifth time interval 2716 shows an optional idle time interval before a start of a next switching period. As discussed previously, second time interval 2710 and fifth time interval 2716 may be distributed as a dead time between the charge and discharge intervals, and/or between third time interval 2712 and fourth time interval 2714 as desired without affecting waveform synthesis. The switching periods may toggle between Z.sub.+ and Z.sub. switching periods as discussed previously.
(139) Referring to
(140) Third load system 104c includes a DC load 2806. Fourth converter 106d includes inductor 502 and source control switch 504. Inductor 502 and source control switch 504 are connected in series with DC load 2806. Link capacitor 110 is connected in parallel with third converter 106c and fourth converter 106d between top line 236 and bottom line 238. Source control switch 504 is connected to discharge link capacitor 110 in the first position illustrated in
(141) Second power source system 102b charges link capacitor 110 while DC load 2806 is disconnected from link capacitor 110. Once second power source system 102b has transferred a predetermined packet of energy to link capacitor 110, DC load 2806 is connected to link capacitor 110 to consume the power. While directing energy from second power source system 102b to link capacitor 110, third converter 106c forms the desired output voltage and current waveforms by sequentially selecting the switch vectors, S.sub.XYZ and S.sub.LMN, as described above. Depending on the relative locations of the current and voltage vectors at the particular instant of time, and the selection of S.sub.XYZ and S.sub.LMN, in the rectifier mode of operation, one of the switch vectors may lead to charging or discharging link capacitor 110, while the other switch vector always leads to charging link capacitor 110.
(142) The current, I.sub., can be an equivalent of current I.sub.1 described above. Therefore, an equation for the duty ratio for first switch vector S.sub.XYZ can be determined based on equations (9) and (18) as:
(143)
where I.sub. and P.sub.XYZ are negative. P.sub.XYZ can be substituted into equation (31) using Equation (21) to define the duty ratio as
(144)
(145) The current I.sub.can be an equivalent of current I.sub.2 described above. Therefore, an equation for the duty ratio for second switch vector S.sub.LMN can be determined based on equations (10) and (19) as:
(146)
where I.sub. and P.sub.LMN are positive to discharge link capacitor 110 and negative to charge link capacitor 110. P.sub.LMN can be substituted into equation (33) using Equation (22) to define the duty ratio as
(147)
(148) Referring to
(149) Second power source system 102b may operate at a different frequency than second load system 104b. Second power source system 102b and second load system 104b may alternate between providing power and receiving power or may consistently provide power and consumer power, respectively.
(150) While directing energy from second power source system 102b to link capacitor 110, second converter 106b forms the desired output voltage and current waveforms by sequentially selecting S.sub.XYZs and S.sub.LMNs as described above where s indicates source side variable values. While directing energy from link capacitor 110 to second load system 104b, first converter 106a also forms the desired output voltage and current waveforms by sequentially selecting S.sub.XYZl and S.sub.LMNl as described above where l indicates load side variable values.
(151) By examining the relative locations of the current and voltage vectors for second power source system 102b and second load system 104b, one will supply power and one will consume power based on the power factor angle being greater than 90 degrees (supplying power) or being less than 90 degrees (consuming power). For example,
(152) In the case illustrated in
(153) Equations (28), (30), (32), and (34) can be used to define the duty ratios as:
(154)
where P indicates the power transfer between second power source system 102b and second load system 104b, s indicates source side variable values, and l indicates load side variable values.
(155) A technique to model AC sources and loads as DC current sources and loads has been described. The technique can be used to incorporate more than two systems in a generalized manner. Link capacitor 110 is connected to at least one source system and at least one load system. A DC subsystem may require at least one sub-interval in each high frequency cycle while an AC subsystem may require at least two sub-intervals in each high frequency cycle to attain a desired operating point.
(156) Each high frequency switching interval can be divided into N sub-intervals where N is based on the number of source and load systems. The link capacitor must be charged during the first sub-interval and discharged during the last sub-interval.
(157) During first time interval d.sub.1,
(158)
where I.sub.1 is the current output from a first equivalent current source, and P.sub.1 is an average net power transferred to link capacitor 110 from the first equivalent current source. It can be observed that both I.sub.1 and P.sub.1 are negative since link capacitor 110 is charged during the first sub-interval. Hence,
(159)
(160) During second time interval d.sub.2,
(161)
where I.sub.2 is the current output from a second equivalent current source/load, V.sub.c2 is a capacitor voltage at an end of d.sub.2, and P.sub.2 is an average net power transferred to link capacitor 110 from the second equivalent current source/load. Hence,
(162)
(163) During third time interval d.sub.3,
(164)
where I.sub.3 is the current output from a third equivalent current source, V.sub.c3 is a capacitor voltage at an end of d.sub.3, and P.sub.3 is an average net power transferred to link capacitor 110 from the third ideal equivalent current source/load. Hence,
(165)
(166) During an n.sup.th time interval d.sub.n,
(167)
where I.sub.n is the current output from an n.sup.th equivalent current source, V.sub.cn is a capacitor voltage at an end of d.sub.n, and P.sub.n is an average net power transferred to link capacitor 110 from the n.sup.th ideal equivalent current source/load. Hence,
(168)
(169) During a time interval N d.sub.N,
(170)
where I.sub.N is the current output from an N.sup.th equivalent current source, V.sub.cN is a capacitor voltage at an end of d.sub.N, and P.sub.N is an average net power transferred to link capacitor 110 from the N.sup.th ideal equivalent current source/load. It can be observed that both I.sub.N and P.sub.N are positive since link capacitor 110 is always discharged during the N.sup.th sub-interval. Hence,
(171)
(172) For power balance,
(173)
(174) The generalization of the duty intervals allows extension of the converters to more than two source and load systems and provides flexibility in ordering of the switch vectors.
(175) Referring to
(176) In an operation 3300, a voltage, a current, and/or a power of DC power source 500 is received, for example, from source system 102. In alternative embodiments, power conversion system 100 may include a plurality of DC sources. In an illustrative embodiment, the voltage, the current and/or the power may be assumed to be constant such that the voltage, the current and/or the power of DC power source 500 is received only once. For example, the voltage, the current and/or the power of DC power source 500 may be received after a selection from a user interface window or after entry by a user into a user interface window presented under control of control application 120. As another option, the voltage, the current and/or the power of DC power source 500 may be received by reading the respective values from a storage location in computer-readable medium 116. As still another option, the voltage, the current and/or the power of DC power source 500 may be received from DC power source 500 at a startup of power conversion system 100. As yet another option, the voltage, the current and/or the power of DC power source 500 may be dynamic and may be received from DC power source 500 at various time intervals that may or may not be periodic.
(177) In an operation 3302, a voltage, a current, and/or a power of a multi-phase AC load is received, for example, from load system 104. In alternative embodiments, power conversion system 100 may include a plurality of multi-phase AC loads. In an illustrative embodiment, the voltage, the current and/or the power may be assumed to follow a predefined waveform that includes a predefined number of phases at a predefined frequency such that the voltage, the current and/or the power of load system 104 is received only once. For example, the voltage, the current and/or the power of load system 104 may be received after a selection from a user interface window or after entry by a user into a user interface window presented under control of control application 120. As another option, the voltage, the current and/or the power of load system 104 may be received by reading the respective values from a storage location in computer-readable medium 116 or computing a value based on the predefined parameters such as a peak voltage, a peak current, a number of phases, a frequency, and a power factor angle. As still another option, the voltage, the current and/or the power of load system 104 may be received from load system 104 at a startup of power conversion system 100. As yet another option, the voltage, the current and/or the power of load system 104 may be dynamic and may be received from load system 104 at various time intervals that may or may not be periodic.
(178) In an operation 3304, the switching period T.sub.s and capacitance C of link capacitor 110 are received. For example, the switching period T.sub.s and capacitance C of link capacitor 110 are received after a selection from a user interface window or after entry by a user into a user interface window presented under control of control application 120 or by reading the respective values from a storage location in computer-readable medium 116.
(179) In an operation 3306, the switch vectors S.sub.XYZ and S.sub.LMN are selected, for example, as described above with reference to
(180) In an operation 3308, an order for applying the selected switch vectors S.sub.XYZ and S.sub.LMN is determined as first switch vector S.sub.XYZ and second switch vector S.sub.LMN. For example, a switch vector that is charging may be selected first, and the discharging switch vector selected second.
(181) In an operation 3310, a current for each switch vector is mapped to a phase current. For example, I.sub. is mapped to a second-phase current, and I.sub. is mapped to a third-phase current based on the selected first and second switch vectors as indicated in equations (23) and (24).
(182) In an operation 3312, a power is computed for each switch vector based on the mapping, for example, as indicated in equations (25) and (26).
(183) In an operation 3314, a DC charging interval is computed, for example, as
(184)
where V.sub.in is the input voltage of DC power source 500, and P.sub.in=V.sub.inI.sub.in, and I.sub.in is the input current of DC power source 500.
(185) In an operation 3316, an interval for connecting each switch vector is computed, for example, using equations (27) and (29), the computed power for each switch vector, and the mapped phase currents.
(186) In an operation 3318, one or more idle times, if any, are computed. For example, a total idle time may be computed as T.sub.s minus the DC charging interval and the computed interval for connecting each switch vector. The total idle time may be distributed between each charging/discharging interval and/or between each switching period.
(187) In an operation 3320, source switch 504 is closed for the computed DC charging interval to charge link capacitor 110.
(188) In an operation 3322, DC power source 500 is disconnected from link capacitor 110 for the computed idle time, if any.
(189) In an operation 3324, first switch vector S.sub.XYZ is closed for the interval computed for first switch vector S.sub.XYZ. First switch vector S.sub.XYZ is closed by closing the positive and negative throws of first half-bridge 230, second half-bridge 232, and third half-bridge 234 as indicated by XYZ in one of
(190) In an operation 3328, second switch vector S.sub.LMN is closed for the interval computed for second switch vector S.sub.LMN. Second switch vector S.sub.LMN is closed by closing the positive and negative throws of first half-bridge 230, second half-bridge 232, and third half-bridge 234 as indicated by LMN in one of
(191) Processing may continue in any of operations 3300, 3302, 3304, and 3306 depending on the dynamics of power conversion system 100.
(192) Referring to
(193) In an operation 3400, a voltage, a current, and/or a power of the multi-phase source is received, for example, in a manner similar to that described for receiving the three-phase load parameters in operation 3302.
(194) In an operation 3402, a voltage, a current, and/or a power of DC load is received, for example, in a manner similar to that described for receiving the DC source parameters in operation 3300.
(195) Similar to operation 3304, in an operation 3404, the switching period T.sub.s and capacitance C of link capacitor 110 are received.
(196) In an operation 3406, the switch vectors S.sub.XYZ and S.sub.LMN are selected, for example, as described above with reference to
(197) In an operation 3408, an order for applying the selected switch vectors S.sub.XYZ and S.sub.LMN is determined as first switch vector S.sub.XYZ and second switch vector S.sub.LMN. For example, a switch vector that is charging may be selected first, and the discharging switch vector selected second.
(198) In an operation 3410, a current for each switch vector is mapped to a phase current. For example, I.sub. is mapped to a second-phase current, and I.sub. is mapped to a third-phase current based on the selected first and second switch vectors as indicated in equations (23) and (24).
(199) In an operation 3412, a power is computed for each switch vector based on the mapping, for example, as indicated in equations (25) and (26).
(200) In an operation 3414, a DC discharging interval is computed, for example, as
(201)
where V.sub.in is the DC voltage provided by DC power source 500, C is a capacitance value of link capacitor 110, and P.sub.in=V.sub.inI.sub.in where I.sub.in is a current provided to the DC source.
(202) In an operation 3416, an interval for connecting each switch vector is computed, for example, using equations (31) and (33), the computed power for each switch vector, and the mapped phase currents.
(203) In an operation 3418, one or more idle times, if any, are computed. For example, a total idle time may be computed as T.sub.s minus the DC discharging interval and the computed interval for connecting each switch vector. The total idle time may be distributed between each charging/discharging interval and/or between each switching period.
(204) In an operation 3420, first switch vector is closed for the interval computed for the selected first switch vector S.sub.XYZ. As described previously, first switch vector S.sub.XYZ charges link capacitor 110. In an operation 3422, the three-phase source is disconnected from link capacitor 110 for the computed idle time, if any.
(205) In an operation 3424, second switch vector S.sub.LMN is closed for the interval computed for the selected second switch vector. As described previously, second switch vector S.sub.LMN may charge or discharge link capacitor 110. In an operation 3426, the three-phase source is disconnected from link capacitor 110 for the computed idle time, if any.
(206) In an operation 3428, source switch 504 is closed for the computed DC discharging interval to discharge link capacitor 110. In an illustrative embodiment where second switch vector S.sub.LMN discharges link capacitor 110, operation 3428 may occur before operation 3424.
(207) In an operation 3430, DC power source 500 is disconnected from link capacitor 110 for the computed idle time, if any.
(208) Processing may continue in any of operations 3400, 3402, 3404, and 3406 depending on the dynamics of power conversion system 100.
(209) Referring to
(210) Similar to operation 3400, in an operation 3500, a voltage, a current, and/or a power of the multi-phase source is received.
(211) Similar to operation 3302, in an operation 3502, a voltage, a current, and/or a power of the multi-phase load is received.
(212) Similar to operation 3304, in an operation 3504, the switching period T.sub.s and capacitance C of link capacitor 110 are received.
(213) Similar to operation 3406, in an operation 3506, the switch vectors S.sub.XYZ and S.sub.LMN are selected, for example, as described above with reference to
(214) Similar to operation 3306, in an operation 3508, the switch vectors S.sub.XYZ and S.sub.LMN are selected, for example, as described above with reference to
(215) Similar to operations 3308 and 3408, in an operation 3510, an order for applying the selected switch vectors S.sub.XYZl and S.sub.LMNl and S.sub.XYZs and S.sub.LMNs is determined. For example, the first switch vector is a charge vector while the last switch vector is a discharge vector. The capacitor may be discharged in between multiple charge vectors to limit a peak capacitor voltage.
(216) Similar to operation 3410, in an operation 3512, a current for each source switch vector, S.sub.XYZs and S.sub.LMNs, is mapped to a phase current.
(217) Similar to operation 3310, in an operation 3514, a current for each load switch vector, S.sub.XYZl and S.sub.LMNl, is mapped to a phase current.
(218) Similar to operation 3412, in an operation 3516, a power is computed for each source switch vector, S.sub.XYZs and S.sub.LMNs.
(219) Similar to operation 3312, in an operation 3518, a power is computed for each load switch vector, S.sub.XYZl and S.sub.LMNl.
(220) Similar to operation 3416, in an operation 3520, an interval for the selected switch vectors, S.sub.XYZl, S.sub.LMNl and S.sub.XYZs and S.sub.LMNs is computed, for example, using equations (35)-(38), the computed power for each switch vector, and the mapped phase currents.
(221) Similar to operation 3418, in an operation 3522, one or more idle times, if any, are computed. For example, a total idle time may be computed as T.sub.s minus the computed interval for connecting each switch vector. The total idle time may be distributed between each charging/discharging interval and/or between each switching period.
(222) Similar to operation 3420, in an operation 3524, first source switch vector S.sub.XYZs is closed for the interval computed for S.sub.XYZs. As described previously, S.sub.XYZs charges link capacitor 110. Similar to operation 3422, in an operation 3526, the multi-phase source is disconnected from link capacitor 110 for the computed idle time, if any.
(223) Similar to operation 3424, in an operation 3528, second source switch vector S.sub.LMNs is closed for the interval computed for S.sub.LMNs. As described previously, S.sub.LMNs may charge or discharge link capacitor 110. Similar to operation 3426, in an operation 3530, the multi-phase source is disconnected from link capacitor 110 for the computed idle time, if any.
(224) Similar to operation 3320, in an operation 3532, first load switch vector S.sub.XYZl is closed for the interval computed for S.sub.XYZs. As described previously, S.sub.XYZl may charge or discharge link capacitor 110. Similar to operation 3322, in an operation 3534, the multi-phase load is disconnected from link capacitor 110 for the computed idle time, if any.
(225) Similar to operation 3324, in an operation 3536, second load switch vector S.sub.LMNl is closed for the interval computed for S.sub.LMNs. As described previously, S.sub.LMNl discharges link capacitor 110. Similar to operation 3326, in an operation 3538, the multi-phase load is disconnected from link capacitor 110 for the computed idle time, if any.
(226) Processing may continue in any of operations 3500, 3502, 3504, and 3506 depending on the dynamics of power conversion system 100.
(227) Referring to
(228) Similar to operation 3500, in an operation 3600, a voltage, a current and/or a power of all the DC and/or AC sources are received.
(229) Similar to operation 3502, in an operation 3602, a voltage, a current and/or a power of all the DC and/or AC loads are received.
(230) Similar to operation 3504, in an operation 3604, the switching period T.sub.s and capacitance C of link capacitor 110 are received.
(231) Similar to operation 3506, in an operation 3606, the switch vectors S.sub.XYZ and S.sub.LMN of all the source subsystems are selected, for example, as described above with reference to
(232) Similar to operation 3508, in an operation 3608, the switch vectors S.sub.XYZ and S.sub.LMN of all the load subsystems are selected, for example, as described above with reference to
(233) Similar to operation 3510, in an operation 3610, the order of all of the selected switch vectors is determined. This may be facilitated by an optimization code to achieve the desirable specifications such as a limited peak capacitor voltage, a desired duty ratio behavior, a converter efficiency etc.
(234) Similar to operation 3512, in an operation 3612, a current for all source switch vectors, S.sub.XYZ and S.sub.LMN, are mapped to the phase currents.
(235) Similar to operation 3514, in an operation 3614, a current for all load switch vectors, S.sub.XYZ and S.sub.LMN, are mapped to the phase current.
(236) Similar to operation 3516, in an operation 3616, a power for all source systems' switch vectors is computed.
(237) Similar to operation 3518, in an operation 3618, a power for all load systems' switch vectors is computed.
(238) Similar to operation 3520, in an operation 3620, an interval for all the sub-intervals is computed, for example, using equations (48), the computed power for each switch vector, and the mapped phase currents.
(239) Similar to operation 3522, in an operation 3622, one or more idle times, if any, are computed. For example, a total idle time may be computed as T.sub.s minus the computed interval for connecting each switch vector. The total idle time may be distributed between each charging/discharging interval and/or between each switching period.
(240) Similar to operation 3520-3538, in an operation 3624, all the dc and ac source and load control is performed to charge and discharge the link capacitor 110. All the source and load systems are disconnected from link capacitor 110 for the computed idle time, if any. The system returns to 3600, 3602, 3604, 3606 or 3608 for the next high frequency switching cycle
(241) As used in this disclosure, the term connect indicates an electrical connection whether by wire or by air or some other medium that conducts an electrical signal. Connect encompasses a direct connection (in which the referenced elements are in direct contact) and an indirect connection (in which the referenced elements are not in direct contact, but are connected via intermediate elements).
(242) The word illustrative is used herein to mean serving as an example, instance, or illustration. Any aspect or design described herein as illustrative is not necessarily to be construed as preferred or advantageous over other aspects or designs. Further, for the purposes of this disclosure and unless otherwise specified, a or an means one or more. Still further, using and or or in the detailed description is intended to include and/or unless specifically indicated otherwise. The illustrative embodiments may be implemented as a method, apparatus, or article of manufacture using standard programming and/or engineering techniques to produce software, firmware, hardware, or any combination thereof to control a computer to implement the disclosed embodiments.
(243) The foregoing description of illustrative embodiments of the disclosed subject matter has been presented for purposes of illustration and of description. It is not intended to be exhaustive or to limit the disclosed subject matter to the precise form disclosed, and modifications and variations are possible in light of the above teachings or may be acquired from practice of the disclosed subject matter. The embodiments were chosen and described in order to explain the principles of the disclosed subject matter and as practical applications of the disclosed subject matter to enable one skilled in the art to utilize the disclosed subject matter in various embodiments and with various modifications as suited to the particular use contemplated.