Method of marketing an elevated prefabricated building
09945113 ยท 2018-04-17
Inventors
Cpc classification
E02D27/02
FIXED CONSTRUCTIONS
E04B2001/3577
FIXED CONSTRUCTIONS
E04B1/348
FIXED CONSTRUCTIONS
E04B2103/02
FIXED CONSTRUCTIONS
International classification
E04B1/00
FIXED CONSTRUCTIONS
E04B1/348
FIXED CONSTRUCTIONS
Abstract
A method of marketing an elevated prefabricated building includes the steps of: 1) offering to a customer for a quoted price, a building that has a precast concrete chain wall foundation and a prefabricated building that is to be supported by the precast concrete chain wall foundation; 2) the offer in step a including an offer to install the building at the site within a span of construction time on site of a week or less; 3) the precast concrete chain wall foundation offered for shipment to a selected site after it has been cast; and 4) the precast concrete chain wall foundation and prefabricated building being offered to be installed at the selected site with a lifting device that lifts each from the transport vehicle to the site.
Claims
1. A method of constructing a prefabricated package and foundation, comprising the steps of: a) selecting a building site having a surface at a grade elevation; b) constructing a self supporting, one piece liftable pre-cast concrete chain wall foundation at a location away from the building site, said constructing including the filling of a mold with reinforcement and slurried concrete that sets after a pour of said slurried concrete and wherein the pre-cast concrete chain wall foundation has a plurality of corner columns, a plurality of intermediate columns spaced in between the corner columns, upper and lower spaced apart beams, wherein the beams and columns are of precast concrete construction, wherein load transfer from each beam to another is through one of said precast concrete columns and not via external fasteners; c) transporting the pre-cast concrete chain wall of step b to the building site of step a using a load carrying vehicle; d) unloading the pre-cast concrete chain wall from the load carrying vehicle; e) placing the pre-cast concrete chain wall on the building site; and f) placing the said package on the pre-cast concrete chain wall after step e, wherein the said package is a walled structure having walls that rest upon and transfer load to the chain wall foundation.
2. The method of claim 1 wherein the walled structure is constructed on the building site of step a.
3. The method of claim 1 wherein the walled structure is constructed away from the building site and further comprising the step of transporting the walled structure to the building site on a load carrying vehicle.
4. The method of claim 1 further comprising the step of constructing an underground foundation and in step e the pre-cast concrete chain wall is placed on the foundation.
5. The method of claim 4 wherein the foundation includes piling.
6. The method of claim 4 wherein the foundation includes one or more footings.
7. A method of constructing an elevated building on a selected building site having a surface with a grade elevation, comprising the steps of: a) fabricating a self supporting, one piece liftable pre-cast concrete chain wall foundation at a location that is not the selected building site; b) transporting the pre-cast concrete chain wall foundation to the building site with a mobile vehicle; c) transporting a package to the building site with a mobile vehicle; d) using a crane to lift and place the pre-cast concrete chain wall foundation on the building site; e) placing the package upon the pre-cast concrete chain wall foundation, and wherein the package rests upon and transfers load to the chain wall and from the chain wall there is load transfer to the building site.
8. The method of claim 7 further comprising the step of driving piling or deep anchoring materials at the building site and securing the pre-cast concrete chain wall foundation to the piling with tension load transfer connections.
9. The method of claim 7 wherein the pre-cast concrete chain wall foundation weighs between about 8,000 and 60,000 pounds.
10. The method of claim 7 wherein the package is constructed on the building site of step a.
11. The method of claim 7 wherein the package is constructed away from the building site and further comprising transporting the package to the building site on a load carrying vehicle.
12. The method of claim 7 further comprising the step of forming an opening in at least one wall section of the pre-cast concrete chain wall structure.
13. The method of claim 12 wherein the one wall section has a wall section area and the opening has an opening area that is at least one half of the wall section area.
14. The method of claim 7 further comprising the step of forming an opening in more than one wall section of the pre-cast concrete chain wall structure.
15. The method of claim 14 wherein each wall section has a wall section area and the opening of each wall section has an opening area that is at least one half of the wall section area that has the opening.
16. The method of claim 14 further comprising the step of forming an opening in each wall section of the pre-cast concrete chain wall structure.
Description
BRIEF DESCRIPTION OF THE SEVERAL VIEWS OF THE DRAWINGS
(1) For a further understanding of the nature, objects, and advantages of the present invention, reference should be had to the following detailed description, read in conjunction with the following drawings, wherein like reference numerals denote like elements and wherein:
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
(16)
(17)
(18)
(19)
(20)
(21)
DETAILED DESCRIPTION OF THE INVENTION
(22)
(23) In
(24) The completed combination of building 12, pre-cast concrete chain wall 6, and optional foundation 8 or 9 can be seen in figure V. Tie down plates 10 can be used to secure the building 12 to the pre-cast concrete chain wall 6. Similar tie down plates 10 can be used to secure the chain wall to the optional foundation 8 or 9.
(25)
(26) In
(27) Pre-cast chain wall foundation 15 can include a number of columns 24-28. These columns include corner columns 24 and intermediate columns 25, 26, 27, 28 as shown in
(28) The upper beam 30 can include longitudinal reinforcing bars 31 or rebars and spaced stirrups 32. In
(29) The upper beam 30 can include optional notches 29 as shown in
(30) One or more plastic tubing sections 38 is provided at numerous locations on pre-cast chain wall foundation such as for example at the lower end portion of a column 24-28 as shown in
(31) When the pre-cast chain wall foundation 15 is transported to building site 16 using transport vehicle 39, a lifting device 40 or like mechanism is employed to transfer pre-cast chain wall foundation 15 from transport vehicle 39 to the trench or excavation 18 at building site 16.
(32) In
(33) A prefabricated building 48 or other building can be transported to building site 16 using a transport vehicle 39. A lifting device such as truck crane 40 or other device can be used to transfer building 48 to pre-cast chain wall foundation 15. In
(34) A plurality of piling such as treated timber piles 50 can optionally be used as part of a tie-down arrangement as shown in
(35) An opening or channel 51 is formed through the upper end portion of pile 50. A galvanized wire rope 52 or other tie is inserted through channel or opening 51 leaving end portions 55 of galvanized wire rope or tie 52 exposed so that a tie can be formed between the end portions 55 and pre-cast chain wall foundation 15. Pile 50 is then driven a further distance into the earth until its upper end is about even with the elevation of the bottom 21 of trench or excavation 18. Shims can be placed on each pile 50 as needed. The trench or excavation 18 is then preferably widened for enabling a user to form a connection between end portions 55 and chain wall foundation 15. The enlarged excavation 53 is simply an enlargement of the trench or excavation 18 at each pile location. The wire rope 52 is then threaded through plastic tubing 38 or channel formed through pre-cast chain wall foundation 15. The wire rope 52 is then clamped or fastened together to form a tie between each piling 50 and pre-cast chain wall foundation 15, each can be at a position below a column 24-28.
(36) The present invention provides an improved business method that enables a contractor or vendor to offer a pre-cast building to a customer for delivery in a very short period of time. Because the pre-cast chain wall foundation 15 is a pre-cast prefabricated structure, it can be transported to a job site in a very short period of time such as for example in less than a week or in less than a day. Similarly, building 48 can be a prefabricated building that can be transported using a transport vehicle 39. The building 48 can be transported in a short period of time such as in less than a week or in less than a day to a selected job site or building site 16. Using the business method of the present invention, the customer can be offered a building 48 and foundation 15 than can be erected in less than a week or even less than a day. Such a customer can also be offered a pre-cast chain wall foundation 15 that is already constructed and available for inspection before it is ever installed.
(37) The following is a list of parts and materials suitable for use in the present invention.
(38) TABLE-US-00001 PARTS LIST Part Number Description 1 metal form for new pre-cast concrete chain wall 2 steel reinforcing cage 3 optional louver to provide access under future building, or allow water flow 4 inserts to accept bolts for tie- downs, landing, etc. 5 concrete to be poured into form 6 finished pre-cast chain wall 7 cables to set chain wall and building 8 optional piling foundation 9 optional concrete footing foundation 10 tie down plates 11 optional landing 12 building or other structure 15 pre-cast chain wall foundation 16 building site 17 excavator 18 trench or excavation 19 bucket 20 side wall of excavation (trench) 21 bottom of excavation (trench) 22 lower end portion 23 upper end portion 24 corner column 25 column 26 column 27 column 28 column 29 notches (5-6 deep) 30 upper beam 31 longitudinal reinforcing bar 32 stirrup 33 lower beam 34 longitudinal reinforcing bar 35 stirrup 36 vertical reinforcing bar 37 stirrup 38 plastic tubing or channel 39 transport vehicle 40 lifting device 41 boom 42 crane line 43 rigging 44 sling 45 rigging 46 sling 47 spreader bar 48 prefabricated building 49 earth's surface 50 treated timber pile 51 opening or channel 52 galvanized wire ropes 53 enlarged excavation 54 second embodiment of the present invention 55 end portion
(39) All measurements disclosed herein are at standard temperature and pressure, at sea level on Earth, unless indicated otherwise.
(40) The foregoing embodiments are presented by way of example only; the scope of the present invention is to be limited only by the following claims.