DRYING DEVICE FOR A POWDERED BUILD MATERIAL, AND INSTALLATION FOR PRODUCING THREE-DIMENSIONAL COMPONENTS
20230035265 · 2023-02-02
Inventors
Cpc classification
B22F10/28
PERFORMING OPERATIONS; TRANSPORTING
B33Y30/00
PERFORMING OPERATIONS; TRANSPORTING
B33Y40/00
PERFORMING OPERATIONS; TRANSPORTING
B22F12/41
PERFORMING OPERATIONS; TRANSPORTING
B29C64/255
PERFORMING OPERATIONS; TRANSPORTING
Y02P10/25
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
International classification
B22F1/145
PERFORMING OPERATIONS; TRANSPORTING
B22F10/28
PERFORMING OPERATIONS; TRANSPORTING
B22F12/41
PERFORMING OPERATIONS; TRANSPORTING
Abstract
A drying device for a powdered building material, in particular for a building station, unpacking station and/or sieve station which can be combined to form an installation for producing three-dimensional components by layer-by-layer solidification by means of a beam acting on the powdered building material, having a container which has a container base and, opposite the container base, a container opening, having a connection flange which has a fastening portion for releasably receiving the container opening of the container, having a connection portion which is located opposite the fastening portion of the connection flange and has a through-opening, having a membrane which closes the through-opening and can be connected to the connection portion, having a retaining element arranged in the container, by means of which retaining element drying agent stored in the container is held separate or remote from the membrane, and a drying space which receives the drying agent and a free space arranged between the retaining element and the membrane is formed.
Claims
1. A drying device for a powdered building material, for a building station, unpacking station and/or sieve station which are combinable to form an installation for producing three-dimensional components by layer-by-layer solidification by means of a beam acting on the powdered building material, having a container which has a container base and, opposite the container base, a container opening, having a connection flange which has a fastening portion for releasably receiving the container opening of the container, having a connection portion which is located opposite the fastening portion of the connection flange and has a through-opening, having a membrane which closes the through-opening and which is connectable to the connection portion, having a retaining element arranged in the container, by means of which retaining element drying agent stored in the container is held separate or remote from the membrane, and a drying space which receives the drying agent and a free space arranged between the retaining element and the membrane is formed.
2. The drying device according to claim 1, wherein the retaining element is provided in a replaceable manner in the container.
3. The drying device according to claim 1, wherein the retaining element is in the form of a mesh, screen or in the form of a support structure having a membrane, which has an annular collar which engages an inner circumferential wall of the container by friction and/or clamping.
4. The drying device according to claim 1, wherein at least one seal is provided between the container and the fastening portion of the connection flange.
5. The drying device according to claim 1, wherein the membrane is held at the connection portion of the connection flange by a seal, in particular a flat seal.
6. The drying device according to claim 1, wherein the membrane is in the form of a moisture-permeable membrane.
7. The drying device according to claim 1, wherein the container is formed at least in some regions of a transparent material.
8. The drying device according to claim 1, wherein a fill quantity of drying agent is provided in the drying space, so that at least one tenth of the volume of the drying space, or at least half of the volume of the drying space, is free of drying agent.
9. The drying device according to claim 8, wherein there is provided as the drying agent a powdered, spherical or pebble-shaped material which takes up moisture by adsorption.
10. The drying device according to claim 8, wherein the drying agent indicates the absorption of moisture by a color change.
11. An installation for producing a three-dimensional component by layer-by-layer solidification by means of a beam acting on a powdered building material, which installation consists at least of: a building station which comprises a process chamber in which the component is producible layer by layer on a substrate plate in a building module by selectively solidifying the building material, and having a feed station arranged upstream of the process chamber in a powder circuit of the building station for feeding fresh or cleaned building material, and having an emptying station arranged downstream of the process chamber for discharging processed building material, which comprises at least one collecting funnel, and/or having an unpacking station which comprises an unpacking chamber in which the component is removable from the building module, and having an emptying station arranged downstream of the unpacking chamber in a powder circuit of the unpacking station for discharging processed building material, which comprises at least one collecting funnel, and/or having a sieve station which comprises a sieve device for separating oversized particles and/or impurities from processed building material, and having a feed station arranged upstream of the sieve device in a powder circuit of the sieve station for feeding processed building material, which comprises a storage funnel and an emptying station arranged downstream of the sieve device for discharging cleaned building material, which comprises a collecting funnel, wherein at least one drying device according to claim 1 is connectable to the storage container and/or to the collecting funnel.
12. The installation according to claim 11, wherein an opening is provided in a wall portion of the storage funnel and/or of the collecting funnel, which opening is closeable by the drying device with the membrane.
13. The installation according to claim 11, wherein the drying device is provided on vertically oriented wall portions of the storage funnel and/or of the collecting funnel.
14. The installation according to any one of claims 11, wherein the drying device is provided adjoining or adjacent to a feed opening of the storage funnel and/or of the collecting funnel and/or is oriented towards the visible side of the building station, unpacking station and/or sieve station.
15. A storage container for transporting and storing powdered building material for an installation, having a powder receiver which is closeable by a closure member, wherein the drying device according to claim 1 is connectable to the closure member and/or to the powder receiver.
16. The storage container according to claim 16, wherein the storage container is provided for the installation for producing a three-dimensional component by layer-by-layer solidification by means of a beam acting on the building material.
Description
[0022] The invention and further advantageous embodiments and further developments thereof will be described and explained in detail in the following text by means of the examples shown in the drawings. The features which are to be found in the description and the drawings can be applied according to the invention individually on their own or in a plurality in any desired combination. In the figures:
[0023]
[0024]
[0025]
[0026]
[0027]
[0028]
[0029]
[0030] The building station 16 comprises a beam source 21, for example in the form of a laser source. This beam source 21 emits a beam 22, in particular a laser beam 22, which is fed via a beam guide to a processing head 26 of a process chamber 24. The beam 22 is directed via the processing head 26 onto the building material 14. This processing head 26 can be arranged on a linear axis system. This linear axis system 28 can be in the form of a two-axis system, so that the processing head 26 is movable in the process chamber 24 in the X-/Y-plane parallel to and above a work surface 31. Alternatively to the processing head 26, a scanner device can also be associated with the process chamber 24. The scanner device comprises a controllable scanner mirror by means of which the beam 21 is directed onto the building material 14.
[0031] In the work surface 31 there is a building module 33 within which a substrate plate 34 is guided so as to be movable up and down. The three-dimensional component 12 is produced on this substrate plate 34 by selectively solidifying the powdered building material 14.
[0032] Above the work surface 31 there is preferably provided an application and levelling device 36. This application and levelling device 36 travels over the work surface 31. In this manner, on the one hand the powdered building material 14 can be applied into the building module 33 and at the same time the excess building material 14 which has been applied can be discharged from the building module 33 in a collecting device 46 by the levelling device.
[0033] The building material 14 preferably consists of a metal powder or ceramics powder. Other materials which are suitable and employed for laser melting and/or laser sintering can also be used. The process chamber 24 is preferably hermetically sealed. For producing the three-dimensional component 12, the process chamber is filled with protecting gas or an inert gas in order to avoid oxidation on melting of the building material 14.
[0034] The building station 16 further comprises a powder storage device 41. This powder storage device 41 has a powder storage funnel 42 which is preferably equipped with a fill level sensor in order to detect the stored level of building material 14. Via a metering device 43, a predetermined amount of building material 14 is removed from the powder storage funnel 42 and fed to the application and levelling device 36 in the process chamber 24.
[0035] The building material 14 that has not solidified after the exposure process is transferred by means of the application and levelling device 36 into a collecting device 46. This collecting device 46 preferably comprises a collecting funnel 47, the opening of which is integrated in the work surface 31 or lies in the work surface 31. This collecting device 46 feeds the processed building material 14 introduced via the application and levelling device 36 to a downstream metering device 43.
[0036] Associated with this metering device 43 downstream is a connection point 50 of an emptying station 51, which is provided for connection of a connecting device 48 to which a cartridge container 49 can be fastened. Via the metering device 43, a predetermined amount of processed building material 14 is transferred into the cartridge container 49.
[0037] A storage place 54 for further cartridge containers 49 and/or connecting devices 48 can be provided in the housing 19 of the building station 16. Both filled and empty cartridge containers 49 can be stored in this storage place 54.
[0038] “Fresh building material” 14 is understood as being building material 14 that is for the first time provided for the production of a three-dimensional component 12 and fed to the process chamber 24 for the process of producing the three-dimensional component 12.
[0039] “Processed building material” 14 is understood as being powdered building material 14 that has been fed to the process chamber 24 and was not solidified by the selective solidification by means of the beam 22. This unsolidified powdered building material 14 is guided out of the process chamber 24 by the application and levelling device 36.
[0040] “Cleaned building material” 14 is understood as being building material 14 that, starting from processed building material, has been cleaned, for example in a sieve station. The processed building material is thereby freed of oversized impurities and the like. This cleaned building material can again be fed to the building station 16 for a work process.
[0041] The building station 16 can further comprise in the powder storage device 41 a connection point 50 of a feed station 52 for at least one connecting device 48 with the cartridge container 49. This is shown herein below in
[0042] The unpacking station 18 comprises an unpacking chamber 61 in which the building module 33, which for removal from the process chamber 24 is preferably closed by a cover, can be inserted in order subsequently to be emptied in the unpacking station 18. The substrate plate 34 with the component 12 is removed from the building module 33 and cleaned of unsolidified building material 14 in the unpacking chamber 61. The processed building material 14 which accumulates in the unpacking chamber 61 on a work surface 31 is transferred to a collecting device 46, which can be configured analogously to the collecting device 46 of the building station 16. Via the metering device 43, processed building material 14 is fed to the connection point 50 of the emptying station 51. A connecting device 48 which receives an empty cartridge container 49 can be fastened to the connection point 50. This cartridge container 49 is filled with processed building material 14.
[0043] Openings 63 with a glove port can be provided in the unpacking chamber 61 for freeing the component 12 of loose building material 14 and feeding the loose building material to the collecting device 46. A suction device for cleaning the component 12 and/or the work surface 31 can also be provided.
[0044] The cartridge container 49 filled with the processed building material 14 is fed to a sieve station 66. This sieve station 66 can be integrated in the unpacking station 18. The sieve station 66 can also be integrated in the building station 16. The sieve station 66 can further be arranged so that it is isolated and separate from the building station 16 and the unpacking station 18. The building station 16, the unpacking station 18 and the sieve station 66 can also form a common installation in a housing 19.
[0045] The sieve station 66 comprises at least one connection point 50 for receiving the connecting device 50 at a feed station 52, to which the connecting device 48 with the cartridge container 49 can be fastened. The processed building material 14 delivered by the cartridge container 49 through connecting device 50 is preferably fed by means of a metering device 43, in particular a metering screw, to a sieve device 67. This sieve device 67 comprises a sieve 68 which can preferably be excited by means of ultrasonic frequencies or low frequencies. The processed powdered building material 14 can thereby be cleaned. For example, coarse particles or oversized particles and/or impurities can be retained by the sieve 68 and transferred to an oversized-particle container 69. The processed powdered building material 14, which is free of oversized particles and/or impurities, is discharged as cleaned building material 14 via an outlet opening 71. This further outlet opening 71 opens into a connection point 50 of an emptying station 51, to which the connecting device 48 with an empty cartridge container 49 arranged thereon can be fastened. The cartridge container 49 serves to receive the processed and cleaned powdered building material 14.
[0046] The connecting device 48 with the cartridge container 48 filled with the processed and cleaned building material 14 is then conveyed to the powder storage device 41 again in order to supply the powder storage device 41 with building material 14.
[0047] The term “feed station” 52 is understood as meaning that the connecting device 48 with a cartridge container 49 filled with building material 14 can be connected to this feed station 52 so that the building material 14 provided in the cartridge container 49 can be fed to the respective station, in particular the building station 16 and the sieve station 66.
[0048] The term “emptying station” 51 is understood as meaning that a connecting device 48 with an empty cartridge container 49 can be connected to this emptying station 51 in order to transfer processed and/or cleaned building material 14 into the cartridge container 49. The processed and/or cleaned building material 14 can thus be guided out of the respective station, in particular the building station 16, the unpacking station 18 and/or the sieve station 66.
[0049]
[0050] The storage funnel 42 comprises a feed opening 131 through which powdered building material 14 is fed to the storage funnel 42. The metering device 43 is provided at the lower end (not shown) of the storage funnel 42. At least one wall portion 132 is formed adjoining the feed opening 131. This wall portion 132 is preferably oriented vertically. This wall portion 132 comprises an opening 133. This opening 133, which is shown in
[0051]
[0052] Opposite the fastening portion 147, the connection flange 146 has a connection portion 151 by which the container 141 can be fastened to the wall portion 132. Abutting this connection portion 151 there is provided a membrane 152. A seal, in particular a flat seal 153, is provided between the membrane 152 and the wall portion 132. On the one hand, the membrane 152 is thereby held fixed to the connection flange 151. On the other hand, the opening 133 is sealed with respect to the surrounding area. The opening 133 is closed by the membrane 152.
[0053] A retaining element 156 is positioned in the container 141. This retaining element 156 is in the form of a mesh, screen or in the form of a support structure with a membrane. The retaining element 156 preferably has an annular collar 157, whereby the retaining element 156 can be fastened to an inside wall of the container 141 by clamping. By means of the retaining element 156, the drying device 134 is divided into a drying space 161 and a free space 162. Drying agent 164 is preferably provided in the drying space 161 (
[0054] By means of the retaining element 156 arranged in a replaceable manner in the container 141, the container 141 can easily be filled with drying agent 164. Moist drying agent 164 can also easily be replaced. The free space 162 formed between the membrane 152 and the retaining element 156 is preferably smaller in volume than the drying space 161.
[0055]
[0056] A fill quantity of drying agent 164 is provided in the drying space 161, so that, in particular in the case of a horizontal orientation of the drying device 134, a free volume remains in the drying space 161 above the drying agent 164. For example, the fill quantity of the drying agent 164 can comprise half the volume in the drying space 161 according to line 166. A larger fill quantity or a smaller fill quantity of drying agent 164 can also be provided. In any case, the fill volume of drying agent 164 does not correspond to the volume of the drying space 161 but is smaller, so that a free volume always remains above the drying agent 164.
[0057] The above-described drying device 134 can further be provided at a closure member 171 or cover or a powder receiver 173 of a storage container 172. The closure member 171 preferably has the opening 133. This is positioned by the drying device 134 analogously to the opening 133 at the storage funnel 42. Thus, moisture removal can likewise be provided on transportation or storage of the powdered building material 14 in the storage container 172.
[0058] Furthermore, the opening 133 can be provided at the powder receiver 173.
[0059] Furthermore, it can be provided that this drying device 134 is provided at a cartridge container 49, in particular at a vertically oriented wall portion or at a base located opposite a cartridge opening.
TABLE-US-00001 10. Installation 11. 12. Component 13. 14. Building material 15. 16. Building station 17. 18. Unpacking station 19. Housing 20. Beam guide 21. Beam source 22. Beam 23. Beam deflection device 24. Process chamber 25. 26. Processing head 27. 28. 29. 30. 31. Work surface 32. 33. Building module 34. Substrate plate 36. Application and levelling device 41. Powder storage device 42. Storage funnel 43. Metering device 44. Metering screw 46. Collecting device 47. Collecting funnel 48. Connecting device 49. Cartridge container 50. Connection point 51. Emptying station 52. Feeding station 53. Cover 54. Storage place 61. Unpacking chamber 63. Openings 66. Sieve station 67. Sieve device 68. Sieve 69. Oversized-particle container 71. Outlet opening 131. Feed opening 132. Wall portion 133. Opening 134. Drying device 136. Fastening element 137. Fill level sensor 138. Free volume 141. Container 142. Container base 143. Container opening 146. Connection flange 147. Fastening portion 148. Sealing 149. Annular collar 151. Connection portion 152. Membrane 153. Flange sealing 154. Through-opening 156. Retaining element 157. Annular collar 161. Drying space 162. Free space 164. Drying agent 166. Line 171. Closure member 172. Storage container 173. Powder receiver