Abstract
A friction bolt (10) includes a first generally circular tube (12) having an internal diameter and defining a longitudinal split, the tube being radially expandable. The bolt has a first leading end (16) for insertion into a borehole (50), a second end defining a head (18), and a second generally circular tube defining a longitudinal split and having an external diameter which is substantially the same as or larger than the internal diameter of the first generally circular tube. The second tube is located inside the first tube (12) with an exterior of the second tube in contact with the interior of the first tube (12). The friction bolt (10) is installed in a rock face (80) using standard friction bolt (10) installation equipment and methods.
Claims
1. A friction bolt comprising: a first generally circular tube having an internal diameter and defining a longitudinal split, the first generally circular tube being radially expandable, the first generally circular tube having a first leading end for insertion into a bore and a second end defining a head; and a second generally circular tube defining a longitudinal split and having an external diameter which is substantially the same as or larger than the internal diameter of the first generally circular tube, the second generally circular tube is located inside the first generally circular tube with an exterior of the second generally circular tube in contact with the interior of the first generally circular tube.
2. The friction bolt as claimed in claim 2, wherein the longitudinal splits defined in the first and second tubes are substantially coincident.
3. The friction bolt as claimed in claim 1, wherein the second generally circular tube extends for substantially the full length of the first generally circular tube apart from the first leading end.
4. The friction bolt as claimed in claim 1, wherein a third generally circular tube defining a longitudinal split and having an external diameter which is substantially the same as or larger than the internal diameter of the first generally circular tube is located inside the first generally circular tube, and wherein the longitudinal splits defined in the first and third generally circular tubes are substantially coincident.
5. The friction bolt as claimed in claim 4, further comprising one or more further generally circular tubes defining a longitudinal split and having an external diameter which is substantially the same as or larger than the internal diameter of the first generally circular tube, located inside the first generally circular tube.
6. The friction bolt as claimed in claim 1, wherein the second generally circular tube is fixed in position in the first generally circular tube.
7. A method of installing a friction bolt into rock comprising the steps of: providing a friction bolt comprising a first generally circular tube having an internal diameter and an external diameter defining a longitudinal split, the tube being radially expandable, the bolt having a first leading end for insertion into a bore and a second end defining a head; inserting one of more inserts into the first generally circular tube, each insert comprising a second generally circular tube defining a longitudinal split and having an external diameter which is substantially the same as or larger than the internal diameter of the first generally circular tube located with an exterior of the second generally circular tube in contact with the interior of the first generally circular tube; drilling a borehole into the rock, the borehole having an internal diameter which is smaller than the external diameter of the friction bolt; and inserting the friction bolt into the borehole using force to compress the first tube and the insert to create radial pressure on the walls of the borehole.
8. The method of installing a friction bolt as claimed in claim 7, wherein the friction bolt is provided with the insert pre-installed in the first generally circular tube.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Specific embodiments of the invention will now be described, by way of example only, and with reference to the accompanying drawings, in which:
[0025]
[0026]
[0027]
[0028]
[0029]
[0030]
[0031]
[0032]
[0033]
[0034]
[0035]
[0036]
[0037]
[0038]
[0039]
[0040]
DESCRIPTION OF THE INVENTION
[0041] The drawings show a friction bolt 10. The friction bolt 10 includes an elongate tube 12 made of steel, which is typically in the order of 2 m long, but whose length can vary from 1 to 5 m depending on the particular application. The tube 12 is split longitudinally along its length. The split 14 extends along the length of the tube. The tube tapers at the leading end 16 of the bolt. The tapered end 16 makes it easier to insert the tube into a pre-drilled bore. At the proximal end, a domed ring 18 is fixed to the tube by a weld 20. In the drawings where features of the various embodiments are the same, the same reference numbers are used.
[0042] With reference to
[0043]
[0044] Advantageously, with reference to
[0045]
[0046]
[0047] Typically, the rock bolts will be manufactured and sold with the inserts pre-installed. It is also possible that the inserts may be inserted into the rock bolts on site just prior to insertion into a bore or possibly even after insertion of the rock bolt into the bore.
[0048] It will be appreciated by persons skilled in the art that numerous variations and/or modifications may be made to the above-described embodiments, without departing from the broad general scope of the present disclosure. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive.