PREFABRICATED VERTICAL GEOTEXILE DITCH CHECK SYSTEM
20230035252 · 2023-02-02
Inventors
Cpc classification
E02B11/00
FIXED CONSTRUCTIONS
E02B3/04
FIXED CONSTRUCTIONS
International classification
E02B11/00
FIXED CONSTRUCTIONS
Abstract
A ditch check system and methods for storm water control are provided. The ditch check system can include a velocity-restricting component of non-woven geotextile fabric with one or more porosities configured to control the velocities of storm water flows for sediment control and silt retention. The velocity-restricting component can have one or more reinforcing elements to provide additional support to protect against tearing and/or undue movement of the fabric, as well as provide attachment points for fasteners used to fasten the fabric to support members. The ditch check system can further include a front water seal and a rear scour guard attached to the velocity-restricting component at ground level which are substantially impermeable to vertical water flow to inhibit ditch scouring and prevent the flow of storm water under the ditch check system. To facilitate transportation, installation, and assembly, one or more of the components of the ditch check system can be supplied as a pre-assembled package.
Claims
1. A ditch check system comprising: a velocity-restricting component comprising a water-permeable material configured to filter sediment and debris from a storm water flow passing therethrough, the velocity-restricting component having an upper edge and a lower edge defining a body therebetween; a front water seal connected to the lower end of the velocity-restricting component; a rear scour guard connected to the lower end of the velocity-restricting component on an opposite side of the velocity-restricting component from the front water seal; at least one compression tube extending laterally along the lower end of the velocity-restricting component; and a plurality of compression stakes located at spaced locations along the at least one compression tube and configured to apply a downward force to the at least one compression tube sufficient to resist migration of the at least one compression tube upon impact of storm water thereagainst; wherein the velocity-restricting component is configured to substantially conform to opposite sides of a sloping terrain of a storm water drainage ditch so as to direct and control a velocity of the storm water flow from the sides of the storm water drainage ditch flows a central portion thereof, while filtering sediment and debris displaced by the storm water flow.
2. The ditch check system of claim 1, the at least one compression tube comprises comprising series of individual lateral sections of varying lengths.
3. The ditch check system of claim 1, wherein the velocity-restricting component comprises at least one geotextile fabric having an apparent opening size of about 20 to 70 sieve.
4. The ditch check system of claim 1, the velocity-restricting component further comprising a flexible sheet material having a plurality of laterally extending release stages, each of the release stages having a different flow rate therethrough.
5. The ditch check system of claim 1, wherein the front water seal comprises a substantially water impermeable material extending along a front side of the velocity-restricting component at the lower end thereof, and wherein the front water seal is configured to substantially deter storm water from passing beneath the lower end of the velocity-restricting component.
6. The ditch check system of claim 1, wherein the rear scour guard comprises a substantially water impermeable material extending along a rear side of the velocity-restricting component at the lower end thereof, and wherein the rear scour guard is configured to substantially isolate at least a portion of soil therebeneath from the storm water flow passing through the body of the velocity-restricting component.
7. The ditch check system of claim 6, wherein the velocity-restricting component, front water seal, and rear scour guard comprise a pre-fabricated unit.
8. The ditch check system of claim 1, wherein each of the compression stakes comprises a stake portion configured to penetrate the compression tubes and into a portion of soil therebelow; and a compression pin extending horizontally through the stake portion, wherein as the stake portions are driven through the at least one compression tube and into the soil the compression pins exert the downward force on the at least one compression tube.
9. The ditch check system of claim 1, wherein at least a bottom edge of the velocity-restricting component comprises an angled configuration.
10. A ditch check system comprising: a contoured velocity-restricting component comprising segments of one or more water-permeable materials of differing porosities and configured to filter sediment and debris from a storm water flow; a front water seal connected proximate a lower end of and extending upstream from the velocity-restricting component; a rear scour guard connected proximate the lower end of the velocity-restricting component opposite to the front water seal; a plurality of compression tubes located along the lower end of the velocity-restricting component; and a series of compression stakes, the compression stakes securing the compression tubes along a lower portion of the velocity-restricting component; wherein the velocity-restricting component, front water seal, and rear scour guard are suppled as a pre-fabricated assembly shaped to fit a sloping terrain of a storm water ditch to control a velocity of the storm water flow along a storm water ditch.
11. The ditch check system of claim 10, the velocity-restricting component further comprising a series of vertical stakes attached thereto at different spaced intervals to secure the velocity-restricting component along the storm water ditch.
12. The ditch check system of claim 11, wherein the velocity-restricting component comprises a reinforced sheet of a water-permeable filtering and sediment retention material having at least one reinforcing component therealong, therein the vertical stakes are attached to the velocity restricting component along the at least one reinforcing component.
13. The ditch check system of claim 10, the plurality of compression stakes further comprising dowel rods extending horizontally therethrough, the dowel rods configured to exert a downward force on the plurality of compression tubes to resist migration of the compression tubes upon impact of storm water thereagainst.
14. The ditch check system of claim 10, wherein the one or more materials of the velocity-restricting component comprise geotextile fabrics having an apparent opening size of about 20 to 70 sieve.
15. The ditch check system of claim 10, wherein each of the front water seal and rear scour guard comprise a substantially water impermeable sheet.
16. The ditch check system of claim 10, wherein at least a lower edge of the velocity-restricting component is contoured to substantially follow sloping sides of the storm water ditch.
17. A method of installing a ditch check system along a storm water ditch having sloping sides along which storm water flows are directed toward central longitudinal channel, the method comprising: positioning a vertical velocity-restricting component across the storm water ditch to substantially track the sloping sides of the storm water ditch, wherein the velocity-restricting component comprises a plurality of laterally extending release stages, each of the release stages having a different flow rate therethrough; positioning a front water seal at ground level and extending upstream from a lower portion of the velocity-restricting component; positioning a rear scour guard at ground level and extending downstream from the lower portion of the velocity-restricting component; positioning a series of weighted compression tubes laterally along the lower portion of the velocity-restricting component and on top of the front water seal, the compression tubes extending at least partially along the lateral length of the velocity-restricting component; engaging the compression tubes to the front water seal with a series of compression stakes; and securing the edges of the front water seal and rear scour guard to the storm water ditch.
18. The method of claim 17, further comprising: excavating a trench upstream of the velocity-restricting component into which the front water seal and compression tubes are placed.
19. The method of claim 17, further comprising: positioning an extended scour guard sheet at ground level downstream of the rear scour guard, a trailing edge of the rear scour guard overlapping a leading edge of the extended scour guard.
20. The method of claim 17, further comprising exerting a downward force on the compression tubes as the compression stakes engage and are urged therethrough.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0028] The accompanying drawings, which are included to provide a further understanding of the embodiments of the present disclosure, are incorporated in and constitute a part of this specification, illustrate embodiments of this disclosure, and together with the detailed description, serve to explain the principles of the embodiments discussed herein. No attempt is made to show structural details of this disclosure in more detail than may be necessary for a fundamental understanding of the exemplary embodiments discussed herein and the various ways in which they may be practiced. According to common practice, the various features of the drawings discussed below are not necessarily drawn to scale. Additionally, dimensions of various features and elements in the drawings may be expanded or reduced to more clearly illustrate embodiments of the disclosure.
[0029]
[0030]
[0031]
[0032]
[0033]
[0034]
[0035]
[0036]
[0037]
[0038]
DETAILED DESCRIPTION
[0039] The embodiments of the present disclosure will now be described in more detail with reference to the attached drawing figures, and without limitation, the present disclosure is directed to a ditch check system to slow the velocity of storm water and channel and filter the released flow through the system fabric. The ditch check system can comprise a prefabricated vertical geotextile ditch check system or a kit with multiple components that can be easily and securely installed along sloped, angled, or other contoured storm water drainage ditches, culverts, etc. The ditch check system can direct and control storm water flows at different, varying velocities, filter sediment and other solids from such storm water flows, and have the structural integrity to prevent failure during heavy rain and/or flooding when water levels and volumes are significantly increased. While some devices that receive storm water flow can address either the need for either controlling velocity or filtration, the disclosed embodiments can provide both functions while accommodating sloped or contoured geographies. The ditch check system can have a series of components configured to mount and/or attach together and cooperate to channel and slow storm water, including providing temporary detention thereof to trap displaced sediment and debris and allow the settling of coarse sediment. The ditch check system can also pool and release concentrated flow at the bottom of a storm water ditch as filtered horizontal sheet flow. As combined, the structure can further dissipate energy from the concentrated water flow, thereby minimizing erosion downstream.
[0040] Turning to the figures,
[0041] By way of illustration and not limitation, in embodiments, a ditch check system 100 can be provided as a kit with a series of prefabricated components. For example, the components of the kit can include a vertical velocity-restricting component 110, front water seal 114, and rear scour guard 116 of the velocity-restricting component 110, which can be sewn or stitched together along the bottom of a body of a contoured vertical section (e.g. ground level) to form the one piece/three component assembly that is pre-shaped to fit the contours of storm water ditches. Alternatively, adhesive materials and/or fasteners can be used secure mating interfaces between each of the components. To facilitate transportation and installation, the components of the ditch check system 20 are supplied as a package, and multiple such packages can be staged along the length of the same drainage ditch for improved flow management. The modular kit can also help to ensure quality control and consistency in installation of the system.
[0042] The velocity-restricting component 110 can be attached to vertical posts or stakes 111 spaced at different intervals relative to a central channel 12 of the storm water ditch 10. The stakes 111 can be wooden, metal stake or rails, polymers, or other resilient and durable materials capable of supporting segments 112 of velocity restricting component 110. In some examples, the segments 112 can be formed as panels extending lengthwise along the velocity restrictor sheet 110. Various fasteners, such as staples, pins, nails, rings, clips, or other fasteners can be used for fastening the sheet to the stakes 111.
[0043] The ditch check system 100 also can include a series of compression tubes 120 that can be applied or located on top of the front water seal 114 and can be held in place with a series of spaced compression stakes 130 to prevent migration of the compression tubes 120 that could otherwise undermine the system. In some examples, the compression tubes 120 can comprise weighted tubes, and can include elongated bags of a polymeric fabric or similar flexible material. For example, the compression tubes 120 can be a polyethylene, polypropylene, nylon, or other, similar fabric material. The material can be permeable or impermeable, depending on the application. The compression tubes can act as a dam or berm to aid in directing the storm water through the sheet body of the vertical velocity-restricting component 110. The lengthwise line of tubes can slow the velocity of storm water flows and can provide controlled storm water release. In addition, in some examples, the tubes can back up and can provide some ponding of storm water flows, allowing some collection of sedimentation and/or solids upstream of the velocity-restricting component 110. This settling can also limit the unimpeded travel of pollutants (e.g., metals, hydrocarbons, oils, and/or other unwanted substances) which might otherwise reach the local environment.
[0044] The compression tubes 120 can be filled with a filler material, for example, and not limitation, in some embodiments, the compression tubes can be filled with pine chips. Other materials also could be used. The ballast can be disposed within the bag of the compression tubes 120 and substantially fill the tubes to provide sufficient weight to restrain movement, including when placed on a downhill slope along which storm water may flow, e.g. along the sloping sides of a storm water drainage ditch. The weight can also prevent erosive undermining and destabilization of the ditch check system 100. The compression tubes 120 can be provided in varying lengths, with a number of tubes provided based on the size and/or configuration of the installation. For example, in certain examples the compression tubes can vary between approximately 5′ and approximately 10′ in length.
[0045] The compression tubes 120 (for example, Silt Saver® Heavy weight Compression Tubes) can be placed on top of the front water seal 114 and staked down with the compression stakes 130. The compression stakes 130 can be spaced at selected intervals along the compression tubes 120 based on length of the installation and expected water flow conditions. In some examples the compression stakes 130 can have two components. A stake portion 132 can penetrate the compression tubes 120 and front water seal 114 and into the soil of the ditch 10 below. The compression stakes can also incorporate a horizontal compression pin 134 to enhance compression of the compression tubes 120. The pin 134 can be a dowel or rod extending through the stake portion 132 approximately perpendicular to the axis of the stake portion, such that when the compression stakes are driven into the soil, the pins 134 exert additional downward clamping force onto the compression tubes 120 to help tie them in position relative to the velocity-restricting component 110 and the front water seal 114.
[0046] In general, the terms velocity-restricting component, vertical flow restrictor, filter sheet, etc. are used interchangeably herein. The purpose of these elements is sufficiently described so as to be understood by those of skill in the art.
[0047] The pooling of storm water that does not infiltrate into the soil can create hydrostatic pressure which can undermine and ultimately cause the failure of traditional ditch check or rock dam systems. The use of compression tubes 120 in the ditch check system 100 combine with the upstream water seal 114 to form a water seal, configured to minimize a traditional point of least resistance for storm water flows or leakage under the vertical velocity-restricting component 110. Instead, the water flow can be redirected through the vertical body of the velocity-restricting component 110. This orientation limits the pooling of water to prevent such failures from rising hydrostatic pressure. As the water travels through the velocity-restricting component 110 it is converted into horizontal sheet flow, further reducing the hydrostatic pressure of the flow. This conversion to horizontal flow yields less hydrostatic pressure and helps to prevent sediment disruption downstream of the ditch check system 100.
[0048] The components of the ditch check system 100, for example as illustrated in
[0049] Once at the site, the assembly can be easily moved to the target position within a ditch 10 as a compact unit. The ditch can be primarily v-shaped, as illustrated in
[0050] The stakes 111 can be driven into hard pan soil and spaced at various intervals dependent upon their distance from the highest velocity of the storm water flow in the center of the ditch 10 to address the increased hydrostatic pressure in that channel. The primary force of concentrated storm water flow is directed at the center of the ditch and is reduced as it extends laterally. Vertical post or stake spacing is adjusted based upon the proximity to the central channel 12 of the ditch 10 to enhance the structural integrity of the system. For example,
[0051] In many situations, appropriate temporary erosion and sediment control can involve using multiple ditch check systems 100 in series in the downslope of the same ditch 10 (also shown in
[0052] The arrangement and porosity of the velocity-restricting component 110 can be tailored for the expected or desired flow through each system in the series. In areas of particularly high flow volumes and velocities, such a series can allow for a more orderly and stable transition to sheet flow as the storm water travels progressively further downstream 4. For example, a ditch check system 100 installed further upstream 2 in the ditch 10 can have a more porous velocity-restricting component 110 than those of systems installed further downstream 4. The succession of systems can promote a metered slowing of flow velocity and a reduction of turbulence, such that low-energy ponding of runoff water can prompt settlement and deposition of suspended solids, especially larger particles which can be sensitive to small changes in flow velocity.
[0053] During assembly, the layout of each ditch check system 100 in the series can easily be arranged and checked for adjacent assemblies in both the lateral and flow directions prior to being fixed in place. If necessary, adjustments can be made to ensure overland flows, as drawn downstream 4 by gravitational forces, are properly channeled and slowed by the successive restrictor sheets. The stakes 111 can then be inserted and driven into the soil of the contoured ditch 10 as desired at intervals, and one or more of the compression tubes, water seal and the scour guard can be pinned or secured to seal the systems.
[0054] As seen in
[0055] The horizontal front scour guard 114 can be attached to the velocity restrictor sheet 110 at or near ground level. The front scour guard 114 can act as a water seal and lay flat with the ground lengthwise along the velocity-restricting component 110 in front of the vertical stakes 111. The front scour guard 114 is shown in
[0056] In some examples, an upstream trench 14 or toe-in can be excavated into which to tuck the front scour guard 114 (and subsequently the compression tubes) to seal and preclude water from flowing underneath the ditch check system 100. The upstream trench 14 and front scour guard 114 can be oriented transverse to the expected direction of water flow.
[0057] As used herein, the terms “water seal” and “scour guard” are interchangeable and intended to cover a variety of permutations. In some examples, the “water seal” and/or “scour guard” can comprise a substantially impervious membrane material for anchoring with fasteners, staples, adhesives, and/or weights. In other examples, some components such as the “water seal” can comprise a geotextile fabric and can be partially buried or otherwise secured to prevent water from flowing beneath the ditch check system 100.
[0058] The trench 14 can be relatively shallow such that there is little volume available for the collection of water. For example, the front scour guard 114 can be pinned into a 4″ deep trench at 2′ intervals with sod pins or staples. The trench 14 can be, for example, 1″×10″, 2″×8″, 3″×6″, or a 4″×5″ trench, or can further vary in depth and width as desired or as dictated by site geography. When the front scour guard 114 is tucked into the contours of the trench 14, the trench can be backfilled and compacted. In some situations, it can be desirable to leave a compacted ridge of soil along the upslope edge of the sheet 110.
[0059] In other examples, the present ditch check system 100 does not necessarily require a full upstream trench for the vertical velocity-restricting component. The location can often have only a toe-in or a natural shallow recessed area lengthwise along the velocity-restricting component for the front scour guard.
[0060] An end view of a representative ditch check system 100 is shown in
[0061] In some examples, although only a single layer is shown in
[0062] The compression tubes 120 can be weighted and confined by the compression stakes 130 against which they are placed. The compression tubes 120 can have multiple individual sections that are a homogenous length, or the sections can have various lengths depending on the contours of the ditch and attachment requirements with the rest of the ditch check system 100. For example, the compression tubes can vary between approximately 5′ and approximately 10′ in length. In other examples, shorter linking tubes of less than 5′ may be necessary to prevent flow gaps between longer tube segments. In one embodiment, the compression tubes can have varied lengths depending on the configuration of the storm water ditch or other installation. For example, a first compression tube 121 can have a length greater than the length of a second compression tube 122 in order to better follow the sloping sides of the storm water ditch 10.
[0063] In some embodiments, the stake portion 132 can extend into the soil of the ditch 10 below the front scour guard 114 in the upstream trench 14 such that, in combination with the compression pins 134, there is three-dimensional constraint of the various compression tubes 120. For example, the stake portion 132 and the compression pins 134 of the compression stakes 130 can form a substantially t-shaped configuration as shown in
[0064] The front water seal 114 and rear scour guard 116 can be attached at or near the lower end 117 at ground level of the velocity-restricting component 110 (e.g. as indicated in
[0065] In some examples, to isolate the soil beneath and further protect the soil downstream of the velocity-restricting component 110, an extended scour guard 140 can be positioned at the rear of the rear scour guard 116. At least the trailing edge 144 of the rear scour guard can overlap with the leading edge 146 of the extended scour guard 140 to prevent water penetration at the interface. Alternatively, at least a portion of the rear scour guard 116 and/or extended scour guard 140 can be at least partially buried to help anchor the ditch check system 100 in the ditch 10. The free edges around the perimeters of the rear scour guard 116 and extended scour guard 140 can then be secured in place similar to the front water seal 114 with sod pins 142 (as shown in
[0066] As generally shown in
[0067] The materials of the velocity-restricting component 110 can be homogenous, or the web material 113 can have woven fibers which can have staged sections or porosities across the height and width of the velocity-restricting component 110. In some examples, a non-woven web can be spun-bonded, knitted, or other similar fabric or sheet filtering materials with varied pore sizes. Alternately, the web material 113 can be a woven material with varied opening sizes for filtering sediment, particulates, and/or other matter.
[0068] The web material 113 can be a sheet formed from natural materials, synthetic materials, or a combination thereof. The silt retention materials can be formed from one or more polymers or polymeric materials. As used herein the term “polymer” or “polymeric material” includes, but is not limited to, homopolymers, copolymers, such as for example, block, graft, random, and alternating copolymers, terpolymers, etc. and blends and modifications thereof.
[0069] One example of a fabric that may be suitable for use as a material for the velocity-restricting component 110 is shown and described in U.S. Reissue Pat. No. RE 42,095, the disclosure of which is incorporated by reference as if fully set forth herein, and can include a belted silt retention fencing material, such as BSRF® geotextile silt and/or sediment control failure material commercially available from Silt-Saver, Inc. (Conyers, Ga.) under the trade name BELTED SILT RETENTION FENCE fabric. Other example fabrics can include woven and non-woven polypropylene, polyethylene, and other fabric materials such as, for example, Amoco Fabrics and Fibers Company (Austell, Ga.) PROPEX® 1198 geotextile.
[0070] As used herein, the term “water-permeable” generally refers to the ability of an element or article to allow water to pass or flow therethough. The flow rate of water through a “water-permeable” structure as used will be sufficient for soil erosion and ditch check applications in which storm water runoff must be filtered and allowed to pass through the structure without substantial pooling or flooding around the silt retention sheet(s) when installed. For example, in embodiments, flow rates in a range or about 50-70 gal/min/ft{circumflex over ( )}2 or greater can be used. However, it will also be understood that whether a particular material is sufficiently water-permeable will depend on the particular application for which the material is used, the particle size of each component in the soil, and numerous other factors understood to those of skill in the art. Thus, while certain examples are provided and described herein, it will be understood that the performance criteria for a given application may vary and that some materials can be suitable for some applications and not be suitable for others.
[0071] A series of reinforcement elements 126 can be integrally formed therewith or otherwise attached and applied to the web 113 of the of the velocity-restricting component 110 at spaced locations. For example, at least one reinforcing band can be attached or integrated therealong spanning the opposing sides of the velocity-restricting component. The reinforcing elements 126 can be located along the sheets, in positions so as to serve as points of attachment for fasteners 127 that are used to fasten the reinforced silt retention sheets to the vertical support stakes or members 111 to anchor the web 113 in position to filter silt and debris from storm water flows. The fasteners 127 can be a staple, pin, clip, hook, hook and loop, snap, band, screw, nail, or other implement capable of penetrating the fabric of the velocity-restricting component 110 and securing it to the stakes 111. As shown, the fasteners 127 can be inserted through the reinforcing elements 126 for a more secure connection to prevent displacement of the segments of the velocity-restricting component 110 during heavy flows passing therethrough. The reinforcing elements 126 can thus help to minimize tearing of the fabric at or proximate to the attachments points along the stakes 111, thereby reducing the failure rate of the system.
[0072] In one example, as shown in
[0073] By way of example, and not limitation, in embodiments, the ditch check system 100 can be provided with a tensile strength within a range of about 200-400 lbs. in a warp direction (e.g. vertical, parallel to the length of the roll), and in some embodiments, about 260-275 lbs. in the warp direction; and about 150-275 lbs. in the fill direction (e.g. horizontal, perpendicular to the length of the roll), and in some embodiments, about 180-220 lbs. in the fill direction; a burst strength of approximately 150-250 lbs., and in some embodiments 175-180 lbs.; and a maximum elongation of about 30%-60%.
[0074] Additional reinforcing elements can be incorporated as needed into the velocity-restricting component 110 through bonding, such as through the use of adhesives, thermal bonding, or the like, needle punching, or other similar applications to provide further support and strength to the body of the sheet. In other examples, the additional reinforcing elements also can include cords, cables, wires, or other similar materials that are inter-woven with or interspersed within the fibers of the water-permeable web material 113 during the formation of the velocity-restricting component 110. As a further alternative, other materials, such as mesh, geogrid, or lattice structure can be used as a base for the web material 113 onto which the reinforcing material can be applied or spun.
[0075] In some embodiments, smaller reinforcement elements can also be placed between larger reinforcing elements as needed, depending upon the application in which the velocity-restricting component 110 is to be used. For example, in areas of expected heavier flooding or high silt, dirt or mud flows, such as in areas where landslides or mudslides may be prevalent, extra reinforcement can be provided in the form of strips, borders, or other geometric shapes. The reinforcing elements can provide enhanced load support and assist in creating a controlled transition from smaller to larger AOS between the flow control zones of the velocity-restricting component 110 without interfering or creating a blockage to flow. The reinforcing elements can also include additional resilient, high strength and non-toxic/environmentally friendly materials, such as fiberglass reinforced scrim or belting material.
[0076] In some embodiments, reinforcing elements 126 connecting the web 113 of the velocity-restricting component 110 can further be releasable and/or removable (i.e. via fasteners or the like) so as to enable repair and replacement of smaller portions or sections 112 of the velocity-restricting component 110 as needed, without having to substantially replace the entire velocity-restricting component 110.
[0077] In some examples, a velocity-restricting component 110 as shown in
[0078] Similarly, in some embodiments, a transition between the filtering first control zone 118 and one or more second flow control zones 119 can include reinforcing elements 126 defining support areas for the velocity-restricting component 110, which can be approximately 0.5″-1.0″ in width, although greater or lesser widths also can also be appreciated. The one or more second flow control zones 119 can be release stages designed to meter a greater amount of flow and transition from intermediate zones or areas which can vary in porosity. In addition to or instead of the reinforcing elements 126, the mating edges of the various adjacent zones can overlap or otherwise be joined to each other to provide increased horizontal loading strength/support to prevent localized collapse during heavy flow, and improve sedimentation by providing a more stable barrier capable of retaining more solids.
[0079] In some examples, the velocity-restricting component 110 can be supplied as a modular system having a lower body comprising one or more first filtering or sediment flow control sections and a retention section. These sections can have openings of varying porosities, the porosities generally increasing upwards from the retention section. In one example, a lower retention zone 124 can have a pore size of approximately 20-70 sieve, and can increase in size along or from a filtering first or upper flow control zone 118, including mesh opening sizes of various ranges. A subsequent second flow control zone or zones 119 can have still larger apparent opening sizes, for example increasing in mesh opening size along the body thereof, so as to define and/or form a series of release stages to enable further flow and overflow volumes to pass therethrough. Other pore sizes can also be anticipated, often based on surrounding soil content (for example, fine particulates such as clay).
[0080] Various intermediate and/or upper flow control zones can extend upwards from the lower sediment flow control section of the velocity-restricting component 110 and have increased opening sizes to allow still further increased flow volumes to pass through as water levels rise. Additionally, as floatables and other natural debris collect against the permeable portions of the system, they can further contribute to the filtration provided by the of the velocity-restricting component 110.
[0081] It should be noted that these structures are provided by way of example, not by limitation, and that further additional sections of water-permeable sections can be added as needed or desired. For example, once installed, silt and sediment can build at the base of a velocity-restricting component 110, effectively raising the ground level upstream of the ditch check system 10. To compensate, intermediate and/or upper overflow sections can, for example, be replaced or augmented, or additional sections can be added above the existing sections to reconfigure the overall flow profile through the velocity-restricting component 110. Furthermore, depending on the particular application and jurisdiction in which the system is used, various minimum physical property and performance requirements for storm water flows and/or erosion control may apply.
[0082]
[0083] In some embodiments, an extended scour guard 140 can be positioned to extend beyond the trailing edge 144 of the rear scour guard 116 to add additional downstream soil protection to the ditch check system 10. The extended scour guard 140 also can be exchanged with, for example, various erosion control blankets, synthetic turf reinforcement mats, and/or other sheet/rolled erosion control products. The extended scour guard 140 can be placed at least partially under the attached rear scour guard 116 such that the trailing edge 144 of the rear scour guard overlays the leading edge 146 of the extended scour guard. Both sheets can be pinned around the edges with sod staples or pins 142 at selected intervals (e.g., for example, from 6″ to up to 2′ intervals). Other greater of lesser intervals also can be used as appropriate for the contours of the specific site. In some examples, grommets or similar means can be used to provide secure openings and prevent tearing of the rear and extended scour guards.
[0084] All horizontally oriented ground components of the ditch check system 100 can be pinned down around at least some of the outer edges with sod pins 142, stakes, staples, or other implements known in the art. For example, in an embodiment the extended scour guard 140 can be placed at least partially under the rear scour guard 116 and both components secured together at 2′ intervals. Other intervals also can be envisaged to fit the contours of the ditch 10. In some examples, a layer of silt or soil can also be allowed to overlay the edges of the scour guards and/or compression tubes (through sedimentation of runoff and/or backfill during installation) to further anchor the edges of the system so the scour guards have good soil contact.
[0085] Further views of an example ditch check system 100 as disclosed herein can be seen in
[0086] It is recommended to check components of the ditch check system 100 for deficiency, or changes in the patterns of storm water runoff and erosion at a site to ensure proper management of water and sediment control is maintained through the life cycle of, for example, a construction project. This can be especially true due to seasonal changes in forecasted weather, such as high intensity storms or winter snowmelt conditions. In many cases, the use of prefabricated or pre-assembled ditch check systems such as those disclosed herein can simplify the relocation or positional adjustment of the system should it become necessary, in order to maintain a more laminar flow regime downstream or to compensate as deviations from expected flow patterns develop.
[0087] The fabric of the velocity-restricting component 110 of the ditch check system 100 can be, for example, a high visibility color (with each stage being the same or a different color) to provide a visual delineation of the overflow release and filtering stages and increase visibility of the entire system to workers. At the terminal edges of the ditch check system 100 on the sloping sides of the ditch, the fabric of the velocity-restricting component 110 can be wrapped around the outermost vertical stakes 111, by at least 360 degrees, to prevent tearing.
[0088] The modular nature of the velocity-restricting component 110 and other components of the pre-assembled ditch check system 100 can further enables additional sections of water-permeable web material having pores with varying mesh opening sizes or porosities can be added as needed. For example, silt and soil 16 can build up upstream of the velocity-restricting component 110 as storm water flows pass therethrough and sedimentation occurs, as illustrated in FIG. land the cross section in
[0089]
[0090] In
[0091] At 906, the example method can include positioning a front water seal upstream of the velocity-restricting component, and at 908 can include positioning a rear scour guard downstream of the velocity-restricting component. The front water seal and the rear scour guard can, for example, comprise water-impermeable sheets attached at ground level and supplied with the velocity-restricting component as part of a pre-assembled package or kit. At 910, embodiments of the example method also can include positioning a series of compression tubes on top of the front water seal and along the lower portion of the velocity-restricting component. In some example embodiments, the front water seal and compression tubes can be installed in the trench excavated ahead of the velocity-restricting component (see, e.g., step 904).
[0092] Referring to
[0093] In embodiments, the example method, at 916, further can include the step of securing the edges of the front water seal and rear scour guard to the soil of the storm water ditch with sod pins, staples, or other suitable fasteners. In some embodiments, an extended scour guard at can be positioned downstream of the rear scour guard to provide additional soil protection to the ditch check system. At least a trailing edge of the rear scour guard and a leading edge of the extended scour guard can overlap to prevent the passage of storm water flows between them.
[0094] As used herein, the terms “about” or “approximately” for any numerical values or ranges indicate a suitable dimensional tolerance that allows the part or collection of components to function for its intended purpose as described herein. More specifically, “about” or “approximately” may refer to the range of values ±20% of the recited value, e.g. “about 90%” may refer to the range of values from 71% to 99%. In addition, the terms “upstream” and “downstream” relate to the direction of storm water flows. Thus, “upstream” relates to a position of flow in advance of a system as disclosed and described herein. Similarly, “downstream” relates to a position of flow trailing a system as disclosed and described.
[0095] The present disclosure has been described herein in terms of examples that illustrate principles and aspects of the present disclosure. While the specific examples described herein are described in detail, it is to be the detailed description and drawings herein are made merely for purposes of providing a full and enabling disclosure of the present invention. The skilled artisan will understand, however, that a wide gamut of additions, deletions, and modifications, both subtle and gross, may be made to the presented examples without departing from the spirit and scope of the present disclosure. Changes in detail and structure can be made without departing from the spirit of the invention as defined in the appended claims. The description is not intended to and should not be construed to limit the present invention of otherwise exclude any such other examples, adaptations, variations, modifications, and equivalent arrangements which are apparent from or reasonably suggested by the present disclosure and description thereof.