SURFACE VESSEL FUELING SYSTEMS AND METHODS
20230029515 ยท 2023-02-02
Inventors
- Jeremy S. MEAUX (Maurice, LA, US)
- Isaac D. KREMERS (Grand Rapids, MI, US)
- Nicholas B. JONES (Lafayette, LA, US)
- Mark E. COOPER (Norfolk, VA, US)
- Quinton P. ELLIOTT (Sunset, LA, US)
- Andrew T. PIDDUCK (Broussard, LA, US)
- Joel C. JURISICH (Lafayette, LA, US)
- Robert L. HENRY (Youngsville, LA, US)
- Garret MARZOLF (Tomball, TX, US)
Cpc classification
Y02E30/30
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
B66D1/26
PERFORMING OPERATIONS; TRANSPORTING
International classification
B63B27/30
PERFORMING OPERATIONS; TRANSPORTING
B66D1/26
PERFORMING OPERATIONS; TRANSPORTING
Abstract
A system that includes a first winch assembly having a first structure on which a fuel hose is configured to be spooled and unspooled, the first structure having a first rotational axis. The system also includes a second winch assembly located rearward of the first winch assembly, the second winch assembly includes a second structure on which a messenger line is configured to be spooled and unspooled, the second structure having a second rotational axis and being rotatable between first and second rotational positions. Upon the second structure being in the first rotational position the second rotational axis is non-orthogonal to the first rotational axis. Upon the second structure being in the second rotational position, the second rotational axis is orthogonal to the first rotational axis. The second structure including an axial through opening through which the fuel line is configured to pass when the second structure is in the second rotational position.
Claims
1. A fuel hose assembly deployment and retrieval system configured to off-load and on-load a fuel hose and a messenger line coupled to a distal end portion of the fuel hose, the fuel hose assembly deployment and retrieval system comprising: a first winch assembly including a first structure on which the fuel hose is configured to be spooled and unspooled, the first structure having a first rotational axis; and a second winch assembly located rearward of the first winch assembly and including a second structure on which the messenger line is configured to be spooled and unspooled, the second structure having a second rotational axis and being rotatable between first and second rotational positions, upon the second structure being in the first rotational position the second rotational axis is non-orthogonal to the first rotational axis, in the second rotational position the second rotational axis is substantially orthogonal to the first rotational axis, the second structure including an axial through opening through which the fuel line is configured to pass when the second structure is in the second rotational position.
2. The fuel hose assembly deployment and retrieval system according to claim 1, wherein when the second structure is in the first rotational position, the second rotational axis is non-orthogonal and non-parallel to the first rotational axis
3. The fuel hose assembly deployment and retrieval system according to claim 1, wherein the first and second winch assemblies are attached to a common frame.
4. The fuel hose assembly deployment and retrieval system according to claim 1, wherein the second winch assembly is coupled to a frame, the second structure being rotatable between the first and second rotational positions by a linear actuator having a first end coupled to the frame and a second end coupled to a part of the second winch assembly.
5. The fuel hose assembly deployment and retrieval system according to claim 1, further comprising a guide roller assembly positioned between the first and second winch assemblies, the guide roller assembly including first and second horizontal rollers arranged parallel to one another, the first horizontal roller being coupled to a motor that is configured to cause the first horizontal roller to rotate, an area between the first and second horizontal rollers being a designated pathway for the fuel hose to pass upon the fuel hose being spooled onto or spooled off the first structure.
6. The fuel hose assembly deployment and retrieval system according to claim 5, wherein the guide roller assembly is configured to hold the fuel hose taught upon the fuel hose being spooled off the first structure.
7. The fuel hose assembly deployment and retrieval system according to claim 1, further comprising a pivot pin and a frame on which a base of the second winch assembly is supported, the pin extending into an opening in the base and an opening in the frame to prevent the second winch assembly from rotating.
8. The fuel hose assembly deployment and retrieval system according to claim 1, further comprising a messenger line buoy chute located rearward of the second winch assembly and through which the fuel hose and messenger line are configured to pass.
9. The fuel hose assembly deployment and retrieval system according to claim 5, further comprising a messenger line buoy chute located rearward of the second winch assembly and through which the fuel hose and messenger line are configured to pass.
10. The fuel hose assembly deployment and retrieval system according to claim 5, wherein the second horizontal roller is continuously urged towards the first horizontal roller.
11. The fuel hose assembly deployment and retrieval system according to claim 9, wherein the first winch assembly, guide roller assembly, second winch assembly and messenger line buoy chute are coupled to a common frame.
12. The fuel hose assembly deployment and retrieval system according to claim 1, wherein the second structure is diametrically smaller than the first structure.
13. The fuel hose assembly deployment and retrieval system according to claim 12, wherein the first structure is coupled to and rotated by a first motor and the second structure is coupled to and rotated by a second motor, the second motor being smaller than the first motor in terms of both power and size.
14. The fuel hose assembly deployment and retrieval system according to claim 5, further comprising a longitudinal tray that extends between the first winch assembly and the guide roller assembly, the longitudinal frame being configured to support the fuel hose as the fuel hose is spooled off and onto the first structure of the first winch assembly.
15. The fuel hose assembly deployment and retrieval system according to claim 14, wherein the longitudinal tray includes a bottom surface that comprises or is coated with a material having a low coefficient of friction.
16. The fuel hose assembly deployment and retrieval system according to claim 14, wherein the longitudinal tray includes a bottom surface that comprises a nylon strip.
17. The fuel hose assembly deployment and retrieval system according to claim 11, wherein the frame has a length of 20 to 25 feet and a width of 5 to 7 feet.
18. The fuel hose assembly deployment and retrieval system according to claim 1, further comprising a messenger line buoy chute assembly located rearward of the second winch assembly and including first and second horizontal rollers arranged parallel to one another and between which the fuel hose and messenger line are configured to pass.
19. The fuel hose assembly deployment and retrieval system according to claim 18, wherein the messenger line buoy chute assembly includes a guide ramp located at an entrance of a buoy chute, the guide ramp being made of or coated with a material having a low coefficient of friction.
20. The fuel hose assembly deployment and retrieval system according to claim 1, further comprising a messenger line buoy chute assembly located rearward of the second winch assembly, the messenger line buoy assembly including a buoy chute through which the fuel hose and messenger line are configured to pass, the messenger line buoy assembly including a buoy eject arm that pivots between a first position and a second position, the system further comprising one or more position sensors that are configured to detect when the buoy eject arm is in the first position or in the second position, the one or more sensors being operatively coupled to a motor that rotationally drives the second structure of the second winch assembly.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0011]
[0012]
[0013]
[0014]
[0015]
[0016]
[0017]
[0018]
[0019]
[0020]
[0021]
[0022]
[0023]
[0024]
DETAILED DESCRIPTION
[0025]
[0026] According to one implementation, a clamp 18 is fitted onto a distal end portion of the fuel hose assembly 10. The use of the clamp is discussed in more detail below.
[0027] According to one implementation, the fuel hose 12 is a 2.5 inch rubber hose, the support rope 14 is a 3.0 inch nylon rope and the messenger line 20 is a 1.0 inch nylon rope.
[0028] As discussed above, and as shown in
[0029] When the transfer of fuel from the RV to the USV is complete, the quick connect/disconnect connector 16 of the fuel hose assembly 10 is disconnected from the fuel supply connector 3 of the RV and the fuel hose assembly 10 and messenger line 20 are returned to the sea. Thereafter, the fuel hose assembly 10 and messenger line 20 are retrieved onto the USV while the RV is maintained rearward of the USV.
[0030]
[0031] When the purging operation is complete, in step 25 the distal end of the fuel hose assembly 10 is capped and cleared from the RV deck back into the sea. Thereafter, in step 26 the supply fuel line on the deck of the RV is stowed while in step 27 the fuel hose assembly 10 and messenger line 20 are brought onboard the USV and the refueling module is shutdown. When the fuel hose assembly 10 and messenger line 20 are fully recovered, the USV notifies the RV it is ready to break from refueling formation. Thereafter, in step 29 the RV breaks formation.
[0032]
[0033] The fuel hose assembly 10 typically comprises a rubber hose 12 that is coupled to a heavy-duty support rope 14. The support rope 14 is needed so that tension applied to the fuel hose assembly 10 during refueling operations is applied to the heavy-duty support rope 14 and not directly to the hose 12 itself. Without the use of the support rope 14, the hose 12 would easily fail (e.g. snap/break) due to stresses imposed on it by its weight when filled with fuel and by tension applied to the hose while being transferred between the USV and RV. Because each of the fuel hose 12 and support rope 14 typically have a diameter between 2 to 3 inches, the resultant fuel hose assembly 10 is both heavy and bulky, especially when compared to the size and weight of the messenger line 20.
[0034] FIGS, 7A-14C depict a fuel hose deployment and retrieval system 100 that is adapted for use on an aft part of the USV 1. The system 100 is used to offload the fuel hose assembly 10 and messenger line 20 from the USV and to thereafter retrieve them. The system 100 includes a first winch 110 and a second winch 130 that are respectively configured to spool out and spool in the fuel hose assembly 10 and messenger line 20, the second winch being located rearward of the first winch. (Note that in
[0035] An advantage of using separate winches for spooling the fuel hose assembly 10 and messenger line 20, is that each of the winches can be specifically configured to accommodate the different sizes and weights of the fuel hose assembly and messenger line. For example, the second winch 130 may be significantly smaller than the first winch 110 and requires a much smaller motor (in terms of size and power) than that of the first winch. As such, each of the fuel hose assembly 10 and messenger line 20 can be more efficiently spooled off and onto the respective drums of the first and second winches. The separate spooling of the fuel hose assembly 10 and messenger line 10 also prevents them from being entangled with one another.
[0036] Positioned between the first and second winches 110 and 130 is a guide roller assembly 150 that is configured to both guide and drive the fuel hose assembly 10 in the rearward direction 102. The system also includes a messenger line buoy chute 170 located rearward of the second winch 130. According to one implementation, a longitudinal tray 160 extends between the first winch 110 and the guide roller assembly 150 to support the fuel hose assembly 10 as it is spooled off and onto the drum of the first winch. According to one implementation, the bottom 161 of the support tray 160 comprises or is coated with a material having a low coefficient of friction. According to one implementation the bottom 161 of the support tray 160 comprises a nylon strip.
[0037] According to some implementations, the overall length L of the fuel hose deployment and retrieval system 100 is between about 20 to 25 feet and the overall width W is between about 5 to 7 feet,
[0038]
[0039] As noted above, when the messenger line winch 130 is In the initial ready state, the rotational axis 131 of drum 132 is arranged non-orthogonal to the rotational axis 111 of the first winch 110, and in some instances is arranged both non-orthogonal and non-parallel to rotational axis 111 of the first winch 110.
[0040] With reference to
[0041]
[0042] In the implementation of
[0043]
[0044] An important feature of the second winch 130 is that it possess a through opening 142 extending between first and second opposing ends of the device. As will be discussed in more detail below, the through opening 142 makes way for the fuel hose assembly 10 to pass internally through the length of the second winch 130 as it is being spooled off and onto the drum of the first winch 110. To protect the fuel hose assembly 10 from coming into contact with the chain drive 136 as it enters and exits the through opening 142, a composite guard 143 is provided adjacent and internal to the chain drive.
[0045]
[0046] The messenger line buoy chute 170 also comprises a pair of horizontal rollers 174a-b, a pair of vertical rollers 175a-b and a guide ramp 176 that are arranged to assist in guiding the messenger line 20 into the entrance of the chute 171. According to one implementation, the guide ramp 176 is made of or coated with a material having a low coefficient of friction.
[0047] As noted above, according to one implementation the underway replenishment refueling operation begins by first launching the buoy 22 and the attached messenger line 20 into the sea using the second winch assembly 130. When the buoy 22 is launched, the eject arm 172 of the messenger line buoy chute 170 rotates from its first position to the second position as shown in
[0048] Upon the messenger line 20 being sufficiently deployed into the sea, rearward deployment of the fuel hose assembly 10 begins, as shown in
[0049] As the fuel hose assembly 10 is deployed, it advances rearward through the guide roller assembly 150, the inner through opening 142 of the second winch assembly 130 and the buoy chute 171. According to one implementation, the deployment continues until about 300 to 400 feet of the fuel hose assembly 10 resides in the sea in an area located between the USV and RV. Thereafter, the messenger line 20 and a distal end of the fuel hose assembly 10 are brought onboard the RV as explained above, and fuel is transferred from the RV to one or more fuel storage tanks located on the USV.
[0050] As explained above, when the transfer of fuel from the RV to the USV is complete, the fuel hose assembly 10 is disconnected from the RV and retrieved onboard the USV. This involves returning the messenger line 20 and fuel hose assembly 10 into the sea and then returning them to the USV using the first and second winches 110 and 130. During the retrieval process, the second winch 130 is initially maintained in its second rotational position with its rotational axis 131 being arranged substantially orthogonal to the rotational axis 111 of the first winch 110. With the first and second winches arranged as such, the first winch 110 is activated to spool the fuel hose assembly onto its drum with the fuel hose assembly 10 passing through the inner bore 142 of the second winch 130. The fuel hose assembly 10 is rewound onto the drum of the first winch 110 until the hose clamp 18 returns to its initial ready state position (see
[0051] When the spooling of the fuel hose assembly 10 onto the drum of the first winch 110 is complete, thereafter, the second winch is pivoted on the frame 101, as shown in