Branch structures of electrically-heated pipe-in-pipe flowlines

09909706 ยท 2018-03-06

Assignee

Inventors

Cpc classification

International classification

Abstract

A flowline branch structure (10) has at least one inner branch assembly with an inner flowline branch and at least one inner flowline pipe attached to and communicating with the inner flowline branch. At least one outer branch assembly (12) of the flowline branch structure has an outer branch housing disposed around the inner flowline branch and at least one outer pipe (14) disposed around the inner flowline pipe and attached to the outer branch housing. A generally annular space is defined between the inner and outer branch assemblies. At least one wiring element including an electrical heating element is disposed in the sealed space on an outer side of the inner branch assembly. The, or each, wiring element extends in one continuous length across an interface between the inner flowline pipe and the inner flowline branch. This reduces the number of connections necessary to create the flowline branch structure.

Claims

1. A flowline branch structure having: at least one inner branch assembly comprising an inner flowline branch and at least one inner flowline pipe attached to and communicating with the inner flowline branch, wherein the inner flowline branch comprises a main tubular bore and at least one secondary tubular bore in fluid communication with the main tubular bore and extending laterally relative to a central longitudinal axis of the main tubular bore; at least one outer branch assembly comprising an outer branch housing disposed around the inner flowline branch and at least one outer pipe disposed around the inner flowline pipe and attached to the outer branch housing; an annular space defined between the inner and outer branch assemblies; and at least one wiring element disposed in the space on an outer side of the inner branch assembly and extending in one continuous length across an interface between the inner flowline pipe and the inner flowline branch, wherein the, or each, wiring element also extends from the interface in one continuous length across a full length of the inner flowline pipe and the inner flowline branch, between opposed ends of the inner branch assembly.

2. The flowline branch structure of claim 1 wherein the, or each, wiring element extends continuously from the interface to overlap beyond an end of the inner flowline pipe or the inner flowline branch, which end is remote from the interface.

3. The flowline branch structure of claim 1, wherein at least one wiring element is an electrical heating element or a data-carrying element.

4. The flowline branch structure of claim 1, wherein at least one wiring element is diverted or branched from a generally longitudinal orientation to lie beside the secondary tubular bore.

5. The flowline branch structure of claim 1, wherein the annular space contains thermally-insulating material that covers an external surface of the inner branch assembly and the, or each, wiring element.

6. The flowline branch structure of claim 1, wherein the annular space is sealed.

7. The flowline branch structure of claim 1, and comprising: first and second inner branch assemblies, each comprising an inner flowline branch; at least one inner flowline pipe attached to and communicating with the inner flowline branch of at least one of the inner branch assemblies; first and second outer branch assemblies each comprising an outer branch housing disposed around a respective inner flowline branch and at least one outer pipe disposed around the inner flowline pipe and attached to the outer branch housing; and an annular space defined between the first and second inner branch assemblies and the first and second outer branch assemblies.

8. A subsea flowline or a subsea installation comprising at least one of the flowline branch structures of claim 1.

9. A flowline branch structure having: at least one inner branch assembly comprising an inner flowline branch and at least one inner flowline pipe attached to and communicating with the inner flowline branch, wherein the inner flowline branch comprises a main tubular bore and at least one secondary tubular bore in fluid communication with the main tubular bore and extending laterally relative to a central longitudinal axis of the main tubular bore; at least one outer branch assembly comprising an outer branch housing disposed around the inner flowline branch and at least one outer pipe disposed around the inner flowline pipe and attached to the outer branch housing; an annular space defined between the inner and outer branch assemblies; and at least one wiring element disposed in the space on an outer side of the inner branch assembly and extending in one continuous length across an interface between the inner flowline pipe and the inner flowline branch, wherein the, or each, wiring element is interrupted or terminated by a connection disposed on the inner flowline branch.

10. A method of constructing a flowline branch structure, comprising laying at least one wiring element on an outer side of an inner branch assembly having at least one inner flowline pipe attached to an inner flowline branch, to extend in one continuous length across an interface between the inner flowline pipe and the inner flowline branch and across a full length of the inner flowline pipe and the inner flowline branch, between opposed ends of the inner branch assembly, wherein the inner flowline branch comprises a main tubular bore and at least one secondary tubular bore in fluid communication with the main tubular bore and extending laterally relative to a central longitudinal axis of the main tubular bore.

11. The method of claim 10, comprising laying the, or each, wiring element to extend continuously from the interface to overlap beyond an end of the inner flowline pipe or the inner flowline branch, which end is remote from the interface.

12. The method of claim 11, comprising attaching a further inner flowline pipe or inner flowline branch to the inner branch assembly and laying the overlap of the, or each, wiring element on that further inner flowline pipe or inner flowline branch.

13. The method of claim 12, wherein the overlap extends in one continuous length across a full length of the further inner flowline pipe or inner flowline branch.

14. The method of claim 10, further comprising attaching at least one inner flowline pipe to the inner flowline branch before laying the wiring element.

15. The method of claim 10, further comprising laying thermally-insulating material over an outer side of the inner branch assembly and upon the, or each, wiring element.

16. The method of claim 10, further comprising placing an outer branch housing around the inner flowline branch and at least one outer pipe around the inner flowline pipe, and attaching the outer pipe to the outer branch housing to define an annular space between the inner branch assembly and an outer branch assembly comprising the outer branch housing and the outer pipe.

Description

BRIEF DESCRIPTION OF THE DRAWINGS

(1) In order that the invention may be more readily understood, reference will now be made, by way of example, to the accompanying drawings in which:

(2) FIG. 1 is a perspective view of an ILT in accordance with the invention;

(3) FIG. 2 is a perspective view of the ILT of FIG. 1 incorporated into a subsea pipeline;

(4) FIG. 3 is a perspective view of two penetrator couplings of the ILT of FIG. 1;

(5) FIG. 4 is a perspective view of a tee assembly disposed between the penetrator couplings of the ILT of FIG. 1;

(6) FIG. 5 is a perspective view of an inner pipe being part of the tee assembly shown in FIG. 4;

(7) FIG. 6 is a perspective view of heater wiring being part of the tee assembly shown in FIG. 4;

(8) FIG. 7 is a perspective view of one of two tee forgings that are part of the tee assembly shown in FIG. 4;

(9) FIG. 8 is a perspective view of an insulating sleeve being part of the tee assembly shown in FIG. 4;

(10) FIG. 9 is a perspective view of an outer pipe arranged to fit around the insulating sleeve of FIG. 8 in the tee assembly of FIG. 4;

(11) FIG. 10 is a perspective view of an insulating shell being part of the tee assembly shown in FIG. 4;

(12) FIG. 11 is a perspective view of an outer shell arranged to fit around the insulating shell of FIG. 10 in the tee assembly of FIG. 4;

(13) FIG. 12 is a perspective view of a first tee forging of FIG. 7 welded to a first end of the inner pipe of FIG. 5;

(14) FIG. 13 is a perspective view of the heater wiring of FIG. 6 placed around the assembly of the tee forging and inner pipe shown in FIG. 12;

(15) FIG. 14 is an enlarged detail perspective view corresponding to Detail A of FIG. 13, showing placement of the heater wiring around the tee forging;

(16) FIG. 15 is a perspective view of the insulating sleeve of FIG. 8 placed around the heater wiring on the inner pipe shown in FIG. 13;

(17) FIG. 16 is a perspective view of the outer pipe of FIG. 9 placed around the assembly of the insulating sleeve on the heater wiring that rests against the inner pipe shown in FIG. 15;

(18) FIG. 17 is a perspective view of a second tee forging of FIG. 7 welded to a second end of the inner pipe in the assembly of FIG. 16;

(19) FIG. 18 is a perspective view of an over-length of the heater wiring in the assembly of FIG. 16 now placed around the second tee forging to complete the tee assembly, as also shown in FIG. 4;

(20) FIGS. 19a, 19b and 19c are a sequence of perspective views showing attachment by welding of the penetrator couplings of FIG. 3 to the tee forgings at respective ends of the tee assembly shown in FIG. 18;

(21) FIGS. 20 and 21 are enlarged detail views of the interface between a penetrator coupling and a tee forging as shown in FIGS. 19b and 19c, showing details of connections between heater wiring of the tee assembly and of the penetrator coupling;

(22) FIG. 22 is a perspective view showing insulating shells of FIG. 10 assembled around the tee forgings of the tee assembly;

(23) FIG. 23 is a perspective view showing outer shells of FIG. 11 being assembled around the insulating shells of FIG. 10;

(24) FIG. 24 is a flow diagram illustrating methods of the invention; and

(25) FIGS. 25 to 27 are schematic side views of some variants of the invention.

DETAILED DESCRIPTION OF THE INVENTION

(26) FIG. 1 shows an ILT 10 as an example of a branch structure of the invention. In this example, the ILT 10 is a double ILT and so comprises two tee structures each generally indicated at 12, separated by a short portion of flowline generally indicated at 14.

(27) As will be explained, the flowline portion 14 is of PiP construction comprising inner and outer pipes separated by annulus. The annulus is kept dry and is filled with an insulation material that is configured to meet the thermal requirements of the particular subsea project. Internal air pressure may also, or alternatively, be reduced in the annulus to improve insulation. Similarly, the tee structures 12 comprise inner and outer parts that are spaced apart and insulation is disposed in the gap between those parts.

(28) The outer pipe of the flowline portion 14 is designed to withstand the hydrostatic pressure dictated by the projected water depth and the stresses imparted by the chosen installation method, such as J-lay, and by thermal expansion cycles when in place on the seabed. The inner pipe of the flowline portion 14 can be located within the outer pipe by the use of centralisers or spacers clamped at discrete intervals along the inner pipe. However, centralisers or spacers may be omitted, for example where the compressive strength of any insulation material is sufficient to maintain spacing between the inner and outer pipes during installation and in use.

(29) In the example shown, penetrator couplings 16 are disposed at each end of the ILT 10, welded to respective ones of the tee structures 12. As FIG. 2 shows, the penetrator couplings 16 engage with female couplings 18 of respective pipe lengths 20 of a subsea pipeline generally indicated at 22, thus integrating the ILT 10 as part of the pipeline 22.

(30) FIGS. 3 to 11 show various components of the ILT 10. FIGS. 12 to 23 show how those components are assembled to make the ILT 10, while FIG. 24 is a flow chart illustrating methods of the invention.

(31) FIG. 3 shows two of the penetrator couplings 16 whereas FIG. 4 shows a tee assembly 24 to be disposed between the penetrator couplings 16. The tee assembly 24 comprises the tee structures 12 and the flowline portion 14, which are further particularised now with reference to FIGS. 5 to 11.

(32) FIG. 5 shows a steel inner pipe 26 of the PiP flowline portion 14. The inner pipe 26 is a tube of circular cross-section and has a length L.sub.1 from end to end.

(33) FIG. 6 shows wiring elements generally indicated at 28. As will be explained, the wiring elements 28 comprise electrical heating elements and optionally also data-carrying elements. In this example, the heating elements are electrical resistance elements and the data-carrying elements are optical fibres. The wiring elements 28 are preferably flexible to allow them to be bent as shown to facilitate positioning of the elements 28 during assembly of the ILT 10, as will be described.

(34) Whilst shown collectively in FIG. 6 for convenience, the wiring elements 28 are laid individually against the outer surface of the inner pipe 26 as will be explained. When so laid, the wiring elements 28 are spaced around the circumference of the inner pipe 26 with the heating elements in heat-conducting contact with the inner pipe 26. Whilst the wiring elements 28 follow individual paths, all of them extend generally longitudinally in a direction parallel to the central longitudinal axis of the inner pipe 26.

(35) FIG. 7 shows inner parts of one of the two tee structures 12. Specifically, a tee forging 30 comprises a tubular flowline portion 32 that has opposed main ends 34 and has a length L.sub.2 from one main end 34 to the other. The inner and outer diameters and the wall thickness of the flowline portion 32 substantially match those of the inner pipe 26. This facilitates welding one of the main ends 34 of the tee forging 30 to an abutting end of the inner pipe 26 and maintains structural continuity. A penetrator coupling 16 as shown in FIGS. 1 and 2 is welded to the other main end 34 of the tee forging 30.

(36) An integral branch portion 36 of the tee forging 30 intersects and communicates with the flowline portion 32. An optional tubular pup piece 38 is welded to the outer end of the branch portion 36.

(37) In a subsea installation, the branch portion 36 or any pup piece 38 attached to the branch portion 36 is welded or otherwise coupled to another pipe, not shown. That other pipe could be a spool or jumper extending across the seabed to a wellhead or, via another tee structure, to another flowline.

(38) FIG. 8 shows a tubular insulating sleeve 40, for example of a silica-based mineral such as Izoflex as supplied by ITP Interpipe SA of France. The sleeve 40 is of one piece to be slid along the inner pipe 26 outside the wiring elements 28 already laid along the outside of the inner pipe 26. However, the sleeve 40 could be divided longitudinally into two or more pieces to be assembled around the inner pipe 26 outside the wiring elements 28. In either case, the inner diameter of the sleeve 40 is slightly greater than the outer diameter of the inner pipe 26 so as to accommodate the thickness of the wiring elements 28 laid on the inner pipe 26.

(39) Other well-known insulating measures may be taken instead or in addition to the sleeve 40 of Izoflex, for example by choosing a different insulating material or by creating a partial vacuum in an annulus around the inner pipe 26. The latter approach is taken in the preferred embodiments, as will be described later.

(40) FIG. 9 shows the outer pipe 42 of the PiP flowline portion 14. The outer pipe 42 is a tube of circular cross-section, whose inner diameter is greater than the outer diameter of the insulating sleeve 40. Between them, the outer pipe 42 and the inner pipe 26 define the annulus that contains the insulating sleeve 40.

(41) It is important for continuity of thermal insulation that the tee structures 12 are also insulated. Consequently, FIG. 10 shows a kit of insulating parts, again suitably formed of Izoflex, shaped to fit together around each tee forging 30. The insulating parts comprise longitudinally-divided part-tubular half-shells 44 arranged to be assembled around the tubular flowline portion 32 of a tee forging 30 and a tubular part 46 arranged to fit around the branch portion 36 of the tee forging 30. The tubular part 46 could extend to cover any pup piece 38 that may be welded to the branch portion 36 as shown in FIG. 7.

(42) Each tee structure 12 of the ILT 10 further comprises outer shell parts 48, 50 of steel as shown in FIG. 11. These outer shell parts 48, 50 enclose the insulating parts 44, 46 around the tee forging 30 and maintain structural continuity along the pipeline 22. The outer shell parts 48, 50 also define a space around the tee forging 30 that communicates with the annulus between the inner and outer pipes 26, 42.

(43) The outer shell parts 48, 50 are longitudinally-divided part-tubular upper and lower half-shells 48, 50 respectively that are arranged to be assembled around the insulating parts 44, 46 shown in FIG. 10. The upper half-shell 48 comprises a tubular extension 52 that surrounds the tubular insulating part 46 around the branch portion 36 of a tee forging 30.

(44) Having described the various components of the ILT 10, reference is now made to FIGS. 12 to 23 to describe how those components are assembled to make the ILT 10.

(45) FIG. 12 shows the first step of welding the flowline portion 32 of a first tee forging 30 to a first end of the inner pipe 26. A welded interface 54 between the first tee forging 30 and the inner pipe 26 results. Next, the wiring elements 28 are added as shown in FIG. 13, extending along the inner pipe 26 and in heat-conducting contact with its outer surface. The wiring elements 28 are angularly spaced around the outer circumference of the inner pipe 26 and extend longitudinally in a direction parallel to the central longitudinal axis of the inner pipe 26.

(46) As FIG. 13 shows, the wiring elements 28 extend continuouslywithout joins, connectors or junctionsfrom the inner pipe 26 onto and along the length L.sub.2 of the flowline portion 32 of the first tee forging 30. In the example shown, the wiring elements 28 extend further, slightly beyond the length L.sub.2 of the flowline portion 32 to overlap the exposed main end 34 of the first tee forging 30. A short overlength 56 of the wiring elements 28 results at that main end 34.

(47) Detail A of FIG. 13 and the corresponding enlargement of FIG. 14 show wiring elements 28 that intersect the branch portion 36 of the first tee forging 30. Those wiring elements 28 are shaped to follow the curvature of the branch portion 36 and so to convey heat to production fluid flowing in the branch portion 36. In this example, eight of the wiring elements are shaped in this way, four to each side of the branch portion 36.

(48) FIG. 13 also shows that the wiring elements 28 extend continuouslyagain without joins, connectors or junctionsto and beyond the opposite, free end of the inner pipe 26. Here, a substantial overlength 58 of the wiring elements 28 is shown bent back from the free end of the inner pipe 26 to expose that end for subsequent assembly steps as will be described.

(49) It follows from the above that the continuous length L.sub.c of the wiring elements 28 without joins, connectors or junctions is equal to or preferably greater than L.sub.1+L.sub.2. L.sub.1+L.sub.2 is the aggregate length of the assembly of the inner pipe 26 and the flowline portion 32 of the first tee forging 30 as shown in FIG. 12.

(50) Next, FIG. 15 shows the insulating sleeve 40 placed around the wiring elements 28 on the inner pipe 26 and FIG. 16 shows the outer pipe 42 slid into place on top of the insulating sleeve 40. The branch portion 36 of the first tee forging 30 can be used conveniently as a stop for both of those assembly operations if desired.

(51) Care must be taken not to damage the wiring elements 28 during assembly operations. For example, the overlength 58 of the wiring elements 28 at the free end of the inner pipe 26 can be bent inwardly to allow the sleeve 40 and the outer pipe 42 to be slid over the overlength 58 if desired, before being bent back again to expose that end of the inner pipe 26 as shown in FIG. 16.

(52) FIG. 17 shows the flowline portion 32 of a second tee forging 30 welded to the free end of the inner pipe 26. This creates a second welded interface 54 between the second tee forging 30 and the inner pipe 26. Next, as shown in FIG. 18, the overlength 58 of the wiring elements 28 is laid around the second tee forging 30 in a manner similar to the arrangement shown in FIGS. 13 and 14. Again, in the example shown, the wiring elements 28 extend further, slightly beyond the length L.sub.2 of the flowline portion 32 to overlap the exposed main end 34 of the second tee forging 30. Thus, the overlength 58 is longer than L.sub.2, leaving another short overlength 60 of the wiring elements 28 remaining at that main end 34.

(53) The flowline portions 32 of the first and second tee forgings 30 need not be identical in length. Thus, one flowline portion 32 could have a length L.sub.2 and the other flowline portion 32 could have a length L.sub.3 that is greater than or less than L.sub.2. Where L.sub.2 and L.sub.3 are not identical, the continuous length of the wiring elements 28 without joins, connectors or junctions (L.sub.c) could be equal to or preferably greater than L.sub.1+L.sub.2+L.sub.3. Where L.sub.2=L.sub.3, the expression may be shortened to L.sub.cL.sub.1+2L.sub.2

(54) Turning next to FIGS. 19a, 19b and 19c, these show attachment of the penetrator couplings 16 to the first and second tee forgings 30 of the tee assembly 24. Each penetrator coupling 16 includes a PiP section 62 that corresponds to the inner and outer pipes 26, 42 of the flowline portion 14. Similarly, an annulus between inner and outer pipes of that PiP section 62 contains insulation and wiring elements that are similar to those of the flowline portion 14.

(55) Successive welding operations performed on the inner pipes of the PiP sections 62 attach the penetrator couplings 16 to the exposed main ends 34 of the first and second tee forgings 30.

(56) The annulus defined by the PiP section 62 of each penetrator coupling 16 is open at an inner end facing the associated tee forging 30. Conversely, that annulus is closed at an outer end facing away from the associated tee forging 30. The annulus is suitably closed by a welding a bulkhead between the inner and outer pipes of the PiP section 62 or by swaging the outer pipe inwardly to be welded to the inner pipe.

(57) After attachment of the penetrator couplings 16, the arrangement of wiring elements 28 around each tee forging 30 is shown in FIGS. 20 and 21. Here, connections are made between the wiring elements 28 and counterpart wiring elements 64 of a penetrator coupling 16, namely welding of electrical heating elements 28E as shown in FIG. 20 and fibre-optic welding of data-carrying elements 28D as shown in FIG. 21, the latter connections also involving junction boxes 66.

(58) The wiring elements 64 of a penetrator coupling 16 may also overlap the free end of the PiP section 62 to create an overlength. In that case, connection between the wiring elements 28 and the counterpart wiring elements 64 may conveniently and accessibly be effected on a tee forging 30 as FIGS. 20 and 21 show. It would also be possible to effect connection between the wiring elements 28 and the counterpart wiring elements 64 on the PiP section 62 of a penetrator coupling 16.

(59) By way of example, the wiring elements 28 may comprise thirty-six electrical heating elements 28E and three data-carrying elements 28D. Each electrical and fibre-optic connection must be tested from one penetrator coupling 16 to the other penetrator coupling 16.

(60) FIGS. 22 and 23 show the ILT 10 being completed by assembly of the insulating parts 44, 46 around the tee forgings 30 and then by assembly of the outer shell parts 48, 50 around the insulating parts 44, 46. The outer shell parts 48, 50 are welded to the outer pipe 42 and to the penetrator couplings 16 by circumferential girth welds. The outer shell parts 48, 50 are also welded to each other by longitudinal seam welds.

(61) Finally, air is pumped out of the communicating spaces between the inner and outer pipes 26, 42 of the flowline portion 14, between the tee forgings 30 and the outer shell parts 48, 50 and between the inner and outer pipes of the PiP sections 62 of the penetrator couplings 16 to create a partial vacuum in those spaces. A hole through a wall of one of the outer components, for example in the outer pipe 42, may be provided to connect a suction line for this purpose. Such a hole is plugged and sealed after use to maintain the partial vacuum. A valve or connector may also be welded to close the generally annular space around the tee forging.

(62) Creating a partial vacuum in the generally annular spaces in this way is optional and may not be necessary in all applications, for example if a different insulating material such as an aerogel is used.

(63) FIG. 24 is a flow diagram that outlines principal steps of the method described above.

(64) Finally, FIGS. 25 to 27 show schematically how the invention may be applied to various combinations of double-walled branch structures and PiP pipe lengths. Like numerals are used for like parts.

(65) FIG. 25 shows a tee 68 welded end-on to a pipe length 70 to form an assembly 72, with at least one heating wire 74 extending continuously from one end of that assembly 72 to the other end. The wire 74 extends along an inner pipe 76 of the pipe length 70 and across an inner tee structure 78 of the tee 68, without intermediate joins, connectors or junctions in the wire 74.

(66) FIG. 26 shows a tee 68 disposed between two pipe lengths 70 to form an assembly 80. On one of those pipe lengths 70, an annulus 82 between the inner pipe 76 and an outer pipe 84 is closed at one end by a bulkhead 86 that is suitably welded to the inner pipe 76 and the outer pipe 84. Again, at least one heating wire 74 extends continuously from one end of the assembly 80 to the other end, without intermediate joins, connectors or junctions in the wire 74. Thus, the wire 74 extends along the inner pipes 76 of the pipe lengths 70, across an inner tee structure 78 of the tee 68 and through the bulkhead 86.

(67) FIG. 27 shows two tees 68 at respective ends of a pipe length 70 to form an assembly 88. Again, at least one heating wire 74 extends continuously from one end of the assembly 88 to the other end, without intermediate joins, connectors or junctions in the wire 74. Thus, the wire 74 extends along the inner pipe 76 of the pipe length 70 and across inner tee structures 78 of the tees 68.

(68) Many variations are possible within the inventive concept. For example, an ILT or other branch structure of the invention need not have couplings such as the penetrator couplings of the embodiments described above; the structure could instead be welded directly to adjoining pipe lengths of a pipeline.

(69) In the simple examples described above, the branch portion 36 of a tee forging has a central longitudinal axis that is orthogonal to the central longitudinal axis of the flowline portion 32. However, other angles are of course possible between a flowline portion and a branch portion while allowing them to intersect and communicate with each other.

(70) Electrical heating may be effected by resistive heating, by inductive heating or by direct electrical heating known in the art by the acronym DEH.