Rock bolt seal
09890511 ยท 2018-02-13
Inventors
Cpc classification
E02D5/808
FIXED CONSTRUCTIONS
International classification
Abstract
The invention provides a seal for placement between a washer plate of a rock bolt and a rock face, wherein the washer plate has an outer edge at a perimeter thereof and wherein the rock bolt has a longitudinal axis, wherein the seal comprises a body made of a spongy material, wherein the body is planar and has an outer dimension that matches that or that is larger than that of outer edge of the washer plate and an inner dimension that has a void towards the center of the inner dimension through-which the longitudinal axis of the rock bolt can pass. The seal is for preventing the leakage of cementing grout (that is used in securing the rock bolt in a bore hole in a mass of rock below a rock face) between the washer plate and the rock face.
Claims
1. A rock bolt for installation in a borehole in a rock face, the rock bolt comprising: a hollow cylindrical tube having an exterior surface with an exterior diameter and an interior surface providing an airspace within the tube; a cylindrical rod having a threaded proximal end and a threaded distal end, wherein the rod comprises an expansion bushing mounted at the distal end thereof and a nut mounted at the proximal end thereof, wherein the rod extends through the hollow cylindrical tube between the nut and the expansion bushing, and wherein the airspace is between the interior surface of the tube and an exterior surface of the rod; a pressure sphere and a washer plate mounted on the rod between the nut and the proximal end of the tube through central openings in the pressure sphere and the washer plate, wherein the pressure sphere has a grouting orifice, wherein the central opening of the pressure sphere has a proximal central opening that matches a diameter of the threading at the proximal end of the rod and a distal central opening that matches the exterior diameter of the tube such that, at the distal central opening of the pressure sphere, the pressure sphere is mounted on the exterior surface of the tube, and wherein the central opening of the washer plate is larger than the exterior diameter of the tube and, at the central opening of the washer plate, the washer plate rests flush against an outer surface of the pressure sphere, towards a distal portion of the pressure sphere; and a seal for placement between the washer plate and the rock face, wherein the washer plate has an outer edge at a perimeter thereof, wherein the seal comprises a body made of a spongy material, wherein the body is planar and has an outer dimension that matches that or that is larger than that of the outer edge of the washer plate and an inner dimension towards a center of the body, the body having a void through which the tube can pass.
2. The rock bolt according to claim 1, wherein the spongy material is a flexible, resilient and water-resistant material.
3. The rock bolt according to claim 2, wherein the flexible, resilient and water-resistant material comprises one or more materials selected from the group consisting of polyurethane foam rubber, latex foam rubber and neoprene.
4. The rock bolt according to claim 3, wherein the spongy material is of about 10 mm thickness.
5. The rock bolt according to claim 2, wherein the flexible, resilient and water-resistant material is carpet underlay.
6. The rock bolt according to claim 5, wherein the spongy material is of about 10 mm thickness.
7. The rock bolt according to claim 2, wherein the flexible, resilient and water resistant material comprises one or more materials selected from the group consisting of waffle rubber, urethane foam, and bonded urethane.
8. The rock bolt according to claim 7, wherein the spongy material is of about 10 mm thickness.
9. The rock bolt according to claim 1, wherein the void through which the tube of the rock bolt can pass allows for an airspace between the seal at the inner dimension thereof and the rock bolt along a longitudinal axis thereof.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1) The prior art and embodiments of the invention are described with reference to the drawings, wherein:
(2)
(3)
(4)
(5)
(6)
(7)
DETAILED DESCRIPTION OF THE INVENTION
(8) Before the rock bolt seal of the present invention is described in detail, it will be useful to describe how a prior art rock bolt works with the aid of
(9)
(10) To install rock bolt 1 in bore hole 8, distal end of bolt 1 is inserted in bore hole 8. The diameter of expansion bushing 3 must be less than that of bore hole 8 when bolt 1 is first inserted into bore hole 8. Bolt 1 is inserted into bore hole 8 until the outer edge of washer plate 5 rests against rock face 9, leaving the proximal end of rod 2, together with pressure sphere 6 and nut 7 protruding from bore hole 8.
(11) Once bolt 1 is in place in bore hole 8, nut 7 is tightened, which in turn causes expansion bushing 3 to expand until the diameter of the bushing matches the diameter of bore hole 8, thereby anchoring bolt 1 within bore hole 8.
(12) Once bolt 1 is anchored in bore hole 8 via expansion bushing 3, bolt 1 is cemented in place with cementing grout. Cementing grout is applied under pressure through grouting orifice 11 in the outer surface of pressure sphere 6. As the central opening at the proximal end of pressure sphere 6 abuts the proximal threaded end of rod 2 and bolt 7 mounted thereon, and as the central opening at the distal end of pressure sphere 6 abuts the exterior surface of tube 4, cementing grout will fill the interior of pressure sphere 6 and, once pressure sphere 6 is filled, cementing grout will start to fill the airspace between the interior surface of tube 4 and the exterior surface of rod 2. As cementing grout is inserted through orifice 11, grout will work its way through the airspace between the interior surface of tube 4 and the exterior surface of rod 2 towards the distal end of rod 2, thereby pushing air out of the distal end of tube 4 into an airspace 10a defined by the distal end of tube 4, expansion bushing 3 and the wall of bore hole 8. Airspace 10a is continuous with airspace 10b between the wall of bore hole 8 and the exterior surface of tube 4 and the airspace 10c between rock face 9 and the interior surface of washer plate 5. Orifice 14 in washer plate 5 (two orifices 14 shown in the washer plate 5 in
(13) One or more of the interior surface of tube 4, the exterior surface of tube 4 and the exterior surface of rod 2 can be affixed with protuberances which will strengthen the cementing of rock bolt 1 in bore hole 8 once the cementing grout hardens.
(14) So long as rock face 9 is smooth or has been treated with a coating of a material such as shotcrete that has been allowed to harden to a smooth finish, the outer edges of washer plate 5 will abut rock face 9 without gaps existing between the outer edges of washer plate 5 and rock face 9. As illustrated in
(15) The present invention is illustrated in isolation in
(16) The outer dimension 105 of body 101 can best be understood when viewing
(17) The square-shaped seal 100 could also be used with a washer plate 5 of a different shape, so long as the outer edges of washer plate 5 rest within the outer dimension 105 such that the outer edges of washer plate 5 rest against the spongy material of the inner dimension 107 of the body 101 of seal 100. In an alternative embodiment, seal 100 could be differently shaped to better match the shape of washer plate 5. For example, if washer plate 5 were circle-shaped, the outer dimension 105 of body 101 could also be circle-shaped, so long as the outer dimension 105 of body 101 matched the outer dimension formed by the outer edge of circle-shaped washer plate 5, or was larger than the outer dimension of circle-shaped washer plate 5, and the outer edge of circle-shaped washer plate 5 rested against the spongy material of the inner dimension 107 of body 101 when washer plate 5 was pressed towards rock face 9 during installation of rock bolt 1.
(18) The positioning of seal 100 with respect to rock bolt 1 can best be understood when viewing
(19) To use the invention, distal end of rock bolt 1 is placed through the void 109 in the inner dimension 107 of the body 101 of seal 100 prior to (or as) the distal end of rock bolt 1 is placed in bore hole 8. As before, bolt 1 is pressed into bore hole 8 so that the distal end of bolt 1 is pushed towards the distal end of bore hole 8. Before the distal surface of washer plate 5 is pressed up against rock face 9, body 101 of seal 100 is aligned so that the outer edges of washer plate 5 rest within the outer edges 103 (defining outer dimension 105) of the body 101 of seal 100 so that the outer edges of washer plate 5 press up against the inner dimension 107 of the body 101 of seal 100. Once bolt 1 is in place with washer plate 5 flush against rock face 9 (with seal 100 pressed there-between), nut 7 is tightened to anchor bolt 1 in place through expansion of expansion bushing 3 is and cementing grout is inserted as before. With seal 100 in place, any gaps between rock face 9 and the external edges of washer plate 5 are filled by the inner dimension 107 of body 101. If void 109 is larger than the diameter of tube 4, cementing grout will be able to pass through airspace 10c and pass through to escape orifice 14, thereby signaling to the person installing the grout to stop the installation process once cementing grout starts to escape from escape orifice 14.
(20) The inner dimension 107 of the body 101 of seal 100 has to be sufficiently wide (the width being the surface between the outer dimension 105 and the void 109) so that any portion of the inner dimension 107 is not blown out of the gap between the washer plate 5 and the rock face 9 by cementing grout as cementing grout fills airspace 10c between rock face 9 and the interior surface of washer plate 5, thereby opening the gap and allowing cementing grout to escape. Similarly, the spongy material that seal 100 is made of must be sufficiently strong so that such a blowout is unlikely.
(21) Seal 100 can be made of any spongy material that will fill the previously described gaps when bolt 1 is installed in a bolt hole 8 to prevent, or at least lessen, the passage of cementing grout through the gaps for a sufficient time to allow the grout to harden. The inventor has found that carpet underlay is a suitable spongy material that is sufficiently flexible, durable and water-resistant. Carpet underlay is also a material that can be easily obtained. Carpet underlay can comprise one or more of the following substances: waffle rubber, urethane foam, and bonded urethane. Carpet underlay can be made of recycled material wherein the aforementioned substances can be reclaimed scrap of high density urethane foam used in furniture and automotive manufacturing and crumb rubber which is made from used car tires.
(22) Seal 100 may be made by cutting out the seal 100 from a sheet of the spongy material, such as carpet underlay. Seal 100 with inner dimension 107 may be stamped from the sheet with a die having cutting surfaces matching those of outer dimension 105 and void 109. Alternatively, the cuts may be made with two separate dies or with a cutting edge such as a knife or scissors.
(23) Carpet underlay that is of about 10 mm thickness has been found by the inventor to be particularly suitable. This thickness of material allows a planar seal 100 to be cut therefrom which is about 10 mm thick, which is sufficient to fill many gaps that a worker will encounter when applying cementing grout when installing a rock bolt. As used herein, about 10 mm refers to the thickness of the spongy material in its uncompressed state, and envisions material that is between 8 and 12 mm thick. If the rock face 9 is particularly jagged, larger gaps between the rock face 9 and the outer edges of washer plate 5 may be encountered. In such a case, two or three seals 100 may be stacked together to form a stack of seals 100 that is about 20 or about 30 mm thick. While it is possible to use more than a double or triple layer of seals 100, it may be more satisfactory to first apply more shotcrete (or similar material) to the rock face 9 in order to smooth out the surface of rock face 9 to minimize gaps.
(24) While the inventor has found carpet underlay to be a satisfactory material from which seals 100 are cut, the person skilled in the art will understand that any planar, spongy material will be suitable so long as it is sufficiently flexible, resilient and water-resistant. Such materials include polyurethane foam rubber, latex foam rubber and neoprene.