Continuous casting process of metal
12157165 ยท 2024-12-03
Assignee
Inventors
Cpc classification
B22D11/108
PERFORMING OPERATIONS; TRANSPORTING
B22D11/103
PERFORMING OPERATIONS; TRANSPORTING
International classification
B22D11/103
PERFORMING OPERATIONS; TRANSPORTING
B22D11/108
PERFORMING OPERATIONS; TRANSPORTING
Abstract
A continuous casting process of a steel semi-product is provided. The process includes a step of casting using a hollow jet nozzle located between a tundish and a continuous casting mould. The nozzle includes, in its upper part, a dome for deflecting the liquid metal arriving at the inlet of the nozzle towards the internal wall of the nozzle, defining an internal volume with no liquid metal. A simultaneous step of injecting powder through a hole of the dome occurs. The powder has a particle size of 200 m or less. The dome includes a first device to inject the powder without any contact with the dome and a second device to avoid sticking or sintering of the powder onto the first device.
Claims
1. A continuous casting process of a steel semi-product comprising the steps of: casting, using a hollow jet nozzle located between a tundish and a continuous casting mould, the nozzle including, in an upper part, a dome for deflecting liquid metal arriving at an inlet of the nozzle towards an internal wall of the nozzle, thereby defining an internal volume with no liquid metal; and injecting, simultaneously, powder through a hole of the dome, the powder having a particle size of 200 m or less, the dome including a first device to inject the powder without any contact with the dome, the first device including a hollow body passing through the hole of the dome, said hollow body having a double wall, the double wall further comprising an internal wall, the powder being in contact with an internal surface of the internal wall during the injecting; an outer wall of the double wall being made of one material and having an external surface, the external surface of the outer wall being arranged away from an inner surface of the hole of the dome, the external surface of the outer wall and the inner surface of the hole of the dome delimiting between them a space, circulating a cooling gas inside the double wall via an inlet on an end of the double wall during the injecting, the cooling gas circulating in the double wall with a flow rate ranging from 10 to 30 m.sup.3/h, the circulation of the gas avoiding sticking or sintering of said powder onto the internal wall of the double wall; and exhausting the cooling gas from the double wall via an outlet on said end of the double wall, during the injecting.
2. The continuous casting process according to claim 1, wherein the gas is nitrogen.
3. The continuous casting process according to claim 1, wherein a powder feeder is partly disposed in the hollow body.
4. The continuous casting process according to claim 3, wherein the powder feeder goes through a support arm of the dome.
5. The continuous casting process according to claim 1, wherein the hollow body is a tube with a circular section.
6. The continuous casting process according to claim 5, wherein an inner diameter of the tube ranges from 8 to 30 mm.
7. The continuous casting process according to claim 1, wherein the gas cools the double wall.
8. The continuous casting process according to claim 1, wherein the inlet and the outlet of the double wall are arranged out of the dome.
9. The continuous casting process according to claim 1, wherein the outer wall does not contact the dome.
10. The continuous casting process according to claim 1, wherein an external surface of the internal wall and an internal surface of the outer wall define a gas input channel and a gas outlet channel, the gas circulating in the gas input channel in a first direction and the gas circulating in the gas outlet channel in a second direction opposite to the first direction.
11. The continuous casting process according to claim 10, wherein the gas circulating in the gas input channel is in contact with the external surface of the internal wall and with the internal surface of the outer wall, and the gas circulating in the gas outlet channel is in contact with the external surface of the internal wall and with the internal surface of the outer wall.
12. The continuous casting process according to claim 10, further comprising a plurality of transverse walls extending radially from the internal wall to the outer wall.
13. The continuous casting process according to claim 1, wherein the hollow body has an injection outlet, from which the powder is injected into the mould, the injection outlet of the hollow body being contained in the hole of the dome.
14. A continuous casting process of a steel semi-product comprising the steps of: casting, using a hollow jet nozzle located between a tundish and a continuous casting mould, the nozzle including, in an upper part, a dome for deflecting liquid metal arriving at an inlet of the nozzle towards an internal wall of the nozzle, thereby defining an internal volume with no liquid metal, injecting, simultaneously, powder through a hole of the dome, the powder having a particle size of 200 m or less, the dome including a first device to inject the powder without any contact with the dome, the first device including a hollow body passing through the hole of the dome, said hollow body having a double wall, the first device being surrounded by an insulating layer, the insulating layer being a thermal barrier between the hollow body and the dome, the insulating layer being in contact with an inner surface of the hole of the dome, circulating a cooling gas inside the double wall via an inlet on an end of the double wall during the injecting, the cooling gas circulating in the double wall with a flow rate ranging from 10 to 30 m.sup.3/h, the circulation of the gas avoiding sticking or sintering of said powder onto the double wall.
15. The continuous casting process according to claim 14, wherein the insulating layer extends at least over a length of the hole, the length being taken along a longitudinal axis of the hole.
16. A continuous casting process of a steel semi-product comprising the steps of: casting, using a hollow jet nozzle located between a tundish and a continuous casting mould, the nozzle including, in an upper part, a dome for deflecting liquid metal arriving at an inlet of the nozzle towards an internal wall of the nozzle, thereby defining an internal volume with no liquid metal; and injecting, simultaneously, powder through a hole of the dome, the powder having a particle size of 200 m or less, the dome including a first device to inject the powder without any contact with the dome, the first device including a hollow body having a double wall comprising an internal wall and an outer wall, an external surface of the internal wall and an internal surface of the outer wall defining a gas input channel and a gas outlet channel, the first device passing through the hole of the dome, the powder being in contact with an internal surface of the internal wall during the injecting; the outer wall of the double wall being made of one material and having an external surface, the external surface of the outer wall being arranged away from an inner surface of the hole of the dome, the external surface of the outer wall and the inner surface of the hole of the dome delimiting between them a space; circulating a cooling gas in the gas input channel in a first direction; and circulating the cooling gas in the gas outlet channel in a second direction opposite to the first direction, the cooling gas circulating in the gas input channel and in the gas outlet channel with a flow rate ranging from 10 to 30 m.sup.3/h, the circulation of the gas avoiding sticking or sintering of said powder onto the internal wall of the double wall.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1) Other features and advantages of the invention will become apparent on reading the following detailed description given solely by way of non-limiting example, with reference to the appended figures in which:
(2)
(3)
(4)
(5)
(6)
LEGEND
(7) (1) Tundish (2) Refractory dome (3) Copper tube (4) Water cooling jacket (5) Refractory ring (6) Hole (7) Support arm (8) Submerged entry nozzle (9) Mould (10) Powder container (11) Powder feeder (12) Hollow body (13) Double wall (14) Insulating layer (15) Vibration means (16) Traversal wall (17) Gas input channel (18) Gas output channel
DETAILED DESCRIPTION
(8) The present invention relates to a continuous casting process in which a flow of liquid metal is poured from a tundish into a ingot mould through the hollow jet nozzle (HJN). A hole is made through the dome 2 of the HJN, and in particular through one of the support arm 7 of the dome 2, to allow the injection of powder in the melt, as already known from the prior art.
(9) During the injection, the metallic powder flowing through the hole is in direct contact with the refractory dome that is at a very high temperature (up to 1200 C.). Inventors have discovered that despite the very short contact time between the particles and the refractory material, it is sufficient to gradually stick the particles together and to sinter them. A cluster of sintered powder is then formed after some minutes of casting and can lead to the full plugging of the powder injector. For example, an injection hole of 20 mm diameter is fully plugged after about 10 minutes of casting when using an iron powder with a size range between 100 and 180 m.
(10) With particles of a powder having a size of 200 m or more, the problem does not occur, as particles do not stick together in the lapse of time during which they are in direct contact with the refractory dome.
(11) According to the invention, first means are provided to prevent a direct contact between the dome 2 at high temperature (approximately between 1000 and 1300 C.) and the powder during injection. Said first means comprise a hollow body 12, for example, extending inside the hole 6 of the dome 2, the powder being injected inside the hollow body 12 during casting. This hollow body 12 may have any suitable shape as long as it creates a physical barrier between the dome 2 and the powder. For example, as illustrated in
(12) In addition to said first means, second means are provided for preventing the sticking and sintering of the powder inside the hollow body. They are described in
(13) In a first embodiment of the present invention as illustrated in
(14) In
(15) Trials performed with casting equipment according to this first embodiment of the present invention and with injection of powder having particles size ranging between 100 and 200 m, for example, have shown a drastic improvement of the duration of the injection without any plugging problem.
(16) In another embodiment of the invention as illustrated in
(17) In another embodiment of the invention as illustrated in
(18) In this embodiment the powder feeder 11 is located above the dome 2 but in another embodiment, not illustrated, it could be located into the hollow body 12 having a shape of a bent tube.
(19) For all embodiments, the insulating layers can be made up of ceramic fibers which are resistant to high temperatures, such as 1300 C.
(20) The powder used for injection can be of any type, i.e. metallic or ceramic, or a mixture of different powder types.