METHOD OF EXTRACTING PLUG AND REMOVABLE UNIT WHEN REFUELING NUCLEAR REACTOR
20180033504 ยท 2018-02-01
Inventors
- Nikolay Dmitrievich Vasil'yev (Saint Petersburg, RU)
- Vladimir Evgen'yevich Ogurtsov (Saint Petersburg, RU)
- Alexandr Ivanovich Kuznetsov (Saint Petersburg, RU)
Cpc classification
G21C19/19
PHYSICS
Y02E30/30
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
G21C19/10
PHYSICS
G21C1/02
PHYSICS
International classification
Abstract
A method of the plug and removable block extraction when reloading the nuclear reactor. The invention relates to nuclear engineering, in particular to a process of the plug and the removable block extraction from a fast reactor with a heavy liquid metal coolant. The technical result consists in extracting the plug and the removable block without fuel assemblies from the nuclear reactor using a complex of handling equipment under radiation safety conditions. The method of the plug removable block extraction involves preliminary installation of handling equipment, removing the plug from the reactor monoblock, as well as transportation and positioning of the plug in the plug shaft, unloading the removable block, its transportation and placing the removable block in the shaft for the removable block disassembly.
Claims
1. A method of plug and removable block extraction during nuclear reactor reloading which consists in the following: the plug transportation device is installed on the reactor plug, an additional cargo is installed on the plug transportation device, cable reduction box internal frame part is installed and fixed on the reactor monoblock cover, the plug transportation device middle part is turned into a position where its projections enter into the operational area of the cable reduction box fixing element, the additional cargo is dismantled and the external part of cable reduction box is installed on the reactor monoblock, the internal media of the cable reduction box cavity is replaced, the guide channel is installed on the cable reduction box, the reloading armor is installed on the guide channel, the internal media of the reloading armor and guide channel is replaced, the plug transportation device with the plug is moved into the reloading armor, the reloading armor with the plug is transported into the plug shaft where the plug is unloaded, the guide channel is re-installed on the cable reduction box, the reloading armor with the removable block transportation device is installed on the guide channel, the internal media of the cable reduction box and reloading armor cavities is replaced, the reloading armor automatic grip is lowered to the coupling with the removable block, the removable block transportation device with the removable block is moved into the highest position in the reloading armor, the reloading armor with the removable block is transported to the removable block disassembling shaft and the removable block is unloaded.
2. The plug and removable block extraction method during nuclear reactor reloading as defined in claim 1, wherein after installation and fixation of the additional cargo on the device for plug transportation, the pressure flange is dismantled.
3. The plug and removable block extraction method during nuclear reactor reloading as defined in claim 1, wherein the sealing between the guide channel and the cable reduction box is provided by the sealing member (element).
4. The plug and removable block extraction method during nuclear reactor reloading as defined in claim 1, wherein replacement of the internal medium of the cable reduction box cavity is carried out by checking the tightness of cable reduction box cavity with overpressure, then the gas-air mixture is removed from the cavity of the cable reduction box into the ventilation with the controlled gaseous medium, and then the cable reduction box cavity is filled with inert gas.
5. The plug and removable block extraction method during nuclear reactor reloading as defined in claim 1, wherein the reloading armor is installed on the upper support surface of the guide channel fixed on the ceiling of the reactor shop central hall.
6. The plug and removable block extraction method during nuclear reactor reloading as defined in claim 1, wherein replacement of the internal medium of the reloading armor and the guide channel is carried out by checking the tightness of the reloading armor and guide channel cavities with overpressure, then the gas-air mixture is removed from the reloading armor and guide channel cavities into the ventilation with gas medium control, and then the reloading armor and guide channel cavities are filled with inert gas.
7. The plug and removable block extraction method during nuclear reactor reloading as defined in claim 1, wherein movement of the device for plug transportation together with the plug into the reloading armor is carried out by moving the device for plug transportation together with the plug to the upper position by the cable reduction box fixing element movement drive, then the reloading armor automatic grip is lowered and the coupling of the reloading armor automatic grip with the plug transportation device is carried out, then the reloading armor automatic grip is moved together with the plug into the highest position, and then the dampers of the reloading armor and cable reduction box are closed and sealed.
8. The plug and removable block extraction method during nuclear reactor reloading as defined in claim 7, wherein the reloading armor automatic grip is lowered until it stops against the limiting element of the guide channel.
9. The plug and removable block extraction method during nuclear reactor reloading as defined in claim 1, wherein transportation of the reloading armor with a plug to the shaft and unloading of the plug is carried out by a cargo crane and a lifting beam.
10. The plug and removable block extraction method during nuclear reactor reloading as defined in claim 1, wherein after transportation of the reloading armor with a plug into the shaft and unloading the plug, the reloading armor is transported to its place of storage and the guide channel is removed.
11. The plug and removable block extraction method during nuclear reactor reloading as described in claim 1, wherein after moving the reloading armor automatic grip together with the removable block to its highest position in the reloading armor, the cable reduction box and reloading armor dampers are closed and sealed.
Description
BRIEF DESCRIPTION OF THE SEVERAL VIEWS OF THE DRAWINGS
[0035] The invention is illustrated at the following drawings provided.
[0036]
[0037]
[0038]
DETAILED DESCRIPTION OF THE INVENTION
[0039] To remove the plug and the removable block of the nuclear reactor, a set of handling equipment is used consisting of the following: 1-cable reduction box, 2-additional cargo, 3-guide channel, 4-reloading armor, 5-plug transportation devices, 6-removable block transportation devices, as well as a set of lifting beams and automated system of handling equipment machinery management.
[0040] Cable reduction box 1 is intended for installation of handling equipment and provides its coupling with the RMB housing 7, as well as operating personnel radiation protection.
[0041] Additional cargo 2 prevents surfacing of the reactor plug 8 when the pressure flange is removed, the former keeping the plug in the housing 7 of the RMB when in operation.
[0042] Guide channel 3 which is a tube with a supporting flange having flanges for connection to the special ventilation stationary system, is designed to create the unloading path for the plug and the removable block, to place control devices, as well as to direct and position the reloading armor grip as it moves outside of the armor.
[0043] Reloading armor 4, which is a vertical cylindrical vessel having heat insulation and biological protection made of lead (opposite to the core), equipped with a pulling hoist with an automatic grip 9, providing for automatic engagement and disengagement with the head of plug 5 and removable block 6 transportation devices.
[0044] To move the plug 8 of the reactor, the plug transportation device 5 is used, and to move the removable reactor block 10, the removable block transportation device 6 is used.
[0045] The use of the plug transportation device (PTD) 5 provides for the following: engagement and fixation of the reloading armor 4 with the automatic grip 9, the possibility to move the plug 8 along the unloading path into the reloading armor 4, the possibility of fixing and releasing the additional cargo 2 and the possibility of the plug breakaway 8 during unloading.
[0046] Usage of the removable block transportation device (RBTD) 6 provides for the following: engagement and fixation of the reloading armor 4 with the automatic grip 9, the possibility to move the removable block 10 along the unloading path to the removable armor 4, the control over fastening or unfastening of the removable block 10 in the RMB shaft and pressing in or breakaway of the removable block 10 to overcome the buoyancy applied to it.
[0047] A set of lifting beams (not shown) provides for the transportation of the handling equipment set devices using, for example, an electric bridge crane.
[0048] The automated control system (ACS) (not shown) of the handling equipment mechanisms provides for the collection, processing, monitoring, reporting of information on the situation and status of the executive bodies, operating influences on electric motor drives of the handling equipment set, registration of the information on the process of the reactor plant unloading. The ACS performs its function when the plug 8 is lifted and when the removable block 10 of the reactor is removed.
[0049] The proposed method is carried out in the following sequence.
[0050] Initial state: [0051] the top protection of the reactor is dismantled; [0052] electric drives of the main circulation pump (MCP) and drives of the control and protection systems (CPS) are dismantled.
[0053] First, the following preparatory works are performed on a stopped reactor monoblock for the handling equipment installation (
[0054] Using a cargo crane and a lifting beam, PTD 5 is installed onto the plug 8 and secured with screws from the service platform. Additional cargo 2 is mounted onto the upper end of the of PTD 5 using a cargo crane and a lifting beam. Pressure flange (not shown) is detached and disassembled using a device designed for unscrewing (screwing) of the pressing flange nuts. Using a cargo crane and a lifting beam, the inner frame of the cable reduction box 1 is installed and fixed onto the RMB housing 7 with fastening screws. Using a special tool (wrench), the supporting ring (the middle turning part of the PTD) is turned into a position where its projections enter the operating area of the cable reduction box locking element located on the lead screws of the cable reduction box 1. With the use of a cargo crane and a lifting beam, additional cargo 2 is removed. Using a cargo crane and a lifting beam, the external part of the cable reduction box 1 is mounted with a closed and sealed damper on the RMB housing 7. The internal cavity of the cable reduction box 1 is checked for leaks with overpressure. The internal medium of the cable reduction box cavity 1 is replaced: inert gas instead of air medium.
[0055] Removal of the plug from the RMB (
[0056] Using a cargo crane and a lifting beam, the guide channel 3 is installed on the cable reduction box, the upper bearing surface of the guide channel is fixed on the ceiling of the reactor shop central hall. The tightness between the guide channel 3 and the cable reduction box 1 is provided using a sealing element (not shown). Reloading armor 4 is installed on the upper bearing surface of the guide channel 3 using a cargo crane. A transition piece (not shown) is fixed onto the automatic grip 9 of the reloading armor 4 in advance for docking with PTD 5. The damper of the reloading armor 4 is decompressed and opened. The internal cavity of the reloading armor 4 and the guide channel 3 is checked for leaks with overpressure. The internal medium of the reloading armor and guide channel 4 cavities is replaced: inert gas instead of air medium. The gate of the cable reduction box 1 is decompressed and opened. The movement drive of the locking element of the cable reduction box 1 is turned on and the PTD 5 is moved together with the plug 8 in its upper position where the upper limiting elements of the cable reduction box fixing member are automatically removed from the projections of the supporting ring, and the buoyancy acting on the plug is equal to zero. The grip of the reloading armor 4 is lowered into the lowest position until it stops against the stop member of the guide channel 3; control drives located on the moving line of the guide channel 3 are connected to the automatic grip 9 and the latter is interlocked with the PTD 5. Control drives of the grip and the clutch are disconnected, the automatic grip 9 coupled with the PTD 5 is lifted by 100200 mm upwards. At the same time, the stops of the fixing member of the cable reduction box are removed from the PTD 5 supporting ring. The automatic grip 9 of the reloading armor 4 with a plug 8 is moved into the highest position; the dampers of the cable reduction box 1 and reloading armor 4 are closed and sealed. Reloading armor 4 with a plug 8 are transported into the plug shaft 11, and the shaft is unloaded by decompressing and opening the damper as well as lowering the automatic grip 9 to the lower position.
[0057] Inside the plug shaft 11, similar control drives for managing the automatic grip 9 removal are arranged as well as the drives for the PTD 5 disengagement. The automatic grip 9 with a transition element is lifted to the uppermost position; the damper is closed and sealed, and the reloading armor 4 is transported to its place of storage. The guide channel 3 is dismantled.
[0058] Then, the removable unit 10 (without SFA) is unloaded from the RMB (
[0059] Initial state: [0060] The cable reduction box 1 damper is closed and sealed; [0061] plug 8 of the reactor is unloaded; [0062] the SFA are unloaded form the removable block 10;
[0063] The guide channel 3 is re-installed on the cable reduction box using a cargo crane and a lifting beam, the upper bearing surface of the guide channel is fixed on the ceiling of the reactor shop central hall. The tightness between the guide channel 3 and the cable reduction box 1 is ensured by a sealing element. Reloading armor 4 is installed on the upper bearing surface of the guide channel 3 using a cargo crane. The RMTD 6 is preliminarily fixed onto the automatic grip 9 of the reloading armor 4. The damper of the reloading armor 4 is decompressed and opened. The internal cavity of the reloading armor 4 and the guide channel 3 is checked for leaks with overpressure. The internal medium of the cable reduction box 1 and reloading armor 4 cavities is replaced by means of replacing air with inert gas. The gate of the cable reduction box 1 is decompressed and opened. The automatic grip 9 of the reloading armor 4 is moved into its lowest position until it stops against a limiting element of the guide channel 3; the drive control (located on the moving line of the channel guide 3) is connected to the automatic grip 9 and the latter is interlocked with the removable block 10. Using the drive located on the moving line of the guide channel 3, the interlocks of the removable block 10 are opened by turning the appropriate rotating pins. The control drive of the automatic grip 9 is disconnected from the RMTD 6, and the automatic grip 9 of the reloading armor 4 with the removable block 10 are moved into the uppermost position; the cable reduction box 1 and reloading armor 4 dampers are closed and sealed. Reloading armor 4 is transported together with the removable block 10 to the shaft for the removable block 12 disassembly, unloaded into the shaft, then the damper is decompressed and opened, moving the grip to the lower position. The automatic grip 9 with the RBTD 6 is moved up into the uppermost position, the damper is closed and sealed and the reloading armor 4 is transported to its place of storage. The removable block 10 does not have tight-fitting seats, unlike the plug 8, so when the rotary locks are turned around, buoyancy and extra effort by pulling hoist of the reloading armor 4 is enough to unload it from the RMB.
[0064] Above the plug shaft 11 and the shaft for the removable block disassembly 12, grip disengaging control drives as well as drives for disengaging of the PTD 5 and PTD 6 are arranged.
[0065] After full completion of unloading operations, the inner surface and the seats of the central RMB shell are inspected.
[0066] The claimed inventive method allows to carry out all process operations related to the plug and removable block extraction (without SFA) by means of a set of handling equipment and transportation devices providing a reliable biological protection for personnel and equipment.