DEVICE AND METHOD FOR CHECKING A FUEL ROD OF A FUEL ELEMENT

20180033502 ยท 2018-02-01

    Inventors

    Cpc classification

    International classification

    Abstract

    The disclosure relates to a device for checking a fuel rod comprising a testing container having first and second chambers, a first checking device arranged in the testing container, wherein the testing container has at least one inlet opening, at least one outlet opening, and an insertion opening for inserting the fuel rod into the second chamber, and wherein a valve is arranged in a connecting channel connecting the first and the second chamber. A method is disclosed for checking a fuel rod in a water-filled basin of a submerged nuclear plant having such a device, wherein the fuel rod is inserted into the second chamber of the testing container through the insertion opening while the valve is closed, wherein a fluid is fed in via the at least one inlet opening, and wherein the valve is opened in order to check the fuel rod with the first checking device.

    Claims

    1. A device for checking a fuel rod of a fuel element in a water-filled pool of an nuclear plant underwater, comprising a test container having a first chamber and a second chamber, and a first testing device situated in the test container, wherein the test container has at least one inlet opening and at least one outlet opening, and the test container has an insertion opening for inserting the fuel rod into the second chamber, and a valve is situated in a connecting channel that connects the first and the second chambers.

    2. The device according to claim 1, wherein the at least one inlet opening leads into a first chamber of the test container.

    3. The device according to claim 1, wherein the test container has a first outlet opening in the first chamber and a second outlet opening in the second chamber.

    4. The device according to claim 1, in which a second inlet opening leads into the second chamber of the test container.

    5. The device according to claim 1, wherein the test container has an exit opening situated behind the insertion opening relative to an axis.

    6. The device according to claim 5, having at least one guide channel, formed by the wall of the test container, which adjoins one or more of the insertion opening or the exit opening.

    7. The device according to claim 1, in which the first test device is a spectroscopic measuring device, in particular an infrared measuring device.

    8. The device according to claim 1, having a second test device that is situated in the second chamber of the test container.

    9. The device according to claim 8, having a light source that is situated in the second chamber.

    10. The device according to claim 8, in which one or more of the first or the second test device is enclosed by a shielding device.

    11. The device according to claim 1, having at least one mirror that is situated in one or more of the first chamber or in the second chamber of the test container.

    12. The device according to claim 1, having a handling tool for inserting the fuel rod into the test container and for moving and rotating the fuel rod.

    13. The device according to claim 1, having a sealing device via which the second chamber may be closed off from the water-filled pool.

    14. The device according to claim 13, in which the sealing device includes at least one sealing element that completely encompasses the at least one guide channel.

    15. The device according to claim 13, in which the sealing device includes at least one additional test housing that completely covers the fuel rod and at least a portion of the handling or actuating means outside the test container.

    16. A method for checking a fuel rod in a water-filled pool of a nuclear plant underwater, using a device comprising a test container having a first chamber and a second chamber, and a first testing device situated in the test container, wherein the test container has at least one inlet opening and at least one outlet opening, and the test container has an insertion opening for inserting the fuel rod into the second chamber, and a valve is situated in a connecting channel that connects the first and the second chambers, the method comprising, inserting the fuel rod into the second chamber of the test container through the insertion opening, with the valve closed, and supplying a fluid via the at least one inlet opening, and opening the valve in order to check the fuel rod with the first test device.

    17. The method according to claim 16, in which the supplying of the fluid is maintained during the check of the fuel rod.

    18. The method according to claim 16, in which the valve is opened as soon as the sealing device closes off the second chamber from the water-filled pool.

    19. The method according to claim 16, in which the fuel rod is checked with the second test device with the valve closed, the fuel rod being moved up and down along a direction and/or rotated about a longitudinal axis during the check.

    Description

    [0033] The invention is explained in greater detail below, also with regard to further features and advantages, with reference to the description of exemplary embodiments and the appended drawings, which in each case show schematic diagrams as follows:

    [0034] FIG. 1 shows a device for checking a fuel rod of a fuel element, with the valve closed,

    [0035] FIG. 2 shows a device for checking a fuel rod of a fuel element, with the valve open, and

    [0036] FIG. 3 shows a device for checking a fuel rod of a fuel element having an additional test housing, with the valve open.

    [0037] FIG. 1 shows a device 2 for checking a fuel rod 4 of a fuel element (not illustrated) in a water-filled pool 6 of a nuclear plant, with the fuel rod 4 inserted and a valve 24 closed.

    [0038] The device 2 includes a test container 8 that is lowered into the water-flooded pool 6. The test container 8 has an interior that is formed by a first chamber 10, a second chamber 12, and a connecting channel 22. A valve 24, in the present case a shutoff valve, which is movable between an open position (FIG. 2) and a closed position (FIG. 1) for opening and closing the connecting channel 22, and thus, for establishing a fluidic connection between the first chamber 10 and the second chamber 12, is provided in the connecting channel 22.

    [0039] An infrared measuring device or an infrared camera as the test device 14 is situated in the first chamber 10. To protect the radiation-sensitive test device 14 from the radioactive radiation emitted from the fuel rod 4, the test device 14 is enclosed by a shielding device 34. The test device 14 is situated in parallel to the fuel rod 4, so that the exit or entry window 46 of the test device for the infrared radiation points in the direction of the second chamber 12.

    [0040] Gas flows into the first chamber via a first inlet line 44 and a first inlet opening 16 that is present in the wall 26 of the first chamber 10. A second inlet opening 44 and a second inlet opening 16 may be provided in the wall 26 of the second chamber 12, which open into the second chamber 12 and by means of which the second chamber 12 may be separately ventilated. Present in the wall 26 that surrounds the first chamber 10, at the bottom side 52 of the test container 8, is an outlet opening 18a that leads into the water-flooded pool 6 via an outlet channel 48a. An outlet opening 18b, which once again leads into the water-flooded pool 6 via an outlet channel 48b, is also present in the side of the wall 26 surrounding the second chamber 12.

    [0041] The test container 8 has an insertion opening 20a on a top side 50 for inserting the fuel rod 4 into the second chamber 12. An exit opening 20b that is situated behind the insertion opening 20a, relative to the axis Z that extends in parallel to a center longitudinal axis A of the fuel rod, is used for removing the fuel rod 4 from the chamber 12, so that the fuel rod 4 can be moved through the chamber 12 to enable checking of multiple axial sections extending in parallel or along a center longitudinal axis A of the fuel rod 4. The insertion opening 20a and the exit opening 20b are adjoined by a guide channel 28a, b, respectively, that is formed by the wall 26 of the test container 8, the guide channel 28a leading from a top side 50 of the test container 8 into the second chamber 12, and the guide channel 28b leading from the second chamber 12 to a bottom side 52 of the test container 8. The guide channel 28a, b prevents excessive tilting of the fuel rod 4 so that it may be led in and out of the second chamber 12 more easily.

    [0042] The device 2 also includes a second test device 30 that is situated in the second chamber 12 of the test container 8 in such a way that the inserted fuel rod 4 is in the field of vision of the second test device. In the present case, the second test device 30 is a camera that is insensitive to radiation, so that no shielding device 34 is required. A light source 32 is provided in the second chamber 12 for checking the fuel rod 4 with the second test device 30.

    [0043] A mirror 36 is situated in the first chamber 10 for directing the thermal radiation emitted from the fuel rod 4 into the entry window 46 of the first test device 14 or the infrared camera. The radiation exposure for the first test device 14 may be further reduced by the mirror 36, since the first test device is not directly exposed to the radioactive radiation that is emitted from the fuel rod 4.

    [0044] For inserting the fuel rod 4 into the test container 8 and moving it parallel to a direction R and rotating it about a longitudinal axis A of the fuel rod 4 during the check, the device includes a handling tool 38, a gripper, for example, which is already present for transporting the fuel rods 4 in the water-flooded pool 6.

    [0045] The device 2 also includes a sealing device 40 via which the second chamber 12 may be closed off from the water-filled pool 6. The sealing device 40 includes two sealing elements 42, situated in each case in a recess 54 in the wall 26 of the test container 8 adjoining the guide channel 28a, b, and each completely enclosing a guide channel 28a, b. The sealing elements 42, as illustrated in FIG. 2, are fillable with gas or a liquid medium, so that a gap that may be present between the inserted fuel rod 4 and the guide channel 28a, b is completely closable.

    [0046] For checking the fuel rod 4 in the water-flooded pool of the nuclear plant, the fuel rod 4 is inserted into the second chamber 12 of the test container 8 through the insertion opening 20a, with the valve 24 closed (FIG. 1). Gas is supplied via the inlet channel 44 and the inlet opening 16 in order to displace the residual water from the second chamber 10 and to avoid entry of water through the outlet opening 18a and the outlet channel 48a. Supplying of the gas is maintained during the check of the fuel rod 4.

    [0047] When the fuel rod 4 is completely inserted, a check with the second test device 30, situated in the second chamber 12, initially takes place with the valve 24 still closed and the light source 32 switched on. For checking multiple axial sections or the entire surface of the fuel rod 4, during the check with the second test device 30 the fuel rod is moved up and down in parallel to the direction R and rotated about its longitudinal axis A.

    [0048] If a location to be examined in greater detail is detected during the check with the second test device 30, an additional check with the first test device 14 then takes place. In principle, however, it would also be possible to check the entire fuel rod 4 with the first test device 14.

    [0049] For checking the fuel rod with the first test device 14, the fuel rod is rotated by 180 by means of the handling tool 38, so that the surface position to be checked is facing the first test device 14. The two sealing elements 42 are filled with air to avoid entry of water. The valve 24 is subsequently opened (FIG. 2), so that the gas flowing through the first inlet opening passes through the first chamber 10 and the connecting channel 22 and into the second chamber 12, where it displaces the water from the chamber 12. During checking of the fuel rod 4 with the first test device 14, the entire interior of the test container 8, i.e., the first chamber 10, the connecting channel 22, and the second chamber 12, is thus free of water, thereby ensuring the functionality of the infrared measurement.

    [0050] FIG. 3 shows a device 2 in which the sealing device 40 includes two additional test housings 56 which completely cover the fuel rod 4 and at least a portion of the handling or actuating means 38 outside the test container 8. The test housings 56 are mounted on the test container in such a way that an interior of the test housings 56 and the second chamber 12 form a shared interior.

    [0051] The sealing device 40 also includes a sealing element 42 which is fillable with gas or a liquid medium, and which is situated in a recess 54 in the wall 58 of the additional test housing 56 and completely encompassed by the guide channel 28a jointly formed by the wall 58 of the additional test housing 56 and the wall 26 of the test container. For better clarity of the illustration, the sealing element 42, despite the inserted fuel rod 4 and the opened valve 24, is shown in an unfilled state.

    [0052] The device includes a first inlet channel 44a that opens into the first chamber 10 and a first inlet opening 16a in the first chamber 10, as well as a second inlet channel 44b that opens into the second chamber 12 and a second inlet opening 16b in the second chamber 12. Fluid may thus flow through each chamber 10, 12 independently of the other chamber, and the residual water that is present may be removed from the chambers. According to FIG. 3, the second inlet channel 44b is formed by the wall 60 of the additional test housing 56, and the inlet opening 16b opens into the guide channel 28b in an upper area of the additional test housing 56. The test container [sic; test housing] 56 situated on the bottom side 52 has an outlet opening 18b in a lower area. To ensure sufficient fluid flow in the second chamber 12, the guide channel 28b is wider than the diameter of the fuel rod 4. The second chamber 12 may thus be completely vented in the direction of the outlet opening 18b.

    [0053] Directly after the fuel rod is inserted and the additional test housing 56 is mounted, the water may be blown out of the second chamber 12, so that a check or pre-inspection of the fuel rod 4 with the second test device 30 also takes place in a water-free environment. For checking a position of the fuel rod 4 to be examined in greater detail, the valve 24 may then be opened at any time during the check with the second test device to enable a check with the first test device 14 without having to also ventilate the second chamber beforehand, thus saving time.

    TABLE-US-00001 List of reference numerals 2 device 4 fuel rod 6 pool 8 test container 10 first chamber 12 second chamber 14 first test device 16 inlet opening 18a, b outlet opening 20a insertion opening 20b exit opening 22 connecting channel 24 valve 26 wall of the test container 28 guide channel 30 second test device 32 light source 34 shielding device 36 mirror 38 handling tool 40 sealing device 42 sealing element 44 inlet channel 46 exit or entry window 48a, b outlet channel 50 top side 52 bottom side 54 recess 56 test housing 58 wall R direction A longitudinal axis Z axis