Method for correcting a rail track
09863097 ยท 2018-01-09
Assignee
Inventors
Cpc classification
E01B27/028
FIXED CONSTRUCTIONS
E01B35/00
FIXED CONSTRUCTIONS
E01B33/00
FIXED CONSTRUCTIONS
International classification
E01B35/00
FIXED CONSTRUCTIONS
E01B27/06
FIXED CONSTRUCTIONS
E01B33/00
FIXED CONSTRUCTIONS
Abstract
For correction of a track position in connection with ballast cleaning, after cleaned ballast has been returned to a track, the actual position of the latter is measured while determining actual position data. Parallel to that, fixed point correction values are determined by a sighting trolley following behind. The actual position data and the fixed point correction values are transmitted to the tamping machine, following behind, and are used for determining correction values for a desired track position to be created by tamping.
Claims
1. The method for correction of a track position in connection with ballast cleaning by means of a cleaning machine which precedes a tamping machine with regard to a working direction, comprising the following steps: a) after cleaned ballast has been returned to a track, the actual position of the track is measured while determining actual position data of the track, b) parallel in time to step a), determining fixed point correction values in that the track position with respect to fixed points is detected, c) transmitting the actual position data of the track and the fixed point correction values to the tamping machine, which is following behind, wherein the position data and the correction values are used for determining correction values for a desired track position to be created by tamping.
2. The method according to claim 1, wherein, immediately after a first tamping of the track by the said tamping machine, both actual position data of the track as well as fixed point correction values are detected again and used by a following second tamping machine for determining new correction values for a desired track position.
Description
(1) The invention will be described in more detail below with reference to an embodiment represented in the drawing in which
(2)
(3)
(4) On a track construction site shown in
(5) Immediately following the cleaning machine 1, a sighting trolley 11shown on a larger scale in
(6) Following the sighting trolley 11, a tamping machine 14 with a measuring trailer 15 is provided. The latter is articulatedly connected to a rear machine end 16 and also equipped with measuring axles 9, designed to roll on the track 2, and with a measuring chord.
(7) The sighting trolley 11 visible in
(8) The method according to the invention will now be described in more detail. While ballast is cleaned continuously by means of the first vehicle, i.e. the cleaning machine 1, a track position correction takes place, also continuously, by means of the tamping machine 14 following behind.
(9) After the cleaned ballast has been returned to the track 2, the actual position of the latter is measured while recording actual position data by means of the measuring trailer 8. Parallel to that, fixed point correction values are determined immediately behind the cleaning machine 1 by the sighting trolley 11 in that the present track position or actual position with respect to fixed points 12 is detected. The actual position data and the fixed point correction values are transmitted by radio to the tamping machine 1, following behind, and used in connection with a software program for determining correction values for a desired track position to be created by tamping.
(10) In a further variant of the invention, it is possible to employ an additional tamping machine immediately behind the tamping machine 14 shown in