METHOD FOR ADJUSTING OR REPLACING A MANHOLE FLOATING TYPE HATCH

20230093545 ยท 2023-03-23

    Inventors

    Cpc classification

    International classification

    Abstract

    The present disclosure relates to the field of construction, and, more particularly, to the adjustment of the position of a floating manhole or the replacement of a manhole with a new manhole so that the manhole is aligned with the connecting surface, e.g., the roadway. The object of the disclosure is to make it quicker, easier, and cheaper to adjust the position of a floating manhole, or to replace the manhole with a new manhole by aligning the manhole surface with the connecting surface, e.g., the roadway.

    Claims

    1. A method of adjusting and/or replacing a floating manhole, in which the manhole is lifted from the well, comprising before raising the manhole, the manhole and the surrounding cracked, concave, deformed asphalt concrete mixture surface are heated by infrared to the required temperature, then a cylindrical protective sleeve of diameter is inserted, the new asphalt concrete mixture is added over the cracked, concave, deformed asphalt concrete mixture around the manhole and mixed and distributed evenly, then pulls out the protective sleeve, installs a manhole and, together with the asphalt concrete mixture distributed around it, compresses, a new homogeneous asphalt concrete mixture .

    2. The method for adjusting and/or replacing a floating manhole according to claim 1, characterized in that the temperature of the infrared heating temperature depends on the type of asphalt concrete mixture.

    3. The method for adjusting and/or replacing a floating manhole according to claim 1, characterized in that the diameter of the protective sleeve corresponds to the diameter of the upper cavity of the manhole frame.

    4. The method for adjusting and/or replacing a floating manhole according to claim 1, characterized in that the protective sleeve is made of a material capable of withstanding the force of the mass of asphalt concrete mixture being poured around it.

    5. The method for adjusting and/or replacing a floating manhole according to claim 1, characterized in that hot (laying temperature) asphalt concrete mixture is poured onto the asphalt concrete mixture deformed around the well.

    6. The method for adjusting and/or replacing a floating manhole according to claim 1, characterized in that the manhole together with the asphalt concrete mixture distributed around it, is compressed by means of a vibratory roller or a vibratory plate.

    Description

    BRIEF DESCRIPTION OF THE DRAWINGS

    [0013] FIG. 1 shows well floating type manhole before adjustment or replacement.

    [0014] FIG. 2 shows a view of the well with the protective sleeve inserted during adjustment or replacement.

    [0015] FIG. 3 shows a well floating type manhole after adjustment or replacement and compression with a vibratory roller or vibratory plate.

    [0016] The method of adjusting or replacing the floating type manhole is given in all the stages of the process in the above pictures, which shows the manhole cover 1, installed in the frame 2, asphalt concrete mixture 3, well 4, road base layer 5, newly laid asphalt concrete mixture layer 6, protective sleeve 7.

    DESCRIPTION

    [0017] In an example embodiment, before the manhole is raised, the manhole and the cracked, sunken, deformed asphalt surface around it 3, is heated to the required temperature by infrared rays, then a cylindrical protective sleeve 7 of the appropriate diameter is inserted into the cavity of manhole 4, the new asphalt concrete mix is poured onto the cracked, sunken and deformed asphalt cover 3 around the manhole 4, mixed with the old pavement and distributed evenly, then the protective sleeve 7 is removed, place the manhole cover frame 2, and, together with the asphalt concrete distributed around it, it is compacted to form a new homogeneous surface. The subsequent disclosure describes this process in more detail.

    [0018] At the beginning, before removing the manhole frame 2 with the cover 1, the upper part of the manhole frame 2 and the cracked, dented, deformed asphalt concrete mixture 3 around it (FIG. 1) are heated by infrared rays to the required temperature, which already depends on the type of poured asphalt concrete mixture. The heated asphalt concrete mixture softens, which makes it easy to pull out the manhole frame 2. Next, a cylinder-shaped protective sleeve 7 of the appropriate diameter is inserted into the upper cavity of the well 4 (FIG. 2), which protects the well 4 during repair from asphalt concrete mixture and other debris entering its interior. The protective sleeve 7 is made of a material capable of withstanding the force of the asphalt concrete mixture mass poured around it. Hot (laying temperature) asphalt concrete mixture is poured onto the deformed asphalt concrete mixture 3 around the well 4, mixed with the old coating and evenly distributed. Since the deformed asphalt concrete mixture 3 is heated, and the asphalt concrete mixture poured on it is also hot (laying temperature), these two elements easily adhere to each other, forming a homogeneous mixture. Then, the protective sleeve 7 is pulled out, and the hatch frame 2 with cover 1 is placed in its place, which, together with the asphalt concrete mixture mass 6 distributed around it, is leveled with the roadway (FIG. 3) with the help of a vibratory roller or vibratory plate.

    [0019] In an example embodiment, the infrared heating temperature depends on the type of asphalt cover, and the diameter of the protective sleeve 7 corresponds to the diameter of the upper cavity of the manhole 4 and is made of a material capable of withstanding the force of the mass of asphalt concrete poured around it, and hot (of laying temperature) asphalt concrete 6 is poured on the de-formed asphalt pavement 3 around manhole 4. The manhole cover frame 2 with lid 1 together with the asphalt concrete spread around it, is compressed by means of a vibratory rolling compactor or a vibratory plate compactor.

    INDUSTRIAL APPLICABILITY

    [0020] Compared with the prototype, in the floating manhole cover adjustment and/or replacement method, the deformed asphalt concrete mixture 3 around the manhole 4 and the upper part of the manhole frame 2 are heated by infrared rays, which facilitates the extraction of the manhole frame 2 from the manhole 4 without widely tearing the asphalt concrete mixture 3 around the manhole 4. All this allows quick, easy, inexpensive installation and adjustment of the manhole position with the connecting surface, e.g., the roadway. In addition, the protective sleeve 7 used during the process prevents asphalt concrete mixture and other debris from entering the well, preventing additional cleaning work.