Apparatus for warning of exceeding speed limit in railway vehicles
09718485 ยท 2017-08-01
Assignee
Inventors
Cpc classification
B61K9/02
PERFORMING OPERATIONS; TRANSPORTING
B61L15/0062
PERFORMING OPERATIONS; TRANSPORTING
B61L25/025
PERFORMING OPERATIONS; TRANSPORTING
B61L15/0072
PERFORMING OPERATIONS; TRANSPORTING
B61L25/021
PERFORMING OPERATIONS; TRANSPORTING
B61L27/20
PERFORMING OPERATIONS; TRANSPORTING
International classification
B61L25/02
PERFORMING OPERATIONS; TRANSPORTING
B61L27/00
PERFORMING OPERATIONS; TRANSPORTING
B61L3/00
PERFORMING OPERATIONS; TRANSPORTING
B61L15/00
PERFORMING OPERATIONS; TRANSPORTING
Abstract
The present disclosure relates to an apparatus for warning of exceeding speed limit in railway vehicles, wherein a train speed is estimated after a predetermined time, a remaining time is calculated until a train reaches a speed limit based on the estimated speed, and when the calculated time is smaller than a preset reference value, a warning signal is generated. Thus, an adequate warning can be given to cater to a train operation situation because a TTSLC indicator is used that notifies when an emergency braking will be activated by exceeding a set speed limit value after a certain time lapses, resultantly increasing the train operation frequency and the availability of trains.
Claims
1. An apparatus for providing a warning of potentially exceeding a speed limit in a railway vehicle, the apparatus comprising: an estimation unit that estimates a future speed of the railway vehicle based on a current speed of the railway vehicle and operational information related to an environment in which the railway vehicle operates; an Automatic Train Protection (ATP) system that automatically applies a braking force to reduce a current speed of the railway vehicle when the current speed exceeds a preset braking speed limit, the automatic braking unit having a corresponding preset ATP warning speed limit at which an automated first warning signal is generated; a determination unit that utilizes the estimated future speed to determine a time period from a current time to a time when the railway vehicle will reach the preset braking speed limit speed; and a warning generation unit that provides a second warning signal when the determined time period is less than a preset reference period, wherein the estimation unit receives the operational information and estimates the future speed based on at least a constant tractive force and a constant braking force applied to the railway vehicle, wherein the operational information comprises at least the tractive force, the braking force, the current speed, track gradient information and track curvature information, and wherein the warning generation unit provides the second warning signal at a speed that is greater than the preset ATP warning speed such that the railway vehicle operates at a speed greater than the preset ATP warning speed without the second warning signal being generated.
2. The apparatus of claim 1, wherein the estimation unit: receives the operational information from a propulsion system or a braking system; generates a dynamics model of the railway vehicle based on a longitudinal dynamics model of the railway vehicle; and estimates the future speed based on the generated dynamics model.
3. The apparatus of claim 1, wherein: the estimation unit estimates the future speed at an nth step subsequent to a current kth step using the following Equation:
4. The apparatus of claim 1, wherein: the determination unit calculates TTSLC (Time-To-Speed-Limit-Crossing) using nT; T is a sampling period; and TTSLC is a time for the railway vehicle to reach a speed limit when a speed subsequent to the nth step is estimated by the estimation unit.
5. The apparatus of claim 1, wherein the preset reference period is set in consideration of at least a reaction time of an operator of the railway vehicle, a reaction time of the ATP system, a reaction time of a braking device, a time until a specific braking force is generated or a communication delay time of the second warning signal.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1) The accompanying drawings, which are included to provide further understanding of the disclosure and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the disclosure and together with the description serve to explain the principle of the disclosure. In the drawings:
(2)
(3)
(4)
(5)
(6)
(7) Additional advantages, objects, and features of the disclosure will be set forth in part in the description which follows and in part will become apparent to those having ordinary skill in the art upon examination of the following or may be learned from practice of the disclosure. The objectives and other advantages of the disclosure may be realized and attained by the structure particularly pointed out in the written description and claims hereof as well as the appended drawings.
(8) It is to be understood that both the foregoing general description and the following detailed description of the present disclosure are exemplary and explanatory and are intended to provide further explanation of the disclosure as claimed.
DETAILED DESCRIPTION
(9) Exemplary embodiments will be described more fully hereinafter with reference to the accompanying drawings, in which some exemplary embodiments are shown. The present inventive concept may, however, be embodied in many different forms and should not be construed as limited to the example embodiments set forth herein. Rather, the described aspect is intended to embrace all such alterations, modifications, and variations that fall within the scope and novel idea of the present disclosure.
(10) Referring to
(11) Now, a TTSLC indicator will be described in detail with reference to
(12) That is, the TTSLC indicator may mean that the train speed reaches an ATP speed limit value for emergency braking when time lapses as much as a TTSLC value.
(13)
(14) The future speed estimation unit (21) unit receives, from a propulsion system or a braking system, information necessary for speed estimation including tractive force, braking force, current speed, track gradient and track curvature information to generate dynamics model of the train based on longitudinal dynamics model of the train, and to estimate a future speed of the train based on the data measured by the dynamics model and a sensor.
(15) The longitudinal dynamics model of the train may be obtained from the following Equation 1 using Newton's second law.
(16)
where, m is a train equivalent mass of the train, v is a train longitudinal speed of the train, Te is a tractive force, Tb is a braking force, Rr is a running resistance formed by adding a rolling resistance and an aerodynamic drag. Furthermore, Rg is a grade resistance, and Rc is a curving resistance.
(17) The train equivalent mass m is defined by an imagination of a lumped mass, although the train is substantially formed by connecting several rolling stocks. The tractive force Te and the braking force Tb are respectively received from a tractive device (not shown) and a braking device (not shown) of the train.
(18) The train running resistance Rr is expressed by a sum of the rolling resistance and aerodynamic drag, and may be modeled by the following quadratic equation 2 to speed.
Rr=c.sub.1+c.sub.2+c.sub.3.sup.2[Equation 2]
where, c.sub.1, c.sub.2, c.sub.3 are respectively constants, the quadratic term to the speed is an equation to aerodynamic drag, linear and constant terms to speed are expression to rolling resistance.
(19) The grade resistance Rg may be expressed by a relational expression to the train equivalent mass m and grade level of the train as shown in the following Equation 3.
R.sub.g=mg[Equation 3]
where, m is a train equivalent mass of the train, g is a gravitational acceleration, is gradient angle. That is, if there is almost no inclination, the grade resistance Rg may be disregarded.
(20) Furthermore, the curving resistance Re is a function to curvature radius, and may be expressed by the following Equation 4.
(21)
where, c4 is a constant, and r is a curvature radius.
(22) When Equations 2 to 4 are substituted for Equation 1, it may be defined by the following Equation 5.
(23)
(24) Furthermore, discretization of the longitudinal dynamics model of train may be expressed by the following Equation 6.
(25)
where, T is a sampling period.
(26) Meantime, the future speed estimation unit (21) may be designed by N-step ahead type that estimates a future train speed subsequent to n step, using the Equation 6. To this end, it is assumed that there is no change and constant in the tractive force and braking force applied to the current train
(27) When the above-proposed dynamics model is used to estimate the train future speed, 1-step ahead, 2-step ahead and 3-step ahead train speed estimations may be respectively defined by the following Equations 7 to 9.
(28)
(29) In the similar method, (n1)-step ahead train speed estimation may be defined by the following Equation 10.
(30)
(31) Furthermore, n-step ahead train speed estimation may be expressed by the following Equation 11.
(32)
(33) The train speed at k+n step may be estimated using train data at k step sequentially using Equations 7 to 11.
(34) That is, the train future speed at k+nth step may be estimated using curvature received from kth step, track data including grade information, propulsive force and braking force of train, train speed and train dynamics model.
(35) The TTSLC calculation unit (22) calculates a TTSLC value at which time point the train can exceed an ATP speed limit based on the train future speed estimated by the future speed estimation unit (21) and ATP speed limit information for emergency braking. That is, when the train maintains a current acceleration/deceleration states, the TTSLC calculation unit (22) can calculate when the train will exceed the preset ATP speed limit after several seconds. When it is assumed that the train will exceed the ATP speed limit at nth step, it may be expressed by the following Equation 12.
(k+n).sub.lim[Equation 12]
where, .sub.lim is an ATP speed limit value for emergency braking.
(36) This means that the train speed will exceed the ATP speed limit subsequent to nth step when k is a current time, where the TTSLC value may be calculated by the following Equation 13.
TTSLC=nST[Equation 13]
where, unit of TTSLC value is second, and T is a sampling period.
(37) That is, it means that the train will exceed the ATP speed limit for emergency braking when a time as much as TTSLC value lapses at the current time. For example, when the TTSLC value is calculated as 3 seconds, the train can reach the ATP speed limit for emergency braking after 3 seconds under the current train operation condition.
(38) The warning generation unit (23) generates a warning signal when the time (TTSLC value) calculated by the TTSLC calculation unit (22) is smaller than the preset reference value. That is, when the set reference value is T.sub.threshold, a warning signal is generated when TTSLCT.sub.threshold, and no warning signal is generated when TTSLC>T.sub.threshold.
(39) When the TTSLC value is very large, it may be determined that a great many times remain to exceed the ATP speed limit for emergency braking, and when the TTSLC value is very small, it may be determined that a very small time remains to exceed the ATP speed limit for emergency braking.
(40) The T.sub.threshold may be adequately set in consideration of the driver, supervisor, or ATP reaction time, reaction time of braking device, a time until a sufficient braking force is generated, and communication delay time.
(41)
(42) The speed at N-Step ahead may be estimated based on various types of information received at steps S41 to S43 (S44).
(43) Information on the ATP speed limit for emergency braking is received (S45) to calculate the TTSLC value (S46) and the calculated TTSLC value is compared with the preset reference value (S47).
(44) As a result of comparison, if it is determined that the TTSLC value is greater than the reference value, no warning signal is generated (S48). But if it is determined that the TTSLC value is smaller than the reference value, a warning signal is generated (S49).
(45)
(46) In the prior art, the ATP speed limit curve (5-5) for warning is reached at Tw, even if the train speed (5-1) is continuously maintained below the ATP speed limit curve (5-2) for emergency braking, such that a warning signal on excessive speed can be transmitted to the driver or the supervisor to allow meddling in the train operation (5-3).
(47) However, the present disclosure is configured in such a manner that the ATP speed limit curve (5-2) for emergency braking cannot be reached when the train speed (5-1) is continuously maintained below the ATP speed limit curve (5-2) for emergency braking, whereby the TTSLC value becomes infinite and the driver or the supervisor is not transmitted with the warning signal.
(48) The apparatus for warning of exceeding speed limit in railway vehicles according to the exemplary embodiments of the present disclosure has an industrial applicability in that a time for activating the emergency braking due to deviation from the allowable speed limit can be predicted to enable a further safe operation, and more efficient train operation can be enabled because the train can be operated near to an emergency braking speed limit, if necessary.
(49) The above-mentioned apparatus for warning of exceeding speed limit in railway vehicles according to the present disclosure may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. Thus, it is intended that embodiments of the present disclosure may cover the modifications and variations of this disclosure provided they come within the scope of the appended claims and their equivalents. While particular features or aspects may have been disclosed with respect to several embodiments, such features or aspects may be selectively combined with one or more other features and/or aspects of other embodiments as may be desired.