Vacuum pre-wetting apparatus and methods
09714462 ยท 2017-07-25
Assignee
Inventors
Cpc classification
C25D17/001
CHEMISTRY; METALLURGY
C23C18/1803
CHEMISTRY; METALLURGY
C23C18/163
CHEMISTRY; METALLURGY
C25D17/06
CHEMISTRY; METALLURGY
C23C18/1851
CHEMISTRY; METALLURGY
C25D5/34
CHEMISTRY; METALLURGY
International classification
C23C16/00
CHEMISTRY; METALLURGY
C23C18/16
CHEMISTRY; METALLURGY
C25D17/06
CHEMISTRY; METALLURGY
C25D17/00
CHEMISTRY; METALLURGY
C25D5/34
CHEMISTRY; METALLURGY
Abstract
A processing apparatus may include a down-facing substrate processing chamber fixed at acute angle to horizontal. A chuck plate on a platform may pivot from an open position wherein the platform is at an acute angle to the processing chamber, to a parallel position wherein the platform is parallel to the processing chamber. The chuck plate may then be moved linearly into sealing engagement with the processing chamber. A chuck holder may be provided on the platform to hold the chuck in place.
Claims
1. Processing apparatus, comprising: a base; a chamber plate at a fixed acute angle to the base, with the chamber plate including a down-facing substrate processing chamber; a chuck plate on a platform below the chamber plate, with the chuck plate pivotal from an open position wherein the platform is at an acute angle to the chamber plate, to a closed position wherein the platform is parallel to the chamber plate; a chuck holder on the platform movable from a load/unload position wherein a wafer chuck may be loaded onto or removed from the platform, to a hold position wherein the chuck is secured onto the platform.
2. The apparatus of claim 1 with a first side of the down-facing substrate processing chamber vertically above a second side of the down-facing substrate processing chamber, and with a vacuum port at the first side of the down-facing substrate processing chamber connectable to a vacuum source, and a liquid inlet and a liquid drain at the second side of the down-facing substrate processing chamber.
3. The apparatus of claim 1 further including a liquid de-gassifier supported on the chamber plate and connected to the liquid inlet, with the de-gassifier including a tank, a tank vacuum source connected to the tank, a spray nozzle in the tank connected to a liquid source, and pressure equalization line connecting the tank to the down-facing substrate processing chamber.
4. The apparatus of claim 3 with the tank vertically above the processing chamber.
5. The apparatus of claim 1 further including at least one actuator for moving the platform linearly into sealing engagement with the chamber plate.
6. The apparatus of claim 1 with the down-facing substrate processing chamber having an upper surface oriented at an angle of 10-30 degrees to horizontal.
7. The apparatus of claim 1 with the down-facing substrate processing chamber having a volume of 0.5 to 2.5 liters.
8. The apparatus of claim 1 further including a vacuum seal on the platform sealing against the chamber plate, and a chuck seal sealing against the chuck, when the platform is sealed against the chamber plate.
9. The apparatus of claim 1 with the chuck holder including a chuck fitting on a shaft, a spring urging the chuck fitting into the hold position, and a chuck actuator operable to move the chuck fitting into the load/unload position, against the force of the spring.
10. A vacuum pre-wet apparatus, comprising a base; a chamber plate having a substrate processing chamber oriented at a fixed angle relative to the base; a chuck plate on a platform assembly; a pivot actuator connected to the platform assembly for pivoting the platform assembly from a first position where the chuck plate is at an acute angle to the processing chamber, to a second position wherein the chuck plate is parallel to the processing chamber; and at least one lift actuator attached to the platform assembly and to the chamber plate, for moving the chuck plate linearly into sealing engagement with the chamber plate.
11. The apparatus of claim 10 with the pivot actuator supported on the platform assembly.
12. The processing apparatus of claim 6 with the platform horizontal when in the load/unload position.
13. A vacuum pre-wet apparatus for pre-wetting a substrate in a chuck, comprising a chamber plate having a down-facing processing chamber; a chuck plate on a platform assembly below the chamber plate, with the chuck plate adapted to receive a chuck holding a substrate; a pivot actuator connected to the platform assembly for pivoting the platform assembly from a first position where the chuck plate is at an angle to the chamber plate, to a second position wherein the chuck plate is parallel to the chamber plate; and at least one lift actuator attached to the platform assembly for moving the chuck plate linearly into and out of sealing engagement with the chamber plate while the platform assembly is in the second position.
14. The apparatus of claim 13 with the pivot actuator supported on the platform assembly.
15. The apparatus of claim 13 wherein the pivot actuator is a linear actuator and the chuck plate is attached to the chamber plate via a hinge.
16. The apparatus of claim 13 with the at least one lift actuator also attached to the chamber plate.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1) In the drawings, the same element number indicates the same element in each of the views.
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
DETAILED DESCRIPTION OF THE DRAWINGS
(14) Processing a wafer within a chuck provides various advantages. However, initially moving a wafer into a chuck requires a small but not insignificant amount of time. On the other hand, the time interval between the end of the pre-wetting process, and the start of the plating process, is preferably minimized to prevent features on the wafer from de-wetting. The present apparatus and methods may provide the benefits of both processing a wafer within a chuck while also reliably achieving pre-wetting performance.
(15) As shown in
(16) Referring to
(17) Operation of the pivot actuator 102 pivots the platform assembly 28 from the open or chuck handoff position shown in
(18) In
(19) As best shown in
(20) The spring 32 around the shaft 34 pushes the cross plate 44 down and away from the chuck plate 44, which pulls the chuck fitting 36 down. The chuck 38 is securely held down onto the chuck plate 44 via operation of the actuators 60, as well as via the spring 32. To release the chuck 38 for chuck loading/unloading, the actuators 60 are reversed to lift the chuck 38 up off of the chuck plate 44, as shown in
(21) Referring momentarily to
(22) As shown in
(23)
(24) In one example of operation of the pre-wet apparatus 20, the robot 150 moves the chuck 38 carrying or enclosing the wafer into position above the chuck plate 52. The chuck fitting 36 is in the up position shown in
(25) Referring to
(26) The valve block 112 is controlled (via a tool or system electronic controller) to connect the chamber 50 to a vacuum source. Air in the chamber and in the features of the wafer is drawn out.
(27) The tank 80 is also connected to the vacuum source. Water is sprayed out of the nozzle 90. Dissolved gasses are drawn off and degasified water collects in the tank 80. The valve 66 opens allowing the chamber 50 to fill with degasified water. The water flows into the chamber 50 via gravity until the wafer 40 is covered. Gravity flow may be used because the tank 80 is above the chamber 50, and the pressure of the tank 80 and the chamber 50 is equalized via the equalization line 86 and operation of the valve block 112. Gravity flow decreases the turbulence of the water entering the chamber. The chamber 50 is then vented to ambient pressure and the water drained out of the chamber. The equalization line may be closed to maintain vacuum in the degasification tank 80.
(28) The lift actuators 110 are reversed pulling the chuck out of the chamber and back to the parallel position shown in
(29) Turbulent water flow in the chamber may result in droplets that splash onto the wafer surface before the bulk fluid wets the wafer surface. This can cause defects. Consequently, the water entering the vacuum pre-wet chamber preferably covers the wafer in a smooth quiescent manner via gravity flow and valve control. Dissolved oxygen in non-degassed or insufficiently degassed water can nucleate and cause air bubbles and splashing. The degassing tank 80 is used to effectively degas the water and avoid these drawbacks. The degassing tank is positioned vertically above the chamber 50 to allow for quiescent flow into the chamber 50. The degassing tank may operate continuously so that degassed water is continuously available.
(30) In some applications the spray nozzle 90 may be omitted with the water degasified via exposing the free surface area of the water to vacuum in the tank 80. However, spraying is generally more effective as it exposes the surface area of the individual droplets to vacuum before they enter the bulk fluid. The tank 80 may be evacuated to pressure different from the process chamber 50.
(31) The volume of the chamber 50 is minimized to e.g., 0.5 to 1.5 liters for a 300 mm diameter wafer, so that the time required to fill and drain the chamber are minimized. The wafer 50 is supported on a wafer seal 130 in the chuck. The back side of the wafer and the chuck are exposed to vacuum to avoid a pressure differential which could unduly stress and damage the wafer. A wafer equalization through hole in the chamber plate, above the maximum water level of the chamber 50, maintains equal pressure on both sides of the wafer. A wafer equalization line from the valve block 112 connects to the through hole.
(32) The chamber is inclined at a fixed angle AA in
(33) During a pre-wet process, the chamber 50 may be operated at room temperature and at a pressure just above the boiling point of water, generally about 12-50 torr. After the wafer is covered with water, the vacuum may be maintained for up to 30, 60 or 120 seconds, or longer, to dissolve trapped gasses into the deionized and degassified water. In some applications, depending on the feature materials and characteristics, vigorous boiling may be used to agitate water in the features of the wafer and displace air from the features.
(34) Pressure cycling may also be used, where with the wafer covered in water within the chamber 50, the pressure in the chamber is rapidly cycled. This may be performed by reducing the pressure to minimum, usually at a nominal pressure just sufficient to avoid boiling. Water is introduced into the chamber to entirely cover the wafer. The chamber is then rapidly vented to ambient pressure. The chamber is then rapidly returned to the vacuum conditions, and the chamber than again rapidly vented. This pressure cycling may be repeated 2, 3, 4 or 5 times. The water is then drained and the chuck removed from the apparatus 20.
(35) As used here, connected means functionally linked with, and not necessary adjoining and/or mechanically attached to. Relative to liquid holding or handling elements, connected means plumbed to, i.e., with a hose, line or tube directly or indirectly carrying liquid between elements. Horizontal means the line or plane formed by liquid in a vessel. Above and below have their conventional meanings as relative to the direction of gravity.
(36) Thus, novel methods and apparatus have been shown and described. Various changes and substitutions may of course be made without departing from the spirit and scope of the invention. The invention, therefore, should not be limited except by the following claims and their equivalents.