Machine tool
09707657 ยท 2017-07-18
Assignee
Inventors
Cpc classification
Y10T29/5128
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
Y02P70/10
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
B23Q39/044
PERFORMING OPERATIONS; TRANSPORTING
B23Q7/1405
PERFORMING OPERATIONS; TRANSPORTING
Y10T29/519
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
Y10T29/513
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
B23Q2039/006
PERFORMING OPERATIONS; TRANSPORTING
Y10T29/5129
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
B23Q39/046
PERFORMING OPERATIONS; TRANSPORTING
B23Q17/00
PERFORMING OPERATIONS; TRANSPORTING
Y10T29/5127
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
Y10T29/49998
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
B23P21/006
PERFORMING OPERATIONS; TRANSPORTING
Y10T29/5124
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
International classification
B23Q39/04
PERFORMING OPERATIONS; TRANSPORTING
B23Q7/16
PERFORMING OPERATIONS; TRANSPORTING
B23Q7/14
PERFORMING OPERATIONS; TRANSPORTING
B23Q11/00
PERFORMING OPERATIONS; TRANSPORTING
Abstract
The invention relates to a machine tool as well as to a method for operating the machine tool. The machine tool comprises a workpiece carrier (20) that can be incrementally rotated about an incremental advance axis (22) and has several carrier sides (25). A first workpiece chuck unit (26) for holding a workpiece in a first position (P1) and a second workpiece chuck unit (27) for holding a workpiece in a second position (P2) are arranged on each carrier side (25). In each angular position or incremental advance position of the workpiece carrier (20), one carrier side (25) is in a loading station (30), one carrier side (25) is in an unloading station 31, and the respectively other carrier sides (25) are in respectively one work station (32). A workpiece changing device (34) is provided, said device moving a partially machined workpiece (16a) out of the first position (P1) in the unloading station (31) into the second position (P2) in the loading station. The position change of the partially machined workpiece (16a) preferably also takes place during the incremental advance movement of the workpiece carrier (20). Preferably, the partially machined workpiece (16a) can be turned in doing so.
Claims
1. A machine tool (10), comprising: a workpiece carrier (20) that is supported so as to be rotatable about a vertical axis (22), wherein the workpiece carrier (20) can be incrementally rotated forward by an indexing drive (21) in steps by respectively one increment angle () between successive angular positions, the workpiece carrier (20) having a plurality of carrier sides (25), each of the plurality of carrier sides (25) having a respective first workpiece chuck unit (26) and a respective second workpiece chuck unit (27); a loading station (30) for insertion of a workpiece into a given one of the first workpiece chuck units (26) when the given one of the first workpiece chucks units (26) has been rotated forward into an angular position in the loading station (30); a workpiece changing device (34) that transfers the workpiece after partial processing thereof from the given one of the first workpiece chucks units (26), when the given one of the first workpiece chucks units (26) has been rotated forward into an angular position in an unloading station (31), and into one of the second workpiece chucks units (27), wherein the one of the second workpiece chucks units (27) is disposed on the carrier side (25) that is located in the next successive angular position in the loading station (30); the unloading station (31), for removing the workpiece from the one of the second workpiece chuck units (27) when all workpiece processing steps have been completed and the one of the second workpiece chucks units (27) is located in the angular position in the unloading station (31); a plurality of work stations (32) disposed between the loading station (30) and the unloading station (31), each of the plurality of work stations (32) being associated with at least one machining unit (40) and/or measuring unit and/or verification unit for processing the workpiece, wherein each of the at least one machining units (40) is arranged laterally and/or above the respective first workpiece chuck units (26) and the respective second workpiece chuck units (27) of the carrier sides (25) when the carrier sides (25) are located in the associated work stations (32) of each of the at least one machining units (40); and in transferring the workpiece after partial processing thereof from the given one of the first workpiece chucks units (26) and into the one of the second workpiece chucks units (27), the workpiece changing device (34) rotates or swivels the workpiece in such a manner that an uppermost face of the workpiece, when the workpiece is mounted within the given one of the first workpiece chuck units (26), is turned downward when the workpiece is received within the one of the second workpiece chucks units (27).
2. The machine tool (10) tool as in claim 1, wherein directions of normal vectors (N) extending from adjoining carrier sides (25) are inclined relative to each other by an angle that corresponds to the increment angle ().
3. The machine tool (10) tool as in claim 1, wherein each of the plurality of work stations (32) comprises a maximum of four receptacle sites for respectively one machining unit (40) and/or measuring unit and/or verification unit.
4. The machine tool (10) tool as in claim 1, wherein the workpiece changing device (34) is disposed to remove the workpiece after partial processing thereof from the given one of first workpiece chuck units (26) when the given one of the first workpiece chucks units (26) has been rotated forward into the angular position in the unloading station (31), while a second finished, machined workpiece is removed from the second workpiece chuck unit (27), which is disposed on the same carrier side as the given one of the first workpiece chucks units (26).
5. The machine tool (10) tool as in claim 1, wherein the workpiece changing device (34) is disposed to insert the workpiece after partial processing thereof during the preceding dwell phase of the workpiece carrier (20), into the one of the second workpiece chuck units (27) located in the loading station (30), while a second workpiece is inserted in the first workpiece chuck unit (26), which is disposed on the same carrier side as the one of the second workpiece chucks units (27).
6. The machine tool (10) tool as in claim 1, wherein the workpiece changing device (34) comprises a swivel gripper (33a) having at least one gripper hand (35), which can be swiveled about a swivel axis (36) that extends between the unloading station (31) and the loading station (30).
7. The machine tool (10) tool as in claim 1, wherein the machine tool (10) further comprises a machine frame (11) having a head plate (12) and a base plate (13), and the workpiece carrier (20) is arranged between the head plate (12) and the base plate (13) so as to be rotatable on the machine frame (11).
8. The machine tool (10) tool as in claim 7, wherein the head plate (12) and the base plate (13) are connected to each other via connecting elements (14) that are disposed radially outward with respect to the vertical axis (22).
9. The machine tool (10) tool as in claim 7, wherein receptacle spaces for respectively receiving the at least one machining unit (40) and/or measuring unit and/or verification unit of a given work station (32) are arranged on the head plate (12) and/or on one or more connecting elements (14).
10. The machine tool (10) tool as in claim 7, wherein the base plate (13) is free of receptacle spaces for receiving respective machining units (40) and/or measuring units and/or verification units.
11. The machine tool (10) tool as in claim 7, wherein a discharge duct (41) for shavings and/or coolant is provided in and/or on the base plate (13).
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1) Advantageous embodiments of the machine tool and of the method for operating the machine tool can be inferred from the dependent claims, the description and the drawings. Hereinafter, preferred exemplary embodiments of the machine tool and the method will be explained in detail with reference to the appended drawings. They show in
(2)
(3)
(4)
(5)
(6)
(7)
DETAILED DESCRIPTION OF THE PARTICULAR EMBODIMENTS
(8)
(9) The machine tool 10 comprises a workpiece carrier 20 that is shown schematically by itself in
(10) The workpiece carrier 20 comprises several carrier sides 25. In accordance with the example, the number of carrier sides 25 corresponds to the number of possible angular positions of the workpiece carrier. Considering the exemplary embodiment shown here, the workpiece carrier 20 has eight carrier sides 25. However, there may also be fewer or more carrier sides 25, for example, between five and twelve carrier sides. This depends on the size of the machine tool and the complexity or number of process steps required for machining and/or measuring or verification, and/or for the measuring units and/or verification units of the workpieces 16.
(11) A first workpiece chuck unit 26, as well as a second workpiece chuck unit 27, are arranged on each carrier side 25. The two workpiece chuck units 26, 27 are preferably arranged horizontally next to each other and are identical in the exemplary embodiment described here. In accordance with the example, each workpiece chuck unit 26, 27 has at least two clamping jaws 28, which can be moved relative toward each other and between which a workpiece 16 can be clamped or held in place. The manner in which the workpiece 16 is held by a workpiece chuck unit 26, 27, but can be varied in many ways. For example, if the workpieces are at least partially cylindrical it is possible to use a clamping chuck.
(12) The first workpiece chuck unit 26 holds a workpiece in a first position P1, and the second workpiece chuck unit 27 holds a workpiece 16 in a second position P2 which, in the preferred exemplary embodiment, is located after the first position P1 in the direction of rotation of the workpiece carrier 20. Alternatively, it is also possible to provide another relative location of the two positions P1, P2 relative to the common carrier side 25.
(13) The machine tool 10 comprises several stations corresponding to the number of carrier sides 25 or angular positions. A loading station 30, an unloading station 31 and several work stations 32 are located in the direction of rotation of the workpiece carrier 20 between the loading station 30 and the unloading station 31. Preferably, the unloading station 31 is arrangedin the direction of rotation of the workpiece carrier 20directly ahead of the loading station 30, so that the workpiece chuck units 26, 27 that are in one angular position in the unloading station 31 will be located in the loading station 30 after the next rotation of the workpiece carrier 20 by the increment angle . In the preferred exemplary embodiment described here, there are six work stations 32.
(14) As illustrated by
(15) In the unloading station 31, a completely finished workpiece 16b is removed from one of the two workpiece chuck units 26, 27 and in accordance with the example, from the second workpiece chuck unit 27; this may also be accomplished with the use of a gripper unit 33.
(16) In the exemplary embodiment as in
(17) Furthermore, the gripper hands 35 can be swiveled about the swivel axis 36 so that each gripper hand 35 can be moved between the unloading station 31 and the loading station 30. The swivel axis 36 extendsaccording to the example, centrally betweenbetween the unloading station 31 and the loading station 30. Preferably, the swivel axis 36 extends at a right angle to the incremental advance axis 22. In the exemplary embodiment, the swivel axis 36 intersects the incremental advance axis 22.
(18) At least one machining unit 40 and/or measuring unit and/or verification unit is provided in each work station 32. In accordance with the example, each work station 32 can be equipped with up to four such units, for example, machining units 40. Consequently each workpiece chuck unit 26, 27 in a work station 32 can be associated with one or two units for machining and/or verification and/or measurement of the respectively mounted workpiece 16. In the exemplary embodiments illustrated here, only the machining units 40 are shown, in which caseat each locationit is possible that, at least in part, there may also be a measuring unit or a verification unit. Hereinafter, only the machining units 40 are mentioned as examples.
(19) The machining units 40 are arranged either in the head plate 12 of the machine frame 11 or farther outside viewed in radial direction toward the incremental advance axis 22, laterally to the respectively associate workpiece chuck unit 26, 27. For example, the machining units 40 may also be arranged in or on one or several connecting elements 14. The machining units 40 are thus locatedviewed in vertical directionabove or laterally next to an associate workpiece chuck unit 26, 27. No machining units 40 are provided below the workpiece chuck units 26, 27. The base plate 13 of the machine frame 11 is thus free of machining units 40. As a result of this the removal of shavings falling onto the base plate 13 during cutting operations on the workpieces 16 in the work stations 32 can be optimized. Each of
(20) Each of the machining units 40 is disposed for machining a respectively allocated workpiece 16. To accomplish this, the machining units comprise one machining tool 43 each. A machining tool 43 may be a drilling tool, a milling tool, a grinding tool or another desired machining tool, in particular for the cutting-type machining of the workpiece 16. For machining the workpiece 16, the machining units 40 or the machining tool 43 can be moved toward the workpiece 16 and away from said workpiece. To accomplish this, the machining units 40 that are arranged on the head plate 12 above the workpiece chuck units 26, 27 can be moved along a first supply axis 44 that is preferably parallel to the incremental advance axis 22. Alternatively, for optimizing the design space, it is also possible to incline the first supply axis 44 relative to a vertical axis so that the machining units 40 arranged at a work station 32 on the head plate 12 may be arranged more closely next to each other (
(21) If necessary, the machining units 40 can also be moved in one plane that extends at a right angle to the respective supply axis 44, 45. Verification or measuring units comprise, instead of the machining tool 43, a verification or measuring tool, however, they may be appropriately deliverable and movable.
(22) Viewed in the direction of the incremental advance axis 22, the workpiece carrier 20 is arranged between the head plate 12 and the base plate 13. Consequently, in a work station 32, the work area 15 of this work station is delimited by the carrier side 25, the head plate 12, the base plate 13 and, optionally, by at least one connecting element 14.
(23) The machine tool 10 operated as hereinabove is equipped to perform the following method. To accomplish this, an appropriate, not illustrated, machine control unit may be provided.
(24) During the startup of the machine tool 10, all workpiece chuck units 26, 27 are initially not loaded. At the start, a workpiece blank 16c is set in a starting position into the first tool chuck unit 26 in the loading station 30. In this starting state, the workpiece blank 16c has not been machined yet by this machine tool 10. The workpiece carrier 20 is sequentially incrementally rotated about the incremental advance axis 22. In accordance with the example, after the workpiece carrier 20 has performed seven incremental movements, a partially machined workpiece 16a is positioned in the first workpiece chuck unit 26 in the unloading station 31. The second workpiece chuck units 27 are still empty.
(25) With the help of the workpiece changing device 34 configured as a swivel gripper 33a in the exemplary embodiment as in
(26) The partially machined workpieces 16a are moved from the first position P1 on one carrier side 25 into the second position on the same carrier side 25 by means of the workpiece changing device 34.
(27) Step by step the respectively second workpiece chuck units 27 are loaded with a partially machined workpiece 16a in the loading station 30. After the startup phase of the machine tool 10, one workpiece is present in respectively each workpiece chuck unit 26, 27 in the work stations 32.
(28) After the completion of this startup phase a finished machined workpiece 16b as well as a partially machined workpiece 16a are removed during each dwell phase of the workpiece carrier 20 in the unloading station 31, and a workpiece blank 16c as well as a partially machined workpiece 16a are supplied to the loading station 30. The swivel gripper 33a having the two gripper hands 35 and acting as the workpiece changing device 34 is swiveled during the incremental advance movement of the workpiece carrier 20 about its swivel axis 36, so that a partially machined workpiece 16a is removed from a first workpiece chuck device 26 and inserted in a second workpiece chuck device 27 during each dwell phase, and that thus the position change of the partially machined workpiece 16a can be performed.
(29) In the exemplary embodiment of the machine tool 10 shown here, all receptacle spaces for arranging a machining unit 40 and/or measuring unit and/or verification unit in each work station 32 are occupied. In modification thereof, these receptacle spaces may be occupied only partially by a respective unit. The arrangement and the number of units depends on how and in what sequence a workpiece 16 is machined, tested or measured.
(30) Each tool 16 thus moves twice through each work station 32. During the first pass, the workpiece 16 is in the first position P1 in a first workpiece chuck unit 26 and during the subsequent second pass it is in the second position P2 in a workpiece chuck unit 27. Consequently, in accordance with the example, each workpiece 16 can be machined, tested and/or measured in up to twelve successive work steps in the work stations 32. The number of maximum work steps corresponds to twice the number of existing work stations 32. As a result of the fact that the partially machined workpiece 16a is turned after its first pass and before its second pass, it is possible to machine the upper side 50, as well as the underside 51, by the machining units 40 arranged in the head plate 12, or to have them measured by a measuring unit or checked by a verification unit. The arrangement of machining units and/or measuring units and/or verification units in the base plate is thus not intended.
(31) With the use of this method or of this machine tool, it is possible to machine and/or measure and/or check T-fittings 55 with three pipe sections 56 oriented at right angles relative to each other from three sides, for example (
(32)
(33) During the subsequent incremental advance movement, the carrier 57 that is currently in the unloading station 31 is rotated by 180 about its rotational axis 59 into its respectively other rotational position. The partially machined workpiece 16a that has so far been in the first position P1 is moved into the second position 22. During this position change, the partially machined workpiece 16a is turned so that its until now downward facing underside 51 now faces upward, and vice versa.
(34) The method for machining the workpieces 16 or the T-fittings 55 corresponds to the method as has been explained in conjunction with
(35) The invention relates to a machine tool 10 as well as to a method for operating the machine tool 10 or for machining workpieces 16. The machine tool 10 comprises a workpiece carrier 20 that can be incrementally rotated about an incremental advance axis 22 and has several carrier sides 25. A first workpiece chuck unit 26 and a second workpiece chuck unit 27 are arranged on each carrier side 25. The first workpiece chuck unit 26 holds the workpiece in a first position P1, and the other workpiece chuck unit 27 holds it in a second position P2 on the carrier side 25. In each angular position or incremental advance position of the workpiece carrier 20, one carrier side 25 is in a loading station 30, one carrier side 25 is in an unloading station 31, and the respectively other carrier sides 25 are in respectively one work station 32. A workpiece changing device 34 is provided, said device moving a partially machined workpiece 16a out of the first position P1 located in the unloading station 31 and into a second position P2. This position change is completed at the latest while the carrier side 25, after one incremental advance movement from the unloading station 31 into the subsequent loading station 30. Preferably, the partially machined workpiece 16a is turned during the position change or during the transport from the unloading station 31 to the loading station 30.
LIST OF REFERENCE SIGNS
(36) 10 WerkzeMachine tool 11 Machine frame 12 Head plate 13 Base plate 14 Connecting element 15 Work area 16 Workpiece 20 Workpiece carrier 21 Indexing drive 22 Incremental advance axis 25 Carrier side 26 First workpiece chuck unit 27 Second workpiece chuck unit 28 Clamping jaw 30 Loading station 31 Unloading station 32 Work station 33 Gripper unit 33a Swivel gripper 34 Workpiece changing device 35 Gripper hand 36 Swivel axis 40 Machining unit 41 Discharge duct 43 Opening Machining tool 44 First supply axis 45 Second supply axis 50 Upper side 51 Underside 55 T-Fitting 56 Pipe section 57 Carrier 58 Rotary drive 59 Rotational axis Increment angle N Direction of the normal P1 First position P2 Second position