Thermally pre-insulated pipe clamp

09702499 ยท 2017-07-11

    Inventors

    Cpc classification

    International classification

    Abstract

    A unitary, pre-insulated pipe clamp/hanger has a conventional C-channel section clamp/hanger-receiving body portion 1 with a pipe receiving mouth 2, a fastening nail receiving mounting portion 3 integrally formed along the exterior of one wall with the nail penetration direction extending in an opposite direction to a pipe insertion/receiving direction of the mouth, A lining strip of thermally insulating, closed cell, polyethylene foam 4 is adhered to line the entire interior of the channel with respective foam end portions 5,5 thereof protruding from the channel across the pipe-receiving mouth. One end portion 5 is longer than the other end portion 5, forming a mouth closing, flap. The resulting assembly has an R-value of at least 5. The adhesion can be by double-sided adhesive tape attached between the clamp channel portion and the foam. respectively.

    Claims

    1. A unitary, thermally pre-insulated pipe clamp/hanger assembly for a pipe carrying heating or cooling fluid in a building comprising: a supporting body having a mounting portion for attachment to the building and a C-section channel portion for receiving a pipe portion therein through a mouth thereof and, an elongate lining strip of resiliently compressible, thermally insulating foam adhered in covering relation to an inner surface of the channel portion, the foam strip having opposite longitudinal end portions adjacent respective opposite sides of the mouth of the channel portion with at least one end portion protruding across the mouth of the channel towards an opposite end portion, thereby forming a foam flap movable between positions opening the mouth to permit receipt of the pipe portion in the channel portion and closing the mouth with the pipe portion received in the channel portion and the foam strip being for completely encircling the pipe portion in thermally insulating contact with an entire surface thereof.

    2. An assembly according to claim 1 wherein the foam flap is movable away from the mouth of the channel portion by engagement with the pipe portion.

    3. An assembly according to claim 2 wherein the channel portion comprises a first wall and a second wall, upstanding in spaced apart relation on opposite sides of a base of the channel portion, respectively, the first wall adjoins the mounting portion and is higher than the second wall and, said foam flap extends from an upper free end of the second wall and is longer than the opposite end portion of the foam strip which is located on an upper free end of the first channel wall, such that the foam flap protrudes beyond the shorter wall and across at least a majority of the width of the channel mouth forming a hook-shape, which overlaps the opposite end portion of the foam strip.

    4. An assembly according to claim 1 wherein the end portions of the foam strip progressively increase in thickness toward towards their respective tips, which tips have complementary profiles such that the tip of the shorter end portion fits against the overlapping inside surface of the tip of the foam flap.

    5. An assembly according to claim 1 wherein the thermally insulating foam is adhered to the inner surface of the channel portion by a double sided adhesive tape having respective opposite sides adhering to the inside of the inner surface of the supporting body and the foam lining, respectively.

    6. An assembly according to claim 4 having an R value of at least 5.

    7. A thermally pre-insulated pipe clamp/hanger assembly for a pipe carrying heating or cooling fluid in a building comprising: a supporting body having a mounting portion for attachment to a building and a receptacle portion with a mouth for admitting a portion of a pipe carrying heating or cooling fluid into the receptacle portion, and an elongate lining strip of resiliently compressible, thermally insulating foam adhered in covering relation to an inner surface of the receptacle portion and having a longitudinal end portion forming a foam flap covering the mouth so that, when the pipe portion is in the receptacle portion, the foam strip can completely encircle the pipe portion in thermally insulating contact with an entire surface thereof.

    8. An assembly according to claim 7 having an R value of at least 5.

    9. An assembly according to claim 7 wherein the thermally insulating foam is adhered to the inner surface of the receptacle portion by double sided adhesive tape having respective opposite sides adhering to the inner surface of the receptacle and to the foam lining strip, respectively.

    10. An assembly according to claim 8 wherein the thermally insulating foam is adhered to the inner surface of the receptacle portion by double sided adhesive tape having respective opposite sides adhering to the inner surface of the receptacle portion and to the foam lining strip, respectively.

    11. An assembly according to claim 7 wherein the longitudinal end portion of the foam strip progressively increases in thickness towards a tip, increasing the thermal insulation by the foam strip over the mouth.

    12. An assembly of a thermally pre-insulated pipe clamp/hanger and a pipe carrying heating or cooling fluid in a building, the pipe clamp/hanger comprising: a supporting body having a mounting portion of attachment to the building and a receptacle portion with a mouth for admitting a portion of the pipe carrying heating or cooling fluid into the receptacle portion, an elongate lining strip of resiliently compressible, thermally insulating foam adhered in covering relation to an inner surface of the receptacle portion and having a longitudinal end portion forming a foam flap covering the mouth; and, a portion of the pipe admitted into the receptacle portion with the foam strip completely encircling the pipe portion in thermally insulating contact with an entire surface thereof.

    Description

    BRIEF DESCRIPTION OF THE DRAWINGS

    (1) Embodiments of the invention will now be described with reference to the accompanying drawings in which:

    (2) FIGS. 1A, 1B; 1C, 1D; 1E and 1F are diagrammatic end and side views respectively, of a typical polyethylene pipe/tubing (PEX); foam insulation; and a conventional pipe hanger/clamp body;

    (3) FIGS. 2A and 2B are diagrammatic side views of a pre-insulated unitary pipe hanger/clamp of the invention before and after insertion of the pipe therein;

    (4) FIG. 3 is a perspective view of a foam covered mouth of the pre-insulated pipe clamp/hanger;

    (5) FIG. 4 is a schematic perspective view of the pre-insulated pipe clamp/hanger prior to receipt of the pipe and illustrating the relative dispositions of the end portions of the foam insulation lining;

    (6) FIG. 5 is a perspective view showing an initial stage in the insertion assembly of a pipe into the pre-insulated pipe clamp/hanger in which the end of the foam flap has been pushed/raised away from the mouth by the pipe registration;

    (7) FIG. 6 is a perspective view showing a subsequent stage in which the foam flap is hooked over the pipe, aiding alignment of the pipe for complete insertion through the mouth and into the pre-insulated body by relative vertical movement of the pipe and clamp;

    (8) FIG. 7 is a perspective view showing the pipe fully inserted and the upper, longer foam end portion being retained in firm engagement around the upper side of the pipe by an installer's finger prior to permanent firm retention by engagement with the underside of a floor joist by hammering the nail into the joist;

    (9) FIG. 8 is a perspective view of a PEX pipe with foam insulation on respective end portions and a pre-insulated pipe clamp/hanger of the invention clamped to a central, otherwise uninsulated, portion of the pipe, located snugly between the pipe insulation;

    (10) FIG. 9 is a perspective view showing an uninsulated, conventional hanger/clamp body clamped to a central uninsulated portion of otherwise foam insulated PEX revealing the uninsulated region subject to unwanted heat transfer; and,

    (11) FIGS. 10A-10E and 11A-11C, respectively, are various views of components of another embodiment before and after pipe insertion.

    PARTICULAR DESCRIPTION

    (12) As shown particularly in FIGS. 2A-2B, and 3-7, a unitary, pre-insulated pipe clamp/hanger according to a first embodiment of the invention comprises a conventional C-channel section PEX clamp/hanger body portion 1 with a pipe receiving mouth 2, a fastening nail receiving mounting portion 3 integrally formed along the exterior of one (longer) wall/arm of the channel section with the nail penetration direction extending in an opposite direction to a pipe insertion/receiving direction of the mouth, A lining strip of thermally insulating, closed cell, polyethylene foam 4 is secured by adhesive (not shown) to directly line the entire interior of the channel with respective foam end portions 5,5 thereof protruding from the channel part way towards each other across the pipe-receiving mouth. One of the end portions 5 is much longer than the other end portion 5, forming a resilient, mouth closing, flap. The resulting assembly has an R-value of at least 5.

    (13) The insulating foam 4 is installed in the body by an uncompressed method which will then will permit a PEX tubing 6 to be inserted/received manually.

    (14) In the embodiment of FIGS. 10 and 11, the clip body 11 is cavitied for maximum strength with minimum material. A lining strip 18 of double-sided adhesive tape adheres to the interior surface of the channel, covering it completely. The foam insulation protrudes a short distance from each side as shown at 4 in FIG. 10E to completely fill the gap in the pipe insulation where the clamp is secured to ensure continuous insulation.

    (15) The foam is formed as an extrusion in which the free end portions 15,15 progressively increase in thickness towards their tips and have complementary curved profiled surface portions 17,17, such that the free end of the shorter end portion fits against the overlapping inside surface of the flap-form end portion of the foam lining, with the curved profiles of the free ends increasing the area of contact and therefore the thermal sealing,

    (16) The end portions are closed together in abutment both before and after pipe insertion.

    (17) Insertion of the pipe into the clamp occurs in two steps; the longer foam end portion, and the pipe are aligned as shown in FIG. 5 and then moved laterally (horizontally), so that the pipe pushes up the foam end portion, (also lifted, if needed, by the installer's finger), and passes through the gap between the two foam end portions into engagement with the longer end portion, which provides a hooking and guiding action aiding alignment of the pipe vertically above the mouth with the tip of the end portion extending over the pipe, as shown in FIG. 6. The pipe is then received fully into the clamp/clip channel through the mouth by relative (vertical) movement of the clamp and pipe together. As shown in FIG. 6, the installer uses his finger to press and retain the upper, longer, end portion of foam in firm engagement around the upper surface of the pipe, strap fashion until the assembly is raised into engagement with the underside of a floor joist support which engages the foam end portion keeping it in place and the nail is driven into the joist to complete the insulating encirclement of the pipe by the foam.

    (18) The clamps can be manufactured in many sizes to accommodate the construction industry and the color, curves and edges on clamp will be designed to be to be unique.

    (19) The foam insulation does not compact with age, but expands and contracts with changes in ambient temperature, maintaining the pipes completely covered, avoiding dripping from condensation on coolant carrying pipes.

    (20) In the region where the foam surrounds the pipe at the mouth, the foam self-seals thermally because the ends of the foam, corresponding to the edges of a slit foam tube, are subsequently shaped/angled to provide flat abutting surfaces, when the pipe is fully inserted.