Raw material supply apparatus, raw material supply method and flash smelting furnace
09689610 ยท 2017-06-27
Assignee
Inventors
Cpc classification
F27D19/00
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F27B3/18
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F27D2019/0075
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F27D7/02
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F27D3/0025
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F27D3/18
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F27D2019/0028
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F27D7/04
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F27B3/28
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F27D3/16
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
International classification
F27D3/00
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F27D19/00
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F27B3/28
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F27D3/16
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F27B3/18
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F27D7/02
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F27D3/18
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Abstract
A raw material supply apparatus that supplies a raw material into a flash smelting furnace and supplies a first gas contributing to a reaction of the raw material into the flash smelting furnace, includes: a raw material passage that is provided out of a lance through which the first gas passes, the raw material passing through the raw material passage; and an adjuster that adjusts a distribution of the raw material by blowing a second gas to the raw material passing through the raw material passage.
Claims
1. A raw material supply apparatus that supplies a raw material into a flash smelting furnace and supplies a first gas contributing to a reaction of the raw material into the flash smelting furnace, comprising: a raw material passage that is provided out of a lance through which the first gas passes, the raw material passing through the raw material passage; an adjuster that adjusts a distribution of the raw material by blowing a second gas to the raw material passing through the raw material passage, wherein the adjuster has a plurality of pipe lines that blow the second gas to the raw material; a measuring device that measures the distribution of the raw material; and a controller that controls an amount of the second gas blown from each of the plurality of pipe lines to the raw material based on a measurement result of the measuring device.
2. The raw material supply apparatus as claimed in claim 1 further comprising a supply portion that supplies the raw material to the raw material passage from two directions.
3. A flash smelting furnace comprising a raw material supply apparatus that supplies a raw material into the flash smelting furnace and supplies a first gas contributing to a reaction of the raw material into the flash smelting furnace, comprising: a raw material passage that is provided out of a lance through which the first gas passes, the raw material passing through the raw material passage; an adjuster that adjusts a distribution of the raw material by blowing a second gas to the raw material passing through the raw material passage, wherein the adjuster has a plurality of pipe lines that blow the second gas to the raw material; a measuring device that measures the distribution of the raw material; and a controller that controls an amount of the second gas blown from each of the plurality of pipe lines to the raw material based on a measurement result of the measuring device.
Description
BRIEF DESCRIPTION OF DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
DESCRIPTION OF EMBODIMENTS
(12) However, there may be a case where the raw material supplied to the flash smelting furnace has a block shape and particles are not distributed. Even if the raw material is supplied from three directions as in the case of Document 1, equalization of the raw material may be insufficient. When the equalization of the raw material is insufficient, reaction between the raw material and oxygen may be insufficient. Therefore, variability may occur in a reaction product. When a separation wall or a collision plate is provided in a supply passage of raw material as in the case of Document 2, the raw material (for example, copper wire scrap) may get stopped by the separation wall or the collision plate, and flow of the raw material may be prevented. Thereby, the equalization of the raw material may be insufficient.
(13) A description will be given of a flash smelting furnace in accordance with an embodiment with reference to
(14) As illustrated in
(15)
(16) The supply portion 10 of the raw material supply apparatus 1 has a lance 16. The lance 16 has a first passage 11 in which the diffusion gas acting as first gas passes and a fourth passage 14 in which the auxiliary gas for reaction passes. The supply portion 10 has a second passage 12 acting as a raw material passage provided on an outer circumference of the lance 16 and a third passage 13 acting as a passage of the reaction gas provided on an outer circumference of the second passage 12. The second passage 12 and the third passage 13 are separated from each other by a separation wall 21 having a cylinder shape.
(17) The first passage 11 supplies the diffusion gas into the reaction shaft 3. The second passage 12 supplies the concentrate into the reaction shaft 3. The third passage 13 supplies the main blast gas for reaction into the reaction shaft 3 from an air chamber 17. The fourth passage 14 supplied the auxiliary gas for reaction into the reaction shaft 3.
(18) A diffusion cone 15 having a hollow circular truncated cone shape is formed on an edge portion (a lower edge) of the lance 16. A plurality of supplying holes 152 to eject the diffusion gas passing through the first passage 11 into the reaction shaft 3 are formed in a lower portion 151 of a side face of the diffusion cone 15.
(19) A structure 30 to equalize raw material acting as an adjuster is provided on the upper side with respect to the air chamber 17 of the separation wall 21. The structure 30 to equalize raw material is a structure for equalizing distribution of the concentrate passing through the second passage 12, and has a rectifying nozzle 32, a plurality of valves 34 to adjust gas flow amount, a gas supply apparatus 36, a non-contact measuring device 38 (a powder flow meter or a particle size distribution meter using a micro wave or a laser), and a control device 40 acting as a controller.
(20) The rectifying nozzle 32 has a circular ring shape as a whole as illustrated in
(21) The valve 34 to adjust gas flow amount is a valve for adjusting an amount of gas for equalizing raw material that acts as second gas supplied to the gas pipe 44 from the gas supply apparatus 36 and is controlled by the control device 40.
(22) The gas supply apparatus 36 is an apparatus to supply gas for equalizing raw material such as oxygen enriched gas into the second passage 12. The gas for equalizing raw material may be a part of the reaction gas. The gas for equalizing raw material may be compressed gas, compressed nitrogen, or the like. The gas for equalizing raw material supplied from the gas supply apparatus 36 passes through the gas pipe 44 and is blown from the lower edge portion (blowing opening 42b) of the pipe line 42a. A blowing angle of the gas for equalizing raw material illustrated in
(23) As illustrated in
(24) The number of the non-contact measuring device 38 (a powder flow meter or a particle size distribution meter using a micro wave or a laser) is two or more. The non-contact measuring devices 38 are arranged at an interval along an inner face of the separation wall 21. The non-contact measuring device 38 sequentially measures a flow amount and distribution of the concentrate passing through the second passage 12.
(25) The control device 40 adjusts an opening degree of the valve 34 to adjust gas flow amount based on the measurement result of the non-contact measuring device 38, and adjusts an amount of gas for equalizing raw material blown from each pipe line 42a so that the distribution of the concentrate in the second passage 12 is equalized.
(26) In the embodiment, as illustrated in
(27)
(28)
(29) As mentioned above in detail, in the embodiment, the raw material supply apparatus 1 has the second passage 12, through which the concentrate (raw material) passes, that is provided out of the lance 16 through which the reaction gas passes, and the structure 30 to equalize raw material that blows the gas for equalizing raw material to the concentrate passing through the second passage 12 and adjusts the distribution of the concentrate. It is therefore possible to equalize the distribution of the concentrate passing through the second passage 12. The particles of the concentrate can be distributed by the aeration function of the gas for equalizing raw material. And, the density of the particles is low (without blocks). In view of these points, the distribution of the concentrate can be equalized. Further, in the embodiment, a separation wall or a collision plate is not provided in the second passage 12 acting as the raw material passage. Therefore, the prevention of the raw material flow can be suppressed. In view of this point, the raw material can be equalized.
(30) In the embodiment, the structure 30 to equalize raw material has a plurality of the pipe lines 42a that blow the gas for equalizing raw material to the concentrate. And, the control device 40 controls each amount of the gas for equalizing raw material blown to the concentrate from each of the pipe lines based on the measurement result of the non-contact measuring device 38 to measure the distribution of the concentrate. Thus, the amount of the gas for equalizing raw material can be adequately adjusted so that the concentrate is equalized based on actual distribution of the concentrate. Therefore, the concentrate can be equalized with high accuracy. In this case, the divided blocks 42 are used. And, each amount of the gas blown from the pipe lines 42a is individually and finely adjusted. Therefore, the distribution of the concentrate can be equalized with high accuracy.
(31) In the embodiment, the divided blocks 42 having the pipe line 42a is exchangeable with respect to the cut portion 21a provided in the separation wall 21. It is therefore possible to easily adjust the blowing angle of the gas for equalizing raw material by exchanging the divided block 42.
(32) In the embodiment, the supply portion 50 supplies the concentrate (raw material) to the second passage 12 from two directions. Therefore, for example, ease of maintenance is improved and freedom degree of device designing is improved, compared to the case where the concentrate is supplied from three direction or four directions. Even if the raw material is supplied from two directions, the structure 30 to equalize raw material is provided in the embodiment. Therefore, the distribution of the concentrate can be equalized. However, the number of the direction is not limited to two. The supply portion 50 may supply the concentrate to the second passage 12 from three or more directions.
(33) In the embodiment, the flash smelting furnace 100 has the raw material supply apparatus 1 that is capable of supplying the concentrate evenly. Therefore, the reaction between the concentrate and the oxygen (solid-gas reaction) is performed evenly and speedily. And, variability in the reaction product can be suppressed. Thus, degradation of metal loss to the slag caused by partial generation of peroxide slag can be suppressed.
(34) In the embodiment, as illustrated in
(35) The control device 40 equalizes the distribution of the concentrate in the second passage 12 by adjusting the opening degree of the valve 34 to adjust gas flow amount and the angles of the feather members 62 and 82 of the movable dampers 60 and 80 based on the measurement result of the non-contact measuring device 38, in the structure of
(36) One of the movable dampers 60 and 80 may be omitted. Alternately, the number of the movable dampers 60 and 80 may be increased.
(37) In the embodiment, the non-contact measuring device 38 may be provided near each pipe line 42a, according to each pipe line 42a. Thus, the adequate gas amount blown from each pipe line 42a can be controlled with high accuracy.
(38) In the embodiment, the description is given of the case where the control device 40 controls the valve 34 to adjust gas flow amount based on the measurement result of the non-contact measuring device 38. However, the structure is not limited. For example, the control device 40 may monitor the exhausting thermal amount of the coolant water of the water jacket of the reaction shaft 3 and control the valve 34 to adjust gas flow amount according to each blowing opening formed in the rectifying nozzle so that the transition of
(39) In the embodiment, the description is given of the case where the divided blocks 42 of the rectifying nozzle 32 have the structure illustrated in
(40) At least one of the movable damper 60 and the movable damper 80 of
(41) In the embodiment, the description is given of the case where the structure 30 to equalize raw material is provided in a raw material supply apparatus (concentrate burner) of a flash smelting furnace. However, the structure is not limited. The structure to equalize raw material may be applied to another reaction furnace.
(42) The present invention is not limited to the specifically disclosed embodiments and variations but may include other embodiments and variations without departing from the scope of the present invention.