Abstract
According to one embodiment, a power converter includes an inverter and a controller. The inverter operates in an interconnected operation mode in which a grid is connected to an electric load and an isolated operation mode in which the inverter is connected to the electric load, for generating power from a local power supply. The controller detects a frequency difference and a phase difference between an inverter output from the inverter and grid power. The controller calculates, based on the frequency difference and the phase difference, an output frequency pattern to be used for synchronizing the inverter output with the grid power. The controller controls, when switching from the isolated operation mode to the interconnected operation mode, a frequency of the inverter output based on the output frequency pattern.
Claims
1. A power converter comprising: an inverter, configured to operate in an interconnected operation mode in which a grid is connected to an electric load and an isolated operation mode in which the inverter is connected to the electric load, for generating power from a local power supply; and a controller, wherein the controller detects a frequency difference and a phase difference between an inverter output from the inverter and grid power, calculates, based on the frequency difference and the phase difference, an output frequency pattern to be used for synchronizing the inverter output with the grid power, and controls, when switching from the isolated operation mode to the interconnected operation mode, a frequency of the inverter output based on the output frequency pattern.
2. The power converter according to claim 1, wherein the controller calculates the output frequency pattern so that a change in the frequency of the inverter output is within a range of a withstand capacity of the electric load.
3. The power converter according to claim 1, wherein the output frequency pattern includes a first pattern in which the phase of the inverter output is synchronized with the phase of the grid power without a circulation delay and a second pattern in which the phase of the inverter output is synchronized with the phase of the grid power with a circulation delay, and the controller calculates one of the first pattern and the second pattern having shorter synchronization period.
4. The power converter according to claim 1, wherein the controller detects an effective value of a voltage of each of the inverter output and the grid power, and controls, when the switching from the isolated operation mode to the interconnected operation mode, a voltage of the inverter output so that the effective value of the voltage of the inverter output follows the effective value of the voltage of the grid power.
5. The power converter according to claim 1, wherein the controller controls the frequency of the inverter output at a default frequency change rate.
6. The power converter according to claim 4, wherein the controller controls the effective value of the voltage of the inverter output at a default voltage change rate.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0006]
[0007]
[0008]
[0009]
[0010]
[0011]
[0012]
[0013]
[0014]
[0015]
[0016]
[0017]
[0018]
DETAILED DESCRIPTION
[0019] In general, according to one embodiment, a power converter includes an inverter and a controller. The inverter operates in an interconnected operation mode in which a grid is connected to an electric load and an isolated operation mode in which the inverter is connected to the electric load, for generating power from a local power supply. The controller detects a frequency difference and a phase difference between an inverter output from the inverter and grid power. The controller calculates, based on the frequency difference and the phase difference, an output frequency pattern to be used for synchronizing the inverter output with the grid power. The controller controls, when switching from the isolated operation mode to the interconnected operation mode, a frequency of the inverter output based on the output frequency pattern.
[0020] Hereinafter, a power converter according to an embodiment will be described in detail with reference to the accompanying drawings.
[0021] <Configuration>
[0022]
[0023] The power converter is provided between a power grid 4 and the electric load 5. The electric load 5 can also receive power from the power grid 4. The power grid 4 has a switchgear 8. When a failure occurs in the power grid 4, the switchgear 8 is opened, whereby the power grid 4 is disconnected from the electric load 5.
[0024] The electric load 5 is a device operated by electric power. The electric load 5 is, for example, various electronic devices, lighting devices installed in facilities, elevators, air conditioning equipment, etc. That is, in various consumers such as general households, commercial facilities, industrial facilities, public facilities, or medical facilities, a device to which electric power is supplied via a plug can be assumed as a load 5.
[0025] The power converter 1 includes a main circuit 2, a controller 3, and a switchgear 9.
[0026] The main circuit 2 includes a distributed power supply 7, an inverter 6, a reactor FL, a transformer TR, and a capacitor FC.
[0027] The distributed power supply 7 as a local power supply may include, for example, at least one DC power supply, such as a solar battery, a fuel battery, or a secondary battery. The distributed power supply 7 may be formed by combining the above plurality of types of DC power supplies. The distributed power supply 7 may, for example, output DC power to the inverter 6, and be charged with DC power supplied from the inverter 6.
[0028] The inverter 6 generates equivalent AC power to AC power (grid power) supplied from the power grid 4, from the distributed power supply 7. The inverter 6 is, for example, a three-phase AC inverter capable of mutual conversion between DC power and three-phase AC power. The inverter 6 includes U-phase, V-phase, and W-phase arms electrically connected between a DC terminal on a positive side and a DC terminal on a negative side. Each phase arm includes an upper switching element and a lower switching element, and is electrically connected to a corresponding AC terminal between the upper switching element and the lower switching element.
[0029] The reactor FL and capacitor FC form a filter circuit that eliminates noise from AC power output from the inverter 6, and is interposed between the AC terminal of each phase of the inverter 6 and the transformer TR. The reactor FL is connected in series to an AC line connected between the AC terminal of the inverter 6 and the transformer TR.
[0030] The transformer TR is an insulating transformer capable of changing the voltage of AC power transferred between the inverter 6 and the power grid 4. The transformer TR includes a first coil and a second coil that are insulated from each other. The first coil is electrically connected to the AC terminal of the inverter 6 via the filter circuit. The second coil is electrically connected to the power grid 4 via the switchgears 9 and 8, and is electrically connected to the electric load 5.
[0031] The controller 3 includes, for example, at least one processor and a memory storing therein a program to be executed by the at least one processor, and is formed to realize various functions to be described below. For example, the controller 3 synchronizes a frequency and a phase of an inverter output with those of the grid power before switching from an isolated operation mode to an interconnected operation mode.
[0032] The controller 3 generates and outputs a gate signal for controlling operations of the switching elements of the inverter 6 based on a current value and a voltage value of AC power output from the inverter 6, a voltage value (grid voltage value) of AC power output from the power grid 4, and a command value input from an external device.
[0033] The controller 3 includes a voltage control unit 21 such as an automatic voltage regulator (AVR), a current control unit 22 such as an automatic current regulator (ACR), a first frequency calculator 23, an inverter frequency selector 26, an inverter voltage command value selector 27, a first phase calculator 30, a second frequency calculator 24, an isolated operation selector 29, a second phase calculator 31, a modulation wave/gate signal generator 32, an output frequency pattern calculator 25, and an open/close command generator 28.
[0034] Further, the controller 3 includes a first voltage detector 11, a second voltage detector 12, and a current detector 13, and based on the detected values of detectors, detects a frequency difference and a phase difference between the inverter output from the inverter 6 and the grid power.
[0035] The first voltage detector 11 detects a value of a voltage V of the AC power output from the inverter 6. The value of the voltage (inverter output voltage) V detected by the first voltage detector 11 is supplied to the voltage control unit 21 and the first frequency calculator 23.
[0036] The second voltage detector 12 detects a value of a voltage Vg of the AC power output from the power grid 4. The value of the voltage (grid voltage) Vg detected by the second voltage detector 12 is supplied to the second frequency calculator 24 and the isolated operation selector 29.
[0037] The current detector 13 detects a value of a current Iinv of the AC power output from the inverter 6. The current detector 13, for example, detects the value of the current Iinv for at least two phases of the three-phase AC power output from the inverter 6. The value of the current (inverter current) Iinv detected by the current detector 13 is supplied to the current control unit 22.
[0038] The first frequency calculator 23 acquires the value of the output voltage V of the inverter from the first voltage detector 11, and calculates and outputs a frequency fi of the output voltage of the inverter 6. The value of the frequency output from the first frequency calculator 23 is supplied to the voltage control unit 21, the current control unit 22, and the inverter frequency selector 26.
[0039] The second frequency calculator 24 acquires the value of the grid voltage Vg from the second voltage detector 12, and calculates and outputs a value of a frequency fg of an output voltage of the power grid 4. The value of the frequency fg output from the second frequency calculator 24 is supplied to the isolated operation selector 29 and the second phase calculator 31.
[0040] The second phase calculator 31 acquires the value of the frequency fg of the output voltage of the power grid from the second frequency calculator 24, and calculates a value of a phase θg by integrating the value of the frequency fg. The value of the phase θg output from the second phase calculator 31 is supplied to the output frequency pattern calculator 25 and the isolated operation selector 29.
[0041] The isolated operation selector 29 acquires the value of the grid voltage Vg from the second voltage detector 12, acquires the value of the frequency fg of the grid voltage from the second frequency calculator 24, and determines whether or not the power grid 4 has a power failure. For example, the isolated operation selector 29 determines whether or not the power grid 4 has a power failure based on whether or not each of the value of the grid voltage Vg and the value of the grid frequency fg is within a predetermined range. When it is determined that the power grid 4 has a power failure, a power failure flag is set to “1”, whereas, when it is determined that the power grid 4 is normal, for example, the power failure flag is set to “0”.
[0042] Furthermore, the isolated operation selector 29 acquires the phase value θg of the grid voltage Vg from the second phase calculator 31, and also acquires the phase value θ of the output voltage V of the inverter 6 from the first phase calculator 30. Then, the isolated operation selector 29, based on the phase value θg and the phase value θ, sets an operation mode of the power converter 1 to either an isolated operation mode or an interconnected operation mode.
[0043] For example, when a difference between the phase value θg of the grid voltage Vg and the phase value θ of the output voltage V of the inverter 6 is smaller than a predetermined threshold, the isolated operation selector 29 determines that the operation mode of the power converter 1 operating in an isolated operation mode needs to be switched to the interconnected operation mode and changes an isolated operation flag from “1” to “0”. In the interconnected operation mode, the power converter 1 performs an interconnected operation with the power grid 4. Further, when the power grid 4 has a power failure, for example, the isolated operation selector 29 determines that the power converter 1 operating in the interconnected operation mode needs to be switched to an isolated operation mode, and changes the isolated operation flag from “0” to “1”.
[0044] The isolated operation selector 29 supplies the power failure flag and the isolated operation flag to the inverter frequency selector 26, the inverter voltage command value selector 27, the open/close command generator 28, and the output frequency pattern calculator 25.
[0045] The open/close command generator 28 generates and outputs an open/close command for the switchgear 9 in accordance with the values of the power failure flag and isolated operation flag supplied from the isolated operation selector 29. The open/close command generator 28 generates an open/close command to open the switchgear 9 when the power failure flag is “1”, and generates an open/close command to close the switchgear 9 when the power failure flag is “0” and the isolated operation flag is “0”.
[0046] The voltage control unit 21 acquires a voltage command value input from the external device, a value of the output voltage V of the inverter 6, and an output value of the first frequency calculator 23. The voltage control unit 21, while the power converter 1 is operating in the isolated operation mode, calculates an AVR voltage command value for the inverter 6 based on the voltage command value input from the external device.
[0047] The voltage control unit 21, based on the acquired values, calculates the voltage command value for the inverter 6 so that the value of the output voltage V follows the externally received voltage command value, and outputs the calculated voltage command value for the inverter 6. The voltage control unit 21 is, for example, a proportional-plus-integral (PI) control circuit that calculates a voltage command value so that a difference between the value of the output voltage V and the voltage command value input from the external device becomes zero. The voltage command value output from the voltage control unit 21 is supplied to the inverter voltage command value selector 27.
[0048] The current control unit 22 acquires a current command value input form the external device, a value of the output current Iinv of the inverter 6, and an output value of the first frequency calculator 23. The current control unit 22 can acquire a current command value from the external device when the power converter 1 is operating in the interconnected operation mode and calculate a voltage command value for the inverter 6.
[0049] The current control unit 22 uses the acquired values to calculate a voltage command value for the inverter 6 so that the value of the output current Iinv follows the current command value received from the external device, and outputs the calculated voltage command value for the inverter 6. The current control unit 22 is, for example, a proportional-plus-integral (PI) control circuit that calculates a voltage command value so that a difference between the value of the output current Iinv and the current command value input from the external device becomes zero. The voltage command value output from the current control unit 22 is supplied to the inverter voltage command value selector 27.
[0050] The inverter frequency selector 26, as a frequency control unit, controls the frequency of the inverter output based on an output frequency pattern to be described later. The inverter frequency selector 26 selects either one of the output value of the first frequency calculator 23 and the output value of the output frequency pattern calculator 25 based on the values of the power failure flag and isolated operation flag supplied from the isolated operation selector 29, and outputs the selected output value as a value of the frequency f of the output voltage of the inverter 6. The value of the frequency f output from the inverter frequency selector 26 is supplied to the first phase calculator 30.
[0051] When the power converter 1 is operating in the interconnected operation mode, the inverter frequency selector 26 selects the output value of the first frequency calculator 23 as the value of the frequency f of the output voltage of the inverter 6. That is, when the power failure flag is “0” and the isolated operation flag is “0”, the inverter frequency selector 26 selects the output value of the first frequency calculator 23 as the value of the frequency f of the output voltage of the inverter 6.
[0052] When the power converter 1 is operating in the isolated operation mode, the inverter frequency selector 26 selects the output value of the output frequency pattern calculator 25 as the value of the frequency f of the output voltage of the inverter 6. That is, when the power failure flag is “1” and the isolated operation flag is “1”, the inverter frequency selector 26 selects a preset value of a rated frequency, which is the output value of the output frequency pattern calculator 25, as the value of the frequency f of the output voltage of the inverter 6.
[0053] When the power grid 4 recovers from a power failure while the power converter 1 is operating in the isolated operation mode, i.e., when the isolated operation flag is “1” and the power failure flag changes from “1” to “0”, the output value of the output frequency pattern calculator 25 becomes a value that changes based on an output frequency pattern, as will be described later, and is output from the inverter frequency selector 26 as the value of the frequency f of the output voltage of the inverter 6.
[0054] The first phase calculator 30 integrates the value of the frequency f supplied from the inverter frequency selector 26 to calculate the value of the phase θ of the output voltage of the inverter 6. The first phase calculator 30 supplies the calculated value of the phase θ to the isolated operation selector 29, the output frequency pattern calculator 25, and the modulation wave/gate signal generator 32.
[0055] The inverter voltage command value selector 27 selects one of the output value of the voltage control unit 21 and the voltage value of the current control unit 22 based on the values of the power failure flag and isolated operation flag supplied from the isolated operation selector 29, and outputs the selected output value as the voltage command value of the inverter 6. The voltage command value output from the inverter voltage command value selector 27 is supplied to the modulation wave/gate signal generator 32.
[0056] When the power converter 1 is operating in the interconnected operation mode, the inverter voltage command value selector 27 outputs the output value of the current control unit 22 as the voltage command value for the inverter 6. That is, when the power failure flag is “0” and the isolated operation flag is “0”, the inverter voltage command value selector 27 outputs the output value of the current control unit 22 as the voltage command value for the inverter 6.
[0057] When the power converter 1 is operating in the isolated operation mode, the inverter voltage command value selector 27 outputs the output value of the voltage control unit 21 as the voltage command value for the inverter 6. That is, when the isolated operation flag is “1”, the inverter voltage command value selector 27 outputs the output value of the voltage controller 21 as the voltage command value for the inverter 6.
[0058] The modulation wave/gate signal generator 32 generates a modulation wave based on the value of the phase θ of the output voltage of the inverter 6 acquired from the first phase calculator 30 and the voltage command value acquired from the inverter voltage command value selector 27. The modulation wave/gate signal generator 32 compares the generated modulation wave with a carrier wave to generate a gate signal of each switching element of the inverter 6, and outputs the gate signal to the inverter 6.
[0059] When the operation mode of the power converter 1 is switched from the isolated operation mode to the interconnected operation mode (when the power failure flag changes from “1” to “0”), the output frequency pattern calculator 25 calculates a pattern of the frequency f of the output voltage V of the inverter 6 so that the frequency f is synchronized with a frequency of the grid voltage Vg. That is, the output frequency pattern calculator 25 calculates the output frequency pattern based on the frequency difference and the phase difference between the inverter output and the grid power detected by the detection units. The output frequency pattern shows a change of the output frequency of the inverter 6 with respect to time in a synchronization period required for synchronizing the inverter output and the grid power.
[0060]
[0061] Shown herein is an example of the output frequency pattern for synchronizing the phase θ of the output voltage V of the inverter 6 with the phase θg of the grid voltage Vg when the phase θg is advanced with respect to the phase θ.
[0062] When the phase θg of the grid voltage Vg is delayed with respect to the phase θ of the output voltage V of the inverter 6, an output frequency pattern is generated in which the frequency f of the output voltage V of the inverter 6 is decreased at a preset frequency change rate for the predetermined period T.sub.A and, after passing through the period T.sub.B, in which the frequency f takes a constant value at the frequency lower limit value where necessary, is raised at a preset frequency change rate for the predetermined period T.sub.C back to the rated frequency.
[0063] In the following description, a phase difference between the phase θg of the grid voltage Vg and the phase θ of the output voltage V of the inverter 6 is denoted by Δθ. In addition, a rated frequency is denoted by F [Hz], a frequency fluctuation upper limit value is denoted by ΔF.sub.L [Hz], a frequency change rate (upward) is denoted as Δf.sub.U [Hz/s], and a frequency change rate (downward) is denoted as −Δf.sub.D [Hz/s]. Furthermore, a period of an operation at the upward frequency change rate is denoted by T.sub.A [s], a period of an operation at a constant value at the frequency upper limit value (or frequency lower limit value) is denoted by T.sub.B [s], and a period of an operation at the downward frequency change rate is denoted by T.sub.C [s].
[0064] First, in the period T.sub.A, the frequency f is changed from the rated frequency F to a frequency upper limit value F+ΔF.sub.L; accordingly, the period T.sub.A can be expressed by formula (1).
[0065] A phase change amount Δθ.sub.A in the period T.sub.A can be expressed by formula (2).
[0066] Similarly, the frequency f changes from the frequency upper limit value F+ΔF.sub.L back to the rated frequency F in the period T.sub.C. Thus, the period T.sub.C and the phase change amount Δθ.sub.C can be expressed by formulae (3) and (4).
[0067] The phase change amount Δθ.sub.B in the period T.sub.B and the period T.sub.B can be obtained by formulae (5) and (6).
[0068] The period T.sub.A is obtained from formula (1), T.sub.B is obtained from formula (5), and T.sub.C is obtained from formula (3). Thus, the output frequency pattern calculator 25 can determine the output frequency pattern of the output voltage V of the inverter 6 by calculating the phase difference Δθ between the phase θg of the grid voltage Vg and the phase θ of the output voltage V of the inverter 6 and calculating formulae (1), (3), and (6) by using the preset values and Δθ.
[0069] Depending on the value of Δθ, it may be possible to synchronize the phase θ and the phase θg with each other without raising the frequency of the output voltage of the inverter 6 up to the frequency upper limit value. A condition therefor is a case of T.sub.B≤0 in formula (6). By transforming the right side of formula (6) to 0 or less, formula (7) is obtained.
[0070] In this case, Δθ is a sum of Δθ.sub.A and Δθ.sub.C, and a frequency change amount in the period T.sub.A is equal to that in the period T.sub.C. Therefore, formulae (8) and (9) hold.
[Formula 6]
Δθ=πΔf.sub.U(T.sub.A).sup.2+ϕΔf.sub.D(T.sub.C).sup.2 (8)
Δf.sub.UT.sub.A=Δ.sub.DT.sub.C (9)
[0071] Based on the above formulae (8) and (9), the period T.sub.A and the period T.sub.C can be expressed by formulae (10) and (11), respectively.
[0072] Based on formulae (10) and (11), the period T.sub.A and the period T.sub.C of a case without the period T.sub.B are uniquely determined. Accordingly, also in this case, the output frequency pattern calculator 25 can determine the output frequency pattern of the output voltage V of the inverter 6 by obtaining the phase difference Δθ between the phase θg of the grid voltage Vg and the phase θ of the output voltage V of the inverter 6 and calculating formulae (10) and (11) by using the preset values and Δθ.
[0073] The output frequency pattern calculator 25 supplies the inverter frequency selector 26 with a value of a frequency that changes based on the determined output frequency pattern.
[0074] When the power grid 4 is normal, the switchgears 8 and 9 are turned on, and the main circuit 2 is interconnected with the power grid 4, and thereby the power converter 1 performs the interconnected operation with the power grid 4. In this state, the controller 3 acquires the output current Iinv of the inverter 6 from the current detector 13, and calculates, at the current control unit 22, a voltage command value to follow a current command value provided from the externa device such as a host control device. At this time, the isolated operation selector 29 sets the power failure flag to “0”, and sets the isolated operation flag to “0”.
[0075] When an anomaly occurs in the power grid 4, the switchgear 8 is opened, and thereby downstream area of the switchgear 8 experiences a power failure. Thus, the control circuit 3 detects, at the isolated operation selector 29, that the value of the frequency fg of the grid voltage Vg detected at the second voltage detector 12 has deviated from a predetermined value (normal range), and sets the power failure flag to “1” and the isolated operation flag to “1”. In response to this, the open/close command generator 28 supplies an open/close command to the switchgear 9 to open the switchgear 9.
[0076] When power fails in the power grid 4, the voltage control unit 21 calculates a voltage command value to follow a voltage command provided from the external device such as the host control device, and switches an input value of the inverter voltage command value selector 27. In addition, the voltage control unit 21 sets an output value (a fixed value of a rated frequency that is preset) of the output frequency pattern calculator 25 to the frequency f of the output voltage of the inverter 6.
[0077] When the power grid 4 recovers from a power failure, the value of the grid voltage Vg detected by the second voltage detector 12 and the value of the frequency fg of the grid voltage Vg respectively fall within predetermined values (normal ranges), which enables the isolated operation selector 29 to determine that the power grid 4 has recovered from the power failure. In response to this, the isolated operation selector 29 changes the power failure flag from “1” to “0”. The output frequency pattern calculator 25 calculates the phase difference Δθ between the phase θ of the output voltage of the inverter 6 and the phase θg of the grid voltage, and calculates the inverter output frequency pattern as described above.
[0078] The output frequency pattern calculator 25 changes the value of the frequency to be supplied to the inverter frequency selector 26 based on the calculated output frequency pattern. The inverter frequency selector 26 outputs the output value of the output frequency pattern calculator 25 as the frequency f of the inverter 6. At this time, an effective value of the output voltage V of the inverter 6 is made to follow an effective value of the grid voltage Vg at a predetermined voltage change rate based on a voltage command value input from the external device. Alternatively, control may be performed by correcting the voltage command value in the power converter in accordance with the effective value of the grid voltage Vg.
[0079] When the phase difference between the phase θ of the output voltage V of the inverter 6 and the phase θg of the grid voltage Vg falls within a predetermined value, the isolated operation selector 29 determines that the interconnected operation mode needs to performed (the isolated operation flag “0”). When the isolated operation flag becomes “0”, the open/close command generator 28 outputs a command to close the switchgear 9 of the power converter 1.
[0080] When the interconnected operation mode is set, control by the current control unit 22 is selected, and the input value of the inverter voltage command value selector 27 is switched to the output value of the current control unit 22. By setting the current command value at the time of starting the interconnected operation to zero, overcurrent at the time of re-interconnection can be reduced.
[0081] Switching between control by the voltage control unit 21 and control by the current control unit 22 may be performed in accordance with the value of the isolated operation flag, or may be performed by switching of a command value input by the host control device. When switching between the voltage control and the current control is performed in accordance with the value of the isolated operation flag, the value of the isolated operation flag may be supplied to the voltage control unit 21 and the current control unit 22.
[0082] <Effect>
[0083] Next, an effect in the above configuration will be described.
[0084]
[0085] In the figure, a solid line shows a grid power waveform, and a one-dot chain line shows an inverter output waveform. At the time of grid power recovery, for example, as shown in
[0086]
[0087]
[0088] Next, an example is shown in which a synchronization period required for synchronizing the inverter output and the grid power is calculated separately for (case 1) and (case 2). In the following, we will consider voltage/frequency control when switching from an isolated operation mode to an interconnected operation mode, which is executed at the time of grid power recovery.
[0089]
[0090] In
[0091] When Δθ=180°, ΔF.sub.G=0.5 [Hz], and Δf=2 [Hz/s] are substituted into formulae (12) and (13), T.sub.A1=0.78 [s] and T.sub.C1=0.53 [s] are obtained. Since the synchronization period is a sum of these, T.sub.A1+T.sub.C1=1.31 [s] is obtained. That is, in (case 1), the synchronization period=1.31 under the set initial condition.
[0092] Similarly, the synchronization period in (case 2) can be calculated.
[0093]
[0094] In
[0095] When Δθ=180°, ΔF.sub.G=0.5 [Hz], and Δf=2 [Hz/s] are substituted into formulae (14) and (15), T.sub.A2=0.28 [s] and T.sub.C2=0.53 [s] are obtained. Since the synchronization period is a sum of these, T.sub.A2+T.sub.C2=0.81 [s] is obtained. That is, in (case 2), the synchronization period=0.81 under the set initial condition.
[0096] Namely, in the above simulation, a result of T.sub.A2+T.sub.C2<T.sub.A1+T.sub.C1 is obtained. Therefore, in this example, a result is that (case 2) has a shorter synchronization period.
[0097]
[0098]
[0099] Up to this point, it has been assumed that the period T.sub.A during which the frequency is constant is not included. Next, a case in which the frequency upper and lower limit value ΔF.sub.R is taken into consideration will be described. In this case, the frequency pattern will include the period T.sub.B.
[0100]
[0101]
[0102]
[0103] Next, the controller 3 calculates formula (17) under the acquired conditions, and determines whether or not T.sub.A1 appears (step S2). If formula (17) takes a positive value (Yes), the controller 3 calculates T.sub.A1, T.sub.B1, and T.sub.C1 using formulae (16) to (18) and calculates a synchronization period in (case 1) (step S3). On the other hand, if formula (17) becomes negative (No), the controller 3 calculates T.sub.A and T.sub.C1 using formulae (12) and (13) and calculates the synchronization period in (case 1) (step S4). Then, the processing procedure shifts to
[0104] Next, the controller 3 calculates formula (20) and determines whether or not T.sub.B2 appears (step S5). If formula (20) takes a positive value (Yes), the controller 3 calculates T.sub.A2, T.sub.B2, and T.sub.C2 using formulae (19) to (21) and calculates a synchronization period in (case 2) (step S6). On the other hand, if formula (20) becomes negative (No), the controller 3 calculates T.sub.A and T.sub.C2 using formulae (14) and (15) and calculates the synchronization period in (case 2) (step S7).
[0105] Then, the controller 3 compares the synchronization period in (case 1) with the synchronization period in (case 2) (step S8), and if the synchronization period in (case 1) is short (Yes), selects a pattern for increasing the frequency (step S9). If the synchronization period in (case 2) is short (No), a pattern for decreasing the frequency is selected (step S10). As a result, a frequency control pattern based on the shortest synchronization period is generated.
[0106] Finally, the controller 3 determines a frequency control pattern, superimposes a frequency control amount indicated by that pattern on an inverter frequency command value (step S11), and outputs the frequency control amount.
[0107]
[0108] Next, the controller 3 obtains a value obtained by dividing ΔV.sub.G by the synchronization period, and calculates a gradient of a voltage command value (step S22). Finally, the controller 3 determines a voltage command value control pattern, and inputs it to the voltage control unit 21 as a voltage control command value (step S23).
[0109]
[0110] <Effect>
[0111] As described above, in the embodiment, the configuration for realizing the phase synchronization method and the voltage following method taking into consideration the frequency fluctuation and the voltage fluctuation at the time of power recovery of the grid has been described. That is, when there is a frequency fluctuation at the time of power recovery, a phase synchronization period when the frequency is increased and a phase synchronization period when the frequency is decreased are obtained, and an output frequency pattern based on whichever synchronization period is shorter is adopted. Moreover, in the output frequency pattern, by setting the inverter frequency change rate (of) to a value that takes into consideration the withstand capacity of the electric load 5, the electric load 5 is not overloaded. Further, when there is a voltage fluctuation at the time of power recovery, a voltage command value is controlled so as to follow a grid voltage within a synchronization period under the above output frequency pattern.
[0112] From these facts, according to the embodiment, it becomes possible to provide a power converter capable of quickly switching between the isolated operation mode and the interconnected operation mode without exceeding the load capacity. In addition, it can be smoothly interconnected with the power grid and can continuously supply power to the electric load without interruption.
[0113] The present invention is not limited to the above-described embodiment. For example, the controller 3 shown in
[0114] While certain embodiments have been described, these embodiments have been presented by way of example only, and are not intended to limit the scope of the inventions. Indeed, the novel embodiments described herein may be embodied in a variety of other forms; furthermore, various omissions, substitutions and changes in the form of the embodiments described herein may be made without departing from the spirit of the inventions. The accompanying claims and their equivalents are intended to cover such forms or modifications as would fall within the scope and spirit of the inventions.