SYSTEMS AND METHODS OF UNDERHAND CLOSED BENCH MINING
20230126105 · 2023-04-27
Inventors
Cpc classification
E21C37/16
FIXED CONSTRUCTIONS
E21C37/00
FIXED CONSTRUCTIONS
E21C41/16
FIXED CONSTRUCTIONS
International classification
Abstract
The present invention relates to systems and methods of mining, including drilling a first plurality of blast holes along a length of a horizontal stope and blasting explosive within the first plurality of blast holes. The method includes recovering fragmented ore from the horizontal stope and stabilizing the horizontal stope via a first engineered roof. The method then includes drilling a second plurality of blast holes along the length of the horizontal stope and blasting explosive within the second plurality of blast holes. The method further includes recovering fragmented ore from the horizontal stope and stabilizing the horizontal stope via a second engineered roof. The horizontal stope is mined in a downward direction.
Claims
1. A method of mining, comprising: drilling a first plurality of blast holes along a length of a horizontal stope; blasting explosive within the first plurality of blast holes; recovering fragmented ore from the horizontal stope; stabilizing the horizontal stope via a first engineered roof; drilling a second plurality of blast holes along the length of the horizontal stope; blasting explosive within the second plurality of blast holes; recovering fragmented ore from the horizontal stope; and stabilizing the horizontal stope via a second engineered roof, such that the horizontal stope is mined in a downward direction.
2. The method of claim 1, wherein each of the first plurality of blast holes and the second plurality of blast holes are disposed on a floor of the horizontal stope.
3. The method of claim 1, wherein the first engineered roof includes backfill material.
4. The method of claim 1, wherein the explosive is sufficient to cause a seismic event in the downward direction.
5. The method of claim 1, wherein the first plurality of blast holes and the second plurality of blast holes are injected with pumpable emulsion explosives.
6. The method of claim 1, wherein the first plurality of blast holes are patterned in a square configuration.
7. The method of claim 6, wherein the square configuration includes nine blast holes and eight dead holes.
8. The method of claim 1, wherein the length of the horizontal stope is fragmented in one simultaneous blast.
9. The method of claim 1, wherein the length of the horizontal stope is approximately three hundred feet.
10. A method of mining, comprising: drilling a first plurality of blast holes along a length of a horizontal stope, wherein at least one slip-on fault is disposed under the horizontal stope; blasting explosive within the first plurality of blast holes; recovering fragmented ore from the horizontal stope; drilling a second plurality of blast holes along the length of the horizontal stope; blasting explosive within the second plurality of blast holes; recovering fragmented ore from the horizontal stope, such that the horizontal stope is mined in a downward direction.
11. The method of claim 10, wherein each of the first plurality of blast holes and the second plurality of blast holes are disposed on a floor of the horizontal stope.
12. The method of claim 11, wherein the first plurality of blast holes are drilled at a first starting depth, wherein the second plurality of blast holes are drilled at a second starting depth, and wherein the first starting depth is at least twenty feet above the second starting depth.
13. The method of claim 10, wherein the explosive is sufficient to cause a seismic event at the slip-on fault.
14. The method of claim 10, wherein the first plurality of blast holes and the second plurality of blast holes are injected with pumpable emulsion explosives.
15. The method of claim 10, wherein the first plurality of blast holes are patterned in a square configuration.
16. The method of claim 15, wherein the square configuration includes nine blast holes and eight dead holes.
17. The method of claim 10, wherein the length of the horizontal stope is fragmented in one simultaneous blast.
18. The method of claim 10, wherein the length of the horizontal stope is approximately three hundred feet.
19. The method of claim 10, wherein a depth of the first plurality of blast holes is approximately 26 feet deep.
20. The method of claim 10, wherein the first plurality of blast holes includes a burn cut and a plurality of patterned blast hole rings.
Description
BRIEF DESCRIPTION OF THE FIGURES
[0034] Understanding that figures depict only typical embodiments of the invention and are not to be considered to be limiting the scope of the present disclosure, the present disclosure is described and explained with additional specificity and detail through the use of the accompanying figures. The figures are listed below.
[0035]
[0036]
[0037]
[0038]
[0039]
[0040]
DETAILED DESCRIPTION
[0041] It should be understood at the outset that, although illustrative implementations of one or more embodiments are provided below, the disclosed systems and/or methods may be implemented using any number of techniques, whether currently known or in existence. The disclosure should in no way be limited to the illustrative implementations, drawings, and techniques illustrated below, including the exemplary designs and implementations illustrated and described herein, but may be modified within the scope of the appended claims along with their full scope of equivalents.
[0042]
[0043] Specifically, with reference to
[0044] At the outset, it is worth emphasizing that in addition to the vertical vein 12, the mining environment may include additional geological features including faults 36 cutting through the orebody below the downward advancing stope 24. As noted previously, faults 36 are undesirable, due to the inherent risks associated with slippage.
[0045] With that said, returning specifically to method 10, first step 14 illustrates that the vein 12 has already been previously mined and subsequently backfilled. For example, first step 14 illustrates an open stope 24, disposed underneath an engineered roof 38 (e.g., backfilled with engineered cemented paste). This open stope 24 has been mined along the strike of the orebody (e.g., into the page of
[0046] The floor of stope 24 includes a plurality of vertical blast holes 28 (e.g., drilled via long hole drill) with a series of vertical blast hole rings to a particular depth, such as 26 to 28 feet deep. Vertical blast holes 28 are blasted with emulsion explosive, initiated with programmable electronic detonators. The result of this blast is that fragmented ore 34 swells up into open stope 24 as swell 34A depicted by
[0047] By blasting downward with vertical blast holes 28 along the floor of open stope 24, the blast wave is directed in a generally downward direction. Specifically, with reference to
[0048] Upon explosion, blast wave 42 is transmitted through the rock mass, in a downward direction (e.g., from stope 24, through blasted rock and ore body 44).
[0049] Returning to
[0050] Third step 18 illustrates the stope 24 once all swell 34A has been mucked. For example, after mucking, there are two 13 foot high cuts of fragmented ore beneath the open stope 24, first cut 30 and second cut 32.
[0051] Fourth step 20 illustrates that the previously blasted stope 24 is backfilled with an engineered roof 38 (e.g., backfilled with engineered cemented paste), such that first cut 30 is accessed from the footwall crosscut (e.g., by slabbing out the floor and intersecting the ore body). Since the fragmented ore 34 at first cut 30 has already been blasted, load-haul-dump machinery can be used with little to no additional blasting to muck out first cut 30 below engineered roof 38. This mucking will advance along the strike of the ore body (e.g., to the end of the blasted section). As mucking advances, the stope walls are supported with wire mesh and rock bolts.
[0052] Fifth step 22 illustrates that first cut 30 is backfilled with an engineered roof 38 (e.g., backfilled with engineered cemented paste) and allowed to cure for approximately three days. Once cured, the remainder of fragmented ore 34 at second cut 32 is mucked, similar to first cut 30 above. At completion of fifth step 22, all of the fragmented ore 34 from the initial explosions at vertical blast holes 28 has been extracted. This results in a solid un-blasted floor at the bottom of open stope 24. At this point, method 10 repeats itself, as new vertical blast holes 28 are drilled into the floor of open stope 24, such that each of five steps 14, 16, 18, 20, 22 are sequentially repeated. For example, method 10 repeats itself for the blasting and extraction of 26 feet deep fragmented ore 34 (e.g., via first cut 30 and second cut 32) in two downward-progressing stope cuts.
[0053] In an embodiment, vertical blast holes 28 are drilled through one or more faults 36. In a different embodiment, faults 26 are seismically slipped via a prior explosion (e.g., as illustrated by
[0054] Regarding the drilling of vertical blast holes 28, it should be appreciated that the blast holes 28 can be drilled in a number of different patterns. For example,
[0055] In the embodiment illustrated by
[0056] This particular orientation illustrated by
[0057]
[0058] In an embodiment, these blast holes are 26 feet deep (e.g., the blast holes extend 26 feet into the floor of stope 24). The depth 60 of these blast holes is illustrated by the side view of
[0059] The blast is initiated at the burn cut 62, previously illustrated above with respect to
[0060]
[0061] Furthermore, the method 100 disclosed herein is specifically designed for deep narrow vein mines. For example, it should be appreciated that the horizontal stope described and illustrated herein is approximately 7,000 feet below the surface of the earth.
[0062] As described herein, this horizontal stope is mined in slices. For example, one slice of the horizontal stope is blasted, mined, and stabilized. A subsequent slice of the horizontal stope, which is below the previously mined slice, is then blasted, mined, and stabilized. Therefore, as method 100 is described from first stage 120 to fifth stage 160, mining is being performed in an overall downward direction (e.g., toward the center of the earth) on a slice-by-slice basis. As illustrated in
[0063] Starting off with the first stage 120, the horizontal stope 106 may include fill material 102, which may include finely-ground mill tailings mixed with cement and/or slag. In an embodiment, the section of fill material 102 is approximately ten feet high. It should be appreciated that additional fill material 102 and/or natural earthen material may be disposed further above the embodiment illustrated herein.
[0064] Below the fill material 102 is a first engineered ceiling 104. In an embodiment, the engineered ceiling 104 is approximately ten feet high. This first engineered ceiling 104 is configured to retain fill material 102, along with anything above fill material 102, from collapsing down into stope 106. Engineered ceiling 104 generally stabilizes stope 106. For example, engineered ceiling 104 may include cemented and reinforced fill material 102.
[0065] Stope 106 is an open void, configured for blasting and recovery of ore. Namely, mining personnel will access stope 106, drill one or more holes into a surface of stope 106, and blast explosives into the surface of stope 106. The post-blasted material is recovered from within stope 106, and subsequently processed underground or above the surface.
[0066] Whereas prior techniques involved drilling blast holes along the horizontal face of stope 106, the claimed method 100 employs a different technique. Namely, via the underhand closed bench method 100 disclosed herein, mining personnel will drill a plurality of blast holes downward along a length of the stope 106. In a particular embodiment, the blast holes are drilled along a bottom surface or floor 107 of the length of the stope 106 (e.g., the floor of stope 106).
[0067] As noted previously, with respect to
[0068] Continuing on with method 100 of
[0069] Because the blast holes are drilled along the floor 107 of stope 106, blasting occurs in a downward direction (e.g., towards ore 110). In a particular embodiment, by blasting in a downward direction, with sufficient blast magnitude, method 100 intentionally triggers one or more localized seismic in the downward direction (e.g., below stope 106) due to slip on faults beneath the floor of stope 106. For example, blasting proactively triggers these slip on faults below the stope 106, reducing risk of stope collapse. Further, blasting proactively triggers these slip on faults during blasting times, when no mining personnel are present. Additionally, fragmented ore that remains post-blast provides structural support to the walls of stope 106, minimizing any ancillary damage caused from an induced seismic event.
[0070] As illustrated by second stage 130, once blasting has occurred, the stope 106 is commingled with blast material 108. For example, across the entire blast length of stope 106 (e.g., a three-hundred foot strike length), material 108 is blasted thirty feet deep below stope 106. Mining personnel will then recover fragmented ore (e.g., via front-end loaders) from stope 106. This procedure, generally referred to as mucking, may further include supporting the excavated stope 106 with wire mesh and rock bolts. The recovered fragmented ore is processed under the earth or sent above-ground for further processing.
[0071] Crushed and milled waste material (tailings) mixed with cement is then used to backfill the stope 106. For example, third stage 140 and fourth stage 150 of method 100 illustrate that fill material 102 is positioned above stope 106, and is retained above stope 106 via a second engineered ceiling 104. As fill material 102 and second engineered ceiling 104 are installed above stope 106, stope 106 generally moves in a downward direction (e.g., toward ore 110).
[0072] At this point in the method 100, fourth stage 150 and fifth stage 160 illustrate a repetition of the process discussed above. Namely, mining personnel will drill a plurality of blast holes along a length of the stope 106, such as the floor 107 of the length of the stope 106 (e.g., the floor of stope 106). Once the particular hole pattern is drilled into the floor 107 of stope 106, explosives are inserted into the hole pattern. The explosives are subsequently detonated. Though the blast is confined to stope 106, it is configured to fragment ore 110 into blast material 108. Furthermore, the blast intentionally triggers one or more localized seismic in the downward direction (e.g., below stope 106), such as slip on faults below the stope 106. As an example, fourth stage 150 illustrates several slip on faults 112 within ore 110; these slip on faults 112 are seismically triggered during blasting, and thus are no longer a risk at fifth stage 160 (post-blasting).
[0073] Once blasting has occurred, the stope 106 is commingled with blast material 108. Mining personnel will then recover fragmented ore from stope 106. Fill material 102 may be positioned above stope 106, and retained above stope 106 via an engineered ceiling (not illustrated). Again, horizontal stope 106 generally moves in a downward direction (e.g., toward ore 110) as the method 100 repeats until no more ore 110 is recoverable.
[0074] While several embodiments have been provided in the present disclosure, it may be understood that the disclosed systems and methods might be embodied in many other specific forms without departing from the spirit or scope of the present disclosure. The present examples are to be considered as illustrative and not restrictive, and the intention is not to be limited to the details given herein. For example, the various elements or components may be combined or integrated in another system or certain features may be omitted, or not implemented.
[0075] As used in this specification, including the claims, the term “and/or” is a conjunction that is either inclusive or exclusive. Accordingly, the term “and/or” either signifies the presence of two or more things in a group or signifies that one selection may be made from a group of alternatives. As used here, “at least one of,” “one or more,” and “and/or” are open-ended expressions that are both conjunctive and disjunctive in operation. For example, each of the expressions “at least one of A, B, and C,” “at least one of A, B, or C,” “one or more of A, B, and C,” “one or more of A, B, or C,” and “A, B, and/or C” means A alone, B alone, C alone, A and B together, A and C together, B and C together, or A, B, and C together.
[0076] Without further elaboration, it is believed that one skilled in the art can use the preceding description to utilize the claimed inventions to their fullest extent. The examples and embodiments disclosed herein are to be construed as merely illustrative and not a limitation of the scope of the present disclosure in any way. It will be apparent to those having skill in the art that changes may be made to the details of the above-described embodiments without departing from the underlying principles discussed. In other words, various modifications and improvements of the embodiments specifically disclosed in the description above are within the scope of the appended claims. For example, any suitable combination of features of the various embodiments described is contemplated.
[0077] Note that elements recited in means-plus-function format are intended to be construed in accordance with 35 U.S.C. § 112 ¶6. The scope of the invention is therefore defined by the following claims.
[0078] In addition, techniques, systems, subsystems, and methods described and illustrated in the various embodiments as discrete or separate may be combined or integrated with other systems, modules, techniques, or methods without departing from the scope of the present disclosure. Other items shown or discussed as coupled or directly coupled or communicating with each other may be indirectly coupled or communicating through some interface, device, or intermediate component whether electrically, mechanically, or otherwise. Other examples of changes, substitutions, and alterations are ascertainable by one skilled in the art and may be made without departing from the spirit and scope disclosed herein.