State estimation for power system using hybrid measurements
09627886 ยท 2017-04-18
Assignee
Inventors
Cpc classification
Y04S40/20
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
H02J3/00
ELECTRICITY
Y04S10/22
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
Y02E40/70
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
H02J2203/20
ELECTRICITY
Y02E60/00
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
Y04S10/00
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
Y04S40/124
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
International classification
H02J13/00
ELECTRICITY
H02J3/00
ELECTRICITY
Abstract
A method determines voltages of buses of a power system. Values the voltages include a magnitude and a phase angle. The buses of the power system are grouped in a first area and a second area based on a type of measurement associated with each bus. The first area and the second area have at least one common bus, and wherein at least one bus in the first area is associated with a first type of measurement, and at least one bus in the second area is associated with a second type of measurement. Next, the method determines sequentially voltages of the buses of the first and the second areas.
Claims
1. A computer-implemented method for determining voltages of a set of buses of a power system, wherein values of the voltages include a magnitude and a phase angle of the voltages, comprising steps of: providing a connectivity topology of buses connected through branches, wherein the connectivity topology represents such that a bus of the power system is connected with at least one bus of the power system through a branch, wherein each of the buses is associated with a first type of measurement unit or a second type of measurement unit; partitioning the set of buses of the power system into a first-type area and a second-type area based on the connectivity topology of the buses and a type of measurement unit associated with each bus, wherein the first-type area and the second-type area have at least one common bus, and wherein all buses in the first-type area are associated with the first type of measurement unit, and all buses in the second-type area are associated with the second type of measurement unit; calculating the voltages of the buses of the first-type area including the voltage of the common bus based on first type of measurements of the first-type of measurement unit and pseudo measurements derived from second type of measurements of the second type of measurement unit by minimizing a sum of weighted square of measurement errors for all measurements associated with the first-type area; and calculating the voltages of the set of buses of the second-type area using the voltage of the common bus calculated for the first-type area and the second type of measurements of the second type of measurement unit by minimizing a sum of weighted square of measurement errors for all measurements associated with the second-type area, wherein the steps of the method are performed by a processor.
2. The method of claim 1, wherein the first type of measurement is provided by a phasor measurement unit (PMU), and the second type of measurement is provided by a remote terminal unit (RTU) of supervisory control and data acquisition (SCADA) system.
3. The method of claim 2, wherein the common bus is associated with the RTU and adjacent to a bus associated with the PMU.
4. The method of claim 2, wherein the PMU measures a magnitude and phase angle of the voltage of the bus in the first-type area, and a magnitude and a phase angle of current of a branch connected with the bus in the first-type area, and wherein the RTU measures a magnitude of the voltage of the bus in the second-type area, an active power and a reactive power of a branch connected with the bus in the second-type area.
5. The method of claim 2, wherein the first-type area is formed only by PMU buses associated with the first type of measurement unit, and buses adjacent to at least one PMU bus.
6. The method of claim 1, further comprising: forming a first model to associate the measurements in the first-type area with the voltages of buses in the first-type area based on measurements for the buses of the first-type area; solving the first model to determine the voltages of the buses of the first-type area by minimizing the sum of weighted square of measurement errors for all measurements associated with the first-type area; forming a second model to associate the measurements in the second-type area with the voltages of buses in the second-type area based on measurements for the buses of the second area; adding to the second model the voltage of the common bus determined for the first area; and solving the second model to determine the voltages of the buses of the second area by minimizing the sum of weighted square of measurement errors for all measurements associated with the second-type area.
7. The method of claim 6, wherein the first model is a linear model, and the second model is a nonlinear model, further comprising: solving the first model directly; and solving the second model iteratively.
8. A method for determining voltages of buses of a power system using hybrid measurements provided by phasor measurement units (PMUs), and remote terminal units (RTUs) of supervisory control and data acquisition (SCADA) system, wherein values of the voltages include a magnitude and a phase angle of the voltages, and wherein the PMU provide measurements of the voltage of the bus and current of a branch, and the RTU provides measurements of the magnitude of the voltage of the bus and active and reactive powers of the branch, comprising steps for: providing a connectivity topology of buses connected through branches, wherein the connectivity topology represents such that a bus of the power system is connected with at least one bus of the power system through the branch, wherein each of the buses is associated with the PMU or the RTU; partitioning the buses of the power system into a set of PMU areas and a set of SCADA areas based on the connectivity topology of the buses, where the PMU area has at least one bus common with the SCADA area, and wherein the PMU area is formed by PMU buses and buses adjacent to at least one PMU bus, and wherein the SCADA area is formed by SCADA buses; and calculating sequentially voltages of the buses of the PMU area, and the voltages of the buses of the SCADA area, wherein the steps of the method are performed by a processor.
9. The method of claim 8, further comprising: determining the voltages of the buses in the PMU area based on the PMU measurements provided by the PMUs and pseudo measurements determined from the SCADA measurements provided by the RTUs; and determining the voltages of the SCADA area based on the SCADA measurements and voltages of common buses determined for the PMU areas.
10. The method of claim 9, further comprising: forming a nonlinear model for each SCADA area; and solving the nonlinear models iteratively to determine voltages in each SCADA area.
11. The method of claim 10, further comprising: generating pseudo measurements of voltage of common buses in polar coordinates based on voltages determined for the PMU areas.
12. The method of claim 10, further comprising: solving the nonlinear models iteratively until changes in the voltages are less than a given threshold.
13. The method of claim 9, further comprising: forming a linear model for each PMU area, and solving the set linear models using a sparse matrix decomposition to determine voltages in each PMU area.
14. The method of claim 13, further comprising: converting the PMU measurements of currents, and the voltages from polar coordinates into rectangular coordinates; and generating the pseudo measurements of the currents in the PMU area based the SCADA measurements of active and reactive powers.
15. A system for estimating states of buses of a power system using on hybrid measurements provided by phasor measurement units (PMUs), and remote terminal units (RTUs) of supervisory control and data acquisition (SCADA) system, wherein a value of a voltage includes a magnitude and a phase angle of the voltage, and wherein a PMU provide measurements of the voltage of the bus and current of a branch, and a RTU provides measurements of a magnitude of the voltage of the bus and active and reactive powers of a branch, comprising: a processor for providing a connectivity topology of buses connected through branches, wherein the connectivity topology represents such that a bus of the power system is connected with at least one bus of the power system through the branch, wherein each of the buses is associated with the PMU or the RTU; partitioning the buses of the power system into a set of PMU areas and a set of SCADA areas based on the connectivity topology of the buses, where the PMU area has at least one bus common with the SCADA area, and wherein the PMU area is formed by PMU buses and buses adjacent to at least one PMU bus, and wherein the SCADA area is formed by SCADA buses, and for estimating states of the buses in the set of PMU areas based on the measurements provided by the PMUs and pseudo measurements estimated from SCADA measurements provided by the RTUs, and for estimating states of the buses in the set of SCADA areas based on the measurements provided by the RTUs and a state of the common bus.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
(7) PMU and SCADA Observed Areas
(8)
(9) Based on the topology connectivity and a type of measurement unit 110, the buses of the power system are grouped 120 into a set of areas, including first type observed areas 130 and second type observed areas 140. The states of the first and second type observed areas are analyzed sequentially 190 according to various embodiments of the invention. For example, state estimate of the first type areas 160 are determined 150 based on the measurements on the area. Then, state estimate of second type areas 180 are determined 170 based on the results obtained in 150 and measurements on the areas. Finally, the full set of state estimate for the system is generated 195. The method 100 can be performed in a processor 101. The grouping 120 of the system can be predetermined and stored into a memory.
(10) According to the type of measurement unit associated with each bus, the buses of a power system are grouped into a set of areas, including first type observed areas and second type observed areas, wherein the first type observed area and the second type observed area has at least one common bus, and wherein at least one bus in the first type observed area is associated with a first type of measurement unit, and at least one bus in the second type observed area is associated with a second type of measurement unit. A common bus is associated with the second type of measurement unit, and is adjacent to a bus associated with the first type of measurement unit.
(11)
(12) Accordingly, the buses of the power system of
(13) The first area 260 includes the buses 220, 222, 224, 226 and 228, in which buses 222 and 224 are associated with first type of measurement units. The first area 280 includes the buses 236, 238 and 240, in which the bus 238 is associated with the first type of measurement unit.
(14) The second area 250 includes the buses 210, 212, 214 and 220, in which bus 220 is a common bus between the first area 260 and the second area 250. The second area 270 includes buses 226, 228, 230, 232, 234, 236 and 240. Buses 226, 228, 236 and 240 are common buses between the second area 270 and the first areas 260 and 280.
(15) Similarly, in the embodiments for a power system with hybrid SCADA and PMU measurements, the buses are grouped into a set of PMU observed areas and a set of SCADA observed areas. The PMU observed area includes buses connected to PMU devices, and terminal buses of branches that are measured by the PMU devices. The SCADA observed area includes buses connected to RTU devices, and terminal buses of branches which are measured by the RTU devices. The common buses are the buses included in both the PMU observed areas and the SCADA observed areas.
(16) The state of the power system is solved with two-level computation procedure in which the states of PMU areas are determined first, and then the states of SCADA areas are determined next based in the solutions of states for the PMU areas.
(17) The embodiments of the invention are also based on realization that decoupling the power system based on the type of measurement unit associated with buses can simplify the model for each type of areas. A more simplified model is formulated based on the characteristics of measurements for each type of areas, and accordingly the computation burden of state estimation is further reduced.
(18) Models of Components of Power System
(19) In one embodiment, a model of state estimation is formulated based on the models of components in the power system. The typical components include transmission lines and transformers, and their models are shown in
(20) Transmission Line Branch
(21)
(22) Attributes describing the steady-states of the transmission line include the complex voltages at two terminal buses i and bus j, V.sub.i 350 and V.sub.j 355, complex currents entering the branch through bus i and bus j, I.sub.ij 370 and I.sub.ji 375, and complex powers entering the branch through bus i and bus j, P.sub.ij+jQ.sub.ij 360 and P.sub.ji+jQ.sub.ji 365. The complex powers include the active powers, P.sub.ij and P.sub.ji, reactive powers, Q.sub.ij and Q.sub.ji.
(23) The measurement units are usually connected to a bus, and provide various measurements of the bus and branches connected to the bus. The PMU associated with a bus measures the complex voltage of the bus, and the complex currents of branches connected to the bus. For example, if the PMU is installed at bus i 310, the PMU can provide measurements of the voltage of bus i, V.sub.i 350, and the current entering the branch between bus i 310 and bus j 320 through bus i, I.sub.ij 370. The RTU associated with a bus measures the magnitude of the voltage of the bus, and the active and reactive powers of branches connected to the bus. In
(24) The complex voltage of a bus can be represented with either rectangular components as
V.sub.i=V.sub.ir+jV.sub.im,(1)
or polar components as:
V.sub.i=|V.sub.i|.sub.V.sub.
wherein V.sub.ir and V.sub.im are the real and imaginary part of voltage at bus i, V.sub.i, and |V.sub.i| and .sub.V.sub.
(25) Similarly, the complex currents of a branch can also be represented with rectangular components,
I.sub.ij=I.sub.ijr+jI.sub.ijm,(3)
or polar components:
I.sub.ij=|I.sub.ij|.sub.I.sub.
wherein I.sub.ijr and I.sub.ijm are the real and imaginary part of current flowing from bus i to bus j, I.sub.ij, and |I.sub.ij| and .sub.I.sub.
(26) Using the rectangular coordinates, the relationship between the currents of a line branch and the voltages of its terminal buses can be described according to:
I.sub.ijr=g.sub.ijV.sub.ir(b.sub.i0+b.sub.ij)V.sub.img.sub.ijV.sub.jr+b.sub.ijV.sub.jm,(5)
I.sub.ijm=(b.sub.i0+b.sub.ij)V.sub.ir+g.sub.ijV.sub.imb.sub.ijV.sub.jrg.sub.ijV.sub.jm,(6)
wherein V.sub.jr and V.sub.jm are the real and imaginary part of the voltage at bus j.
(27) Using the polar coordinates, the relationship of active and reactive powers of a line branch and the voltages of its terminal buses can be described according to:
P.sub.ij=|V.sub.i|.sup.2g.sub.ij|V.sub.iV.sub.j|[g.sub.ij cos(.sub.V.sub.
Q.sub.ij=|V.sub.i|.sup.2(b.sub.i0+b.sub.ij)+|V.sub.iV.sub.j|[b.sub.ij cos(.sub.V.sub.
wherein |V.sub.j| and .sub.V.sub.
(28) Transformer Branch
(29)
(30) Using the rectangular coordinates, the relationship between the currents of a transformer branch and the voltages of its terminal buses can be expressed as Equation (9) and (10) for the connection 401, and Equation (11) and (12) for the connection 402:
(31)
(32) Using the polar coordinates, the relationship of active and reactive powers of a transformer branch and the voltages of its terminal buses can be expressed by Equation (113) and (14) for the connection 401, and equations (15) and (16) for the circuit 402:
(33)
(34) Weighted Least Square Estimation of PMU Areas
(35) For the PMU area, the relationship between the measurements and state variables can be described as
z=Hx+e,(17)
where, z is a measurement vector, x is a state vector, H is a constant coefficient matrix to represent a linear relationship between the measurements and the states, and e is a measurement error vector.
(36) The covariance matrix of measurement error is
R=E{ee.sup.T}(18)
wherein e.sup.T is a transpose of vector e, and E{.} represents the expectation. According to some embodiments, the state estimation is based on another realization that the distribution of measurements follows a normal distribution and measurements are uncorrelated. Therefore, the covariance matrix is a diagonal matrix, and the i-th diagonal element of the covariance matrix is the variance of the i-th measurement z.sub.i, .sub.z.sub.
(37) According to a weighted least square principle, the state estimate can be determined by solving a minimization of the scaling function J(x), thus:
J(x)=[zHx].sup.TR.sup.1[zHx].(19)
(38) The system state can be solved according to the normal equation expressed as follows:
Gx=H.sup.TR.sup.1z,(20)
wherein G is a gain matrix, G=H.sup.TR.sup.1H. Equation (20) is solved using a sparse Cholesky decomposition.
(39) The covariance of the estimate {circumflex over (x)} is Cov({circumflex over (x)})=G.sup.1. For simplification purposes, the variance of any state estimate can be approximated as
(40)
wherein, {circumflex over (x)}.sub.i is the i-th state estimate, .sub.{circumflex over (x)}.sub.
(41) States and Measurements of Linear Estimation Model
(42) One embodiment uses rectangular coordinates to formulate the state estimation model for the PMU areas. The states for each PMU area are represented by the real and imaginary parts of complex voltages for each bus in the area:
(43)
wherein V.sub.r and V.sub.m are the vectors of real part and imaginary part of voltages of buses in the PMU observed area respectively.
(44) The measurements for each PMU area includes the PMU voltage measurements of buses, PMU currents measurements of branches, and pseudo current measurements of branches that derived from active and reactive power measurements from RTUs:
(45)
wherein V.sub.r.sup.PMU and V.sub.m.sup.PMU are the vectors of real part and imaginary part of PMU voltage measurements of buses, I.sub.r.sup.PMU and I.sub.m.sup.PMU are the vectors of real part and imaginary part of PMU current measurements of line or transformer branches, and I.sub.r.sup.PSEUDO and I.sub.m.sup.PSEUDO in are the vectors of pseudo current measurements derived from RTU active and reactive power measurements of line or transformer branches.
Accordingly, the measuring error vector and covariance matrix can be partitioned based on the type of measurements:
(46)
R=diag{.sub.V.sub.
(47) wherein, e.sub.V.sub.
(48) The PMU measurements and associated variances are usually given in terms of polar coordinates, that is in the form of the magnitude and phase angle. Those values have to be converted into rectangular form to be used in the state estimation procedure. The PMU measurements of voltages and currents in rectangular coordinates can be determined using Equation (26) and (27) for voltage measurements, and equation (28) and (29) for current measurements based on the PMU measurements given in polar coordinates:
V.sub.ir=|V.sub.i|cos .sub.V.sub.
V.sub.im=|V.sub.i|sin .sub.V.sub.
I.sub.ijr=|I.sub.ij|cos .sub.I.sub.
I.sub.ijm=|I.sub.ij|sin .sub.I.sub.
(49) Some embodiments use Equation (30) to determine the variances of measurements based on the given variances in other format. If a measurement of a required variable is not available, but can be determined from other known actual or pseudo measurement variables, then one embodiment determines a variance of the required variable according to
(50)
wherein z.sub.i and .sub.z.sub.
z.sub.i=f(y.sub.1, y.sub.2, . . . , y.sub.m)(31)
wherein f/y.sub.j is the derivative of the required variable z.sub.i with respect to the known variable y.sub.j, and in is the total number of associated variables used to determine the required variable.
(51) Based on Equations (30), (26) and (27), the variances of real and imaginary part of voltages can be determined according to:
.sub.V.sub.
.sub.V.sub.
wherein, .sub.V.sub.
.sub.I.sub.
.sub.I.sub.
wherein, .sub.I.sub.
(52) The pseudo current measurements can be determined based on the given active and reactive power measurements from RTUs. If a PMU voltage measurement is given for the same terminal bus that the RTU power measurements are measured, the pseudo current measurements can be determined accordingly.
(53) Taken a branch between bus i and bus j as example, if the voltage of bus j is provided by a PMU, and the powers of the branch is also provided by a RTU at the same terminal bus j, then the corresponding currents flowing from bus j to bus i can be determined according to:
(54)
wherein, I.sub.jir and I.sub.jim are the required real and imaginary part of pseudo measurements of currents flowing from bus j to bus i, P.sub.ji and Q.sub.ji are the active and reactive powers flowing from bus j to bus i that measured by a RTU at bus j, V.sub.jr and V.sub.jm are the real and imaginary part of voltage that measured by a PMU at bus j. The variance of the pseudo currents can be determined using Equation (30) and Equation (36) and (37).
(55) As shown in
(56)
(57) The example 501 represents a situation when a branch is measured by both RTU and PMU but at a different side of the branch. The voltage of bus associated with RTU is determined first based on the PMU voltage and current measurements at the opposite side to the bus with RTU. Then, the pseudo currents are calculated based on the RTU power measurements and calculated voltage at the same bus accordingly. In the scenario, the branch connects bus i, 510 and bus j, 515. The active and reactive powers flowing from bus j to bus P.sub.ji+jQ.sub.ji 535 are measured by a RTU at bus j, 515, but the voltage of bus j, 515 is not provided. The opposite side bus i, 510 is equipped with a PMU, and both the voltage at bus i, V.sub.i 520 and current flowing from bus i to bus j, I.sub.ij 530 are measured. Thus, a calculated voltage of bus j, V.sub.j is firstly determined based on the voltage of bus i, V.sub.i 520 and current flowing from bus i to bus j, I.sub.ij 530 by using Equation (38) and (39) for a line branch, and Equation (40) and (41) for a transformer branch with the transformer ratio at the side of bus j, and Equation (42) and (43) for a transformer branch with the transformer ratio at the side of bus i.
(58)
(59) Then using the calculated voltage at bus j, and active and reactive power from bus j to bus i, 535 to determine the pseudo measurements of currents from bus j to bus i, 540. The variances of calculated voltage, and pseudo current measurements can be determined by using Equation (30) and above equations accordingly.
(60) The example 502 represents a situation that a branch is measured only by a RTU, but an adjacent branch is measured by a PMU. The voltage of bus associated with RTU is firstly determined based on the PMU voltage and current measurements at the adjacent branch, and then based on the voltage and RTU power measurements, the pseudo current measurements are determined accordingly. In this scenario, there are two branches, one is between bus i, 550 and bus j, 555, and the other is between bus j, 555 to bus k, 560. Bus i 550 is connected to the PMU, and both the voltage of bus i, V.sub.i 565 and current flowing from bus i to bus j, I.sub.ij 570 are measured by the PMU. Bus j 555 is connected to the RTU, and the active and reactive powers flowing from bus j 555 to bus k 560, P.sub.jk+jQ.sub.jk 575 is measured by the RTU. For this example, a voltage at bus j 555, V.sub.j is first determined based on equation (38), (39) for a line branch, and (40), (41) or (42) and (43) for a transformer branch. The required pseudo current I.sub.jk 580 is then calculated based on equations using Equation (36) and (37) by replacing subscript i with k. The variances of pseudo current measurements can also be determined based on those equations and equation (30).
(61) Constant Coefficient Matrix of Linear Estimation Model
(62) According to the type of measurement and state, the coefficient matrix can be partitioned into twelve sub-matrices:
(63)
wherein the subscripts use a pair of two variables to represent the corresponding types of measurements and states. The constant matrix H is constructed based on the measurement location and branch current equations described in the section of transmission line and transformer models.
(64) H.sub.V.sub.
(65) H.sub.V.sub.
(66) H.sub.I.sub.
(67) H.sub.I.sub.
(68) Weighted Least Square Estimation of SCADA Areas
(69) For a SCADA area, the measurements z and state variables x can be related as follows:
z=h(x)+e,(45)
wherein h(x) is a nonlinear relationship between the measurement and state variables.
(70) According to weighted least square principle, the state estimate can be found by solving the minimization of the scaling function J(x):
J(x)=[zh(x)].sup.TR.sup.1[zh(x)],(46)
since h is a nonlinear function of x, an iterative procedure is used to obtain the solution of state estimation. The normal equation used for solving for the state changes, at each iteration, is
Gx=H.sup.TR.sup.1z,(47)
where, x is the vector of state changes, z=zh(x) is the vector of mismatches between measurements and true values,
(71)
is the Jacobian matrix that represents the sensitivity of measurement variables with respect to the state variables, and G is the gain matrix, G=H.sup.TR.sup.1H. The sparse Cholesky decomposition is used to solve for the state changes expressed in Equation (47). The solution of Equation (47) is repeated until the state changes are less than a threshold, or a given maximum iteration number is reached.
(72) States and Measurements of Nonlinear Estimation Model
(73) One embodiment uses polar coordinates to formulate the state estimation model for SCADA observed areas. The states for each SCADA observed area are represented by the magnitude and phase angle of complex bus voltages for each bus in the area:
(74)
wherein |V| v and .sub.V are the vectors of magnitudes and phase angles of voltages of buses in the SCADA observed area respectively.
(75) The measurements for each SCADA observed area includes the SCADA voltage magnitude measurements, SCADA active and reactive power measurements, and pseudo voltage measurements determined based on the results of first-level state estimation:
(76)
wherein, |V|.sup.SCADA is the vector of voltage magnitude of buses measured by RTUs, P.sup.SCADA and Q.sup.SCADA are the vectors of active and reactive powers of line or transformer branches measured by RTUs, and |V|.sup.PSEUDO and .sub.V.sup.PSEUDO are the pseudo magnitude and phase angle measurements of voltages of common buses between the study area and PMU areas.
(77) The pseudo voltage measurements are determined based on the first level estimation results, that is, the estimated voltages at the common buses between the area with PMU areas. Since the results are provided in rectangular coordinates, Equations (50) and (51) are used to convert those values into polar coordinates:
(78)
(79) Accordingly, based on the equations (30), (50) and (51), the variances of pseudo magnitude and phase angle measurements of voltages can be determined as:
(80)
wherein, .sub.|V.sub.
(81) Accordingly, the measuring error vector and covariance matrix can be partitioned based on the type of measurements:
(82)
wherein, e.sub.|V|.sub.
(83) Jacobian Matrix of Nonlinear Estimation Model
(84) According to the type of measurement and state, the Jacobian matrix can be partitioned into ten sub-matrices:
(85)
wherein a pair of two variables are used as subscripts of matrices to represent the corresponding types of measurements and states. The Jacobian matrix H is constructed based on the measurement location and branch power equations described in the section of transmission line and transformer models.
(86) H.sub.|V|.sub.
(87) H.sub.P.sub.
(88) H.sub.Q.sub.
(89) H.sub.|V|.sub.
(90) H.sub..sub.
(91) Among the sub-matrices, H.sub.P.sub.
EXAMPLE
(92)
(93) In step 610, based on the topology of the connectivity and type of measurement unit, the buses of the power system are grouped into the set of PMU observed areas, and the set of SCADA observed areas as shown in
(94) In step 615, all the PMU measurements and associated variances expressed in polar coordinates are converted into rectangular coordinates, including bus complex voltages, and branch complex currents.
(95) In step 620, a set of pseudo branch current measurements are generated based on the SCADA measurements of powers on the branches and PMU measurements on the associated buses for the PMU observed areas.
(96) In step 625, according to the latest PMU measurements and pseudo measurements generated in step 620, a linear state estimation is formulated in rectangular coordinates for each PMU observed area based on the relationship between the measurements and state of buses, and the real and imaginary part of bus voltage are taken as the state variables.
(97) In step 630, a sparse matrix factorization, e.g., the sparse Cholesky decomposition, is used to solve the complex voltage for each bus in the PMU observed area.
(98) In step 635, a set of pseudo voltage and phase angle measurements for the common buses between the SCADA area and the PMU areas is generated and the associated variance are set based on the diagonals of covariance of voltage and phase angle estimates determined in step 630.
(99) In step 640, the complex voltages for all buses at the SCADA areas are initialized with the latest estimate.
(100) In step 645, the derivative matrix of measurements over states is determined according to latest estimate of states, and then an linear model is formulated in polar coordinates for each SCADA observed area based on the SCADA measurements and pseudo measurement generated in step 635, and the state variables are the incremental changes of the voltage magnitude and the phase angle for each bus in the area.
(101) In step 650, a sparse matrix factorization, e.g., the sparse Cholesky decomposition is used to obtain the incremental state changes for the buses in a SCADA observed area, and the states of common buses between SCADA and PMU observed areas are also updated with new solution.
(102) In step 655, the maximum state change is determined. In step 660, the required accuracy is tested, and the method continues with step 670, if the mismatches are less than a threshold, or, otherwise, to step 645. In step 670, based on the state estimate update for SCADA observed areas in step 650, and state estimate for PMU observed areas in step 630, a full set of complex voltage estimate of buses is generated, and then the currents and powers for each branch are determined accordingly.
(103) The above-described embodiments of the present invention can be implemented in any of numerous ways. For example, the embodiments may be implemented using hardware, software or a combination thereof. When implemented in software, the software code can be executed on any suitable processor or collection of processors, whether provided in a single computer or distributed among multiple computers. Such processors may be implemented as integrated circuits, with one or more processors in an integrated circuit component. Though, a processor may be implemented using circuitry in any suitable format.
(104) Further, it should be appreciated that a computer may be embodied in any of a number of forms, such as a rack-mounted computer, a desktop computer, a laptop computer, minicomputer, or a tablet computer. Such computers may be interconnected by one or more networks in any suitable form, including as a local area network or a wide area network, such as an enterprise network or the Internet. Such networks may be based on any suitable technology and may operate according to any suitable protocol and may include wireless networks, wired networks or fiber optic networks.
(105) Also, the various methods or processes outlined herein may be coded as software that is executable on one or more processors that employ any one of a variety of operating systems or platforms. Additionally, such software may be written using any of a number of suitable programming languages and/or programming or scripting tools, and also may be compiled as executable machine language code or intermediate code that is executed on a framework or virtual machine.
(106) In this respect, the invention may be embodied as a non-transitory computer-readable medium or multiple computer readable media, e.g., a computer memory, compact discs (CD), optical discs, digital video disks (DVD), magnetic tapes, and flash memories. The terms program or software are used herein in a generic sense to refer to any type of computer code or set of computer-executable instructions that can be employed to program a computer or other processor to implement various aspects of the present invention as discussed above.
(107) Computer-executable instructions may be in many forms, such as program modules, executed by one or more computers or other devices. Generally, program modules include routines, programs, objects, components, data structures that perform particular tasks or implement particular abstract data types. Typically the functionality of the program modules may be combined or distributed as desired in various embodiments.
(108) Also, the embodiments of the invention may be embodied as a method, of which an example has been provided. The acts performed as part of the method may be ordered in any suitable way. Accordingly, embodiments may be constructed in which acts are performed in an order different than illustrated, which may include performing some acts simultaneously, even though shown as sequential acts in illustrative embodiments.
(109) Although the invention has been described by way of examples of preferred embodiments, it is to be understood that various other adaptations and modifications can be made within the spirit and scope of the invention. Therefore, it is the object of the appended claims to cover all such variations and modifications as come within the true spirit and scope of the invention.