Cement production apparatus
09616401 ยท 2017-04-11
Assignee
Inventors
- Daisuke Sakaniwa (Naka, JP)
- Yoshinori Takayama (Naka, JP)
- Junzhu Wang (Naka, JP)
- Hirokazu Shima (Naka, JP)
Cpc classification
F27B7/2041
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F27B7/20
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
B01F35/80
PERFORMING OPERATIONS; TRANSPORTING
Y02P40/121
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
C04B7/43
CHEMISTRY; METALLURGY
International classification
C04B7/43
CHEMISTRY; METALLURGY
F27B7/20
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Abstract
A cement production apparatus having: a duct 21 in which exhaust gas drained from a lower cyclone flows upward, distributes and introduces the exhaust gas to upper cyclones; material-supplying pipes 22 for supplying cement raw material connected to both side parts of one side surface of the duct 21 below a distribution part 23 among the upper cyclones; and a supply-amount controller 26 provided on an upstream position above the material-supplying pipes 22 for controlling supply-amounts of the cement raw material to the material-supplying pipes 22: and when H is a vertical distance between a horizontal surface P1 passing through centers of distribution outlets 21a of the upper cyclones and a horizontal surface P2 passing through centers of connecting ports 22a of the material-supplying pipes 22, and D is a diameter of the duct 21, a ratio H/D is set to 1.4 to 2.5.
Claims
1. A cement production apparatus comprising: a plurality of cyclones vertically connected to each other in which exhaust gas generated in a cement kiln flows; a duct provided between two upper cyclones and a lower cyclone being arranged below the upper cyclones, the duct in which the exhaust gas drained from the lower cyclone flows upward, distributing and introducing the exhaust gas to the upper cyclones; material-supplying pipes to supply cement raw material, each of the material-supplying pipes connected to a corresponding side part of the duct below a distribution part among the upper cyclones; and a supply-amount controller provided on an upstream position above the material-supplying pipes to control supply-amounts of the cement raw material to the material-supplying pipes, wherein H is a vertical distance between a horizontal surface passing through centers of distribution outlets of the upper cyclones and a horizontal surface passing through centers of connecting ports of the material-supplying pipes, D is a diameter of the duct, and a ratio H/D is set to 1.4 to 2.5.
2. A cement production apparatus comprising: a plurality of cyclones vertically connected to each other in which exhaust gas generated in a cement kiln flows; a duct provided between two upper cyclones and lower cyclone being arranged below the upper cyclones, the duct in which the exhaust gas drained from the lower cyclone flows upward, distributing and introducing the exhaust gas to the upper cyclones; material-supplying pipes to supply cement raw material connected to vertically separated positions of a side surface of the duct below a distribution part among the upper cyclones; and a supply-amount controller provided on an upstream position above the material-supplying pipes configured to control supply amounts of the cement raw material, wherein h is a distance between centers of connecting ports of the material-supplying pipes and D is a diameter of the duct, and a ratio h/D is set to 0.4 to 1.3.
3. The cement production apparatus according to claim 1, wherein a distance between centers of the material-supplying pipes is equal to Dd where D is a diameter of the duct and d is a diameter of the material-supplying pipes.
4. The cement production apparatus according to claim 1, wherein the material-supplying pipes are inclined by an angle of 20 to 50 with respect to an axis of the duct.
5. The cement production apparatus according to claim 1, wherein the connecting ports of the material-supplying pipes are flush with an inner wall surface of the duct.
6. The cement production apparatus according to claim 2, wherein the material-supplying pipes are inclined by an angle of 20 to 50 with respect to an axis of the duct.
7. The cement production apparatus according to claim 2, wherein the connecting ports of the material-supplying pipes are flush with an inner wall surface of the duct.
8. The cement production apparatus according to claim 1, wherein the material-supplying pipes are oriented in a substantially parallel manner with one another.
Description
BRIEF DESCRIPTION OF THE DRAWING
(1)
(2)
(3)
(4)
(5)
(6)
(7)
DETAILED DESCRIPTION OF THE INVENTION
(8) Below, embodiments of a cement production apparatus according to the present invention will be described with reference to the drawings.
(9) As generally shown in
(10) The cement kiln 4 is a rotary kiln having a lateral-cylindrical shape slightly inclined, in which, by rotating around an axis, while carrying the cement raw material supplied from the preheater 3 to a kiln inlet part 6 to a kiln-outlet part 7, cement clinker is generated by heating and burning to about 1450 C. by a burner 8 in the kiln-outlet part 7 in the carrying process, and then the cement clinker is sent out to the cooler 5 from the kiln-outlet part 7. The cement clinker is cooled to prescribed temperature in the cooler 5, and sent to a finishing process.
(11) Exhaust gas which is generated in the cement kiln 4 flows upward in the preheater 3 from a lower part, and then is introduced into the raw mill-and-dryer 2 through an exhaust pipe 9. By the exhaust gas being introduced from the cement kiln 4, the raw mill-and-dryer 2 grinds the cement raw material and dries simultaneously. The raw mill-and-dryer 2 is connected to an exhaust-gas line 12 having a dust collector 10, a chimney 11 and the like.
(12) The preheater 3 is constructed by vertically connecting a plurality of cyclones 13 in which the exhaust gas generated in the cement kiln 4 flows therein. A cyclone 13D which is a lowest part of the preheater 3 is connected to the kiln inlet part 6 of the cement kiln 4.
(13) In
(14) A duct 21 of the preheater 3 connects the cyclones 13A of the top stage which are arranged by two with one of the cyclones 13B of the third stage. To the duct 21, a material-supplying pipes 22 to which the material is supplied from the raw mill-and-dryer 2 are connected. The duct 21 is extended vertically upward from the cyclone 13B of the third stage, and then branched to left-and-right through a distribution part 23, so that distribution outlets 21a are connected to two upper cyclones 13A respectively. In
(15) Connection ports 22a of the material-supplying pipes 22 opening in the duct 21 are connected below the distribution part 23 of the duct 21, and provided by two as a same number as that of the distribution outlets 21a among the upper cyclones 13A. Connecting positions thereof are arranged at both side parts of a side surface of the duct 21 as shown in
(16) As shown in
(17) The connecting ports 22a of the material-supplying pipes 22 are flush with an inner wall surface of the duct 21. The material-supplying pipes 22 are inclined by a suitable angle of 20 to 50 with respect to an axis of the duct 21. The cement raw material is supplied with being fallen down through the material-supplying pipes 22. The material-supplying pipes 22 in
(18) A supply-amount controller 26 controlling supply-amounts of the cement raw material supplied to the material-supplying pipes 22 is provided in upper reaches above the material-supplying pipes 22. By the supply-amount controller 26, a structure is achieved so that the supply-amounts of the cement raw material supplied to the material-supplying pipes 22 are controlled and distributed to the material-supplying pipes 22 in order to uniformly pre-heat the cement raw material supplied to the distribution outlets 21a. The distribution part 23 is an intersection point at which the axis C1 of the duct 21 meets a line C2 linking centers of the distribution outlets 21a with each other to both the cyclones 13A of the upper stage (refer to
(19) In the cement production apparatus constructed as above, when the cement raw material is supplied from the material bunker 1, the cement raw material is milled and dried in the raw mill-and-dryer 2, charged in the preheater 3 from the material-supplying pipe 22, and then supplied to the lower cement kiln 4 while falling in the preheater 3. In the preheater 3, the exhaust gas from the cement kiln 4 flows upward sequentially in the cyclones 13 from the lower part in a counter direction to that of the cement raw material, so that the cement raw material is pre-heated by the exhaust gas from the cement kiln 4 while passing through the cyclones 13 to prescribed temperature (for example, 900 C.). The pre-heated cement raw material is supplied to the kiln inlet part 6 of the cement kiln 4 from the lowest cyclone 13D.
(20) It will be further described to supply the cement raw material from the material-supplying pipes 22. In the duct 21 to which the material-supplying pipes 22 are connected, the exhaust gas rising from the cyclone 13B of the lower stage (the third stage) flows, so that the cement raw material is introduced into the cyclone 13A of the upper stage (a fourth stage) by being carried by the flow. Meanwhile, the exhaust gas generated by combustion in the cement kiln 4 rises inside the preheater 3 as a swirl flow by the cyclones 13. The cement raw material is supplied from the material-supplying pipes 22 and is dropped into the swirl flow.
(21) As shown by velocity vectors in a horizontal cross sectional direction in
(22) As shown in a schematic view shown in
(23) In the horizontal surface P2 passing through the centers of the connecting ports 22 of the material-supplying pipes 22 in which the ratio H/D between the vertical distance H and the diameter D of the duct 21 is set to 1.4 to 2.5, when seeing from above the duct 21, the flow of the exhaust gas flowing out to the distribution outlets 21 among the upper cyclones 13A forms symmetrical swirl flows by 180 at a center part of the duct 21. Accordingly, by providing the connecting ports 22a of the material-supplying pipes 22 on both the one side parts of the side surface of the duct 21, the connecting ports 22a are arranged so as to be separated maximally from each other at the one side surface of the duct 21. As a result, the connecting ports 22a of the material-supplying pipes 22 can be arranged at positions corresponding to the two swirl flows appearing in the duct 21.
(24) The cement raw material supplied from the one material-supplying pipes 22 among the material-supplying pipes 22 provided on the one side surface of the duct 21 is supplied along the swirl flow (in a parallel-flow side); meanwhile, the cement raw material supplied from the other material-supplying pipe 22 is supplied against the swirl flow (in a counter-flow side). The cement raw material in the parallel-flow side along the swirl flow can be supplied on the swirl flow; meanwhile, the cement raw material in the counter-flow side against the swirl flow can be supplied on the swirl flow since the swirl flow is strong, though colliding with the swirl flow. Therefore, the material dropped from the material-supplying pipes 22 is supplied to both the upper cyclones 13A from the distribution part 23 with being carried upward with the swirl flows.
(25) On the upstream position above the material-supplying pipes 22, the supply-amount controller 26 is provided for controlling the supply-amounts of the cement raw material to the material-supplying pipes 22, so that deviation of the material supply-amounts can be calibrated by the supply-amount controller 26. Accordingly, the supply-amounts of the cement raw material supplied to the material-supplying pipes 22 are controlled and distributed to the material-supplying pipes 22 so as to equalize temperatures of the cement raw material supplied to the distribution outlets 21a. Therefore, the cement raw material can be supplied to the respective swirl flows with controlling, so that the cement raw material supplied to the distribution outlets 21a can be pre-heated uniformly.
(26) As a result, respective pre-heating states of the cement raw material supplied to the cyclones can be equalized, so that the loads of both the cyclones are balanced. When gas-temperature difference between outlets of the cyclones of the top stage of the preheater exceeds 100 C. for example, a heat-consumption rate is increased at least 3 kcal/kg-cli or more. By equalizing the pre-heating states as in the apparatus of the present invention, the temperature difference is decreased so that the heat-consumption rate can be reduced. Furthermore, since the connecting ports 22a of the material-supplying pipes 22 are provided to be flush with the inner wall surface of the duct 21, there is no resistance against the swirl flows rising from below, and it is possible to perform an operation with low pressure loss and small energy consumption.
(27) By providing the connecting ports 22a on the one side surface of the duct 21, the material-supplying pipes 22 can be disposed from the one side of the duct 21, so that it is easy to lay the material-supplying pipes.
(28) If the ratio H/D is too small, it is not desirable because dispersibility of material is deteriorated since the connecting ports 22a of the material-supplying pipes 22 approach a distribution part 23 to the upper cyclones 13A. If the ratio H/D is too large, the heat-exchanging efficiency between the exhaust gas and the material is deteriorated since the material supplied from the material-supplying pipes 22 is dropped to the lower cyclone 13. Therefore, it is preferable to set the ratio H/D in a range of 1.4 to 2.5.
(29) Next,
(30) In this case, by arranging the connecting ports 22a of the material-supplying pipes 22 to be vertically separated on the one side surface of the duct 21 and setting the ratio h/D to 0.4 to 1.3, the connecting ports 22a of the material-supplying pipes 22 can be arranged at positions corresponding to the swirl flows generated in the duct 21.
(31) On the upstream position above the material-supplying pipes 22, the supply-amount controller 26 for controlling the supply-amounts of the cement raw material to the material-supplying pipes 22 is provided, so that deviation of the material supply-amounts can be calibrated by the supply-amount controller 26 and the supply-amounts of the cement raw material supplied to the material-supplying pipes 22 can be controlled. Accordingly, the cement raw material supplied to the respective swirl flows with controlling so that temperatures of the cement raw material supplied to the distribution outlets 21a can be equalized and the pre-heating can be equalized. Moreover, since the connecting ports 22a of the material-supplying pipes 22a are arranged at the vertically separated positions on the one side surface, it is easy to lay the material-supplying pipes 22.
(32) If the ratio h/D is less than 0.4, the connecting ports 22a are too close to each other, so that it may be difficult to dispose the connecting ports 22a of the material-supplying pipes 22 at the positions corresponding to the swirl flows. As a result, even if the distribution-amounts are controlled by the supply-amount controller, it may be difficult to pre-heat the cement raw material equally. Furthermore, if the ratio h/D exceeds 1.3, it is not desirable since the cement raw material from the upper and lower material-supplying pipes 22 are carried by the one swirl flow, so that material distribution-amounts at the distribution outlets 21a tend to be biased.
(33) Next, by simulating where the connecting ports of the material-supplying pipes should be arranged in order to drop the cement raw material into the two swirl flows, following results were obtained.
(34) A duct model in simulation was set to have the distribution outlets 21a to the top cyclones: as shown in
(35) As conditions of the simulation, a preheater in a cement kiln had an amount of production of clinker 200 ton/h. In this preheater, to a third cyclone, gas was supplied with gas volume of 14300 Nm.sup.3/h and temperature of 640 C.; and to the material-supplying pipe, gas was supplied with gas volume of 1400 Nm.sup.3/h and temperature of 80 C. An inclined angle of the material-supplying pipes 22 in the duct model 1 was set to 35.
(36) Results of simulating the duct model 1 are shown in Table 1 and
(37) TABLE-US-00001 TABLE 1 TEMPERTURE DIFFERENCE AT MATERIAL DISTRIBUTION SUPPLY-AMOUNT RATIO RATIO OUTLETS (%) H/D ( C.) RIGHT LEFT 1.45 43.0 50 50 1.88 6.0 50 50 2.26 18.5 50 50 2.64 72.4 50 50
(38) As clear from the results shown in Table 1 and
(39) Next, with respect to the above-mentioned duct model 1, thermal fluid simulation was operated by controlling the supply-amounts of the cement raw material distributed to the material-supplying pipes 22 (material supply-amount ratio) so as to minimize the temperature difference between the exhaust gases at the distribution outlets, and the material supply-amount ratio was optimized. Results of simulating were shown in Table 2 and
(40) TABLE-US-00002 TABLE 2 TEMPERTURE DIFFERENCE AT MATERIAL DISTRIBUTION SUPPLY-AMOUNT RATIO RATIO OUTLETS (%) H/D ( C.) RIGHT LEFT 1.45 12.1 10 90 1.88 4.8 47 53 2.26 10.9 81 19 2.64 72.4 50 50
(41) As clear from the results shown in Table 2 and
(42) Next, as shown in
(43) In the duct model 2, five types of the duct models were configured to have the ratio h/D as 0.25, 0.38, 0.76, 1.14, and 1.52 respectively, so that the thermal fluid simulation of the duct models were carried out: h is the center distance of the connecting ports 22a of the material-supplying pipes 22, and D is the diameter of the duct 21. The supply-amounts of the cement raw material to the material-supplying pipes 22 (material supply-amount ratio) were set equally. Conditions of the simulation were set as that of the duct model 1. An inclined angle of the material-supplying pipes 22 in the duct model 2 was also set to 35.
(44) Results of the duct model 2 were shown in Table 3 and
(45) TABLE-US-00003 TABLE 3 TEMPERTURE DIFFERENCE AT MATERIAL DISTRIBUTION SUPPLY-AMOUNT RATIO RATIO OUTLETS (%) h/D ( C.) RIGHT LEFT 0.25 60.6 50 50 0.38 50.4 50 50 0.76 44.9 50 50 1.14 51.4 50 50 1.52 63.4 50 50
(46) As clear from the results shown in Table 3 and
(47) The present invention is not limited to the above-described embodiments and various modifications may be made without departing from the scope of the present invention.
(48) For example, though it was explained to supply the material to the duct that was connected to the cyclone 13A of the top stage, the present invention can be employed for a case in which the material is supplied to the ducts to the cyclones which are provided in plural at each of the stages, or to a rising duct 25 (refer to
(49) Moreover, the present invention can be employed not only for supplying raw material sent from a mill as cement raw material, but also for a case for supplying material while being introduced to the lower cyclone with being pre-heated after flowing through the upper cyclone.
INDUSTRIAL APPLICABILITY
(50) It can be applied for a cement production apparatus that produces cement clinker by burning cement raw material in a kiln while supplying to a preheater.
DESCRIPTION OF REFERENCE SYMBOLS
(51) 3 preheater 4 cement kiln 6 kiln inlet part 13, 13A to 13D cyclone 21 duct 21b inner wall surface 22 material-supplying pipe 23 distribution part 24 upper end 25 rising duct 26 supply-amount controller