Flexible tubular pipe for transporting a petroleum fluid such as a multiphase fluid or a gas
09618419 · 2017-04-11
Assignee
Inventors
- Frédéric Demanze (Caudebec en Caux, FR)
- Antoine Felix-Henry (Rouen, FR)
- Thomas Epsztein (Voillecomte, FR)
- Patrice Jung (La Mailleraye sur Seine, FR)
- Jean-Christophe Bourget (Mont Saint Aignan, FR)
- Cécile Izarn (Tours, FR)
Cpc classification
F16L2201/30
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F16L33/01
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F16L11/10
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F16L11/083
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
International classification
F16L11/10
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F16L11/08
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
G01M3/28
PHYSICS
Abstract
The present disclosure relates to a flexible tubular pipe (1) of the unbonded type and including, from the inside to the outside, an internal carcass (2), first and second polymeric sheaths (3, 4), at least one tensile armor layer (6, 7) and a polymeric sealing sheath (8) and also at each of its ends, a connecting endpiece (10) comprising i.a., a tubular sleeve (15). The tubular sleeve (15) of a first endpiece (10) includes means (30, 31, 32) for draining the gases from the gap (25) between the sheaths (3, 4) towards the outside of the pipe (1) and the tubular sleeve of the second endpiece (10) including means for draining the gases from the gap (25) between two sheaths (3, 4) towards the outside or towards the inside of the pipe (1).
Claims
1. A flexible unbonded tubular pipe for transporting a petroleum fluid comprising: a first polymeric sheath; a second polymeric sheath; at least one tensile armor layer; and a polymeric sealing sheath the pipe having a first end and a second end and comprising, at its first end, a first connecting endpiece, and, at its second end, a second connecting endpiece, the first connecting endpiece and the second connecting end piece each comprising: an end vault and a tubular sleeve partly inserted between a free end of the first polymeric sheath and a free end of the second polymeric sheath, the tubular sleeve cooperating with a crimping assembly providing a sealing between the free end of the second polymeric sheath and the end vault, the tubular sleeve of the first connecting endpiece including a first drainer for draining the gases from a gap between the first polymeric sheath and the second polymeric sheath, towards an outside of the pipe, the tubular sleeve of the second connecting endpiece including a second drainer for draining the gases from the gap between the first polymeric sheath and the second polymeric sheath towards the outside of the pipe or towards an inside of the pipe.
2. The flexible unbonded tubular pipe according to claim 1, further comprising an internal carcass located inside the first polymeric sheath and the second polymeric sheath and a pressure vault between the second polymeric sheath and said at least one armor layer.
3. The flexible unbonded tubular pipe according to claim 1, wherein the first connecting endpiece comprises an additional crimping assembly providing a sealing function between the first polymeric sheath and the tubular sleeve.
4. The flexible unbonded tubular pipe according to claim 1, wherein the second drainer for draining the gases towards an inside of the pipe comprise at least one axial channel delimited in the thickness of the tubular sleeve and extending between end edges of the tubular sleeve.
5. The flexible unbonded tubular pipe according to claim 4, wherein the second drainer for draining the gases towards an inside of the pipe comprise several axial channels shifted relatively to each other in a circumference of the tubular sleeve.
6. The flexible unbonded tubular pipe according to claim 1, wherein the first drainer for draining the gases towards the outside comprises at least one axial channel made in the thickness of the tubular sleeve and extending between an end edge of the tubular sleeve placed in the gap between the first polymeric sheath and the second polymeric sheath and an annular internal chamber delimited between the tubular sleeve, the end vault and the free end of the second polymeric sheath.
7. The flexible unbonded tubular pipe according to claim 6, wherein the first drainer for draining the gases towards the outside comprise several axial channels shifted relatively to each other in a circumference of the tubular sleeve.
8. The flexible unbonded tubular pipe according to claim 6, wherein the annular internal chamber communicates with the outside of the pipe through a passage extending through the end vault and including an inlet orifice opening into the annular internal chamber and an outlet orifice opening outside of the pipe.
9. The flexible unbonded tubular pipe according to claim 8, wherein the outlet orifice of the passage is equipped with a differential valve.
10. The flexible unbonded tubular pipe according to claim 8, wherein the outlet orifice of the passage is connected to a system for measuring the pressure difference of the gas between the outlet orifice of the passage and an inside of the pipe and/or is connected to a gas analysis system.
11. The flexible unbonded tubular pipe according to claim 8, wherein the outlet orifice of the passage is connected to a system for measuring the temperature of the gases and/or to a system for measuring the flow rate of the gases.
12. A method for testing the seal of an interlayer space of a flexible unbonded tubular pipe according to claim 1, the method comprising: pressurizing an inner volume space (V.sub.i) for fluid transport, to a first pressure (P.sub.i); stabilizing the pressure (P.sub.i) in the inner volume space (V.sub.i); and measuring the pressure (P.sub.ei ) within an interlayer space (ei).
13. The test method according to claim 12, wherein the fluid used for pressurizing at least one space of the conduit is selected from a gas and a liquid.
14. The test method according to claim 12, comprising, after stabilizing the pressure (P.sub.i) in the inner volume space (V.sub.i) putting the inner volume space in fluidic communication with the interlayer space, and pressurizing the inner volume space and the interlayer space, to the pressure set when pressurizing an inner volume space (V.sub.i) for fluid transport to a first pressure (P.sub.i ).
15. The test method according to claim 12, further comprising, after measuring the pressure (P.sub.ei) within an interlayer space (ei), depressurizing the inner volume space, with the inner volume space and the interlayer space being connected together.
16. The test method according to claim 15, further comprising, after measuring the pressure (P.sub.ei) within an interlayer space (ei) depressurizing the interlayer space by opening at least one tapping.
17. The test method according to claim 12, further comprising, between stabilizing the pressure (P.sub.i) in the inner volume space (V.sub.i) and measuring the pressure (P.sub.ei) within an interlayer space (ei), measuring the pressure (P.sub.i) within the inner volume space (V.sub.i).
18. The test method according to claim 17, further comprising after measuring the pressure (P.sub.i) within the inner volume space (V.sub.i), depressurizing the inner space to an intermediate pressure below the first pressure.
19. The test method according to claim 17, further comprising, between stabilizing the pressure (P.sub.i) in the inner volume space (V.sub.i) and measuring the pressure (P.sub.ei) within an interlayer space (ei), pressurizing the volume of the interlayer space to a pressure greater than the intermediate pressure and less than or equal to the first pressure set when pressurizing an inner volume space (V.sub.i) for fluid transport to a first pressure (P.sub.i).
20. The test method according to claim 17, further comprising, after measuring the pressure (P.sub.ei) within an interlayer space (ei), depressurizing the interlayer space.
21. The test method according to claim 20, wherein depressurizing the interlayer space is followed by depressurization of the inner volume space.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1) The invention will be better understood upon reading the description which follows, only given as an example and made with reference to the appended drawings, wherein:
(2)
(3)
(4)
(5)
(6)
(7)
(8)
DESCRIPTION OF PREFERRED EMBODIMENTS
(9) In
(10) The flexible tubular pipe 1 comprises from the inside to the outside: an internal carcass 2 consisting of a wound, profiled and interlocked metal strip according to a short-pitch helix, typically with a helix angle comprised between 70 and 90, and intended for withstanding crushing under the effect of the external pressure applied to the pipe, a first polymeric sheath 3 of small thickness, a so-called <<sacrificial sheath>>, a second sealing polymeric sheath 4 or <<pressure sheath>>, said sheaths 3 and 4 being made by extrusion of a polymeric material, generally selected from polyolefins, polyamides and fluorinated polymers, a pressure vault 5 made in metal wire for example interlocked, helically wound with a short pitch, typically with a helix angle comprised between 70 and 90, and ensuring resistance to the internal pressure in the pipe 1, at least one tensile armor layer 6 and in the exemplary embodiment illustrated in
(11) This pipe 1 is of the unbonded type, i.e. the different layers making up this pipe 1 have some freedom for moving relatively to each other.
(12) The pipe illustrated in
(13) Alternatively, the pipe may be of the <<smooth bore>> type, i.e. the pipe 1 does not include any internal carcass 2, the first layer starting from the inside being a polymeric sheath in this case.
(14) According to other embodiments, the polymeric sheaths 3 and 4 may be inserted between the pressure vault 5 and the armor layer 6 or further between both armor layers 6 and 7.
(15) According to another alternative, the pipe 1 does not include any pressure vault 5 and in this case, the 55 crossed armor layers provide both functions of absorbing the tension and of absorbing the internal pressure.
(16) According to still another alternative, both polymeric sheaths 3 and 4 form the pressure vault 5.
(17) The flexible tubular pipe 1 at each of its ends includes a connecting endpiece 10 intended to ensure the connection of the pipes with each other or with terminal equipment and these endpieces may be made under conditions ensuring both good firm attachment and a good seal.
(18) Indeed, the connecting endpieces 10 may provide several functions which are notably the anchoring of the tensile armors 6 and 7 as well as the crimping and the sealing of the free ends of the different polymeric sheaths 3, 4 and 8.
(19) In
(20) In these figures, the common elements are designated with the same references and only the elements facilitating the understanding of the invention have been illustrated, the other elements having been suppressed.
(21) Generally, the endpiece 10 comprises an end vault 11 including a front portion 11a intended for the attachment of the tensile armors 6 and 7 by known means, not shown, and a rear portion 11b intended for the attachment on another connecting endpiece or to terminal equipment. This end vault 11 has a cylindrical central bore 18 with an internal diameter substantially equal to the internal diameter of the internal carcass 2, and the function of which is to ensure the flowing of the fluids transported by the pipe 1. This central bore 18 is placed beside the free end 2a of the internal carcass 2, coaxially with the latter, so as to ensure a continuous flow of the fluids between the pipe 1 and the endpiece 10.
(22) The front portion 11 a of the end vault 11 is covered with a cover 12 which also extends above the free end of the polymeric sealing sheath 8 and of the tensile armor layers 6 and 7.
(23) The vault 11 extends above the free ends 2a , 3a and 4a, of the internal carcass 2, of the first polymeric sheath 3 and of the second polymeric sheath 4, respectively.
(24) A tubular sleeve 15 is partly inserted between the free ends 4a and 3a, of the two polymeric sheaths 4 and 3, respectively. For this, the tubular sleeve 15 includes a wedge-shaped front portion 15a placed between the free end 4a of the second polymeric sheath 4 and the first polymeric sheath 3 and a rear portion 15b covering the free end 3a of the first polymeric sheath 3. The tubular sleeve 15 is held in this position by the internal wall of the end vault 11.
(25) The free end 4a of the second sheath 4 is held on the front portion 15a of the tubular sleeve 15 by crimping means 16 interposed between said free end 4a of the second sheath 4 and the internal wall of the front portion 11 a of the vault 11. The means 16 provide a sealing function between the first sheath 3 on the one hand and the tubular sleeve 15 on the other hand. Conventionally, these means advantageously appear as a cone 16 blocked in the crimping and sealing position by a flange 17. The flange 17 is attached on the front portion 11 a of the end vault 11 for example with screwing members 19. Other crimping and sealing means may be used alternatively, notably O-ring gaskets or special gaskets of the type of those described in document WO2004/01269.
(26) Thus, the cone 16 has the role of providing the seal between the second polymeric sheath 4 and the end of vault 11.
(27) In the embodiment illustrated in
(28) During the circulation of the petroleum fluid inside the pipe 1, gases such as hydrogen sulfide and/or carbon dioxide and/or methane diffuse through the internal carcass 2 and the polymeric sheaths 3 and 4, and risk accumulating in the gap 25 between said polymeric sheaths. This accumulation of gas may cause a rise in pressure at this gap 25 which risks causing collapse of the internal carcass 2 during too rapid depressurization of the pipe 1. Indeed, if the depressurization is too rapid, the pressure inside the pipe 1 risks falling much more rapidly than the pressure at the gap 25 because of the difficulty of discharging the gases accumulated at the gap 25. As permeation phenomena through the sheaths are very slow, the essential part of the discharge of the accumulated gases is accomplished axially along the interface and towards the endpieces. During decompression, because of the overpressure at the gap 25, both sheaths 3 and 4 tend to be detached by a few tens of millimeters while generating annular play at their interface, a play along which the gases may be discharged towards the endpieces 10.
(29) In order to facilitate this discharge by reducing the pressure losses at the endpiece 10, the tubular sleeve 15 of the connecting endpiece 10, illustrated in
(30) As shown in
(31) Preferably the means for draining the gases towards the outside comprise several axial channels 30 shifted relatively to each other in the circumference of the tubular sleeve 15 and uniformly distributed over this circumference.
(32) The annular chamber 31 communicates with the outside of the flexible tubular pipe 1 through a passage 32 crossing the vault 11. This passage 32 includes an inlet orifice 32a opening into the annular chamber 31 and an outlet orifice 32b opening onto the outside of the pipe 1.
(33) In the embodiment illustrated in
(34) In a way identical with the first embodiment illustrated in
(35) In this embodiment, the first polymeric sheath 3 is not attached on the tubular sleeve 35 through a crimping and sealing cone. The tubular sleeve 35 is blocked in position by rings 36 and 37 interposed between the rear portion 35b of the tubular sleeve 35 and an internal edge made inside the vault 11.
(36) In order to avoid accumulation of gas in the gap 25 between both polymeric sheaths 3 and 4, the tubular sleeve 35 of the collecting endpiece 10 illustrated in
(37) Preferably, the means for draining the gases towards the inside comprise several axial channels 38 shifted relatively to each other in the circumference of the tubular sleeve 35 and uniformly distributed over this circumference.
(38) In the embodiment illustrated in
(39) According to another alternative, the tubular sleeve 35 and the ring 36 are solid. In this case, the gases diffuse towards the inside of the flexible pipe 1 through the gaps made between the tubular sleeve 35, and the first polymeric sheath 3 and the internal carcass 2. These gases cannot flow towards the outside of the pipe 1 because of the crimping and of the seal produced by the wedge 16 placed between the vault 11 and the free end of the second polymeric sheath 4.
(40) In the case when the pressure sheath 5 is formed with both polymeric layers 3 and 4, the tubular sleeve 15 or 35 is also placed between two polymeric layers.
(41) As shown in
(42) According to the embodiment illustrated in
(43) According to the embodiment illustrated in
(44) The draining of the gases allows continuous purging of the interlayer between the polymeric sheaths during a rise in pressure at this interlayer for example during stoppage of production.
(45) The outlet orifice 32b of the passage 32 may be equipped with a differential draining valve of the type of the one described in document WO 95/56045. Such a valve is intended to open as soon as the pressure prevailing in the annular chamber 31 is greater than a certain value.
(46) The outlet orifice 32b of the passage 32 may also be connected to a gas analyzer of a known type, so as to quantify the gas composition at the gap 25 between both polymeric sheaths 3 and 4 notably with view to determining or not the presence of acid compounds such as hydrogen sulfide and/or carbon dioxide.
(47) The outlet orifice 32b of the passage 32 may also be connected to a known system for measuring the pressure difference of the gases between this outlet orifice, i.e. the pressure prevailing at the gap 25 between the polymeric sheaths 3 and 4 and the inside of the pipe 1.
(48) The outlet orifice 32b of the passage 32 may further be connected to a system for measuring the flow rate of the gases and/or to a sensor for measuring the temperature of the gases.
(49) For example, this system comprises two pressure sensors, not shown, one measuring the pressure prevailing at the gap 25 and the other one measuring the pressure prevailing inside the pipe 1. The sensors are connected to a device, not shown, for recording and continuously processing the measurements.
(50) By continuously controlling in real time this pressure difference, it is therefore possible to strongly reduce the risk of unacceptable overpressure which may cause collapse of the internal carcass of the pipe. Indeed, during gradual depressurization of the flexible pipe 1, the device allows automatic and fast triggering of an alarm so as to slow down the depressurization rate of this flexible pipe 1 in order to bring the pressure difference between the gap 25 on the one hand and the inside of the flexible pipe on the other hand back to an acceptable level. As soon as the pressure difference returns to an acceptable level, the depressurization rate inside the flexible pipe 1 may be increased.
(51) Generally, the measurement device and/or the gas analyzer are placed at least at one connecting endpiece of an end of the flexible pipes, notably at the upper end of the rising pipes (<<risers>>) ensuring the connection between the sea bed and a support floating at the surface.
(52) In an alternative, the pressure sheath 4 may be surmounted with another intermediate polymeric layer 9, for example an anti-permeability sheath or an anti-H.sub.2S screen, crimped at the endpieces 10 to each of the ends of the pipe 1.
(53) According to a first test method, the whole of which is illustrated in
(54) The tubular sleeve 15 includes a wedge-shaped front portion 15a placed between the free end 9a of the intermediate polymeric sheath 9 and the pressure sheath 4 and a rear portion 15b covering the free end 4a of the pressure sheath 4. The tubular sleeve 15 is held in this position by the internal wall of the end vault 11 of the connecting endpiece 10 (not shown).
(55) In order to conduct the <<FAT>> test, at one of the two ends of the pipe 1, the inner volume space Vi, allowing transport of fluids when the pipe 1 is operating, is connected to at least one gap 25 between the pressure sheath 4 and the anti-permeability sheath 9 via at least one of the tubular sleeves 15 which defines at least one axial channel 30 opening into at least one passage 32.
(56) Said or each passage 32 is connected to at least one additional channel 30, crossing the end vault 11 and opening inside the pipe 1, within said inner volume space V.sub.i, without passing through the tubular sleeve 15.
(57) A control valve 99 is interposed on the additional axial channel 30 for selectively opening or closing the channel 30.
(58) A sensor 99A for measuring the pressure in the inner volume space V.sub.i is tapped on the channel 30 between the inner volume space V.sub.i and the valve 99.
(59) At the other end of the pipe 1, the inner volume space V.sub.i is connected via another additional channel 30 to a system 100 for pressurizing the inner volume space V.sub.i.
(60) The system 100 is for example a volumetric pump if the fluid used for the pressurization is a liquid or a compressor if the fluid used for the pressurization is a gas.
(61) The additional axial channel 30 crosses the end vault 11 and opens into an inner volume space V.sub.i without passing through the tubular sleeve 15. At this same end of the pipe, at least on gap 25 between the sheaths 4, 9 is connected, via at least one second axial channel 30, to a pressure measurement system 102.
(62) For example, the system 102 comprises a pressure probe, measuring the pressure prevailing at the gap 25. The probe is connected to a device, not shown, for recording and continuously processing the measurements.
(63) The second axial channel 30 crosses the tubular sleeve 15 placed at this end of the pipe 1.
(64) In order to carry out the tests, the starting of the volumetric pump or of the compressor of the system 100 causes pressurization of the inner volume space V, of the pipe 1. This generates a radial force which is radially applied outwards on the whole of the structure of the pipe 1, and more particularly on the internal carcass 2 and the pressure sheath 4 and the anti-permeability sheath 9.
(65) The anti-permeability sheath 9 subject to this radial force is subject to irreversible plastic deformation by creep inside the gaps of the pressure vault (not shown). When the inner volume space V.sub.i has reached the test pressure P.sub.i (Pis for example at least 1.3 times the design pressure of the tested pipe, which is set), the remaining areas which one also wishes to test, are pressurized via at least one tubular sleeve 15 until the gap 25 defined between both sheaths 4 and 9 has attained the test pressure P.sub.i.
(66) The pressurization of the remaining areas is accomplished by opening the control valve 99 installed along an additional axial channel 30.
(67) The fluid present in the inner volume space V.sub.i flows into at least one of the passages 32, and then into at least one of the second channels 30 for pressurizing the gap 25.
(68) If one waits for a sufficiently long time, an interlayer space ei defining a volume V.sub.ei is generated between the pressure sheath 4 and the intermediate sheath 9.
(69) The volumetric pump is then stopped when the totality of the empty space is at the test pressure determined before the beginning of the <<FAT>> test, i.e. when the inner volume space V.sub.i and the interlayer space ei are both subject to the test pressure P.sub.i.
(70) The continuation of the test first of all comprises a stabilization phase for at least two hours of the pressure within the pipe 1 in order to check the temperature and pressure equilibrium of the system, i.e., check that the pressure remains substantially the same over a short period. For this purpose a 1% variation over a period of one hour is acceptable as notably indicated by the API 17J standard, paragraph 10.3.1.3.
(71) The continuation of the test then comprises a phase for maintaining the tubular pipe 1 under pressure for a period ranging from a few hours, for example during a minimum of 24 hours as recommended by the Standard API 17J paragraph 10.3.1.5 to a few days.
(72) Subsequently, the pressure difference which may exist between the inner volume space V.sub.i and the interlayer space ei is regularly measured (for example every 30 minutes according to the API 17J standard paragraph 10.3.1.5) by means of the pressure sensors 99A, 102. To do this, the pressure P.sub.i within the inner volume space V.sub.i and the pressure P.sub.ei within the interlayer space ei are measured.
(73) If a minute or quasi-zero pressure difference is measured, i.e. if the observed pressure fluctuations are less than or equal to 4% of the test pressure set beforehand, this means that the inner volume space V.sub.i and the interlayer space ei are subject to the same pressure. The sheaths 4 and 9 are then considered as being perfectly intact.
(74) Conversely, if the pressure difference measured by the pressure sensors 99A, 102 is non-zero or varies significantly (pressure variations of more than 4% of the initial test pressure) as compared with what is imposed by the API 17J standard of January 2009 at paragraph 10.3.2 , this means that the seal of the pipe 1 is not total. This means that in at least one point of the pipe 1 and more particularly at the pressure sheath 4 or at the anti-permeability sheath 9, at least one defect exists which does not allow a perfect seal of the pipe 1 to be ensured. Therefore, its delivery and its installation on site cannot be approved favorably.
(75) Finally, the flexible tubular pipe 1 is depressurized in a controlled way, i.e. set values of the depressurization rate imposed by the manufacturer are observed. Here, the maximum depressurization rate is set to 100 bars per hour for depressurization down to a pressure comprised between 5 and 20 bars.
(76) Such a precautionary step is desirable if the intention is not to cause collapse of the internal carcass 2 on itself. Depressurization may be accomplished by reducing in a controlled way the pressure prevailing within the inner volume space V.sub.i, the valve 99 being open, i.e. by reducing the pressure by tapping operations within the interlayer space ei. Preferentially, it is proceeded with depressurization of the pipe 1 by tapping operations within the interlayer space ei.
(77) A second test method is discussed with reference to
(78) In this second test method, the circuit 200 for pressurizing the inner volume space V.sub.i and the circuit 202 for pressurizing the interlayer space ei are able to operate independently of each other.
(79) The circuits 200, 202 remain advantageously connected together through bypass passages 32 located on either side of the pipe 1.
(80) The circuit 200 for pressurizing the inner volume space V, includes a first pressurization system 100 and an additional channel 30, provided with a control valve 202 positioned at a first end of the pipe 1. It further includes an auxiliary depressurization channel 204 provided with a depressurization valve 206 mounted at a second end of the pipe 1.
(81) The additional channel 30 crosses the end vault 11 of a first connecting endpiece 10 in order to open into the inner volume space V. A first bypass passage 32 is tapped on the additional channel 30. The control valve 202 is interposed between the pressurization system 100 and the passage 32.
(82) The depressurization channel 204 crosses the end vault 11 of the endpiece opposite to the endpiece in which the additional channel 30 is made. It is provided with a pressure sensor 208 positioned between the inner volume space V.sub.i and the depressurization valve 206. A bypass passage 32 is tapped on the depressurization pipe 204 between the control valve 206 and the end vault 11.
(83) The circuit 202 for pressurizing the interlayer space ei includes a distinct pressurization system 100A from the system 100, an upstream pipe 208 provided with a control valve 210, a first axial channel 30 connected to the upstream pipe 208, the axial channel 30 crossing the tubular sleeve 15 located in a first endpiece 10 of the pipe 1, and a pressure sensor 212 mounted on the upstream pipe 208. It further includes a second axial channel 30 present in the tubular sleeve 15 of a second endpiece 10 of the pipe 1, a downstream pipe 214 provided with a valve 216 and a second pressure sensor 218 mounted on the downstream conduit 214.
(84) The circuit 202 further includes a recirculation pipe 220 provided with a control valve 222 connecting a first point 221 of the upstream pipe 208 located between the pressurization system 100A and the first valve 210 on the one hand and the second valve 216, without passing through the pipe 1, on the other hand.
(85) The second <<FAT>> test method first of all comprises the pressurization of the inner volume space Vi of the pipe 1, by means of the system 100 including a volumetric pump or a compressor, to a first <<FAT>> pressure P.sub.i determined beforehand.
(86) The pressurization of the inner volume space V.sub.i gives the possibility of checking the seal of the pressure sheath 4 along its current length but also at the crimping of the latter in the endpieces 10.
(87) Once the pressure P.sub.i is reached, the first valve 202 and the second valve 206 are actuated in order to lock the circuit for pressurizing the inner volume space V.sub.i, it is awaited that the pressure within the pipe 1 is stabilized (advantageously according to the API 17J standard), and then the pressure variations are monitored by the pressure sensor 208.
(88) Next, said inner volume space V.sub.i is depressurized from the pressure P.sub.i down to an intermediate pressure P.sub.int strictly lower than P.sub.i by actuation of the valve 206, so that the pressurization of the volume of the interlayer space ei may be possible. During this step, the inner volume space V.sub.i and the interlayer space ei are not connected together.
(89) The value of the pressure P.sub.int is advantageously selected such that:
P.sub.int=P.sub.i(P.sub.collapse20%)=P.sub.i(P.sub.c*0.8)
The collapse pressure P.sub.collapse of the internal carcass 2 depends on the geometry of the tubular pipe 1 which is subject to the <<FAT>> test.
(90) The test is continued by maintaining pressurization of the inner volume space V.sub.i, to the pressure P.sub.int by maintaining the valve 206 closed and the valve 210 is opened for allowing pressurization of the volume of the interlayer space V.sub.ei, by the second system 100A comprising a second volumetric pump or a second compressor, to a pressure P.sub.ei, strictly greater than P.sub.int and at most equal to P.sub.i. Preferentially P.sub.ei is selected to be equal to P.sub.i.
(91) The interlayer space ei is connected to the system 100A through the upstream pipe 208 and through the axial channel 30 crossing the pierced tubular sleeve 15 as well as the end vault 11 of the connecting endpiece 10 (not shown).
(92) Each of the ends of the interlayer space ei is connected, via at least one tubular sleeve 15 and at least one axial channel 30, to a sensor 212, 218 for measuring pressure. The pressure sensor 212, 218 allows measurement of the progression of the pressurization of the interlayer space ei. The pressurized fluid is injected at one of the two ends of the pipe 1, progresses over the whole of the current length of the pipe between the polymeric sheaths 4, 9 until it reaches the other end which is laid out as an open circuit. As soon as the fluid has flowed as far as the end opposite to the one which allowed introduction of said fluid, the pressure sensor 218 detects a pressure variation.
(93) The circuit 202 for pressurization of the interlayer space ei is then closed via the valve 216 and then via the valve 210. The pressure indicated by the pressure sensor 212, 218 should normally remain substantially stable and with a value equal to the pressure P.sub.i.
(94) Subsequently, the pressure tends to become homogenized in the whole of the interlayer space ei. As explained hereinbefore, according to the recommendations mentioned in the normative document API 17J, a stabilization time is observed and the possible pressure fluctuations are monitored within the inner volume space V.sub.i and the intermediate space ei in order to make sure that the pipe 1 is stable in pressure.
(95) As soon as the pipe 1 is estimated to be stable in pressure, it is held under pressure and the pressure difference between the pressure P.sub.i within the inner volume space V.sub.i and the pressure P.sub.ei within the interlayer space ei is frequently measured. This step gives the possibility of checking the integrity of the seal of the interlayer space ei as well as the integrity of the crimpings of the gap 25, at the end of each of the endpieces. The measured pressure difference is less than the pressure P.sub.collapse for collapsing the internal carcass 2.
(96) Finally the tubular pipe 1 is depressurized by starting with depressurization of the interlayer space ei and then of the inner space V. The way how the pipe is depressurized is applied so that it gives the possibility of avoiding a risk of collapse of the internal carcass 2.