Device for launching a subsurface mining vehicle into a water mass and recovering the same from the water mass
09611014 ยท 2017-04-04
Assignee
Inventors
- Johan Heiler (Zoersel, BE)
- Pieter Abraham Lucieer (Rotterdam, NL)
- Kris De Bruyne (Deurne, BE)
- Harmen Derk Stoffers (Breda, NL)
Cpc classification
B63G2008/008
PERFORMING OPERATIONS; TRANSPORTING
B63G8/001
PERFORMING OPERATIONS; TRANSPORTING
B63B2027/165
PERFORMING OPERATIONS; TRANSPORTING
B63B35/44
PERFORMING OPERATIONS; TRANSPORTING
E21C50/00
FIXED CONSTRUCTIONS
B63G2008/007
PERFORMING OPERATIONS; TRANSPORTING
B63B2021/007
PERFORMING OPERATIONS; TRANSPORTING
E02F3/905
FIXED CONSTRUCTIONS
E02F9/003
FIXED CONSTRUCTIONS
International classification
B63B35/44
PERFORMING OPERATIONS; TRANSPORTING
E02F7/00
FIXED CONSTRUCTIONS
E21C50/00
FIXED CONSTRUCTIONS
E02F3/88
FIXED CONSTRUCTIONS
E02F3/90
FIXED CONSTRUCTIONS
Abstract
A device for launching subsurface mining vehicle into a water mass from a docking well of a floating vessel, and/or recovering said vehicle from the water mass is disclosed. The device comprises a docking frame that is hinge mounted to the vessel, and that comprises first mining vehicle engaging means for guiding the mining vehicle along a longitudinal direction of the frame into the water. The docking frame operatively engages with drive means for tilting the frame in a vertical plane between a substantially horizontal mining vehicle docking position and a substantially vertical mining vehicle launching or recovery position. The device further comprises third engaging means for guiding the mining vehicle when the vehicle extends at least partly underneath a base of the vessel. The device allows lowering or recovering subsurface mining vehicle in a controlled manner.
Claims
1. A device for launching a subsurface mining vehicle into a water mass from a docking well of a floating vessel and/or recovering said vehicle from the water mass, the device comprising a docking frame, located at a side of the docking well and a hinge mounted to the vessel, which docking frame comprises first engaging means for guiding the mining vehicle along a longitudinal direction of the frame, and which docking frame operatively engages with drive means for tilting the frame in a vertical plane between a substantially horizontal mining vehicle docking position and a substantially vertical mining vehicle launching or recovery position; the device further comprising third engaging means for guiding the mining vehicle when the vehicle extends at least partly underneath a base of the vessel.
2. The device according to claim 1, wherein the docking well comprises second engaging means for guiding the mining vehicle, the second engaging means connecting to the first engaging means when the frame is in the substantially vertical mining vehicle launching or recovery position.
3. The device according to claim 2, wherein the second engaging means extend along a side wall of the docking well.
4. The device according to claim 2, wherein the first and second engaging means comprise guiding rails, adapted to cooperate with guiding brackets provided on the mining vehicle.
5. The device according to claim 1, wherein the third engaging means are translatable in a vertical direction along the docking well.
6. The device according to claim 1, wherein the third engaging means comprise a plurality of arms that extend in the docking well in a substantially horizontal direction, and are translatable in said horizontal direction.
7. The device according to claim 6, wherein the third engaging means comprise pads adapted to engage with the mining vehicle.
8. The device according to claim 1, wherein the docking frame comprises a pair of parallel docking legs.
9. The device according to claim 1, comprising locking means for securing the frame in an angular position.
10. The device according to claim 1, wherein the drive means comprise hydraulic drive means mounted on the vessel and mechanically linked to the frame.
11. An assembly comprising a device according to claim 1 and a subsurface mining vehicle in engagement with the docking frame.
12. The assembly according to claim 11, wherein the mining vehicle is adapted to mine an underwater bottom in a substantially horizontal position, and the mining vehicle connects with the docking frame in its docking position in the substantially horizontal position of the mining vehicle.
13. The assembly according to claim 11, wherein the mining vehicle is adapted to mine an underwater bottom in a substantially horizontal position, and the mining vehicle connects to the docking frame in its launching or recovery position in a substantially vertical position of the mining vehicle.
14. A method for launching subsurface mining vehicle into a water mass from a docking well of a floating vessel, the method comprising: providing a device in accordance with claim 1, connecting a mining vehicle to the docking frame in a substantially horizontal docking position of the frame, tilting the frame in a vertical plane between the docking position and a substantially vertical mining vehicle launching position, and lowering the mining vehicle while guiding the mining vehicle along a longitudinal direction of the frame into the water, whereby the mining vehicle is guided by the third engaging means when the vehicle extends at least partly underneath a base of the vessel.
15. A method for recovery of a subsurface mining vehicle from a water mass into a docking well of a floating vessel, the method comprising: providing a device in accordance with claim 1, bringing a mining vehicle in the vicinity of the vessel, catching and guiding the mining vehicle by the third engaging means when the vehicle extends at least partly underneath a base of the vessel, providing the docking frame in a substantially vertical position, engaging the vehicle and the docking frame, pulling the vehicle upwards out of the water mass while guiding the vehicle along a longitudinal direction of the frame, and tilting the frame in a vertical plane between the substantially vertical mining vehicle recovery position to a substantially horizontal docking position.
16. The method according to claim 14, wherein the mining vehicle is guided along second engaging means provided in the docking well, the second engaging means connecting to the first engaging means when the frame is in the substantially vertical mining vehicle launching or recovery position.
17. The method according to claim 16, wherein the mining vehicle is guided along second engaging means that extend along a side wall of the docking well.
18. The method according to claim 16, wherein the mining vehicle is guided by guiding brackets provided on the mining vehicle that engage with the first and second engaging means comprising guiding rails.
19. The method according to claim 14, wherein the third engaging means are translated in a vertical direction along the docking well.
20. The method according to claim 14, wherein the third engaging means comprise a plurality of arms that extend in the docking well in a substantially horizontal direction, and the arms are translated in said horizontal direction to engage the mining vehicle.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1) The invention will now be elucidated in more detail with reference to the accompanying figures, without otherwise being limited thereto. In the figures:
(2)
(3)
(4)
(5)
(6)
(7)
DETAILED DESCRIPTION
(8) A general arrangement of an embodiment of a mining vehicle 1 that is readily launchable and recoverable by a docking device on a floating vessel is shown in
(9) The load-bearing structure further accommodates pumps, electrical vehicle, hydraulic vehicle and the like, and a hinged lifting frame 6 that connects the vehicle 1 to an interconnection hose assembly 7 of a riser 8. Four vehicle guiding brackets 8 are mounted on each side of the vehicle 1 and are intended to guide the vehicle 1 through guiding rails provided in a docking device on a vessel during deployment. The brackets 8 are mounted on the foundations of the track assemblies 4, two per track assembly.
(10) The interconnection hose assembly 7 to which the vehicle 1 connects is schematically shown in
(11) In an embodiment, a number of buoyancy elements or blocks 71 is divided over one or more hoses 70, over an equivalent length of about 50 m for instance. The buoyancy blocks 71 generate an upward force in a part of the hose 70 to create an S-shape which decouples both vertical movements of the end of the riser 72 (due to heave for instance) as well as horizontal movements of the vehicle 1. The total length of the flexible hose 70 may be chosen within a large range and may for instance be around 150 m.
(12) An embodiment of a docking device in accordance with the invention is schematically shown in
(13) The legs (10a, 10b) are provided with first engaging means in the form of guiding rails (15a, 15b). In guiding rails (15a, 15b) eight vehicle guiding brackets 8 (four on each side) can slide in a longitudinal direction 16 of the frame. When a vehicle 1 is skidded into a horizontal docking position on the work deck 13 (the position shown in
(14) The pivot points provided by hinges 14 are positioned in such a way that the guiding rails (15a, 15b) of the frame 10 align with second engaging means in the form of guiding rails (21a, 21b) that extend inside the docking well 20 along opposing side walls (22a, 22b) thereof, when the frame 10 is in its upended (vertical) position.
(15) The device in accordance with the invention comprises an upending frame 10, to tilt the vehicle 1 to a substantially vertical position; a hoisting or lowering system 30, which connects to lifting cables of an interconnection hose assembly. This preferably includes means to store the lifting cables when hoisted on deck; a flexible hose storage reel, to store the hose when hoisted on deck; a buoyancy dispensing system and manipulators to attach and detach buoyancy to the interconnection hose assembly if desired; a system that guides the vehicle 1 both in the upending frame 10 and down through the docking well 20 until the vehicle is 1 below the vessel baseline. This system comprises the first, second and third engaging means (15a, 15b, 21a, 21b, 25); and provisions to disconnect the interconnection hose from its hoisting system 30 and to connect it to a bottom end of the riser 72.
(16) A vehicle hoisting system 30 is adapted to carry the weight of a mining vehicle 1 and the interconnection hose assembly 7 until this weight is handed over to the riser 72. It is dimensioned for the maximal static and dynamic loads that may occur during launch and recovery.
(17) The interconnection hose assembly 7 may comprise two steel wires that take the forces, and a flexible hose 70 to transport the slurry. As soon as the vehicle 1 is in an upright position, the hose assembly 7 is unrolled from its storage reel 32, led over another reel 33 and connected to the vehicle lifting frame 6. This may be a manual action, for which a connection platform 31 may be provided. As soon as the hose assembly 7 is secured, lifting wires 33 that connect a lifting winch 34 to an upper end of the lifting frame 6 of vehicle 1 are tensioned, and the locking pins of the upending frame 10 are released. The vehicle 1 is then suspended in the lifting wires 33.
(18) When the vehicle 1 is suspended from both winches 33, it will be lowered along with the interconnection hose system 7 through the docking well 20 while being guided by the guiding rails (15a, 15b) and docking well guiding rails (21a, 21b) until it is well below the vessel base and ready to be released by the guiding rails (21a, 21b).
(19) The vehicle can now be lowered over the total length of the interconnection assembly 7, which may be as long as 150 m. At this point the weight may be transferred from the hoisting system 30 to a travelling crane, provided at main deck height of the vessel.
(20) When the frame 10 is upright, the guiding rails (15a, 15b) of the upending frame 10 are aligned with the guiding rails (21a, 21b) installed on both sides of the docking well 20. The vehicle guiding brackets 8 slide in these guiding rails during downward movement. As such, and as long as the vehicle is in the docking well 20 and the brackets 8 are inside the guiding rails (21a, 21b), longitudinal and transversal movements as well as rotations of the vehicle 1 relative to the vessel are substantially prevented.
(21) In case of recovery of a vehicle 1, the guiding brackets 8 of the vehicle 1 will most probably not be perfectly aligned with the guiding rails (21a, 21b) inside the docking well 20. The lower parts of these guiding rails (21a, 21b) therefore have a conical shape in a preferred embodiment.
(22) The vehicle 1 in the embodiment shown is equipped with eight guiding brackets 8. The guiding brackets 8 on the vehicle 1 will transfer forces due to waves and current in the docking well 20 onto the vessel. As the vehicle 1 is lowered below the vessel baseline, it becomes subject to the surface current. At first the eight guiding brackets 8 take all forces. As soon as the forward track assembly 4 is lowered below the vessel base, only four brackets 8 remain in the guiding rails (21a, 21b). The vehicle 1 remains mechanically guided as long as at least four brackets 8 are inside the docking well guiding rails (21a, 21b), and no or only limited movement is possible.
(23) A critical moment during deployment of the vehicle 1 is the point where the third and fourth guiding brackets 8 tend to exit the guiding rails (21a, 21b). Third engaging means in the form of additional guiding arms may therefore be used in a preferred embodiment to control the movements of the vehicle when released from the guiding system (21a, 21b). This will prevent peak loads on the structures as well as prevent the vehicle from colliding with the vessel. Four of such guiding arms 25 are installed in a suitable embodiment. These arms 25 can move vertically as well as horizontally. They will guide the vehicle 1 while it is being lowered to prevent movement, and will be gradually released when the vehicle 1 is well below the vessel base.
(24) Aft guiding arms may be used having a relatively long stroke of between 2000 and 6000 m, for instance 4200 mm, while guiding elements in the front have a smaller stroke of between 400 and 1200 mm, for instance 800 mm. Each guiding arm consists of a large pad on an extendable arm which can be moved up and down in the docking well by a rack and pinion mechanism. The pads are fixated onto the extendable arms by means of a ball joint. This gives them the possibility to rotate freely. The pads are mounted in way of the track assemblies and preferably engage the track assemblies 4.
(25) The guiding elements (15a, 15b, 21a, 21b, 25) preferably do not hoist the vehicle 1 while it goes down the docking well 20, but merely guide it. The weight of the vehicle 1 is preferably suspended from the lifting cables 33.
(26) The mining vehicle comprises cylinders, actuators and drives to operate it, as well as sensors, indicators and limit switches. In a preferred embodiment, any movement or action is remotely operated. The vehicle may be centrally controlled, for instance by a redundant PLC based automation system. The operations may be semi-automatic, implying that each action is initiated by and checked by an operator. The system is preferably adapted to ensure that operator actions that may lead to unsafe situations, potential damage or collision of the vehicle may be blocked by the system. Operations on deck or on handling platforms may be performed by one or more operators standing near the vehicle using radio remote controls. All operations that involve control of submerged parts (like the guiding arms 25 for instance) may also be executed from a control cabin located on deck with a clear view on the docking well and hoisting arrangement. The control system preferably also provides the operator with the necessary feedback and status information from sensors, camera images, etc. to ensure a swift and safe operation.
(27) The different steps for launching a mining vehicle 1 may be as follows (see
(28) Up-ending of the vehicle is performed first, as shown in
(29) The vehicle 1 is then connected to the hoisting system 30, as shown in
(30) The vehicle 1 is then lowered from the lifting wires 33 whereby the guiding brackets 8 engage in the first engaging means in the form of rails (15a, 15b) and subsequently in the second engaging means in the form of guiding rails (21a, 21b), provided in the docking well or moon pool 20. During lowering, the flexible hose assembly 7 and umbilical wires are reeled off. While in the docking well 20, the vehicle 1 is already subjected to significant splash and wave loads. Third engaging means in the form of guiding arms 25 are kept completely open to allow the collector 2 of the vehicle 1 to pass without making contact. In this open position, the arms 25 are kept in a retracted position relative to the docking well 20, as shown in
(31) After being lowered over some distance (about 25 m for instance) arms 36 provided with guide rollers 37 are brought in engagement with flexible hose assembly 7. The front (lower) end of the collector 2 of the vehicle 1 is now almost level with the vessel baseline 17.
(32) A clamp and buoyancy handling platform 38 may then be installed, as shown in
(33) The buoyancy handling platform 38 is now moved to its working position (
(34) The vehicle 1 is lowered further until a forward part thereof is located below the vessel, for instance over an additional 8 m. In this position, the guiding brackets 8 of the forward track assembly 4 have been freed from the guiding rails (21a, 21b), as shown in
(35) The guiding arms 25 are now moved from a retracted position shown in
(36) The vehicle 1 is further lowered along with the guiding arms 25 over some distance (about 4.5 m for instance) until the aft brackets 8 of the aft track assembly 4 are located just above the lowest end of the docking well guiding rails (21a, 21b), as shown in
(37) The guiding arms 25 are now opened (retracted in a horizontal direction) and the vessel master may ensure that a very small positive current of the vessel relative to the vehicle 1 occurs to let the vehicle 1 turn around a horizontal axis and around the aft guiding brackets 8 (that are still in the rails (21a, 21b)) of the aft track assembly 4 in the direction of the aft side of the vessel. The guiding arms 25 are subsequently released and moved upward to position them at about the same height level as the aft guiding brackets 8 of the aft track assembly 4. The aft guiding arms 25 in this height position are again brought forward until the pressure pads 25 contact the vehicle aft track assembly 4 at the height of the aft guiding brackets 8, as shown in
(38) The vehicle 1 is then lowered over another distance (5 m for instance) along with the guiding arms 25 until the upper most part of the vehicle 1 (the most aft part) is some distance (about 1 m for instance) below the vessel base line 17, at which point all guiding brackets 8 are located completely outside of the docking well rails (21a, 21b). In this position, shown in
(39) As shown in
(40) The guiding arms 25 are now brought upwards inside the docking well 20. At this point there is no more risk of collision of the vehicle 1 with the vessel, and the vehicle 1 had been lowered over a distance of about 30 m below the vessels' baseline 17 for instance. While being lowered until the lifting frame 6 is a distance (50 m for instance) below the buoyancy handling platform 38, the lifting 33 and umbilical wires are attached to the flexible hose 70 by cable clamps.
(41) From this point on, cable clamps are replaced by buoyancy blocks (not shown). These may be installed using a buoyancy block handling system, and a total of 24 blocks is installed over a length of four hoses or about 50 m in a typical embodiment.
(42) When all buoyancy blocks have been installed, the remaining length of hose and wires will be assembled using clamps. After having deployed the interconnecting hose assembly 7 completely, a travelling crane (not shown) is moved to the vehicle 1 launching side. The actuated arms on the travelling crane then grab the interconnecting assembly 7 and the vehicle 1 is subsequently lowered such that the substantially total load of the mining vehicle 1 and interconnecting assembly 7 is taken by the travelling crane. After the load has been transferred to the travelling crane, the (dummy part of the) lifting wires 33 and hose 70 slackens and may be disconnected, for instance manually from the buoyancy platform 38 at main deck level 13.
(43) The travelling crane in an embodiment then transports the vehicle 1 and interconnection hose assembly 7 from the vehicle launching side of the docking well 20 to a riser side of the docking well 20. A riser handling system is prepared in order to ready a first pipe section for installation. The first section is lowered onto the travelling crane and connected to the riser. The first umbilical may be connected to the umbilical that is part of the interconnection hose assembly. Once connected, the hoist of the riser handling system takes the weight, and the travelling crane is moved back to its starting position at the back end of the docking well.
(44) The docking device in accordance with the invention mechanically guides the vehicle through the substantially complete launch (and/or recovery) operation. Since the vehicle is connected to the vessel in a substantially rigid fashion by the device during the launching and recovery procedure, uncontrolled motions of any of the vehicle 1 or any other component are prevented to a large extent.