Method of fault clearance
09608436 ยท 2017-03-28
Assignee
Inventors
Cpc classification
Y02E60/60
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
H02H3/07
ELECTRICITY
H02H11/00
ELECTRICITY
H02H7/22
ELECTRICITY
H02M7/4835
ELECTRICITY
International classification
H02H7/22
ELECTRICITY
H02H11/00
ELECTRICITY
H02H7/26
ELECTRICITY
Abstract
There is a method of fault clearance for a voltage source converter that interconnects a DC network and an AC network. The voltage source converter is connected to the DC network via one or more DC circuit interruption devices. The method comprises the steps of: (a) detecting a fault in the DC network; (b) carrying out a primary protection sequence, wherein the step of carrying out the primary protection sequence involves carrying out a first sub-sequence that includes the steps of: i. opening the or each DC circuit interruption device, ii. setting a DC power order of the voltage source converter to zero, iii. controlling the voltage source converter to exchange re-circuit breaker active power with the AC network.
Claims
1. A method of fault clearance for a voltage source converter that interconnects a DC network and an AC network, the voltage source converter being connected to the DC network via one or more DC circuit interruption devices, the method comprising the steps of: (a) detecting a fault in the DC network; and (b) carrying out a primary protection sequence, wherein the step of carrying out the primary protection sequence involves carrying out a first sub-sequence that includes the steps of: i. opening the one or more DC circuit interruption devices, ii. setting a DC power order of the voltage source converter to zero, and iii controlling the voltage source converter to exchange reactive power with the AC network; wherein the step of carrying out the primary protection sequence involves the steps of: a. counting a re-close time; b. carrying out the first sub-sequence; c. checking whether the re-close time has elapsed; and d. repeating the first sub-sequence if the re-close time has not elapsed; and wherein the step of carrying out the primary protection sequence further involves the step of carrying out a second sub-sequence if the re-close time has elapsed, the second sub-sequence including the steps of: i. closing the or each DC circuit interruption device; ii. setting a DC power order of the voltage source converter to a non-zero level that is below a pre-fault DC power order of the voltage source converter; iii controlling the voltage source converter to exchange reactive power with the AC network; iv detecting whether the fault is still present in the DC network; and v. restoring the DC power order of the voltage source converter to its pre-fault value if the fault is not detected in the DC network, and repeating the step of carrying out the primary protection sequence if the fault is detected in the DC network.
2. A method according to claim 1, wherein the primary protection sequence is repeated if the fault is detected in the DC network and if the number of times that the primary protection sequence has been carried out is below a predetermined number.
3. A method according to claim 2 further including the steps of: i. opening the one or more DC circuit interruption devices; ii. setting a DC power order of the voltage source converter to zero; and iii. controlling the voltage source converter to exchange reactive power with the AC network; when the number of times that the primary protection sequence has been carried out is equal to the predetermined number.
4. A method according to claim 1, wherein the voltage source converter is connected to the AC network via one or more AC circuit interruption devices, the method further including the step of carrying out a back-up protection sequence that involves the steps of: a. counting a back-up protection time after the step of detecting a fault in the DC network; b. opening the one or more AC circuit interruption devices after the back-up protection time has elapsed; and c. switching the voltage source converter to a current blocking state.
Description
(1) A preferred embodiment of the invention will now be described, by way of a non-limiting example, with reference to the accompanying drawings in which:
(2)
(3)
(4)
(5)
(6) A VSC 10 comprises first and second DC terminals 16,18, and three converter limbs 20.
(7)
(8) Each converter limb 20 extends between the first and second DC terminals 16,18, and has first and second limb portions 22,24.
(9) The VSC 10 further includes a plurality of AC terminals 26. The first and second limb portions 22,24 of each converter limb 20 are separated by a respective one of the plurality of AC terminals 26.
(10) The first DC terminal 16 is connected to a first pole of the DC network 14 via a DC circuit breaker 28, while the second DC terminal 18 is connected to ground. The AC terminal 26 of each converter limb 20 is connected in series to a respective phase of the AC network 12 via a transformer 30 and an AC circuit breaker 32.
(11) It is envisaged that, in other embodiments of the invention, the three-phase AC network 12 may be replaced by a single-phase AC network or another multi-phase AC network. In such embodiments, the VSC 10 may have either a single converter limb 20 or a plurality of converter limbs 20 so as to match the number of phases of the single-phase or multi-phase AC network, wherein the AC terminal 26 of the or each converter limb 20 is connected in series to a respective phase of the AC network 12 via a transformer 30 and an AC circuit breaker 32.
(12) It is envisaged that, in other embodiments, each circuit breaker 28,32 may be replaced by another type of circuit interruption device.
(13) In each converter limb 20, each of the first and second limb portions 22,24 includes a module 34 that is connected in series between the corresponding DC terminal 16,18 and the AC terminal 26. The module 34 includes a pair of switching elements 36 connected in parallel with a capacitor 38 to define a 2-quadrant unipolar module 34 that can provide a zero or positive voltage, and can conduct current in two directions. In the embodiment shown each switching element 36 is constituted by a semiconductor device in the form of an Insulated Gate Bipolar Transistor (IGBT). Each switching element 36 also includes an anti-parallel diode 40 connected in parallel therewith.
(14) In use, the switching elements 36 of each module 34 are switched to control the phase and magnitude of an AC voltage at the corresponding AC terminal 26 and the magnitude of a DC voltage at the first terminal 16 in order to transfer power between the AC and DC networks 12,14.
(15) In each converter limb 20, each of the first and second limb portions 22,24 further includes an inductor 42 that is connected in series with the 2-quadrant unipolar module 34 between the corresponding DC terminal 16,18 and the AC terminal 26.
(16) It is envisaged that, in other arrangements, the 2-quadrant unipolar module 34 may be replaced by a plurality of series-connected 2-quadrant unipolar modules, so as to vary the voltage rating of the VSC 10.
(17) It is envisaged that, in other arrangements, the VSC 10 in
(18) The DC circuit breaker 28 further includes fault detection equipment (not shown) to locally carry out measurements of voltage and/or current characteristics of the DC network 14 to determine whether a fault is present in the DC network 14.
(19) A fault in the DC network 14 may be in the form of a pole-to-ground fault 44 or a pole-to-pole fault 46, as shown in
(20) In the event of a fault 44,46 occurring in the DC network 14, a method of fault clearance for a VSC 10 according to an embodiment of the invention is carried out as follows, with reference to
(21) The fault detection equipment carries out measurements of voltage and/or current characteristics of the DC network 14 to determine whether a fault 44,46 is present in the DC network 14. When the fault detection equipment detects the fault 44,46 in the DC network 14, a primary protection sequence is carried out as follows.
(22) In the primary protection sequence, a re-close timer is started to count a re-close time and a first sub-sequence of the primary protection sequence is carried out as follows.
(23) The DC circuit breaker 28 is opened by, for example, locally opening the DC circuit breaker 28 or remotely sending a control signal to the DC circuit breaker 28. Opening the DC circuit breaker 28 interrupts a supply of current from the AC network 12 that feeds the fault in the DC network 14 via the VSC 10.
(24) The DC power order of the voltage source converter 10 is set to zero, and the VSC 10 is controlled to exchange reactive power with the AC network 12 through switching of the switching elements 36 of each module 34.
(25) Carrying out the first sub-sequence allows the fault in the DC network 14 to be cleared, and allows the VSC 10 to provide control over the AC voltage level of the AC network 12 during the event of fault clearance in the DC network 14. The exchange of reactive power between the VSC 10 and the AC network 12 also allows the VSC 10 to remain energised during the event of fault clearance in the DC network 14.
(26) If the re-close time has not elapsed then the first sub-sequence is repeated.
(27) After the re-close time has elapsed, a second sub-sequence of the primary protection sequence is carried out as follows.
(28) The DC circuit breaker 28 is closed, and the DC power order of the voltage source converter 10 is set to a non-zero level below its pre-fault value.
(29) Since the VSC 10 was maintained in an energised state during the first sub-sequence, the VSC 10 is able to rapidly energise the DC network 14 when the DC circuit breaker 28 is closed to reconnect the VSC 10 to the DC network 14.
(30) Meanwhile the VSC 10 is controlled to exchange reactive power with the AC network 12 through switching of the switching elements 36 of each module 34, so as to continue maintaining the VSC 10 in an energised state and providing control over the AC voltage level of the AC network 12.
(31) The fault detection equipment then carries out measurements of voltage and/or current characteristics of the DC network 14 to determine whether the fault 44,46 is still present in the DC network 14.
(32) If the fault 44,46 is no longer present in the DC network 14, the DC power order of the DC network 14 is restored to its pre-fault value, and the VSC 10 resumes its normal operation of transferring power between the AC and DC networks 12,14.
(33) However, if the fault 44,46 still persists in the DC network 14, a check is carried out to determine whether the number of times that the primary protection sequence has been carried out is below a predetermined number. The predetermined number is the maximum number of attempts to restore the DC network 14 to its normal operating conditions through the primary protection sequence, and may vary depending on the operating requirements of the VSC 10 and the associated power application.
(34) If the number of times that the primary protection sequence has been carried out is below the predetermined number, the primary protection sequence is repeated so as to again attempt to restore the DC network 14 to its normal operating conditions.
(35) When the number of times that the primary protection sequence has been carried out exceeds the predetermined number, the DC circuit breaker 28 is opened, the DC power order of the voltage source converter 10 is set to zero, and the VSC 10 is controlled to exchange reactive power with the AC network 12 through switching of the switching elements 36 of each module 34. The DC circuit breaker 28 is further configured to not automatically re-close. This allows the VSC 10 to remain energised through continuous exchange of reactive power with the AC network 12, so that it may rapidly energise the DC network 14 when the DC circuit breaker 28 is closed at a later time.
(36) When the fault detection equipment initially detects the fault 44,46 in the DC network 14, a back-up protection sequence is also carried out as follows.
(37) A back-up protection timer is started to count a back-up protection time after the fault 44,46 was detected in the DC network 14. Each AC circuit breaker 32 is opened after the back-up protection time has elapsed. The VSC 10 is then switched to a current blocking state.
(38) The back-up protection sequence allows the fault 44,46 in the DC network 14 to be cleared, in the event that the primary protection sequence fails to clear the fault 44,46, and thereby protect the VSC 10 from a high fault current.
(39) The method according to the invention therefore provides a reliable way of clearing a fault 44,46 for a VSC 10 that interconnects a DC network 14 and an AC network 12, without having to rely on disconnection of the VSC 10 from the AC network 12 as the primary method of protection. This permits continuous exchange of reactive power between the VSC 10 and the AC network 12 during the primary protection sequence to remove the risk of an AC undervoltage or overvoltage in the AC network 12, which could lead to unwanted circumstances in the AC network 12, such as cascade tripping.
(40) The method according to the invention also provides a way of re-energising the DC network 14 through automatic re-closing of the or each DC circuit breaker 28 before restoring the DC network 14 to its normal operating conditions.
(41) The number of DC circuit breakers 28 that are required to carry out the method according to the invention, as described above and shown in
(42)
(43) The second arrangement differs from the first arrangement in that, in the second arrangement: a junction between each AC terminal 26 and the transformer 30 defines a high impedance grounding point 48; and the first DC terminal 16 is connected to a first pole of the DC network 14 via a first DC circuit breaker 28, while the second DC terminal 18 is connected to a second pole of the DC network 14 via a second DC circuit breaker 28.
(44) A fault in the DC network 14 may be in the form of a pole-to-ground fault 44 that involves either pole, or a pole-to-pole fault 46, as shown in
(45) In the event of a fault 44,46 occurring in the DC network 14, the method of fault clearance for a VSC 10 as described above and shown in
(46)
(47) The third arrangement differs from the second arrangement in that, in the second arrangement: the first DC terminal 16 is connected to a first pole of the DC network 14 via a DC circuit breaker 28, while the second DC terminal 18 is directly connected to a second pole of the DC network 14.
(48) It is envisaged that, in another arrangement, the first DC terminal 16 is directly connected to a first pole of the DC network 14, while the second DC terminal 18 is connected to a second pole of the DC network 14 via a DC circuit breaker 28.
(49) A fault in the DC network 14 may be in the form of a pole-to-ground fault 44 that involves either pole, or a pole-to-pole fault 46, as shown in
(50) A fault between the two poles of the DC network 14, i.e. a pole-to-pole fault 46, represents a worst case scenario of a DC side fault in terms of magnitude of current. The fault current caused by the pole-to-pole fault 46 is interrupted by opening the DC circuit breaker 28, which is inherently in series with a current path of the DC fault current.
(51) In the event of a pole-to-ground fault 44 that involves the first pole, the resulting capacitive discharge current can be interrupted by opening the DC circuit breaker 28.
(52) In the event of a pole-to-ground fault 44 that involves the second pole, the pole-to-ground fault 44 will experience a persistent current flow, which is associated with discharge of stored energy in the second pole to ground. However, since the VSC 10 is grounded through the high impedance grounding point 48, the majority of the discharged current that will flow through the DC network 14 will also follow a path that passes through the VSC 10. This allows the DC circuit breaker 28 connected to the first pole to be opened in order to interrupt the current associated with the second pole.
(53) In the event of a fault 44,46 occurring in the DC network 14, the method of fault clearance for a VSC 10 as described above and shown in