Multi-anchor concrete post-tensioning system
11473303 · 2022-10-18
Inventors
Cpc classification
E04C5/125
FIXED CONSTRUCTIONS
E04C5/122
FIXED CONSTRUCTIONS
International classification
E04C5/16
FIXED CONSTRUCTIONS
Abstract
A system for use with a post-tensioning concrete anchor may comprise a connector anchor including a bore therethrough, the bore including a first frustoconical portion, the connector anchor adapted to bear on the post-tensioning concrete anchor, and a coupler. The coupler may comprise a coupler body including a bore therethrough, the bore including a second frustoconical portion that is oriented oppositely to the first frustoconical portion, and a connector having a bore therethrough and configured to receive the coupler body therein, the connector adapted to mechanically engage the connector anchor such that a tensioning force can be transmitted from the coupler body to the connector anchor via the connector. A method of using the system may allow a second concrete section to be poured adjacent to a first concrete section before the first concrete section has been stressed.
Claims
1. A system for use with a post-tensioning tendon, the post-tensioning tendon including an anchor body and an anchor encapsulation, the system comprising: a connector anchor including a bore therethrough, the connector anchor adapted to mechanically couple to the post-tensioning tendon; and a coupler, the coupler comprising: a coupler body including a coupler bore therethrough; a connector having a connector bore therethrough and an outer surface, wherein the coupler body is seated within the connector; a first spacer; a second spacer; and a coupler encapsulation on the outer surface of the connector, the coupler encapsulation including a first end and a second end, wherein the first end is adapted to mechanically couple to the post-tensioning tendon; wherein the second spacer is: annular and disposed adjacent to the coupler encapsulation, the connector and coupler body; configured to retain the coupler body and the connector in a specific configuration within the coupler; and configured to provide sealing between a tension member passing through the second spacer and the coupler.
2. The system of claim 1, wherein the connector anchor is mechanically coupled to the anchor encapsulation.
3. The system of claim 2, wherein the first spacer is retained in the connector and retaining the coupler body in the connector.
4. The system of claim 3 wherein the first and second spacers are each selected from the group consisting of elastomers, elastomeric foams, and crushable foams.
5. The system of claim 3, wherein the first spacer serves to retain at least one wedge within the coupler body before a tension member is inserted.
6. The system of claim 2, further comprising a spacer sleeve between the first spacer and an interior wall of the connector.
7. The system of claim 1, wherein the connector bore includes a first frustoconical section and the coupler bore includes a second frustoconical section.
8. The system of claim 7, wherein the first frustoconical section and the second frustoconical section are oriented oppositely.
9. The system of claim 8, further including at least one first wedge disposed in the first frustoconical section and at least one second wedge disposed in the second frustoconical section.
10. The system of claim 1 wherein the connector engages the connector anchor via mating threads.
11. The system of claim 1, wherein the first spacer comprises an elastomer, elastomer foam, or crushable foam.
12. The system of claim 1, wherein the first spacer engages an interior wall of the connector.
13. The system of claim 1, wherein the first spacer serves to retain at least one wedge within the coupler body before a tension member is inserted.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1) The present disclosure is best understood from the following detailed description when read with the accompanying figures. It is emphasized that, in accordance with the standard practice in the industry, various features are not drawn to scale. In fact, the dimensions of the various features may be arbitrarily increased or reduced for clarity of discussion.
(2)
(3)
(4)
(5)
DETAILED DESCRIPTION
(6) It is to be understood that the following disclosure provides many different embodiments, or examples, for implementing different features of various embodiments. Specific examples of components and arrangements are described below to simplify the present disclosure. These are, of course, merely examples and are not intended to be limiting. In addition, the present disclosure may repeat reference numerals and/or letters in the various examples. This repetition is for the purpose of simplicity and clarity and does not in itself dictate a relationship between the various embodiments and/or configurations discussed.
(7) When forming a concrete member to be post-tensioned, anchors may be provided to hold the tendon both before and after stressing.
(8) Apparatus
(9) In some embodiments, as depicted in
(10) First and second anchors 13, 17 may each include a frustoconical passage, 27, 28, respectively, through which the tensioning member extends. Gripping wedges (not shown) may be positioned in frustoconical passages, 27, 28 so that first and second anchors 13, 17 may grip the tensioning member and maintain a tensioning force thereon, as is known. In some embodiments, first and second anchors 13, 17 may be positioned within first concrete form 21 such that first and second anchors 13, 17 will be at least partially encased in first concrete section 23 when form 21 is filled with concrete.
(11) In some embodiments, as depicted in
(12) Second anchor 17 and third anchor 37 may each be stressing anchors configured for use with wedges, seals and/or pocket formers. Thus, second anchor 17 and third anchor 37 each allow the application of stressing force to a tension member extending therethrough. In some instances, such as when it is desired to include third or further concrete sections, third anchor 37 may function in the manner described below with respect to first anchor 13, i.e. third anchor 37 may be connected to a coupler and serve as a fixed anchor for an additional tendon.
(13) As with first post-tensioning tendon 11, second post-tensioning tendon 31 may include a sheath positioned about second tension member 35 and one or more seals 16 between the sheath and each anchor. The sheath and seals may, for example, protect second tension member 35 from corrosion after second concrete section 25 is poured. Additionally, the sheath and seals may, for example, reduce or prevent concrete from ingressing into second tension member 35 and preventing or retarding its tensioning, as discussed below. In some embodiments, a seal for coupler 33 may be omitted. In some embodiments, coupler 33 may be positioned within second concrete form 41 such that coupler 33 will be encased in second concrete section 25, as described below.
(14) Referring now to
(15) In some embodiments, first anchor body 101 may include a bore therethrough for receiving first tension member 15. In some embodiments, the bore through first anchor body 101 may also include a frustoconical passage 104. In some embodiments, a pocket-forming element such as pocket former 19 (
(16) Still referring to
(17) In some embodiments, one or more wedges can be provided in frustoconical passage 104 in first anchor body 101, either alternatively or in addition to wedges 107 in connector anchor 105.
(18) Still referring to
(19) In some embodiments, coupler encapsulation 302 surrounds an outer surface of connector 305 and coupler encapsulation ends 302a, 302b are configured to sealingly engage anchor encapsulation lip 111 and seal 16, respectively. By way of example only, coupler encapsulation 302 may engage seal 16 by means of one or more locking tabs 317. Also by way of example, coupler encapsulation end 302a may engage an outer surface of anchor encapsulation lip 111 and may thereby mechanically couple coupler 302 to first anchor 13. In some embodiments, seal 312 may be included between coupler encapsulation end 302a and anchor encapsulation lip 111.
(20) First and second spacers 308 and 309 may each be annular and may each comprise an elastomer, elastomer form, or crushable foam. Spacer 308 may frictionally engage the interior wall of connector 305; in some embodiments, spacer sleeve 304 may be included therebetween. Spacer 308 serves to retain wedge(s) 307 within coupler body 301 before a tension member is inserted therethrough. In instances in which connector anchor 105 is connected to coupler 33 before being placed into engagement with first anchor 13, spacer 308 may also serve to retain wedge(s) 107 in connector anchor 105. Spacer 309 may maintain coupler body 301 and connector 305 in a desired configuration within coupler 33 during handling and/or may enhance sealing between second tension member 35 and coupler 33 when installed.
(21) Referring now to
(22) With coupler 33 and third anchor 37 in place and second tension member 35 extending therebetween and engaged thereby, concrete can be poured between first concrete section 23 and second concrete form 41 so as to form a second concrete section 25. Once second concrete section 25 has cured sufficiently, second tension member 35 can be used to post-tension second concrete section 25 at third anchor 37. If it is desired to include third or further concrete sections (not shown), third anchor 37 may function in the manner described above with respect to first anchor 13, i.e. third anchor 37 may be connected to a coupler and serve as a fixed anchor for an additional tendon (not shown).
(23) Method
(24) In operation and as depicted in
(25) The use of coupler 33 allows construction of second concrete form 41 before first concrete form 21 is removed. By way of example only, the present system can be used to form a post-tensioned concrete member having at least one intermediate anchor and at least two adjacent concrete sections. Specifically, as shown in
(26) Coupler 33 can be applied to an end of second tension member 35 before coupler 33 is placed into engagement with first anchor 13. Alternatively, an end of second tension member 35 can be inserted into coupler 33 after coupler 33 is placed into engagement with first anchor 13. In some embodiments, first and second tension members can be provided as a single, long tension member, in which case coupler 33 would be threaded onto the tension member before placement of third anchor 37.
(27) In some embodiments, connector anchor 105 may be connected to connector 305 before an end of first tension member 15 is inserted into connector anchor 105. In this instance, alternative, temporary means for retaining the end of first tension member 15 and maintaining access thereto may be desirable.
(28) Provided one end of first tension member 15 is gripped by connector anchor 105, it is not necessary to maintain access to first tension member 15 at first anchor 13. Because the first concrete section can be post-tensioned from second anchor 17, access to first tension member 15 at first anchor 13 is not required and it is not necessary to wait for the first concrete section to cure before assembling second post-tensioning tendon 31 and pouring the second concrete section. In addition, because first anchor 13 serves as a fixed anchor, tension member 15 does not need to extend beyond first anchor 13 sufficiently to serve as the tension member for second concrete section 25.
(29) Because connector anchor 105 can be retained to first anchor 13 by the action of wedges 107, connector anchor 105 can be used with any anchor and it is not necessary to provide a specialized interface or connection. Likewise, once connector anchor 105 is retained to first tension member 15 by the action of wedges 107, tensioning force can be transmitted from coupler body 301 to connector 305 and from connector 305 to first tension member 15 via connector anchor 105.
(30) When first and second concrete sections 23, 25 each reach a predetermined cure point, each section can be post-tensioned at their respective stressing anchors. Specifically, first concrete section 23 can be post-tensioned by applying a tensioning force to an end of first tension member 15 extending from second anchor 17 and second concrete section 25 can be post-tensioned by applying a tensioning force to an end of second tension member 35 extending from third anchor 37.
(31) First anchor 13 and coupler 33 combine to form an intermediate anchor that serves as a fixed anchor to both first and second post-tensioning tendons 11, 31. The connection of coupler 33 to first anchor 13 allows force to be transferred between first and second post-tensioning tendons 11, 31 even though the tension member is discontinuous (15, 35).
(32) The wedges in each anchor grip the respective tension member in response to a tensioning force so as to retain it in tension. If desired, a portion of a tension member extending beyond a stressing anchor after tensioning can be removed and the remaining cable end may be capped or otherwise secured or enclosed.
(33) The foregoing outlines features of several embodiments so that a person of ordinary skill in the art may better understand the aspects of the present disclosure. Such features may be replaced by any one of numerous equivalent alternatives, only some of which are disclosed herein. One of ordinary skill in the art should appreciate that they may readily use the present disclosure as a basis for designing or modifying other processes and structures for carrying out the same purposes and/or achieving the same advantages of the embodiments introduced herein. One of ordinary skill in the art should also realize that such equivalent constructions do not depart from the spirit and scope of the present disclosure and that they may make various changes, substitutions, and alterations herein without departing from the spirit and scope of the present disclosure.
(34) Further, it will be understood that, unless explicitly so recited, the sequential recitation of steps in the claims that follow is not intended to require that the steps be performed sequentially.