Multilevel paint shop for painting objects
09592522 · 2017-03-14
Assignee
Inventors
Cpc classification
B05B16/20
PERFORMING OPERATIONS; TRANSPORTING
B05B13/0221
PERFORMING OPERATIONS; TRANSPORTING
B05B13/02
PERFORMING OPERATIONS; TRANSPORTING
B05B16/95
PERFORMING OPERATIONS; TRANSPORTING
B05B16/40
PERFORMING OPERATIONS; TRANSPORTING
B05C3/10
PERFORMING OPERATIONS; TRANSPORTING
B05B16/90
PERFORMING OPERATIONS; TRANSPORTING
International classification
B05B13/02
PERFORMING OPERATIONS; TRANSPORTING
Abstract
To provide a paint shop for painting objects to be painted in the form of vehicle bodies and/or parts of vehicle bodies, there is proposed a paint shop for painting objects to be painted in the form of vehicle bodies and/or parts of vehicle bodies which comprises the following: a building shell, which encloses a building interior, in which are arranged at least one dip tank and at least one open treatment area, which is open in relation to the building interior; a first transport level, on which objects to be painted can be transported through at least one open treatment area; a second transport level, from which objects to be painted can be dipped into at least one dip tank; and at least one intermediate storage unit, wherein at least one object to be painted can be transported from one transport level of the paint shop into the intermediate storage unit and later can be transported out of the intermediate storage unit into another transport level of the paint shop.
Claims
1. A paint shop for painting objects, said objects to be painted are in the form of vehicle bodies and/or driver's cabins for lorries, comprising a building shell, which encloses a building interior, in which are arranged at least one dip tank and at least one open treatment area, which is open in relation to the building interior; a transport route along which the objects are transported on at least a first transport level and a second transport level, the first transport level lying below the second transport level; at least one first process section comprising at least one treatment area for a surface treatment of the objects, said at least one treatment area of the at least one first process section comprising at least one dip tank for dipping the objects therein; at least one second process section comprising at least one treatment area for a surface treatment of the objects; and at least one intermediate storage unit configured as a high-bay storage unit and configured to transfer the objects between the first and second transport levels and comprising a plurality of storage bays which are stationary and fixed in location, the intermediate storage unit further being stationary and fixed in location and configured to receive the objects along the transport route after said objects have been treated in said at least one dip tank, wherein the at least one first process section terminates at the intermediate storage unit and the at least one second process section starts at the intermediate storage unit so that the objects are transported through the second process section after the objects have been transported through the first process section; wherein the first process section lies at least partially along the second transport level and the second process section lies at least partially along the first transport level; and wherein the objects are lowered into the at least one dip tank from the second transport level.
2. The paint shop according to claim 1, wherein the paint shop comprises at least one drier configured for transportation of the objects through the at least one drier on the second transport level.
3. The paint shop according to claim 1, wherein the paint shop comprises at least one paint spray booth configured for transportation of the objects through the at least one paint spray booth on the second transport level.
4. The paint shop according to claim 1, wherein the paint shop comprises at least one underseal application unit configured for transportation of the objects through the at least one underseal application unit on the first transport level.
5. The paint shop according to claim 1, wherein at least one separation device for the separation of paint overspray from the exhaust air of a paint spray booth and/or at least one device for disposing of paint sludge are arranged on the first transport level.
6. The paint shop according to claim 1, wherein at least one air supply unit for supplying at least one paint spray booth with inlet air is arranged on the first transport level.
7. The paint shop according to claim 1, wherein the paint shop comprises at least one exhaust air unit for discharging exhaust air out of at least one paint spray booth, wherein the exhaust air unit is arranged outside the building shell at the level of the first transport level.
8. The paint shop according to claim 1, wherein at least one heating unit for heating at least one drier is arranged on the first transport level.
9. The paint shop according to claim 1, wherein the paint shop comprises at least two intermediate storage units, which are configured for transportation of the objects from one transport level of the paint shop onto another transport level of the paint shop.
10. The paint shop according to claim 1, wherein each process device of the paint shop either is arranged on the first transport level or is arranged on a framework, which extends upwards from a floor of the building shell arranged on the first transport level.
11. The paint shop according to claim 1, wherein at least one intermediate storage unit is arranged directly adjacent to a wall of the building shell.
12. The paint shop according to claim 1, wherein all the process devices of the paint shop are arranged on the first transport level or on the second transport level of the paint shop.
13. The paint shop according to claim 1, wherein at least one storage bay is provided with a cover.
14. The paint shop according to claim 13, wherein the cover comprises a plastic material.
15. The paint shop according to claim 13, wherein the cover comprises polyethylene.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10) Identical or functionally equivalent elements are given the same reference numerals in all Figures.
DETAILED DESCRIPTION OF THE INVENTION
(11) A paint shop for painting vehicle bodies 102 shown in
(12) Each treatment area is an associated with a process section of the paint shop 100, which terminates in one of three high-bay storage units 108, 110 or 112 of the paint shop 100 serving as intermediate storage unit 107 and/or starts in one of these high-bay storage units 108, 110 or 112.
(13) The three high-bay storage units 108, 110 and 112 are arranged on a first face 114, shown on the left in
(14) The building shell 116 of the paint shop 100 additionally comprises a second face 118 located opposite the first face 114 and two longitudinal sides 120 and 122 connecting the two faces 114 and 118 to one another as well as a horizontal floor 124 and a horizontal top wall 126 (see
(15) The faces 114 and 118 of the paint shop 100 run substantially in a horizontal transverse direction 128 of the paint shop 100, while the longitudinal sides 120 and 122that are configured longer than the faces 114 and 118run substantially in a horizontal longitudinal direction 130 of the paint shop running perpendicularly to the transverse direction 128.
(16) The faces 114, 118, the longitudinal sides 120, 122, the floor 124 and the top wall 126 of the building shell 116 of the paint shop 100 jointly enclose a building interior 132, in which are arranged the treatment areas and the high-bay storage units 108, 110, 112 of the paint shop 100, through which the vehicle bodies 102 are transported one after the other along a transport route 134.
(17) The transport route 134 of the vehicle bodies 102 through the paint shop 100 starts at an entry point 136 located on the second transport level 106 shown in
(18) A pretreatment unit 138 with pretreatment dip tank 140 extends from the entry point 136 in the longitudinal direction 130 of the paint shop 100 towards the first face 114. A turning area 142, in which the transport direction 144 of the vehicle bodies 102 is rotated 180, connects to the treatment line 138. A CDC unit 146 (CDC stands for cataphoretic dip coating) with at least one CDC dip tank 148, which extends in the longitudinal direction 130 of the paint shop 100 towards the second face 118, connects to the turning area 142.
(19) A number of, preferably four, substantially cylindrical containers 149 associated with the pretreatment dip tank 140 are arranged on the first transport level 104 next to the pretreatment dip tank 140.
(20) A number of preferably two, containers 151 associated with the CDC dip tank 148 are arranged on the first transport level 104 next to the turning area 142.
(21) A further turning area 150, in which the transport direction 144 of the vehicle bodies 102 is once again turned 180, follows the CDC unit 146.
(22) After the turning area 150 the transport route 134 of the vehicle bodies 102 branches into two CDC continuous-flow driers 152, which extend parallel to one another towards the first face 114 in the longitudinal direction 130 and respectively terminate in a cooling zone 154.
(23) An air supply/exhaust air unit 155 for the respective cooling zone 154 is arranged above each cooling zone 154 (see
(24) A plurality of heating units 156, which are located on the first transport level 104 and stand on the floor 124 of the building shell 116, are respectively arranged below each of the CDC continuous-flow driers 152 (See
(25) These heating units 156 supply heated inlet air, which is fed into the drying tunnel of the CDC continuous-flow driers 152.
(26) As may be seen from
(27) From the swivel table 160 the vehicle bodies 102 pass through one of two entry tunnels 162 into the first high-bay storage unit 108, which is separated from the building interior 132 by an airtight housing 164.
(28) The high-bay storage unit 108 comprises two storage shelves 166 for vehicle bodies 102, which extend parallel to the transverse direction 128 of the paint shop 100 and are separated from one another by an aisle 168, in which two storage and retrieval units 170 are arranged to travel in the transverse direction 128.
(29) Each of the storage shelves 166 has a plurality of body storage bays 171, which are arranged one above the other in a plurality of vertical columns 172 and next to one another in a plurality of horizontal rows 174 (see
(30) Two of the bays on the second transport level 106 serve as storage positions 176 for the first high-bay storage unit 108. The vehicle bodies 102 are transported onto these positions through the entry tunnels 162.
(31) One of the two storage and retrieval units 170 respectively picks up a delivered vehicle body 102 from one of these storage positions 176 and transports the vehicle body 102 into a free body storage bay 171 for intermediate storage.
(32) If the respective vehicle body 102 is to be further processed, it is removed from its body storage bay 171 and transported by a storage and retrieval unit 170 to one of two retrieval positions 178, which are arranged on the level of the first transport level 104 of the paint shop 100.
(33) It is also possible to transport a vehicle body 102 directly from a storage position 176 to a retrieval position 178 of the first high-bay storage unit 108 by means of a storage and retrieval unit 170.
(34) From these retrieval positions 178 the vehicle bodies 102 on the first transport level 104 are transported out of the first high-bay storage unit 108 through exit tunnels 180 (see
(35) The pretreatment unit 138, the CDC unit 146 and the CDC continuous-flow driers 152 with the cooling zones 154 together form a first process section 184 of the paint shop 100, which starts at the entry point 136 of the paint shop 100 on the second transport level 106 and terminates at the entry tunnels 162 of the first high-bay storage unit 108 on the second transport level 106.
(36) The treatment areas of the first process section 184 are all located on the second transport level 106.
(37) From the swivel tables 182 on the first transport level 104 the transport route 134 of the vehicle bodies 102 extends in two parallel lines in the longitudinal direction 130 of the paint shop 100 towards the second face 118 and through a series of open treatment areas or work spaces, namely through a respective CDC inspection area 186, through a respective seam sealing area 188, through a respective underseal application unit 190 and through a respective fine sealing area 192 to a cross conveyor 193 and a hoisting assembly 194.
(38) The underseal application units 190 comprise both underseal application booths 191 (see
(39) The hoisting assembly 194 transports the vehicle bodies 102 from the first transport level 104 shown in
(40) Adjoining the turning area 196 are a cleaning booth 200 and a filler spray booth 202, in which the vehicle bodies 102 are provided with a coating of a filler material by means of paint robots.
(41) After the filler spray booth 202 the transport route 134 of the vehicle bodies 102 branches into two filler continuous-flow driers 204, which extend parallel to the longitudinal direction 130 of the paint shop 100 towards the first face 114 and respectively terminate in a cooling zone 206.
(42) As may best be seen from
(43) As can also be seen from
(44) An inlet air current is fed by the inlet air plenum system 210 to the filler spray booth 202 located below it and takes up paint overspray in the filler spray booth 202, which is washed out of the air current in the paint spray wash-out unit 208 located below the filler spray booth 202.
(45) As may best be seen from
(46) The heating units 212 are located on the first transport level 104 of the paint shop 100 and stand on the floor 124 of the building shell 116.
(47) A cross conveyor 214, by means of which the vehicle bodies 102 can be transported to a hoisting assembly 216 after passing through the cooling zones 206, adjoins the cooling zones 206 of the filler continuous-flow driers 204 in the transport route 134 of the vehicle bodies 102.
(48) The hoisting assembly 216 transports the vehicle bodies 102 from the second transport level 106 onto a third transport level 218 of the paint shop 100 shown in
(49) The third transport level 218 lies above the second transport level 106, which in turn lies above the first transport level 104.
(50) For example, the third transport level 218 lies at a height of approximately 7.5 m above the floor 124, while the second transport level 106 lies at a height of approximately 5.0 m above the floor 124 and the first transport level 104 lies at the level of the floor 124.
(51) The vehicle bodies 102 are transported by the hoisting assembly 216 to a swivel table 220, which rotates the vehicle bodies 102 around an angle of 90 around a vertical swivel axis, so that the vehicle bodies 102 are then oriented parallel to the transverse direction 128 of the paint shop 100.
(52) In this orientation the vehicle bodies 102 are respectively transported to one of two entry tunnels 222 of the second high-bay storage unit 110.
(53) The vehicle bodies 102 pass through the entry tunnels 222 to two storage positions 224 of the second high-bay storage unit 110 (see
(54) From these storage positions 224 the vehicle bodies 102 are transported by means of two storage and retrieval units 170 of the second high-bay storage unit 110 into a respective vacant body storage bay 171 and set down there.
(55) For the further treatment of a vehicle body 102 this is transported out of its body storage bay 171 by means of one of the storage and retrieval units 170 to one of two retrieval positions 226 of the second high-bay storage unit 110 located on the level of the second transport level 106 of the paint shop 100.
(56) From these retrieval positions 226 the vehicle bodies 102 are respectively transported out of the second high-bay storage unit 110 through one of two exit tunnels 228 (see
(57) The CDC inspection areas 186, the seam sealing areas 188, the underseal application units 190, the fine sealing areas 192, the cleaning booth 200, the filler spray booth 202 and the filler continuous-flow driers 204 with their cooling zones 206 belong to a second process section 230 of the paint shop 100, which starts at the first high-bay storage unit 108 on the first transport level 104 and terminates at the second high-bay storage unit 110 on the third transport level 218.
(58) In this case, the CDC inspection areas 186, the seam sealing areas 188, the underseal application units 190 and the fine sealing areas 192 are located on the first transport level 104, while the cleaning booth 200, the filler spray booth 202 and the filler continuous-flow driers 204 with their cooling zones 206 are located on the second transport level 106.
(59) All the treatment areas of the second process section 230 are therefore located on the first transport level 104 or on the second transport level 106 of the paint shop 100.
(60) The second high-bay storage unit 110, like the first high-bay storage unit 108 and the third high-bay storage unit 112 to be described below, is configured as a clean-room area.
(61) In particular, each of the high-bay storage units is enclosed by an airtight housing 164, which separates the interior of the high-bay storage unit from the building interior 132 of the building shell 116, so that no contaminants can pass from the building interior 132 into the interior of the housing 164 of the respective high-bay storage area.
(62) The interior of the housings 164 of the high-bay storage units is only accessible via the respective entry tunnels 162, 222 and via the respective exit tunnels 180, 228.
(63) To prevent contaminants from passing through these tunnels into the interior of the housing 164, the interior of each high-bay storage unit is placed under an excess pressure of at least approximately 100 Pa, preferably of at least approximately 50 Pa, relative to the air pressure in the building interior 132 by means of an air circulation unit 232 shown schematically in
(64) As may be seen from
(65) The air inlet pipe 242 branches into a number of, e.g. three, air inlet ducts 244, which extend in vertical direction along an end wall 246 of a high-bay storage unit (see
(66) From these air inlet ducts 244 the inlet air discharges through inlet air openings 248 of the air inlet ducts 244 arranged one above the other in vertical direction into the interior 258 of the high-bay storage unit.
(67) Close to the opposite face of the high-bay storage unit, one or more exhaust air ducts 250 are provided, which also extend in vertical direction along a boundary wall of the housing 164 of the respective high-bay storage unit and have exhaust air openings 252 arranged vertically one above the other, through which air is sucked out of the interior 258 of the housing 164 of the high-bay storage unit into an exhaust air pipe 254 shown in
(68) The connection between the exhaust air ducts 250 and the exhaust air pipe 254 is not shown in
(69) As shown in
(70) Alternatively, it can also be provided that each of the high-bay storage units 108, 110 has its own housing 164, which is separated in an airtight manner from the housing of the respective other high-bay storage unit.
(71) As may be seen from
(72) This inflowing inlet air prevents air from passing out of the building interior 132 through the entry tunnel 222 into the interior 258 of the housing 164.
(73) The lock chamber air is sucked out of the entry lock chamber 256 into the exhaust air pipe 254 through air flaps 260.
(74) The exhaust air pipe 254 opens into the air supply device 234 of the air circulation unit 232 on the suction side of the ventilator 236, so that the air circulation circuit from the air supply device 234 through the interior 258 of the housing 164 of the high-bay storage unit and possibly through the entry lock chamber 256 of the high-bay storage unit is closed.
(75) Like the entry tunnels 222 of the second high-bay storage unit 110, the entry tunnels of the remaining high-bay storage units are also provided with an entry lock chamber 256 with circulating air flowing through it.
(76) Similarly, the exit tunnels of all the high-bay storage units are likewise provided with a correspondingly configured exit lock chamber.
(77) To keep the excess pressure in the interior 258 of the housing 164 of the high-bay storage unit at the desired level, a portion of the inlet air supplied to the housing 164 is discharged directly into the building interior 132 through outlets 262 (see
(78) The air lost to the air circulation circuit as a result of this is replaced by suction through the intake 238 of the air supply device 234.
(79) To prevent dirt from dropping onto the vehicle bodies 102 stored in the body storage bays 171 from above, each body storage bay 171 is provided with a cover 264 arranged above the respective storage space for a vehicle body 102 (see
(80) This cover 264 can in particular be configured as a protective film of a suitable plastic material, e.g. polyethylene.
(81) The protective film used as cover 264 complies with the respectively applicable fire protection regulations.
(82) The cover 264 in particular prevents contaminants from the storage and retrieval unit 170 or from a vehicle body transport skid, on which a vehicle body 102 is arranged, from being able to drop onto a vehicle body 102 stored in a lower body storage bay 171 when storing or retrieving a vehicle body 102 in a further body storage bay 171 arranged above the body storage bay 171.
(83) From the exit tunnels 228 of the second high-bay storage unit 110, the vehicle bodies 102 on the second transport level 106 are transported to a respective swivel table 266, which swivels the vehicle bodies 102 around an angle of 90 around a vertical axis, so that the vehicle bodies 102 are then oriented parallel to the longitudinal direction 130 of the paint shop 100.
(84) In this orientation the vehicle bodies 102 on the second transport level 106 of the paint shop 100 are transported to a cross conveyor 268, which distributes the vehicle bodies 102 onto two top coat lines 270.
(85) In each of these top coat lines 270, a top coat preparation booth 272, multiple primer spray booths 274 and an intermediate continuous-flow drier 276 respectively follow one another in the transport route 134 of the vehicle bodies 102 and all extend in the longitudinal direction 130 of the paint shop 100 towards the second face 118.
(86) As may best be seen from
(87) Moreover, an inlet air plenum system 210 is respectively arranged above each primer spray booth 274.
(88) A turning area 278 in the form of an air lock, in which the orientation of the vehicle bodies 102 is rotated around an angle of 180, respectively adjoins the intermediate continuous-flow drier 276 of each top coat line 270.
(89) A cooling zone 280, a plurality of clear coat spray booths 282, an evaporation zone 284, a top coat continuous-flow drier 286 and a cooling zone 288 respectively adjoin the turning area 278 of each top coat line 270 in the transport route 134 of the vehicle bodies 102 and respectively extend in the longitudinal direction 130 of the paint shop 100 towards the first face 114 of the building shell 116.
(90) As may best be seen from
(91) An inlet air plenum system 210 is respectively arranged above each of the clear coat spray booths 282.
(92) As can be seen from
(93) From the cooling zones 288 the vehicle bodies 102 are transported to a respective swivel table 292, which swivels the vehicle bodies 102 around an angle of 90 around a vertical axis, so that the vehicle bodies 102 are then oriented parallel to the transverse direction 128 of the paint shop 100.
(94) In this orientation the vehicle bodies 102 are respectively transported through one of two entry tunnels 294, which are respectively provided with an entry lock chamber, on the second transport level 106 into the third high-bay storage unit 112 of the paint shop 100.
(95) From storage positions of the third high-bay storage unit 112, which are located on the level of the second transport level 106, the vehicle bodies 102 are transported to body storage bays 171 of the third high-bay storage unit 112 by means of storage and retrieval units 170.
(96) From the body storage bays 171 the vehicle bodies 102 for further treatment are transported by means of the storage and retrieval units 170 to retrieval positions of the third high-bay storage unit 112 on the level of the first transport level 104 of the paint shop 100.
(97) Viewed in the longitudinal direction 130 of the paint shop 100, the third high-bay storage unit 112 is arranged behind the second high-bay storage unit 110 on the first face 114 of the building shell 116 and therefore between the first face 114 and the second high-bay storage unit 110.
(98) From the retrieval positions of the third high-bay storage unit 112 the vehicle bodies 102 pass through exit tunnels 296 of the third high-bay storage unit 112, which respectively comprise an exit lock chamber, on the first transport level 104 of the paint shop 100 (see
(99) The top coat lines 270 with the top coat preparation booths 272, the primer spray booths 274, the intermediate continuous-flow driers 276, the cooling zones 280, the clear coat spray booths 282, the evaporation zones 284 and the top coat continuous-flow driers 286 with the cooling zones 288 belong to a third process section 300 of the paint shop 100, which starts at the exit tunnels 228 of the second high-bay storage unit 110 on the second transport level 106 of the paint shop 100 and terminates at the entry tunnels 294 of the third high-bay storage unit 112 on the second transport level 106 of the paint shop 100.
(100) All the treatment areas of the third process section 300, i.e. the top coat lines 270 with the top coat preparation booths 272, the primer spray booths 274, the intermediate continuous-flow driers 276, the cooling zones 280, the clear coat spray booths 282, the evaporation zones 284 and the top coat continuous-flow driers 286 with the cooling zones 288, are located on the second transport level 106 of the paint shop 100.
(101) In the manner already described above in association with the second high-bay storage unit 110, the third high-bay storage unit 112 is configured as a clean-room area that is separated from the building interior 132 of the building shell 116.
(102) From the cross conveyors 298 on the first transport level 104 of the paint shop 100, the vehicle bodies 102 pass to swivel tables 302, which swivel the vehicle bodies 102 around an angle of 90 around a vertical axis, so that the vehicle bodies 102 are then oriented parallel to the longitudinal direction 130 of the paint shop 100 again.
(103) In this orientation the vehicle bodies 102 on the first transport level 104 of the paint shop 100 are respectively transported through one of two finishing and inspection areas 304.
(104) Adjoining the finishing and inspection areas 304 in the transport route 132 of the vehicle bodies 102 is a cross conveyor 306, which transports the vehicle bodies 102 to an exit point 308 of the paint shop 100, from where the finished painted vehicle bodies 102 pass to a final assembly plant.
(105) If finishing work is necessary on a vehicle body 102, this is transported by the cross conveyor 306 to a finishing feed conveyor 319, from where the respective vehicle body 102 passes into a finishing work preparation area 312 by means of a cross conveyor 314.
(106) After the finishing work preparation has been concluded, the vehicle body 102 is transported by means of a cross conveyor 310 and a hoisting assembly 317 adjoining it to the entry of one of the top coat preparation booths 272 on the second transport level 106 to then be painted again.
(107) The finishing and inspection areas 304 as well as the finishing work preparation area 312 belong to a fourth process section 316 of the paint shop 100, which starts at the exit tunnels 296 of the third high-bay storage unit 112 on the first transport level 104 and terminates at the exit point 308 of the paint shop 100 on the first transport level 104 of the paint shop 100.
(108) All the treatment areas of the fourth process section 316, i.e. the finishing and inspection areas 304 and the finishing work preparation area 312, are located on the first transport level 104 of the paint shop 100.
(109) As may best be seen from
(110) Moreover, multiple air supply units 320 are located on the first transport level 104 that serve to supply the inlet air plenum systems 210 of the filler spray booths 202, the primer spray booths 274 or the clear coat spray booths 282 and are arranged between the paint spray wash-out units 208 of these spray booths, on one side, and the second face 118 of the building shell 116, on the other side.
(111) The air supply units 320 are connected to the respectively associated inlet air plenum systems 210 of the spray booths via air inlet ducts (see
(112) Moreover, in the same area on the first transport level 104 of the paint shop 100 a paint sludge disposal area 322 is provided for further processing of the paint overspray washed out of the booth exhaust air by the paint spray wash-out units 208 and is arranged between the air supply units 320, on the one side, and the paint spray wash-out units 208, on the other side.
(113) The paint sludge disposal area 322 can comprise paint coagulation units 323 for water-based paint and/or paint coagulation units 325 for solvent-based paint arranged under the floor 124 of the building shell 116.
(114) Adjacent to the air supply units 320 an exhaust air unit 324, which sucks exhaust air out of the spray booths through exhaust air ducts 327 arranged under the floor 124 of the building shell 116 and discharges it to an exhaust air flue 326, is arranged outside the building shell 116 on the second face 118 of the building shell 116.
(115) The air supply units 320 all lie inside a substantially rectangular cohesive area 328 of the first transport level 104, in which no other process devices of the paint shop 100 are arranged.
(116) Similarly, the paint spray wash-out units 208 lie in a substantially rectangular cohesive area of the first transport level 104, given the reference 330, in which no other process devices of the paint shop 100 are arranged.
(117) The heating units 156 of the CDC continuous-flow driers 152 all lie in a substantially rectangular cohesive area 331 of the first transport level 104 of the paint shop 100, in which no other process devices of the paint shop 100 are arranged.
(118) The heating units 212 of the filler continuous-flow driers 204 also all lie in a substantially rectangular cohesive area 332 of the first transport level 104 of the paint shop 100, in which no other process devices of the paint shop 100 are arranged.
(119) The heating units 290 of the top coat continuous-flow driers 286 also all respectively lie in a substantially rectangular cohesive area 333 of the first transport level 104 of the paint shop 100, in which no other process devices of the paint shop 100 are arranged.
(120) Because of the clear division of the first transport level 104 of the paint shop and the grouping of process devices of like type in the respective cohesive areas 328, 330, 331, 332 and 333 of the first transport level 104, areas for open work spaces, machine areas and process areas do not overlap one another, and in particular the radiation of heat from the heating units 156, 212 and 290 of the continuous-flow driers does not have an adverse effect on the other process devices and work spaces.
(121) As may best be seen from
(122) Under the floor 124 a concrete foundation 336 is respectively provided in the region of each post 334.
(123) The paint shop 100 described above operates as follows:
(124) Vehicle bodies 102 assembled in a shell assembly area are transported at the entry point 136 of the paint shop 100 into the first process section 184 of the paint shop 100 and pretreated in this first process section 184 and provided with a cataphoretic dip coating. In addition, the applied dip coating is dried in the first process section 184.
(125) In this case, the vehicle bodies 102 are transported through the pretreatment dip tank 140 and the CDC dip tank 148 suspended from an overhead conveyor, wherein the vehicle bodies 102 are dipped into the said dip tanks by lowering the overhead conveyor track from the second transport level 106.
(126) Alternatively, the vehicle bodies 102 could also be transported through the first process section 184 on rotary carriers, wherein the vehicle bodies 102 can be dipped into the dip tanks 140 and 148 of the first process section 184 by a rotation around a horizontal axis from the second transport level 106 and can be removed from this tank again by a further rotation around this axis.
(127) From the first process section 184 the vehicle bodies 102 pass into the first high-bay storage unit 108, into which the vehicle bodies 102 on the second transport level 106 are transported and from which the vehicle bodies 102 on the first transport level 104 are transported out again.
(128) Before leaving the first high-bay storage unit 108 the vehicle bodies 102 can be temporarily stored in a body storage bay 171.
(129) The vehicle bodies 102 can be retrieved from the first high-bay storage unit 108 in a retrieval sequence differing from the storage sequence, so that the treatment sequence of the vehicle bodies 102 can be changed between the first process section 184 and the second process section 230.
(130) In this way, paint blocks can be formed for the subsequent painting operation and/or bodies for finishing work can be sorted in a sequence-optimised manner.
(131) The transport of the vehicle bodies 102 from the second transport level 106 onto the first transport level 104 occurs within the first high-bay storage unit 108 by means of the storage and retrieval units 170.
(132) After leaving the first high-bay storage unit 108 on the first transport level 104, the vehicle bodies 102 are sealed in the second process section 230 of the paint shop 100, provided with underbody protection, then hoisted from the first transport level 104 to the second transport level 106 and on the second transport level 106 are painted with a filler that is then dried.
(133) After the filler has dried, the vehicle bodies 102 are hoisted from the second transport level 106 onto the third transport level 218 of the paint shop and transported into the second high-bay storage unit 110.
(134) Only transport devices of the paint shop 100 and no process devices or treatment areas are located on the third transport level 218 of the paint shop.
(135) Before the vehicle bodies 102 leave the second high-bay storage unit 110 on the second transport level 106 again, they can be temporarily stored in body storage bays 171 of the second high-bay storage unit 110.
(136) A change of the treatment sequence of the vehicle bodies 102 can also be made in the second high-bay storage unit 110 in the same manner as in the first high-bay storage unit 108.
(137) The vehicle bodies 102 are transported from the third transport level 218 onto the second transport level 106 of the paint shop 100 within the second high-bay storage unit 110 by means of the storage and retrieval units 170.
(138) After the vehicle bodies 102 have left the second high-bay storage unit 110 on the second transport level 106, these are prepared for the top coat painting operation in the third process section 300 of the paint shop 100, e.g. by sanding, and are then provided with a primer. The primer is intermediately dried before the vehicle bodies 102 are painted with a clear coat and the entire top coat is dried.
(139) The application of primer and clear coat can be performed by means of paint robots or manually or partly by means of paint robots and partly manually.
(140) The vehicle bodies 102 on the second transport level 106 are then transported into the third high-bay storage unit 112.
(141) Before the vehicle bodies 102 on the first transport level 104 are transported out of the third high-bay storage unit 112, these can be temporarily stored in body storage bays 171 of the third high-bay storage unit 112.
(142) In this case, the treatment sequence of the vehicle bodies 102 in the third high-bay storage unit 112 can be changed in the same way as in the first high-bay storage unit 108 and in the second high-bay storage unit 110.
(143) The vehicle bodies 102 are transported in the third high-bay storage unit 112 from the second transport level 106 onto the first transport level 104 by means of the storage and retrieval units 170 of the third high-bay storage unit 112.
(144) After the vehicle bodies 102 have left the third high-bay storage unit 112 on the first transport level 104, the vehicle bodies 102 are finished in the fourth process section 316 of the paint shop 100 and inspected, refinished, if necessary, and then moved to a subsequent final assembly plant at the exit 308 of the paint shop 100.
(145) Most treatment areas arranged on the first transport level 104 of the paint shop 100, in particular the seam sealing areas 188, the open work spaces of the underseal application units 190, the fine sealing areas 192, the finishing and inspection areas 304 and the finishing work preparation area 312 are open treatment areas and open work spaces, which are open towards the building interior 132 of the building shell 116 and are not separated from the building interior 132 by partition walls.
(146) The underseal application booths 191 on the first transport level 104 of the paint shop and the treatment areas arranged on the second transport level 106 of the paint shop, in particular the pretreatment unit 138, the CDC unit 146, the CDC continuous-flow drier 152 with the cooling zone 154, the filler spray booth 202, the filler continuous-flow driers 204 with the cooling zones 206, the top coat preparation booths 272, the primer spray booths 274, the intermediate continuous-flow driers 276, the cooling zones 280, the clear coat spray booths 282, the evaporation zones 284 and the top coat continuous-flow driers 286 with the cooling zones 288 are closed treatment areas, which are separated from the building interior 132 of the building shell by booth or drier walls.
(147) Transport of the vehicle bodies 102 through the pretreatment unit 138, the CDC unit 146 and the underseal application units 190 can be conducted by means of overhead conveyors, transport of the vehicle bodies 102 through the remaining open or closed treatment areas and between the treatment areas as well as to and from the high-bay storage units 108, 110 and 112 can be conducted by means of roller conveyors.
(148) In the paint shop 100 described above the transport of the vehicle bodies 102 from one of the high-bay storage units 108 or 110 into the respective following high-bay storage unit 110 or 112 is always conducted via the respective process section 230 or 300 located between these; no direct transport of vehicle bodies 102 from one of the high-bay storage units into another high-bay storage unit or return transport of vehicle bodies 102 against the flow direction of the transport route 132 is provided.