Packer setting method using disintegrating plug
09587456 ยท 2017-03-07
Assignee
Inventors
Cpc classification
E21B2200/08
FIXED CONSTRUCTIONS
International classification
Abstract
Some examples of a packet setting method using disintegrating plug can be implemented as a method for setting a packer in a wellbore. A disintegrating plug is installed in a tubing. The disintegrating plug blocks flow through the tubing in response to pressure. A packer is installed above the disintegrating plug in the tubing. The tubing including the packer and the disintegrating plug is run into a wellbore. The packer is positioned at a wellbore location to create an annular area between the packer and the wellbore wall. Downhole pressure is applied in the tubing to set the packer.
Claims
1. A method for setting a packer in a wellbore, the method comprising: installing a disintegrating plug in a tubing, the disintegrating plug to block flow through the tubing in response to pressure, wherein installing the disintegrating plug in the tubing comprises: positioning a disintegrating enclosure in the tubing, wherein the enclosure comprises a plurality of baffle plates, and positioning the disintegrating plug in the disintegrating enclosure; installing a packer above the disintegrating plug in the tubing; running the tubing including the packer and the disintegrating plug into a wellbore; positioning the packer at a wellbore location to create an annular area between the packer and the wellbore wall; and applying downhole pressure in the tubing to set the packer.
2. The method of claim 1, wherein installing the disintegrating plug in the tubing comprises: positioning a seat in the tubing to receive the disintegrating plug; and positioning the disintegrating plug above the seat.
3. The method of claim 2, wherein the disintegrating plug comprises a disintegrating ball, and wherein the seat comprises a ball seat.
4. The method of claim 2, wherein the packer comprises a packer setting mechanism, and wherein, in response to applying the downhole pressure in the tubing, the disintegrating plug is forced against the seat sealing the tubing, and wherein the packer setting mechanism sets the packer to create a seal in the annular area between the tubing and an open hole section of a wall of the wellbore or a cased portion of the wellbore.
5. The method of claim 2, further comprising producing through the tubing after setting the packer, wherein the disintegrating plug is raised from the seat in response to producing.
6. The method of claim 5, wherein the disintegrating plug disintegrates in response to contacting production fluids.
7. The method of claim 5, wherein the disintegrating plug disintegrates over time.
8. The method of claim 2, wherein the seat is formed of a disintegrating material.
9. The method of claim 1, wherein the enclosure is a cage.
10. The method of claim 1, further comprising: installing a pump below the disintegrating plug in the tubing; and running the tubing including the packer, the disintegrating plug, and the pump into the wellbore.
11. The method of claim 10, wherein the pump is an Electrical Submersible Pump (ESP).
12. The method of claim 1, wherein the tubing includes a restriction above a setting port of the packer.
13. A method for setting a packer in a wellbore, the method comprising: running a tubing into a wellbore, the tubing comprising: a packer, the tubing comprising a restriction above a setting port of the packer, a disintegrating enclosure formed of a material that disintegrates over time when contacted by production fluids, wherein the disintegrating enclosure comprises a plurality of baffle plates, and a disintegrating plug positioned in the disintegrating enclosure, the disintegrating plug and the disintegrating enclosure positioned below the packer on a seat to receive the disintegrating plug; and applying downhole pressure in the tubing to set the packer.
14. The method of claim 13, wherein the packer comprises a packer setting mechanism, and wherein, in response to applying the downhole pressure in the tubing, the disintegrating plug is forced against the seat sealing the tubing, and wherein the packer setting mechanism sets the packer to create a seal in the annular area between the tubing and an open hole section of a wall of the wellbore or a cased portion of the wellbore.
15. The method of claim 13, further comprising producing through the tubing after setting the packer, wherein the disintegrating plug is raised from the seat in response to producing.
16. The method of claim 13, further comprising: installing a pump below the disintegrating plug in the tubing; and running the tubing including the packer, the disintegrating plug, and the pump into the wellbore.
17. The method of claim 13, further comprising transferring the disintegrating plug to a portion of the wellbore below the seat.
18. The method of claim 1, wherein each of the disintegrating enclosure and the disintegrating plug is formed of a material that disintegrates over time when contacted by production fluids.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11) Like reference numbers and designations in the various drawings indicate like elements.
DETAILED DESCRIPTION
(12) This disclosure describes a packer setting method using a disintegrating plug. Packers may be set by hydraulics, mechanics or hydrostatics. In hydraulically set packers, the hydraulic pressure is introduced through the tubing on which the packer is installed and is communicated to the packer's hydraulically actuated system by a port through the tubing wall, also called a mandrel, on which the packing elements are installed. The port extends through the tubing wall and provides communication from the tubing string inner diameter and the hydraulic cylinder for the packer. There are seals within the cylinder that contain and direct the hydraulic pressure. In this manner, the downhole tubing and annulus are isolated.
(13) Hydraulic set packers sometimes use a temporary block or plug with the tubing below the packer so pressure from the surface can be applied to the hydraulically actuated system to initiate and set the packer. After setting the packer, the temporary block or plug can be removed to allow the production of hydrocarbons from the reservoir. Plugging mechanisms can include dropped balls, standing valves, or other mechanisms. Mechanisms can also be deployed on the tubing to act as temporary barriers, e.g., glass or ceramic disks that can be broken with a dropped bar, flapper type valves which cycles open after setting the packer, or other mechanisms.
(14) For certain packers, e.g., slim-hole, electric submersible pump (ESP) hydraulic-set packer or other packers, a restriction can be included in the tubing above the packer setting port. An ESP packer is an example of a standard hydraulic packer which provides for the through passage of ESP power cables and/or a passage of a vent bore to vent gas. The restriction can be implemented, e.g., as a conduit for ESP power cables. The restriction can cause a narrowing of an inner diameter of the tubing above the packer. Implementing a temporary block or plug, e.g., flapper type valves, in such packers can further narrow the inner diameter of the tubing, e.g., due to the multiple component layers used to operate the block or plug. Further, debris from the breakup of glass or ceramic disks used to set the packer can foul the ESP.
(15) This disclosure describes techniques to set a packer in a wellbore using a disintegrating plug that is installed below the packer. In some implementations, a disintegrating plug is captured below the packer, e.g., a slim-hole ESP packer, below which the ESP is positioned. A plug seat is positioned between the packer and the ESP to retain the disintegrating plug between the plug seat and the restriction in the tubing. During run in of the packer into the wellbore, the plug can float off-seat to allow the tubing to auto-fill. Once the ESP completion is at a specified depth in the wellbore, the tubing is pressured up at the surface to set the packer. When doing so, the plug is forced against the seat allowing pressure to be applied to the packer. With the packer set, the ESP can be started causing fluid (e.g., production fluid) to flow uphole toward the seat. The disintegrating plug flows off seat allowing production through the wellbore. The disintegrating plug will disintegrate over time permitting production fluid flow through the tubing.
(16)
(17)
(18) At 804, a packer 106 is installed above the disintegrating plug 204 in the tubing 202. For example, the packer 106 is a slim-hole ESP packer. In this manner, the disintegrating plug 204 is captured between the packer 106 and the seat 206. At 806, the tubing 202 including the packer 106 and the disintegrating plug 204 are run into a wellbore 102 as shown in
(19)
(20) After setting the packer 106, production through the wellbore 102 can commence. In some implementations, the ESP 108 can be operated to pump production fluids uphole toward the surface. The uphole flowing production fluids can raise the disintegrating plug 204 from the seat 206 allowing the production fluid flow. The packer 106 regulates the production fluid flow through the tubing 202. Over time or in response to contacting the production fluids (or both), the disintegrating plug 204 disintegrates permitting unrestricted flow of the production fluids to the surface. In either the implementations described with reference to
(21)
(22) At 1006, downhole pressure is applied in the tubing 402 to set the packer 404. Similar to the implementations described above, the arrows in
(23)
(24) After setting the packer 404, production through the wellbore 102 can commence. As shown in
(25)
(26) In some implementations, the arrangement of a disintegrating plug above a seat in a tubing can be implemented for purposes other than setting a packer, e.g., testing tubing or other downhole activities which may require the application of differential pressure without the movement of a sleeve to open or close communication between the tubing and the annulus. In any of the implementations described above and/or in other implementations, the seat can be solid or flexible. Solid seats may not allow the passage of the plug unless the plug disintegrates to a size smaller than an opening in the seat. Flexible seats can retract to allow passage of the plug. In any of the implementations described above and/or in other implementations, the plug may not be formed of a disintegrating material. Instead, the plug can be formed of a material that has a specific gravity less than a specific gravity of the production fluids that flow uphole through the tubing, thereby allowing the plug to rise above the seat to permit flow through the seat. In implementations in which the plug is formed of disintegrating material, the plug may disintegrate entirely until the plug dissolves away or partially to reduce to a dimension sufficient to permit production fluid flow and/or removal of the plug.
(27) The example implementations described above describe setting one packer. In some implementations, multiple packers can be set by implementing techniques similar to those described here. For example, multiple packers can be installed in a tubing and a disintegrating plug and a seat can be installed below the lowest packer. Downhole pressure in the tubing can force the plug against the seat causing a pressure seal which can be used to set all the packers. In some situations, each packer can be associated with a respective, different setting pressure to enable witnessing the setting of each packer.
(28) A number of implementations have been described. Nevertheless, it will be understood that various modifications may be made without departing from the spirit and scope of the disclosure.