SYSTEM AND METHOD FOR FILLING CONSTRUCTION JOINT SPACES
20170058511 ยท 2017-03-02
Inventors
Cpc classification
E04F15/02005
FIXED CONSTRUCTIONS
E04F15/02016
FIXED CONSTRUCTIONS
C09J5/02
CHEMISTRY; METALLURGY
International classification
Abstract
A method for filling a construction joint space includes applying a primer layer to one or more construction member edges of one or more construction members, and chemically reacting a filler layer with the primer layer to at least partially fill a remainder of the construction joint space with the filler layer. The construction member edge(s) at least partially form the construction joint space. The primer layer can include an epoxy primer. The filler layer can include at least one of a polyurea and a polyurethane. The epoxy primer can be covered with the filler layer. The method can also include the step of applying a filler retainer to a top surface of the construction member to substantially confine the filler layer within the joint space. A system for filling construction joint spaces includes one or more of a primer layer, a filler layer and a filler retainer.
Claims
1. A method for filling a construction joint space, the method comprising the steps of: applying a primer layer to a construction member edge of a construction member, the construction member edge at least partially forming the construction joint space, the primer layer including an epoxy primer; and chemically reacting a filler layer with the primer layer to at least partially fill a remainder of the construction joint space with the filler layer, the filler layer including at least one of a polyurea and a polyurethane.
2. The method of claim 1 wherein the step of chemically reacting includes covering the epoxy primer with the filler layer.
3. The method of claim 1 wherein the step of at least partially filling includes filling the remainder of the construction joint space with the filler layer.
4. The method of claim 1 wherein the step of applying includes using a two-part epoxy primer.
5. The method of claim 1 wherein the joint filler does not include the polyurea material.
6. The method of claim 1 wherein the filler layer does not include the polyurethane material.
7. The method of claim 1 further comprising the step of applying a filler retainer to a top surface of the construction member to substantially confine the filler layer within the joint space.
8. A system used for filling construction joint spaces that is installed utilizing the method of claim 1.
9. A method for filling a construction joint space, the method comprising the steps of: applying a primer layer to a construction member edge of a construction member, the construction member edge at least partially forming the construction joint space, the primer layer including an epoxy primer; and at least partially filling a remainder of the construction joint space with the filler layer so that the filler layer contacts the primer layer, the filler layer including a polyurea.
10. The method of claim 9 wherein the step of at least partially filling includes chemically bonding the filler layer with the primer layer.
11. The method of claim 9 wherein the step of applying includes using a two-part epoxy primer.
12. The method of claim 9 wherein the step of at least partially filling includes covering the epoxy primer with the filler layer.
13. The method of claim 9 wherein the step of at least partially filling includes filling the remainder of the construction joint space with the filler layer.
14. A system used for filling construction joint spaces that is installed utilizing the method of claim 9.
15. A method for filling a construction joint space, the method comprising the steps of: applying a primer layer to a construction member edge of a construction member, the construction member edge at least partially forming the construction joint space, the primer layer including an epoxy primer; and at least partially filling a remainder of the construction joint space with the filler layer so that the filler layer contacts the primer layer, the filler layer including a polyurethane.
16. The method of claim 15 wherein the step of at least partially filling includes chemically bonding the filler layer with the primer layer.
17. The method of claim 15 wherein the step of applying includes using a two-part epoxy primer.
18. The method of claim 15 wherein the step of at least partially filling includes covering the epoxy primer with the filler layer.
19. The method of claim 15 wherein the step of at least partially filling includes filling the remainder of the construction joint space with the filler layer.
20. A system used for filling construction joint spaces that is installed utilizing the method of claim 15.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0020] The novel features of this invention, as well as the invention itself, both as to its structure and its operation, will be best understood from the accompanying drawings, taken in conjunction with the accompanying description, in which similar reference characters refer to similar parts, and in which:
[0021]
[0022]
[0023]
[0024]
[0025]
[0026]
[0027]
[0028]
[0029]
[0030]
DESCRIPTION
[0031] Embodiments of the present invention are described herein in the context of a joint space filling system (hereinafter sometimes referred to simply as a system) and a method for filling construction joint spaces. Those of ordinary skill in the art will realize that the following detailed description of the present invention is illustrative only and is not intended to be in any way limiting. Other embodiments of the present invention will readily suggest themselves to such skilled persons having the benefit of this disclosure. Reference will now be made in detail to implementations of the present invention as illustrated in the accompanying drawings. The same or similar reference indicators will be used throughout the drawings and the following detailed description to refer to the same or like parts.
[0032] In the interest of clarity, not all of the routine features of the implementations described herein are shown and described. It will, of course, be appreciated that in the development of any such actual implementation, numerous implementation-specific decisions must be made in order to achieve the developer's specific goals, such as compliance with application- and business-related constraints, and that these specific goals will vary from one implementation to another and from one developer to another. Moreover, it will be appreciated that such a development effort might be complex and time-consuming, but would nevertheless be a routine undertaking of engineering for those of ordinary skill in the art having the benefit of this disclosure. Further, although the disclosure herein refers specifically to floor tiles, ceiling tiles and/or wall tiles (hereinafter referred to simply as a tile or tiles) as a matter of convenience, it is understood that the system may also be utilized in and/or with any joint space that is formed at least partially by one or more construction materials.
[0033]
[0034] In alternate embodiments, the joint space filling system 10 can partially, substantially or completely fill the joint space 16, and can exhibit an improved combination of significant resilience, deformation capability and bond strength. The design of the system 10 can vary. In the embodiment illustrated in
[0035] In certain embodiments, the primer layer 18 can include an epoxy primer. In one embodiment, the primer layer 18 can include a two-component epoxy primer that is applied within the joint space 16 prior to the application of the filler layer 20. In certain embodiments, a low viscosity 100% solid epoxy primer can be used for the primer layer 18. Alternatively, other suitable types of epoxy primers can be utilized for the primer layer 18. As provided herein, the primer layer 18 can be applied to a portion of the tiles that are positioned within the joint space 16. In certain embodiments, the primer layer 18 can be applied at a rate of between approximately 0.7 m.sup.2 to 17.5 m.sup.2 per liter so that a film with minimum thickness of between approximately 0.05-1.25 mm is generated over both joint walls. In one embodiment, the primer layer 18 can be applied at a rate of approximately 3.5 m.sup.2 per liter so that a film with minimum thickness of approximately 0.25 mm is generated over both joint walls. Alternatively, other thicknesses of the primer layer can be used.
[0036] In certain embodiments, the filler layer 20 can include an elastomer. For example, the filler layer 20 can include a two-component flexible subsystem that chemically reacts with, and develops a strong chemical bond with the primer layer 212. The filler layer 20 is applied as a joint filler and can include any adequate flexible material formulation, such as, but not limited to, polyurea elastomers, polyurea hybrids, polyurethane elastomers and/or hybrids, silicon, etc., where the specific formulation to be used can be chosen based on the joint exposure conditions.
[0037]
[0038]
[0039]
[0040]
[0041]
[0042]
[0043] In the embodiment illustrated in
[0044] In one embodiment, the filler retainer 422 can be formed from a material such as plastic or another suitable material. Further, the filler retainer 422 can include an adhesive (not shown), such as a tacky surface, that allows the filler retainer 422 to be temporarily secured to the top surface 424 and/or a bottom edge 428 of the tiles 412. In this embodiment, the filler retainer 422 can have a retainer width 430 that is at least as wide as a joint space width 432 of the joint space 416 so that the filler layer 420 is inhibited from exiting the joint space 416.
[0045]
[0046]
[0047]
[0048] At step 500, the joint space is prepared. Preparation can include one or more of the following:
[0049] A. Remove using proper manual or mechanical means any existing dust, film or residues on the tile edge(s) that may hinder the bond between the primer layer and such joint tile edges. For example, power tools such as grinders with metal wire brush wheel that can access the full depth of the joint space can be used for this purpose. Exposure of a new tile edge surface can facilitate proper seepage of the primer layer onto and/or into the tile edge(s).
[0050] B. Apply adhesive tape (not shown) to the top surfaces of the tiles, adjacent to the joint space. The adhesive tape can protect the exposed top surfaces of the tiles surrounding the joint space from direct contact with the primer layer and/or filler layer. If incidental drops of the primer layer and/or filler layer fall outside the taped area on the tile surface, these drops can be removed with a cloth impregnated with acetone or another suitable solvent, or by other suitable methods.
[0051] At step 502, the primer layer is applied to the joint tile edges within the joint space. Care should be taken so that the pot life of the primer layer is not exceeded. As a representative example, if the pot life of the primer layer is about 2 hours, to avoid unnecessary waste of the primer layer materials, more of the primer layer should not be mixed than can be applied on the joint tile edges in approximately a 1.5 hour period. In one embodiment, the primer layer can be applied onto the joint tile edges using relatively thin paint brush. The brushes should be able to reach the full depth of the joint space so that the primer layer can be applied all the way to the bottom of the joint space. In certain embodiments, the primer layer can be applied at a rate of between approximately 0.7 m.sup.2 to 17.5 m.sup.2 per liter so that a film with minimum thickness of between approximately 0.05-1.25 mm is generated over both joint walls. In one embodiment, the epoxy primer can be applied at a rate of approximately 3.5 m.sup.2 per liter so that a film with minimum thickness of approximately 0.25 mm is generated over both joint walls. The primer layer should be allowed to set for a suitable period of time. In one embodiment, the applied epoxy primer should still feel tacky when touched.
[0052] At step 504, for non-horizontal surfaces, the filler retainer can be positioned over the joint space. The filler retainer should leave a top opening of the joint space so that the filler layer can be added to the joint space. For horizontal surfaces, step 504 can be omitted.
[0053] At step 506, the filler layer is added to the joint space to partially or completely fill the joint space. The filler layer contacts at least a portion of the primer layer to permit a chemical reaction/bonding of the filler layer to the primer layer. If the joint space filling system is being used on exterior surfaces and construction members that are exposed to direct sunlight, step 506 can include the addition of a top coat of ultraviolet resistant filler layer may be used to maximize filler color stability. In this embodiment, the standard filler layer can be leveled out with approximately 1 cm (depending on the size of the joint space) remaining to the top of the joint space. Within a relatively short period of time (e.g., about 10 minutes), the remaining approximately 1 cm depth can be filled with ultraviolet resistant filler layer material. In an alternative embodiment, the ultraviolet resistant filler can be used to completely fill the joint space, omitting the use of the standard filler layer.
[0054] At step 508, the filler layer is allowed to cure. For non-horizontal surfaces, once the filler layer has sufficiently cured, the filler retainer can be removed, and the filler layer is then allowed to completely cure. Once the joint space is completely filled, in one embodiment, at least approximately 2 hours of undisturbed cure of the filler layer can occur prior to removing the adhesive tape and/or the filler retainer.
[0055] The system 10 described herein addresses one or more of the following problems, and includes one or more of the following advantages over conventional joint space fillers. The system 10 allows for considerable thermal movement of floor joints and/or wall joints without exhibiting cracking, tearing or bond failure from the joint walls. The system 10 has acceptable color stability when subjected to ultraviolet radiation (direct sunlight) and also self-heals by practically recuperating the original surface conditions when struck by sharp objects. The system 10 and method provided herein can include hybrid elastomer-epoxy formulation of the system 10, which integrates one or more of the following features and/or advantages in a single system 10: [0056] Strong bond between the filler layer and the joint tile edges (via the primer layer) in order to avoid pull out and/or damage by existing floor maintenance and/or cleaning equipment. [0057] Enough flexibility to accommodate volumetric changes in the construction members caused by environmental temperature gradients. [0058] Self-heals by dissipating imprints caused by sharp object impacts. [0059] Exhibits color stability under ultraviolet radiation (direct sunlight exposure). [0060] Ease of application that allows use of automated installation equipment for large projects.
[0061] It is understood that although a number of different embodiments of the joint space filling system 10 and method for filling construction joint spaces have been described herein, one or more features of any one embodiment can be combined with one or more features of one or more of the other embodiment, provided that such combination satisfies the intent of the present invention.
[0062] While a number of exemplary aspects and embodiments of the joint space filling system 10 and method for filling construction joint spaces have been shown and disclosed herein above, those of skill in the art will recognize certain modifications, permutations, additions and sub-combinations thereof. It is therefore intended that the system and method shall be interpreted to include all such modifications, permutations, additions and sub-combinations as are within their true spirit and scope, and no limitations are intended to the details of construction or design herein shown.