Method of manufacturing ball screw device
12269133 ยท 2025-04-08
Assignee
Inventors
Cpc classification
F16H25/24
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Y10T74/19702
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
Y10T29/497
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
B23P21/00
PERFORMING OPERATIONS; TRANSPORTING
F16H25/2204
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Y10T29/49853
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
International classification
B23P15/00
PERFORMING OPERATIONS; TRANSPORTING
B23P21/00
PERFORMING OPERATIONS; TRANSPORTING
F16H25/22
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Abstract
A method of manufacturing a ball screw device includes a nut unit preparation step, a screw shaft preparation step, and an assembly step. In the nut unit preparation step, a nut unit is prepared in which a circulation component, a ball, and a temporary shaft that prevents the ball from falling off are assembled to a nut provided with an inner peripheral track surface. In the screw shaft preparation step, a screw shaft provided with an outer peripheral track surface is prepared. In the assembly step, after the nut unit preparation step and the screw shaft preparation step, the temporary shaft of an arbitrary nut unit is replaced with an arbitrary screw shaft to manufacture the ball screw device.
Claims
1. A method of manufacturing a ball screw device, the method comprising: a nut unit preparation step of preparing a nut unit in which a ball, and a temporary shaft that prevents the ball from falling off are assembled to a nut provided with an inner peripheral track surface; a screw shaft preparation step of preparing a screw shaft provided with an outer peripheral track surface; and an assembly step of replacing the temporary shaft of the nut unit with the screw shaft to manufacture a ball screw device after the nut unit preparation step and the screw shaft preparation step, wherein the nut unit preparation step includes a measurement step of measuring a moving distance, when the ball and a master screw shaft that is a reference are assembled to the nut such that the master screw shaft is moved in an axial direction without rotating while the nut is fixed, and the screw shaft preparation step includes a measurement step of measuring a moving distance, when a master nut that is a reference is assembled to the screw shaft such that the screw shaft is moved in the axial direction without rotating while the master nut is fixed.
2. The method of manufacturing a ball screw device according to claim 1, wherein in the nut unit preparation step, a stopper that prevents the temporary shaft from falling off from the nut is attached to both end portions of the temporary shaft.
3. The method of manufacturing a ball screw device according to claim 1, wherein in the nut unit preparation step, in order to prevent the temporary shaft from falling off from the nut, the nut unit is covered with a packing material.
4. The method of manufacturing a ball screw device according to claim 1, wherein in the ball screw device, an axial gap between the screw shaft and the nut unit is 0.05 mm or less.
5. The method of manufacturing a ball screw device according to claim 1, wherein in the ball screw device, an axial gap between the screw shaft and the nut unit is 0.02 mm or less.
6. The method of manufacturing a ball screw device according to claim 1, wherein in the ball screw device, an axial gap between the screw shaft and the nut unit is 0.005 mm or less.
7. The method of manufacturing a ball screw device according to claim 1, wherein in the ball screw device, an axial gap between the screw shaft and the nut unit is 0 mm or less.
Description
BRIEF DESCRIPTION OF DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
DESCRIPTION OF EMBODIMENTS
(10) Hereinafter, the present invention will be described in detail with reference to the drawings. Note that the present invention is not limited by a mode for carrying out the following invention (hereinafter, referred to as an embodiment). Furthermore, constituent elements in the following embodiments include those that can be easily assumed by those skilled in the art, those that are substantially the same, and those within a so-called equivalent range. Moreover, the constitution elements disclosed in the following embodiments can be appropriately combined.
(11)
(12) As illustrated in
(13) The nut 3 is a cylindrical component, and has a spiral inner peripheral track surface 3a on an inner peripheral surface. The outer peripheral track surface 2a and the inner peripheral track surface 3a are the same lead and face each other. Therefore, a spiral track 5 is provided between the outer peripheral track surface 2a and the inner peripheral track surface 3a.
(14) The nut 3 includes a return path 6 extending in the axial direction. Furthermore, the nut 3 includes two deflectors (not illustrated). The deflectors scoop up the balls 4 from a terminal end of the track 5 and guide the balls 4 to the return path 6, and supply the balls from the return path 6 to a starting end of the track 5. Note that, in the ball screw device of the present disclosure, the deflectors are exemplified as an example of a circulation component. However, other than the deflectors, a tube, a top, an end cap, and other circulation systems may be used, and there is no particular limitation.
(15) A flange 7 for fixing the nut 3 to another component is provided at one end portion in the axial direction on the outer peripheral surface of the nut 3. In the embodiment, a flanged nut is cited as an example of the nut, but the present disclosure may be other nuts such as a non-flanged nut, a square nut, and a trunnion nut, and is not particularly limited. Hereinafter, a direction in which the flange 7 is disposed as viewed from a central portion of the nut 3 in the axial direction is referred to as a first direction X1, and a direction opposite to the first direction is referred to as a second direction X2.
(16)
(17) As illustrated in
(18) The nut unit preparation step S1 is a step of preparing a nut unit 10. As illustrated in
(19) In the nut unit preparation step S1, with respect to the nut 3 and the ball 4 to be prepared, a reference value of a state in which the ball 4 is inserted into the track surface 3a of the nut 3 is set in advance, and it has been confirmed by inspection that a manufacturing error (variation) of the nut and the ball is within a predetermined control range. Here, the control range with respect to the predetermined reference value is controlled within a range stricter than the tolerance, in other words, the reference value is set in advance as a constant, and an allowable range is controlled within a range narrower than the tolerance. As a result, the axial gap in the standard set by the ball screw device 1 which is a finished product is satisfied. Furthermore, for example, a method of measuring a ball center diameter (BCD) and determining the BCD together with a diameter of the inserted ball can be cited to confirm whether or not it is within the range of control with respect to the predetermined reference value. Alternatively, there is a method in which a master screw shaft serving as a master is assembled to a nut and a ball, the nut is fixed, and a moving distance (axial gap) in the axial direction is measured without the master screw shaft rotating.
(20) In the nut unit preparation step S1, after preparing each component, the nut unit 10 is assembled next. To assemble the nut unit 10, a circulation component is assembled to the nut 3. Next, the temporary shaft 11 is inserted into the nut 3. As a result, the inner peripheral track surface 3a of the nut 3 faces the outer peripheral surface of the temporary shaft 11. Furthermore, the temporary shaft 11 is inserted into such an extent as not to cover a part of the inner peripheral track surface 3a, and a portion to be filled with the ball 4 is left open. Next, the ball 4 is inserted between the inner peripheral track surface 3a of the nut 3 and the outer peripheral surface of the temporary shaft 11, and the inner peripheral track surface 3a and the return path are filled with the ball 4. Next, the temporary shaft 11 is further pushed, and the temporary shaft 11 penetrates the nut 3. According to this, the ball 4 abuts on the outer peripheral surface of the temporary shaft 11, and the ball filled in the nut does not fall off from the inner peripheral track surface. Then, the completed nut unit 10 is conveyed from a site 100 on which the nut unit preparation step S1 is performed to a site 102 on which the assembly step S3 is performed, and this step ends. Note that, although the nut unit preparation step S1 of the present embodiment manufactures the nut unit 10 in the site 100, the nut unit preparation step S1 of the present disclosure is not limited to the case of actually manufacturing the nut unit 10. That is, the nut unit preparation step S1 of the present disclosure includes a case where the nut unit 10 itself is purchased or imported from another country, and the nut unit 10 is carried into the site 100 and prepared.
(21) Note that, in the present embodiment, stoppers 12 are fitted to both end portions of the temporary shaft 11 at the time of assembling the nut unit 10. Each of the stoppers 12 is an annular component and is made of an elastic material. As a result, even if the temporary shaft 11 moves in the axial direction during the conveyance of the nut unit 10, the stopper abuts on an end surface of the nut, and the temporary shaft is prevented from falling off from the nut. Furthermore, the nut unit 10 of the present embodiment may be packed with a bag-shaped packing material 13 as illustrated in
(22) The screw shaft preparation step S2 is a step of setting a reference value, which is a constant, in advance on the track surface 2a of the screw shaft 2, confirming whether or not the manufacturing error (variation) is within a predetermined control range, and preparing the screw shaft 2 satisfying a requirement of the control range. Whether or not the manufacturing error is within the control range with respect to a predetermined reference value can be determined by a method in which a master nut serving as a master is assembled to a screw shaft, the nut is fixed, and a moving distance (axial gap) of the master screw shaft in the axial direction is measured. Furthermore, there is a method of measuring a screw groove and making a determination by assuming a ball center diameter (BCD). Furthermore, the screw shaft 2 satisfying the predetermined control range is conveyed from a site 101 where the screw shaft preparation step S2 is performed to the site 102 where the assembly step S3 is performed, and this step ends.
(23) Note that, in the screw shaft 2 described in the embodiment, as illustrated in
(24) The assembly step S3 is a step of assembling the ball screw device 1 by combining the nut unit 10 and the screw shaft 2 in the site 102. In the combination method, as illustrated in
(25) As described above, the method of manufacturing the ball screw device of the embodiment includes the nut unit preparation step S1, the screw shaft preparation step S2, and the assembly step S3. In the nut unit preparation step S1, the circulation component, the ball 4, and the temporary shaft 11 that prevents the ball 4 from falling off are assembled to the nut 3 provided with the inner peripheral track surface 3a to manufacture the nut unit 10. In the screw shaft preparation step S2, the screw shaft 2 provided with the outer peripheral track surface 2a is prepared. In the assembly step S3, after the nut unit preparation step S1 and the screw shaft preparation step S2, the temporary shaft 11 of an arbitrary nut unit 10 manufactured with a predetermined reference value and its control range is replaced with an arbitrary screw shaft 2 manufactured with a predetermined reference value and its control range, thereby manufacturing the ball screw device 1.
(26) According to the manufacturing method of the embodiment, it is controlled whether or not the ball center diameters of the track surface 2a of the screw shaft 2 and the track surface of the nut unit 10 are within the control range from the set value according to the predetermined standard, and the assembled ball screw device 1 is also assembled by picking up the screw shaft 2 and the nut unit 10 having the same set value, so that the axial gap according to the standard is satisfied. Furthermore, in a case where the assembled screw shaft 2 or nut unit 10 is damaged, even if the screw shaft 2 or nut unit is replaced with a new screw shaft 2 or nut unit of the same standard, the axial gap of a predetermined standard is satisfied, and reassembly is facilitated. Furthermore, since the ball 4 is assembled to the nut unit 10 in advance, it is possible to eliminate time and effort of adjusting the ball diameter satisfying the standard in the assembly step. Furthermore, in the assembly step, the screw shaft 2 and the nut unit 10 of the same standard can be arbitrarily assembled, and time and effort of selecting and adjusting the combination of the screw shaft 2 and the nut unit 10 can also be eliminated. Moreover, automation of the assembly can be easily realized.
(27) Furthermore, in the nut unit preparation step S1 of the embodiment, the stoppers 12 for preventing the temporary shaft 11 from falling off from the nut 3 are attached to both end portions of the temporary shaft 11. Alternatively, as in a first modification, in the nut unit preparation step S1, the nut unit is covered with the packing material 13 in order to prevent the temporary shaft 11 from falling off from the nut 3.
(28) Accordingly, when the nut unit 10 is conveyed from the site 100 to the site 102, the temporary shaft 11 is prevented from falling off.
(29) Although the embodiment has been described above, the axial gap is 0.05 mm or less for the standard setting of the ball screw device 1 manufactured in the embodiment, the ball screw device of the present disclosure is not limited to one having the axial gap of 0.05 mm or less. Therefore, the axial gap may exceed 0.05 mm. On the other hand, in consideration of the practicality of the precision grade ball screw, the ball screw device of the present disclosure may be a ball screw device in which the standard of the axial gap is 0.05 mm or less, 0.02 mm or less, or 0.005 mm or less, or a preload is applied (the axial gap is 0 mm or less), and can be applied according to the grade of the ball screw device.
(30) Furthermore, the sites 100, 101, and 102 where each step is performed may refer to different places in the same factory, or may refer to separate factories far from each other, and are not particularly limited. Moreover, the site 102 is not necessarily limited to a site owned by a manufacturing side, and may be on a site of an agent, a processing site, a user, or another side. Furthermore, in the present disclosure, the nut unit preparation step S1, the screw shaft preparation step S2, and the assembly step S3 may be the same site. That is, the nut unit preparation step S1 and the screw shaft preparation step S2 may be performed on the site 102 where the assembly step S3 is performed. In other words, in the nut unit preparation step S1, the nut unit 10 manufactured in a country A may be imported and carried into the site 102 where the assembly step S3 is performed to prepare the nut unit 10. Similarly, in the screw shaft preparation step S2, the screw shaft 2 manufactured in a country B may be imported and carried into the site 102 where the assembly step S3 is performed to prepare the screw shaft 2.
REFERENCE SIGNS LIST
(31) 1 BALL SCREW DEVICE 2, 2A, 2B SCREW SHAFT 2a OUTER PERIPHERAL TRACK SURFACE 3 NUT 3a INNER PERIPHERAL TRACK SURFACE 4 BALL 10 NUT UNIT 11 TEMPORARY SHAFT 12 STOPPER 13 PACKING MATERIAL S1 NUT UNIT PREPARATION STEP S2 SCREW SHAFT PREPARATION STEP S3 ASSEMBLY STEP