MULTI PURPOSE DRILLING SYSTEM AND METHOD
20170044887 ยท 2017-02-16
Assignee
Inventors
Cpc classification
E21B43/305
FIXED CONSTRUCTIONS
E21B43/30
FIXED CONSTRUCTIONS
International classification
E21B43/30
FIXED CONSTRUCTIONS
Abstract
A method of forming a multi purpose drilling for degassing a coal seam that is to mined, the method including the steps of drilling a primary borehole from a surface into a zone above the coal seam, such that at least a portion of the primary borehole extends substantially parallel to the coal seam, and drilling at least one secondary borehole, wherein the least one secondary borehole extends from the primary borehole into the coal seam.
Claims
1. A method of forming a multi purpose drilling for degassing a coal seam that is to be mined, the method including the steps of: drilling a primary borehole from a surface into a zone above the coal seam, such that at least a portion of the primary borehole extends substantially parallel to the coal seam; and drilling at least one secondary borehole; wherein the at least one secondary borehole extends from the primary borehole into the coal seam.
2. A method as claimed in claim 1, wherein the step of drilling at least one secondary borehole involves drilling one secondary borehole into the coal seam such that a majority of the secondary borehole in the coal seam extends substantially parallel to the coal seam.
3. A method as claimed in claim 2, further including the step of drilling branching holes from the secondary borehole that extend into the coal seam.
4. A method as claimed in claim 1, wherein the step of drilling at least one secondary borehole involves drilling a plurality of secondary boreholes such that they extend from the portion of the primary borehole that extends substantially parallel to the coal seam, and into the coal seam.
5. A method as claimed in any one of the preceding claims, wherein the step of drilling the primary borehole involves drilling the primary borehole such that the majority of the primary borehole in the zone above the coal seam extends substantially parallel to the coal seam.
6. A method as claimed in any one of the preceding claims, wherein a portion of the primary borehole is drilled such that it has a larger diameter than the average diameter of the at least one secondary borehole.
7. A method as claimed in any one of the preceding claims, wherein the primary borehole is drilled such that the portion of the primary borehole extending substantially parallel to the coal seam is larger in diameter than a portion of the primary borehole adjacent to the surface.
8. A method as claimed in any one of the preceding claims, wherein the step of drilling the primary borehole involves drilling a pilot hole and reaming at least a portion of the pilot hole.
9. A method as claimed in any one of the preceding claims, wherein the step of drilling at least one secondary borehole involves drilling at least one secondary pilot hole and reaming each of the at least one secondary pilot hole.
10. A method as claimed in any one of the preceding claims, further including the step of drilling at least one well from the surface, each of which intersects with the primary borehole.
11. A method as claimed in claim 10, wherein the step of drilling at least one well from the surface, each of which intersects with the primary borehole, involves drilling the at least one well such that each of the at least one well also intersects with one of the at least one secondary borehole.
12. A method as claimed in claim 10 or claim 11, wherein each of the at least one well is a vertical well.
13. A method as claimed in any one of the preceding claims, further including the step of providing a casing that is at least partially perforated in the portion of the primary borehole that extends substantially parallel to the coal seam.
14. A method as claimed in any one of the preceding claims, further including the step of providing a casing that is at least partially perforated in the at least one secondary borehole.
15. A multi purpose drilling system for degassing a coal seam that is to be mined, the multi purpose drilling system comprising: a primary borehole extending from a surface into a zone above the coal seam; and at least one secondary borehole extending from the primary borehole into the coal seam; wherein at least a portion of the primary borehole extends substantially parallel to the coal seam.
16. A multi purpose drilling system as claimed in claim 15, wherein a majority of the secondary borehole in the coal seam extends substantially parallel to the coal seam.
17. A multi purpose drilling system as claimed in claim 16, wherein branching holes extend from the secondary borehole into the coal seam.
18. A multi purpose drilling system as claimed in claim 15, wherein a plurality of secondary boreholes extend into the coal seam from the portion of the primary borehole that extends substantially parallel to the coal seam.
19. A multi purpose drilling system as claimed in any one of claims 15 to 18, wherein the majority of the primary borehole in the zone above the coal seam extends substantially parallel to the coal seam.
20. A multi purpose drilling system as claimed in any one of claims 15 to 19, further comprising at least one well from the surface, each of which intersects with the primary borehole.
21. A multi purpose drilling system as claimed in any one of claims 15 to 20, further comprising a casing that is at least partially perforated in the portion of the primary borehole that extends substantially parallel to the coal seam.
22. A multi purpose drilling system as claimed in any one of claims 15 to 21, further comprising a casing that is at least partially perforated in the at least one secondary borehole.
23. A multi purpose drilling system as claimed in any one of claims 15 to 22, wherein the portion of the primary borehole extending substantially parallel to the coal seam is larger in diameter than a portion of the primary borehole adjacent to the surface.
24. A method or multi purpose drilling system as claimed in any one of the preceding claims, wherein the zone is a primary caving zone.
25. A method or multi purpose drilling system as claimed in any one of the preceding claims, wherein the zone is between 5 to 40 meters above the coal seam.
26. A method or multi purpose drilling system as claimed in any one of the preceding claims, wherein the zone is between 5 to 25 meters above the coal seam.
27. A method or multi purpose drilling system as claimed in any one of the preceding claims, wherein the zone is between 10 to 15 meters above the coal seam.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0036] To assist in understanding the invention and to enable a person skilled in the art to put the invention into practical effect, preferred embodiments of the invention will be described by way of example only with reference to the accompanying drawings, wherein:
[0037]
[0038]
[0039]
[0040]
[0041]
[0042]
[0043]
[0044]
DETAILED DESCRIPTION OF THE DRAWINGS
[0045]
[0046] With reference to
[0047] A perforated casing (not shown) is inserted into the primary borehole 32 (typically during the drilling of the multi purpose drilling system 30).
[0048] In
[0049] In use, the plurality of secondary boreholes 36 pre drain the coal seam 12 so that longwall panels (22 as seen in
[0050] In
[0051]
[0052] It will be appreciated that the secondary boreholes 36 will no longer drain coal seam gases once the corresponding portion of the coal seam 12 has been mined by the shearer 18.
[0053] A benefit of having a perforated casing in the primary borehole 32 is that the primary borehole 32 remains operational for a longer time in the goaf 16 (compared to not having a casing in the primary borehole 32) as the primary caving zone 14 collapses into the goaf 16. A benefit of draining the goaf 16 using the primary borehole 32 is that not as many vertical wells 40 are required (compared to the prior art solution of drilling vertical wells every 50-200 meters).
[0054]
[0055] It will be appreciated that the multi purpose drilling system 30 is typically drilled before the tailgate 24 and maingate 26 are formed and before the longwall panels 22 are developed and the coal seam 12 is mined. The location of the maingate 26 and tailgate 24 are typically predetermined and the drilling system 30 is drilled such that the ends of the secondary boreholes 36 stop short of the respective maingate 26 or tailgate 24. The secondary boreholes 36 typically stop 5-10 m short of the respective maingate 26 or tailgate 24. A benefit of stopping short of the respective maingate 26 or tailgate 24 is that this prevents gas from escaping from the drilling system 30 into the maingate 26 or tailgate 24.
[0056]
[0057] The primary borehole 132 transitions to being substantially parallel to the coal seam 12. It will be understood that in the present specification, substantially parallel to the coal seam 12 includes 5 to the coal seam 12. The portion of the primary borehole 132 that extends substantially parallel to the coal seam 12 is preferably 5 to 40 meters above the coal seam 12 depending on the strata and the permeability of the strata above the coal seam.
[0058] Similar to the embodiment shown in
[0059] A secondary borehole 136 extends from the primary borehole 132 into the coal seam 12. Branching holes 142 extend from the secondary borehole 136 into the coal seam 12. A casing (not shown) is inserted into the secondary borehole 136. A benefit of casing the secondary borehole 136 is that the casing maintains borehole stability.
[0060] Typically the primary borehole 132 is drilled before the secondary borehole 136 is drilled. A skilled addressee will understand that in one embodiment, the secondary borehole 136 can be drilled before the primary borehole 132. An advantage of drilling the secondary borehole 136 first is that the coal seam roof can be accurately located (using for example gamma detection from the secondary borehole 136) such that a portion of the primary borehole 132 can be drilled so that it can extend substantially parallel to the coal seam 12.
[0061] The primary borehole 132 is typically drilled such that the portion of the primary borehole 132 that extends substantially parallel to the coal seam 12 has a larger diameter than the secondary borehole 136. For example, the average diameter of the secondary borehole 136 is approximately 205 mm (8) and the larger diameter portion of the primary borehole 132 has a diameter of approximately 432 mm (17). The larger diameter portion of the primary borehole 132 aids in draining the goaf (not shown) once the coal seam 12 below the primary borehole 132 has been mined.
[0062] Vertical wells 140 are drilled from the surface 10. The vertical wells 140 are spaced approximately 800-1000 meters apart. The vertical wells 140 intersect the primary borehole 132 and the secondary borehole 136. The vertical wells 140 assist in conveying the coal seam gases to the surface 10 as well as draining water and other liquids from the primary borehole 132 and the secondary borehole 136.
[0063]
[0064]
[0065]
[0066] The first multi purpose drilling system 230 has a primary borehole 232 that is drilled from the surface 10 to above the coal seam 12 and a secondary borehole 236 that is drilled from the same location as the primary borehole 232 from the surface 10 into the coal seam 12. As can be seen, the secondary borehole 236 extends from the primary borehole 232. The primary borehole 232 and the secondary borehole 236 extend towards the install road 162.
[0067] The second multi purpose drilling system 330 has a primary borehole 332 that is drilled from the surface 10 to above the coal seam 12 and a secondary borehole 336 that is drilled from the same location as the primary borehole 332 from the surface 10 into the coal seam 12. The primary borehole 232 and the secondary borehole 236 extend towards the install road 162 from an area close to the ends of the primary borehole 232 and the secondary borehole 236 of the first multi purpose drilling system 230.
[0068] Vertical wells 240, 340, 344 are drilled from the surface 10 so that they intersect with a corresponding primary borehole 232, 332 and a corresponding secondary borehole 236, 336. The vertical wells 240, 340, 344 are spaced approximately 800-1000 meters from corresponding adjacent vertical wells 240, 340, 344. The vertical wells 240, 340, 344 convey coal seam gasses to the surface 10.
[0069]
[0070] The first multi purpose drilling system 430 has a primary borehole 432 that is drilled from the surface 10 to above the coal seam 12 and a secondary borehole 436 that is drilled from the same location as the primary borehole 432 from the surface 10 into the coal seam 12. The primary borehole 432 and the secondary borehole 436 extend towards the install road 162 and intersect a vertical well 544.
[0071] The second multi purpose drilling system 530 has a primary borehole 532 that is drilled from the surface 10 to above the coal seam 12 and a secondary borehole 536 that is drilled from the same location as the primary borehole 532 from the surface 10 into the coal seam 12. The primary borehole 532 and the secondary borehole 536 extend towards the main road 160 and intersect the vertical well 544.
[0072] Additional vertical wells 440, 540 are drilled from the surface 10 so that they intersect with a corresponding primary borehole 432, 532 and a corresponding secondary borehole 436, 536. The vertical wells 440, 540, 544 are spaced approximately 800-1000 meters from corresponding adjacent vertical wells 440, 540, 544. The vertical wells 440, 540, 544 convey coal seam gasses to the surface 10.
[0073]
[0074] The first multi purpose drilling system 630 has a primary borehole 632 that is drilled from the surface 10 to above the coal seam 12 and a secondary borehole 636 that is drilled from the same location as the primary borehole 632 from the surface 10 into the coal seam 12. The primary borehole 632 and the secondary borehole 636 extend towards the main road 160.
[0075] The second multi purpose drilling system 730 is drilled from the same location as the first multi purpose drilling system 630 and has a primary borehole 732 that is drilled from the surface 10 to above the coal seam 12 and a secondary borehole 736 that is drilled from the same location as the primary borehole 732 from the surface 10 into the coal seam 12. The primary borehole 732 and the secondary borehole 736 extend towards the install road 162.
[0076] Vertical wells 640, 644, 740, 744 are drilled from the surface 10 so that they intersect with a corresponding primary borehole 632, 732 and a corresponding secondary borehole 636, 736. The vertical wells 640, 644, 740, 744 are spaced approximately 800-1000 meters from corresponding adjacent vertical wells 640, 644, 740, 744. The vertical wells 640, 644, 740, 744 convey coal seam gasses to the surface 10.
[0077]
[0078] The first multi purpose drilling system 830 has a primary borehole 832 that is drilled from the surface 10 to above the coal seam 12 and a secondary borehole 836 that is drilled from the same location as the primary borehole 832 from the surface 10 into the coal seam 12. The primary borehole 832 and the secondary borehole 836 extend towards the install road 162.
[0079] The second multi purpose drilling system 930 has a primary borehole 932 that is drilled from the surface 10 to above the coal seam 12 and a secondary borehole 936 that is drilled from the same location as the primary borehole 932 from the surface 10 into the coal seam 12. The primary borehole 932 and the secondary borehole 936 extend towards the main road 160.
[0080] Vertical wells 840, 844, 940, 944 are drilled from the surface 10 so that they intersect with a corresponding primary borehole 832, 932 and a corresponding secondary borehole 836, 936. The vertical wells 840, 844, 940, 944 are spaced approximately 800-1000 meters from corresponding adjacent vertical wells 840, 844, 940, 944. The vertical wells 840, 844, 940, 944 convey coal seam gasses to the surface 10.
[0081] Although it is counterintuitive, as the present invention involves more cost and a greater amount of work upfront compared to known prior art solutions, the applicant has found that the present invention can save costs, production time and require less work in the long run for pre drainage and drainage of coal seam gases during development, production and after mining (goaf degassing).
[0082] The foregoing embodiments are illustrative only of the principles of the invention, and various modifications and changes will readily occur to those skilled in the art. The invention is capable of being practiced and carried out in various ways and in other embodiments. For example, it will be understood that the invention can be used for multi seam gas extraction. It is also to be understood that the terminology employed herein is for the purpose of description and should not be regarded as limiting.
[0083] Throughout this specification the word comprise, or variations such as comprises or comprising, will be understood to imply the inclusion of a stated element, integer or step, or group of elements, integers or steps, but not the exclusion of any other element, integer or step, or group of elements, integers or steps.