METHOD OF CONSTRUCTING A TOWER
20170016244 · 2017-01-19
Inventors
Cpc classification
B33Y10/00
PERFORMING OPERATIONS; TRANSPORTING
B33Y80/00
PERFORMING OPERATIONS; TRANSPORTING
B28B1/001
PERFORMING OPERATIONS; TRANSPORTING
Y02E10/728
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
E04H12/12
FIXED CONSTRUCTIONS
E04G21/0463
FIXED CONSTRUCTIONS
International classification
E04H12/34
FIXED CONSTRUCTIONS
B33Y10/00
PERFORMING OPERATIONS; TRANSPORTING
B28B1/00
PERFORMING OPERATIONS; TRANSPORTING
Abstract
A method of constructing a tower is provided, the method including the steps of A: providing an elevation means including a dynamic engaging mechanism realized to engage with a tower surface B: arranging a 3D printing device on the elevation means); C: actuating the dynamic engaging mechanism to effect a vertical elevation of the elevation means; D: actuating the 3D printing device to deposit an essentially horizontal material layer including at least a tower body region; E: repeating steps C and D to obtain a tower structure. A tower constructed using such a method, and a 3D tower printing apparatus, is also provided.
Claims
1. A method of constructing a tower, the method comprising: A: providing an elevation means comprising a dynamic engaging mechanism configured to engage with a tower surface; B: arranging a 3D printing device on the elevation means; C: actuating the dynamic engaging mechanism to effect a vertical elevation of the elevation means; D: actuating the 3D printing device to deposit an essentially horizontal material layer comprising at least a tower body region; and E: repeating steps C and D to obtain a tower structure.
2. The method according to claim 1, comprising the step of actuating the 3D printing device to deposit a number of climbing structure regions, wherein a climbing structure region of the number of climbing structure regions is shaped to complement the dynamic engaging mechanism of the elevation means, to obtain a tower structure incorporating a climbing structure that engages with the dynamic engaging mechanism of the elevation means.
3. The method according to claim 1, wherein a climbing structure is formed to extend at least partially into a body of the tower structure and/or to extend at least partially beyond the body of the tower structure and/or to extend into a tower interior.
4. The method according to claim 1, wherein the dynamic engaging mechanism of the elevation means comprises a number of toothed wheels, and wherein a climbing structure is formed to comprise at least one toothed rack to engage with a toothed wheel of the number of toothed wheels.
5. The method according to claim 1, wherein the elevation means comprises a plurality of vertically arranged toothed wheels, and a climbing structure comprises a corresponding number of vertical toothed racks.
6. The method according to claim 1, wherein a climbing structure comprises a plurality of helical screw threads to accommodate a corresponding number of climbing wheels of the elevation means.
7. The method according to claim 1, comprising the step of actuating the elevation means to raise a platform at a rate corresponding to a hardening time of a previously applied material layer.
8. A tower constructed using the method according to claim 1.
9. A 3D tower printing apparatus comprising: an elevation means comprising a dynamic engaging mechanism) configured to engage with a tower surface; an elevation controller for actuating the dynamic engaging mechanism to effect a vertical displacement of the elevation means; a 3D printing device arranged on the elevation means; and a print controller for actuating the 3D printing device to deposit material in a series of essentially horizontal layers, each layer comprising at least a tower body region to obtain a tower structure.
10. The apparatus according to claim 9, wherein the dynamic engaging mechanism of the elevation means comprises a number of wheels, and wherein the print controller is configured to control the 3D printing device to print a number of climbing structure regions, wherein the number of climbing structure regions are shaped to complement a wheel.
11. The apparatus according to claim 9, wherein the dynamic engaging mechanism of the elevation means comprises a stemming arrangement configured to apply opposing pressure on an interior tower surface.
12. The apparatus according to claim 11, wherein the stemming arrangement comprises at least one star configuration of stemming arms.
13. The apparatus according to claim 9, wherein the elevation means comprises a hydraulic drive system.
14. The apparatus according to claim 9, wherein the 3D printing device comprises an industrial robot with a feed head configured to dispense the material in response to a print instruction from the print controller.
15. The apparatus according to claim 9, comprising a mixing and pumping apparatus to mix fluid concrete and to pump the fluid concrete to the 3D printing device, and a controller configured to adjust a fluid concrete composition and a pumping pressure according to a height above ground of the 3D printing device.
Description
BRIEF DESCRIPTION
[0043] Some of the embodiments will be described in detail, with reference to the following figures, wherein like designations denote like members, wherein:
[0044]
[0045]
[0046]
[0047]
[0048]
[0049] In the diagrams, like numbers refer to like objects throughout. Objects in the diagrams are not necessarily drawn to scale.
DETAILED DESCRIPTION
[0050]
[0051] In this exemplary embodiment, the robot 10 is controlled to deposit unbounded concrete layers L successively to grow the tower body as well as a climbing structure S1. The tower body has a hollow conical shape (indicated by the broken lines), and in this embodiment the climbing structure S1 is realized as a number of ribs or spurs that extend into the interior 22 of the tower structure 2, with a ridged outer surface to engage with ridged or toothed wheels 131 of the elevation means 13. Here, the ridged outer surface of each climbing structure S1 maintains an essentially constant distance D to the central axis X of the tower 2, and the spurs S1 or ribs S1 therefore extend furthest into the tower interior 22 at a lower tower region. At an uppermost tower level, the ridged outer surface of each climbing structure S1 can become flush with the tower wall. For the sake of simplicity, the diagram only shows two diametrically opposing climbing structures S1. A practicable arrangement might comprise three such climbing structures S1 arranged equidistantly at 120 intervals, for example, or four climbing structures S1 arranged equidistantly at 90 intervals.
[0052] The robot 10 is controlled to deposit concrete in a tower body region and climbing structure regions to arrive at the one-piece structure 2 shown in the diagrams. Initially, while a lower level is being formed, the elevation means may not be required. After the tower has grown to a certain height, the elevation means 13 can be arranged to engage with the climbing structures S1, and a drive unit 130 of the elevation means 13 can be controlled to actuate toothed wheels 131, thereby raising the platform 12 upwards as indicated by the arrow. The drive unit 130 can comprise a motor, for example an electric motor driven by battery or connected to a generator (not shown). A system controller can control the print robot 10, a mixing apparatus 15, and the drive unit 130 in a synchronous manner, so that concrete with the correct consistency is continually supplied by a feed line 150 to the robot 10, which moves the feed head 11 to follow a predefined pattern to deposit a helical layer of concrete while the platform is being slowly raised upward by the elevation means 13. In this way, the tower structure 2 can grow in an essentially uninterrupted manner. While the diagram only shows a robot 10 with one articulated arm for one feed head, it should be understood that the apparatus 1 can comprise a plurality of such articulated arms, allowing multiple feed heads to apply layers of concrete in a synchronized manner.
[0053] The inventive additive manufacturing technique is quick and uncomplicated, allowing a very high tower to be printed within a relatively short time, and does not need any mould or slip-form to contain or shape the wet concrete as it is being deposited. The approach taken by embodiments of the invention allows layers of concrete with a precisely controlled consistency (regarding wetness, viscosity, slump value, setting time etc.) to be deposited or printed without any need to contain or mould the concrete while it hardens. Applying successive unbounded or uncontained layers of concrete in this way may result in a ridged texture on the walls of the tower. If a smooth wall is desired, for example a smooth outer tower wall, an additional tool may be deployed to smooth the outer surface of a printed layer, for example a flat blade may be drawn along the outer surface of the soft concrete to smoothen it. Such a tool can be guided by an additional robot arm to follow the printer head, for example.
[0054] This exemplary embodiment shows the mixing apparatus 15 connected by the feed line 150 to the print robot 10, and the feed line 150 passes through an opening 220 in the lower tower region. This opening 220 can serve as a doorway later on, or to provide a passage for power lines to a subsea cable arrangement. Although not shown in the diagram, the feed line 150 can be extended to reach to an uppermost level of the tower structure 2 when the apparatus 1 is used to construct an entire tower in one piece.
[0055]
[0056]
[0057]
[0058] This embodiment also shows a second platform 13 with the same type of elevation means 13. This second platform is used to carry a mixing apparatus 15. An advantage of this arrangement is that the feed line 150 need not be overly long, even if a very high tower is being constructed. The relatively short feed line 150 can ensure that the concrete is still sufficiently fluid by the time it reaches the feed head 11 for printing. A system controller 16 issues print commands 140, mix commands 150, and drive commands 132 to control the elements 10, 11, 13, 15 of the 3D tower printing apparatus 1 in a controlled and synchronous manner.
[0059]
[0060] An alternative embodiment (not shown) could comprise two star configurations of three or more stemming arms, originating from the same hub, arranged so that one set of stemming arms continually applies opposing pressure to suspend the printing device in place, while the other set is displaced upwards. The process is repeated, with each set of pistons alternately fixing the position of the 3D printer and then moving upward. A similar control sequence allows the printer to be lowered back down to the ground when the tower is complete.
[0061] In another realisation, 3D tower printing apparatus 1 can comprise a clamp to straddle the tower wall 2, for example with an arrangement of three clamping arm pairs to apply opposing pressure on the outside and inside wall surfaces. The 3D printing device 10 can be mounted atop the clamp, essentially suspended over the tower wall 2. Two clamping arm pairs can apply opposing pressure at any one time while a third pair advances some distance along the circumference of the tower. Alternatively, the 3D printing device 10 can have an articulated arm realized to extend over the largest diameter of the tower 2, so that it can print an annular ring while the clamping arrangement remains stationary.
[0062] Similarly to
[0063] Although the present invention has been disclosed in the form of preferred embodiments and variations thereon, it will be understood that numerous additional modifications and variations could be made thereto without departing from the scope of the invention.
[0064] For the sake of clarity, it is to be understood that the use of a or an throughout this application does not exclude a plurality, and comprising does not exclude other steps or elements.