Earthquake resisting design method on the basis of PC binding articulation construction method
09534411 ยท 2017-01-03
Assignee
Inventors
Cpc classification
E04C3/34
FIXED CONSTRUCTIONS
International classification
E04B1/98
FIXED CONSTRUCTIONS
E04C5/01
FIXED CONSTRUCTIONS
E04C3/34
FIXED CONSTRUCTIONS
Abstract
In an earthquake resisting design method of a PC construction, a column and a beam, which are high-strength precast prestress concrete members, are joined by binding juncture with a prestressing tendon. A grout is filled and bonded. A first stage linear resilient design is employed, where all construction members are not damaged, for earthquakes up to a predetermined earthquake load design value. A second stage linear resilient design is employed, where earthquake energy is absorbed by breakage of the bond of the grout, and principal construction members are not damaged, for earthquakes exceeding the predetermined earthquake load design value. By employing a non-linear resilient design in which the first stage linear resilient design and the second stage linear resilient design are combined, an earthquake-resisting design level is significantly increased, and the construction can resist earthquakes exceeding a seismic intensity 6 upper.
Claims
1. An earthquake resisting design method on the basis of a prestressed concrete (PC) binding articulation construction method, for a PC construction which is a building having a rigid frame structure, having a plurality of floors, and having a foundation, a column, and a beam, the column and the beam being high-strength precast prestressed concrete members, a cogging being provided on the column, the beam being placed on the cogging, a binding joint portion being provided therebetween, a cable being provided on the beam, and penetrating through a panel zone or a column-beam junction, and the cable integrally joining the column and the beam by binding juncture, the earthquake resisting design method comprising: designing a prestressing tendon as the cable, the prestressing tendon being inserted through each of sheaths disposed in the column and the beam and being tensed and fixed, and a grout being filled and bonded to the prestressing tendon in each sheath; controlling a tensioning force of the prestressing tendon as the cable in a binding junction or a binding joint portion between the column and the beam; thereby providing a first stage linear resilient design, where a juncture state remains full prestress, and any constructions are not allowed to be damaged, up to a predetermined earthquake load design value; and providing a second stage linear resilient design, where the binding junction or binding joint portion between the column and the beam becomes in a juncture state of partial prestress, the binding joint portion opens or separates and allows rotation, a bond between the prestressing tendon and the bonded grout in each sheath is broken within a required length in the vicinity of the binding joint portion, the prestressing tendon comes out, an amount of expansion of the prestressing tendon increases, and thereby the prestressing tendon absorbs earthquake energy, while a tensile force applied to the prestressing tendon hardly increases, the prestressing tendon remains within the linear resilient area, and principal construction members are not allowed to be damaged, when encountering a maximum earthquake exceeding the predetermined earthquake load design value, and wherein a non-linear resilient design for the PC construction is achieved, which is separated to two stages, which are the first stage and the second stage.
2. The earthquake resisting design method on the basis of the PC binding articulation construction method according to claim 1, wherein the predetermined earthquake load design value of the first stage corresponds to earthquakes up to a seismic intensity 6 lower, and the maximum earthquake of the second stage corresponds to earthquakes having a seismic intensity 6 upper or greater.
3. The earthquake resisting design method on the basis of the PC binding articulation construction method according to claim 1, wherein a tensioning force of the prestressing tendon as the cable in the binding junction or the binding joint portion of the column and the beam is 40 to 60% of a standard yield load of the prestressing tendon.
4. The earthquake resisting design method on the basis of the PC binding articulation construction method according to claim 1, wherein the binding joint portion is provided between the foundation and a column base of the column, a secondary prestressing tendon is provided on the column, and penetrates through the foundation and the column base, the secondary prestressing tendon integrally joins the foundation and the column by binding juncture, in a column base portion formed by the integrally joined foundation and column, a juncture state remains full prestress, and all contractions are not allowed to be damaged, up to the predetermined earthquake load design value in the first stage, the binding joint portion opens, separates, and becomes partial prestress, the prestressing tendon is maintained within a resilient range, thereby the earthquake energy is absorbed, and the column is not allowed to be damaged, in the case where the maximum earthquake occurs exceeding the predetermined earthquake load design value in the second stage.
5. The earthquake resisting design method on the basis of the PC binding articulation construction method according to claim 4, wherein a base block is installed as the column base between the foundation and the column.
6. The earthquake resisting design method on the basis of the PC binding articulation construction method according to claim 4, wherein a tensioning force of the secondary prestressing tendon is 40 to 60% of a standard yield load of the prestressing tendon in the binding joint portion of the column base portion.
7. The earthquake resisting design method on the basis of the PC binding articulation construction method according to claim 1, wherein the PC construction includes a PC seismic isolation construction combined with a seismic isolation construction method.
8. An earthquake resisting building built by the PC binding articulation construction method constructed on the basis of the earthquake resisting design method according to claim 1.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
DESCRIPTION OF THE PREFERRED EMBODIMENTS
(11) An earthquake resisting design method on the basis of a PC binding articulation construction method according to the present invention will be described in detail, based on an illustrated embodiment.
(12) As illustrated in
(13) It is preferable to use the base blocks for achieving construction of precast columns safely and easily. However, there is no need to provide base blocks, contrary to the illustration.
(14) The prestressing tendon 7, which is the secondary cable, is used for joining the column 2 and the beam 3 integrally by binding juncture. A tensioning force thereof is designed to be lower than a design value of a PC construction of the related art. The tensioning force at a binding joint portion is set to 50%10% or so of the standard yield load of the prestressing tendon 7. A plurality of secondary prestressing tendons 13 are disposed for tension in the column 2 as well. At a panel zone (a column-beam junction), a prestress is applied to a great beam, which is a beam in a span direction, a girder beam, which is a beam in a longitudinal direction, and the column. Thereby the panel zone receives a prestress force three-dimensionally in all directions of X, Y, and Z. The prestressing tendons 7 and 13 are a bonded type, which are disposed through a sheath 8 disposed in advance, and a grout is filled therein after the fixation with tension. On an upper surface of the beam 3, a slab 9 is placed at each stage. Accordingly, the rigid frame structure having an articulation mechanism is constructed.
(15) In stresses caused by an earthquake force in the rigid frame structure, the largest are ones generated at beam ends and a column surface in the periphery of the panel zone (column-beam junction), and the column base portion of the lowest story. For this reason, the main design object of the present design method is tensioning forces of the panel zone, the column base portion, the binding joint portion 6 in the peripheral thereof, and the secondary prestressing tendons 7 and 13.
(16) The PC binding articulation construction method, which is the basis of the present design method, is established on the basis of two theories, namely, fishing rod theory and articulation theory created by the present inventor. The superiority of the PC binding articulation construction method in earthquake resisting performance can be described from these two theories.
(17) [Fishing Rod Theory]
(18) In an actual fishing rig tackle, as illustrated in
(19) [Articulation Theory]
(20) An articulation of human being is a connection of a bone and a bone, configured to be rotatable at the articulation portion. A connecting surface includes a soft cartilage portion, and the bones are connected with strong muscle having sufficient elasticity in the periphery thereof. With such a structure, when he falls or hits against something, an impact can be reduced or absorbed. In this theory, the column-beam junction, as illustrated in
(21) In order to solve the problem relating to the above-described construction earthquake resisting performance, the present design method is on the basis of countermeasures against large earthquakes with a resilient design by a prestressed concrete construction using properties of the prestressing tendon.
(22) By applying these two theories to the binding joint portion 6 between the column 2 and the beam 3, which are construction members, the PC construction may be provided with quite superior earthquake resisting performance and, in addition, an economical design is enabled.
(23) With RC structure, S structure, and SRC structure of the related art, buildings are significantly deformed (an inter-story deflection angle of approximately 1/100) by an earthquake with a seismic intensity 6 lower or so, and thereby the members are damaged or collapsed so that restoration is impossible.
(24) The present design method is based on the resilient design such that internal energy, accumulated in a concrete member by the prestress applied in advanced, is used for counteracting the earthquakes with a seismic intensity 6 lower or so. The construction itself is resiliently deformed. This reduces significantly the inter-story deflection angle (to approximately 1/150), as compared with the RC construction. A state of full prestress is maintained. The building stays in a good condition after the earthquake disaster.
(25) In contrast, a maximum earthquake larger than that described above is handled by that the construction itself is also the resilient design, but the binding joint portion 6 partly produces a partial prestress effect. In a word, the building suffers no damage even in the maximum earthquake. This is an important design condition and characteristic of the present design method.
(26) The partial prestress effect means that the binding joint portion 6 opens once by an earthquakes input, and the opening closes again by a PC restoration force after the earthquakes has gone.
(27) The reason why the inter-story deflection angle is suppressed to smaller than the building of the related art, such as the RC structure or the SRC structure, when the earthquake load of the same level is applied is that the deformation of the PC construction is resisted by the internal energy accumulated in the PC member, the PC restoration force (vibration control effect) of the column, and the column-beam tightening effect. For example, in the case of the earthquake with a seismic intensity 6 lower or so, a plastic deformation with an inter-story deflection angle of approximately 1/100 or larger occurs in the RC structure and the SRC structure. However, in the PC construction of the present design method, the inter-story deflection angle is up to approximately 1/150, and the amount of deformation is significantly reduced in comparison with the RC structure. The value of the inter-story deflection angle varies not only depending on a construction form, but also on various conditions such as the scale, shape, height of the building and ground. Therefore, the values described above are only reference values for design.
(28) Since there is no accurate (strict) conversion between the inter-story deflection angle and the seismic intensity, the inter-story deflection angle in the present design method is a design value as a rough standard, and the indicated values include the meaning such as about, roughly speaking, substantially, or approximately.
(29) The present design method on the basis of the theories described above is performed so as to satisfy the following requirements: No column failure preceding type destruction occurs; No great beam failure preceding type destruction occurs; The great beam does not drop even though the construction is significantly deformed due to the earthquake force; The great beam is allowed to rotate without slippage downward on the cogging of the column; A binding force of the binding junction is set so that a state of full prestress is maintained up to a seismic intensity 6 lower, or the inter-story deflection angle of 1/150 or so; and At the time of maximum earthquake with a seismic intensity 6 upper or greater, or the inter-story deflection angle from 1/150 to 1/100, the binding joint portion becomes a state of partial prestress, and the structural joint portion between the column and the beam on the cogging opens (or separates), becomes rotatable, and thereby absorbs energy.
(30) The destruction of the panel zone (column-beam junction) is controlled by the column and the beam opening on the cogging. Thereby the panel zone suffers no damage. Axial compressions are added three-dimensionally to the panel zone, which thereby has a restoration force characteristics by the prestress. This prevents residual deformation after the earthquakes perfectly. This is a completely different design idea from that of the related art, in which the destruction of the panel zone in the RC construction and the PC construction absorbs energy.
(31) Confirmed from a number of experiments, when the column-beam junction of the present design method is deformed up to a predetermined earthquake load design value (in the experiments, an inter-story deflection angle of 1/100) in a state of full prestress, small cracks are formed above and below the panel zone. When the amount of deformation becomes higher than the design value, the binding joint portion between the column and the beam on the cogging becomes in a state of partial prestress, opens (or separates), and becomes rotatable. It was verified that this makes the small cracks above and below the panel zone close inversely. Accordingly, no further cracks occur in the panel zone.
(32) In the RC construction of the related art, energy of the earthquake is absorbed by a plastic deformation of the panel zone at the time of large earthquake (seismic intensity 6 lower or greater). As a result, the panel zone is subjected to shear failure. This makes the construction in collapse, which is a so-called column failure preceding type. In contrast, in the column-beam binding junction of the PC construction of the present design method, the binding joint does not separate up to a predetermined earthquake load design value. However, at the time of the maximum earthquake, in which the load exceeds the design value, the panel zone is prevented from being subjected to shear failure by separating the binding joint. Finally, the binding joint portion 6 may be subjected to light damage by the rotation. However, since the great beam 3 is on the cogging 4 and coupled by the prestressing wire (the prestressing tendon) 7, which is wired and tensed as the secondary cable, the great beam 3 does not drop from the cogging 4. The tensioning force of the secondary cable penetrating through the panel zone is set to 50% or so of the standard yield load of the prestressing tendon 7 in the binding junction. This may produce margin (available capacity) in tensile performance, and thereby may make the restoration force after the deformation maintained. These experiments prove a superior earthquake resisting performance according to the present design method.
(33) As regards the rotation of the binding junction of the present design method, a juncture state between the beam 3 and the column 2 is controlled by setting properly the amount of the prestressing tendons 7 arranged on the great beam and penetrating through the panel zone, and tensile force applied to the prestressing tendons 7. In the binding junction, the tensioning force of the prestressing tendon 7 is within a range from 40% to 60%, preferably 50%, of a standard yield load (Py) of the prestressing tendon 7.
(34) At the time of permanent load, or medium and small earthquakes, a state of rigid connection is maintained, in which no rotation occurs, and a resilient stress of the PC construction tackles and controls the load. Design is made to be a state of full prestress up to the seismic intensity 6 lower (an inter-story deflection angle of 1/150). Only when there occurs the maximum earthquake greater than that, the junction between the column 2 and the beam 3 becomes a juncture state of partial prestress, allows rotation, and the binding joint portion 6 starts to separate. Even in this state, the prestressing tendon 7 has a sufficient available capacity, and is within the resilient range. Thus, no fracture (plastic deformation) occurs in the prestressing tendon 7. When the earthquake is gone, the opening closes again by the PC restoration force, and the rotated binding junction (binding joint portion) is restored to the original state. When the separation of the binding joint portion 6 occurs, the prestressing tendon 7 bonded to the grout in the sheath 8 partly comes out, and the bond is broken. This breakage of bond generates a damper effect. Namely, the prestressing wire comes out, an expansion of the prestressing wire increases, and thereby the energy is absorbed. With this effect, an input value at the time of the maximum earthquake is reduced and restrained. Thereby energy of the destruction load caused by earthquake entering the construction having the damper effect is absorbed, and the input load is kept to be a small value.
(35) In the present design method, a load corresponding to an earthquake with a seismic intensity 6 lower (up to an inter-story deflection angle of 1/150) is set to the predetermined earthquake load design value. Design is made to make the construction members and the joint portion to be a state of full prestress at the time of the earthquake or smaller. At the time of a maximum earthquake larger than that, that is, when occurs an earthquake with a seismic intensity 6 upper or greater (an inter-story deflection angle from 1/150 to 1/100), the construction members remain in a state of full prestress, and the joint portion becomes in a state of partial prestress.
(36) Referring to
(37) The line segment OA in the figure is a resilient deformation line of the prestressing tendon 7, while the point A corresponds to a resilient deformation limit value Pe of the prestressing tendon 7. Within this area, a load-deformation relationship of the member is linear. If a tensile force applied to the prestressing tendon 7 exceeds the resilient deformation limit value Pe, the tensile force increases little, and the prestressing tendon 7 is broken soon. A surface area of the triangle 0AB shows an energy absorbed by the prestressing tendon 7. The PC construction of the related art has such an energy consumption history characteristic. The problem thereof is that an amount of deformation is small for a high input value. If the tensile force exceeds the resilient deformation limit value, the prestressing tendon 7 is at risk for breakage, since the expansion of the prestressing tendon 7 is small.
(38) The present design method is based on a resilient design so as to avoid the yield of the prestressing tendon 7. A design value P.sub.1 is a threshold value between an area of full prestress and an area of partial prestress. The design value P1 is set to an input value corresponding to an earthquake with a seismic intensity 6 lower (up to an inter-story deflection angle of 1/150). Up to this, a first stage is designed as to make the entire frame in a state of full prestress, in which the binding joint portion 6 does not open (gap). Therefore, the first stage is a linear resilient design as indicated by line segment 0C.
(39) Subsequently, a second stage is designed as to make the bond between the prestressing tendon 7 and the grout in the sheath 8 to break within a required range of length in the vicinity of the binding juncture surface, whereby the prestressing tendon 7 comes out, in the case where occurs a maximum earthquake with a seismic intensity 6 upper or greater, or an inter-story deflection angle of 1/150 or larger. Since the amount of expansion (an amount of deformation of separation of the joint) of the prestressing tendon 7 increases, the input load decreases as indicated by the arrow a, the binding joint portion 6 opens, the rotation due to the separation occurs, and the juncture state becomes partial prestress. Therefore, the second stage is a linear resilient design as indicated by the line segment CF.
(40) Consequently, a load-deformation relationship of the member becomes non-linear, indicated by the polygonal line 0CF connected the line segment 0C, which indicates the linear resilient design of the first stage, and the line segment CF, which indicates the linear resilient design of the second stage. Past the point C, corresponding to the design value P.sub.1, a gradient of the load-deformation curve declines, or the curve becomes shelving toward a lateral axis direction (horizontal axis direction). This makes the input value at the point F, where a surface area of the triangle CAD is equal to a surface area of the tetragon BDFE, is not much higher than the point C. Thus, the member is not at risk for breakage at all, even when absorbing the same energy as that indicated by the triangle 0AB. When occurs an earthquake in which the load exceeds the design value, the breakage of bond makes the prestressing tendon 7 come out, and thereby the amount of expansion thereof increases. The beam 3 rotates on the cogging 4 of the column 2, whereby the earthquake energy is absorbed, and the input value decreases. This prevents principal construction members (column 2, beam 3, and panel zone) from being damaged. The prestressing tendon 7 has a sufficient available capacity, because the tensile force is 50% or so of the standard yield load Py. Therefore, the prestressing tendon 7 remains within a resilient range, suffers no plastic deformation, and keeps the restoration force, all the way. After the earthquake, the residual energy makes the opening close, and thereby the separated joint is restored to its original state, that is, an original point restoration is achieved. This is an important design point.
(41) In the present design method, when occurs the maximum earthquake in which the load exceeds the predetermined design value the binding joint portion 6 opens or separates, and allows rotation, whereby a state of partial prestress is achieved locally (that is, at the binding joint portion 6). The predetermined design value is set to be a value corresponding to an earthquake with a seismic intensity 6 lower (inter-story deflection angle of 1/150), for example. It may be a value corresponding to an inter-story deflection angle of 1/100. Also it may be a value corresponding to an inter-story deflection angle of 1/50, depending on conditions, such as the scale, the floor height, and the shape of the building, and the arrangement of the construction members.
(42) Since the design provides the prestressing tendon 7 with a sufficient available capacity, the prestressing tendon 7 remains within the resilient range at all way, whereby the building itself has a structure performance of restoring to the original state by the resilient restoration force after the earthquake.
(43) In other words, the prestressing tendon 7 is disposed with tension in a state of prestress having an available capacity. The tensioning force is accumulated in concrete as an internal energy, and the earthquake energy is absorbed by the available capacity. Consequently, even though occurs the earthquakes in which the load exceeds the predetermined design value, the building structure can be protected by the binding joint portion 6 opening. Even though the binding joint portion 6 is subjected to light damage, such damage can be repaired easily. So, the entire building can be continuously used in a good condition after the earthquake. Even though afterquakes occur, or a maximum earthquake occurs again, the same thing is repeated, since the building keeps the superior earthquake resisting performance. Therefore, the present design method is completely different from the earthquake resisting design method which allows damages (plastic deformation) of the construction with the seismic intensity 5 upper or so of the related art.
(44) Referring to
(45) Next, the breakage of bond of the prestressing tendon will be described with reference to
(46) As illustrated in
(47) The surface area A of the prestressing tendon is proportional to a perimeter of the prestressing tendon (cable), which relates to the cross-sectional shape and the number of the cables, and a length of bond. Therefore, adequate adjustment of conditions, such as the strength of the grout, the perimeter of the prestressing tendon, and the length of bond, enables a design in which the magnitude of the maximum bond force is fitted to the design value so that the bond is broken at the predetermined value.
(48) In the present design method, as illustrated in
(49) The PC construction of the present design method is not only an earthquake resisting structure, but also a seismic vibration control structure. The reasons will be described with reference to
(50) The prestress force is an internal force existing in the interior of the member in advance, and acts always in a direction opposite to the direction of deformation of the member. Since the prestressing tendon is designed to be within the resilient range, the prestress force works as a spring, and becomes a resisting force, when the building is about to be deformed due to the earthquake or the like, to restore the deformed building as a pendulum. This is referred to as a restoration force by the prestress, which is a force to restore the original state at the time of deformation. This effect is referred to as a vibration control effect by the prestress. The vibration control effect can be obtained only in the PC construction.
(51) As regards the beam 3 illustrated in
(52) As regards the column 2 illustrated in
(53) According to the present design method, applying prestress in advance to the prestressing tendon 7 with available capacity enables to check safety of the members and constructions, and to provide the PC construction with the vibration control performance.
(54) At the column base portion, this vibration control effect behaves as follows. When occurs a maximum earthquake in which the load exceeds the predetermined design value, the binding joint portion 6 under the column base opens, and becomes in a state of partial prestress. The binding joint portion opens while the prestressing tendon 13 remains within the resilient range. This achieves absorption of earthquake energy, and prevention of damage and destruction of the columns at the column base portion, which supports the entire building and is the most important. Adequately adjusting an amount of the prestressing tendons 13 and a tensioning force provided for the prestressing tendon 13 enables to maintain the prestressing tendon 13 within the resilient range at all times. Thus, after the earthquake, the PC restoration force makes the opening close again, and thereby the joint is restored to the original state (the juncture state of full prestress). This enables the building to be used continuously. In order to provide the prestressing tendon 13 with a sufficient available capacity, the tensioning force thereof is set to be within a range from 40% to 60%, and preferably to be 50% or so, of a standard yield load of the prestressing tendon 13. The bond between the prestressing tendon and the grout is broken in the vicinity of the binding joint portion, thereby the prestressing tendon comes out, and the amount of expansion increases. This enables to absorb the earthquake energy absorbed, to restrain the tensile force borne by the prestressing tendon, to maintain the prestressing tendon within the resilient range of the prestressing tendon, and to reduce the input value of the maximum earthquake.
(55) In addition, although the illustration is omitted, forming the juncture surface of the binding joint portion into a curved surface is effective to prevent damage of the column base. At the time of the maximum earthquake in which the load exceeds the design value, the joint portion opens, and the column body rotates. This can prevent occurrence of cracking or damage of the column body.
(56) In order to show earthquake resisting performance designed by the present design method, the following table marshals relationship between scales of earthquakes and states of members, which are the design goal of the earthquake resisting level, and deformation of members in the RC or SRC structure of the related art, as a comparative example.
(57) TABLE-US-00001 Deformation of In Case of RC or SRC PC members Structure of Related Scale of (Inter-story States of Members according Art (Inter-story Earthquake Deflection Angle) to the Present Design Method Deflection Angle) Moderate 1/150 Member: full prestress. 1/100 earthquake (corresponding to Joint portion: full prestress. (Damage of Member seismic intensity 6 or Collapse of Frame lower) Occurs.) Severe 1/100 Member: full prestress. earthquake (corresponding to Joint portion: partial prestress. seismic intensity 6 upper or greater) Maximum 1/50 Joint portion: partly collapsed. credible (corresponding to Prestressing tendon (secondary cable) earthquake seismic intensity 7) of the beam: within a resilient range. Beam and column: in good condition. Great beam: remaining on the cogging as single beam. Earthquake 1/25 Joint portion at beam end: destructed. larger than Column: in good condition. that Great beam: still remaining on the cogging as single beam with prestressing tendon (secondary cable). Since the great beam does not drop, human life is not damaged. Building: in good condition.
(58) There are few buildings which resist against an earthquake with a seismic intensity 6 upper or greater, in buildings having the RC structure or the like constructed by conventional design methods.
(59) In other words, the RC structure, the SRC structure, and the like are designed to absorb energy at the time of earthquakes of a seismic intensity 6 lower 6 or so, by yielding of reinforcement rods in the great beam portion, and crushing of concrete. Therefore, the building is partly or entirely collapsed.
(60) In contrast, the earthquake resisting structure constructed by the PC binding articulation construction method on the basis of the present design method is designed to absorb earthquake energy on the basis of the fishing rod theory and the articulation theory. A cogging is formed on the column, and the prestress introduced into the construction members is adequately adjusted by the amount of the prestressing tendons penetrating through the panel zone and the tensioning force applied to the prestressing tendon. Thus, when occurs the maximum earthquake with a seismic intensity 6 upper or greater, a joint mortar at the cogging portion separates at upper and lower edges, the great beam rotates on the cogging, and thereby earthquake energy is absorbed. Accordingly, a very superior earthquake resisting structure can be designed and constructed. Since the present design method is the method for designing so as to have the superior earthquake resisting performance, assuming the earthquake one level greater than that assumed in the conventional design method enables to enhance significantly the earthquake resisting level.
(61) In particular, in the PC members in the present design method, the prestress force, which is applied in advance to the column and beam members, works as internal energy, and the PC vibration control effect restrains deformation. Thus, the deformation is smaller than that of the structure, such as the RC structure or the SRC structure, of the related art against the same level earthquake.
(62) In addition, an experimental verification was conducted on earthquake resisting performances of the column-beam junction used by the present design method.
(63) In
(64) In the inter-story deflection angle relationship, the binding junction (the articulation portion) separates at the point that the tensile force acts on the same level as the fixation force introduced into the PC strand, and thereby the rigidity declines. Past the point, the rigidity decreases gradually with increasing load. Over R= 1/66 rad, the bearing force increases a little. Until the application of the force was terminated at R= 1/25 rad, no abrupt decrease occurred in the bearing force. By retaining the fixation force introduced into the PC strand to 50% or so of the standard yield load, the restoration force characteristics became of an inverted S-shaped and origin-oriented type having the secondary gradient zone, which is a zone after the binding junction (the articulation portion) separates, longer than that of the conventional PC construction without cogging. The residual inter-story deflection was quite small, and was 1/1000 rad or so until R= 1/50 rad. A tendency of extremely high restorability is observed.
(65) In contrast, the RC construction yields and proceeds to destruction against input earthquake motions significantly smaller than the PC construction of the present design method, as shown in this graph.
(66) From the experiment result, following findings were obtained. 1. The larger the member deformation angle is, the more broadly the binding joint portion opens. However, few cracks occur in the beam, the column, and the panel zone. 2. When the member deformation angle is large, a great beam rotates while its end is on the cogging. However, the great beam 3 has no risk for drop, because it is connected to the adjacent beam 3 through the column 2 with the prestressing tendon 7, which is the secondary cable. 3. Articulational rotation at the end of the beam prevents the members (the great beam and the column) from being damaged even though the member deformation angle is large.
(67) Based on the findings, the following design can be performed in the present design method. The load corresponding to the earthquake with a seismic intensity 6 lower (up to an inter-story deflection angle of 1/150) is set to be the predetermined earthquake load design value. When occurs an earthquake smaller than that, the member and the binding joint portion 6 are kept in a state of full prestress. When occurs a maximum earthquake with a seismic intensity 6upper or greater (an inter-story deflection angle from 1/150 to 1/100), the member remains in the state of full prestress, while the joint portion is brought into a state of partial prestress. In addition, even when occurs a maximum earthquake with a seismic intensity 7 (an inter-story deflection angle from 1/100 to 1/50), only the joint portion suffers a partial and light damage, while the panel zone and the column 2 and the beam 3 are kept in good conditions.
(68) In a word, the tensioning force to be introduced into the prestressing tendon 7, which is the secondary cable used for joining the column 2 and the beam 3, which are the construction members, with binding articulation juncture, is set to be 50% or so of the standard yield load. This enables to maintain the construction member (frame) in no-damage condition even at the time of the extremely large earthquake. Research of the PC binding articulation construction method is systematically proceeded, and it is confirmed that little residual plastic deformation occurs, and the restoration force characteristics is stable, even when the inter-story deflection angle reaches 1/50 rad or so.
(69) Subsequently, comparison in damage between the RC constructions and the PC construction of the present design method will be described with reference to
(70)
(71) The RC construction is configured to absorb energy by being resiliently deformed up to a certain amount of stress, and by being plastically deformed over the amount. This results in not only increasing the residual deformation, but also doubling the load of the construction because resonance amplifies the shaking at the time of an earthquake, which we have learned actually from a bridge support collapse accident of Hanshin Expressway No. 3 Kobe Route in the case of the Great Hanshin-Awaji Earthquake. As a matter of course, this progresses and doubles the plastic deformation, and results in collapse.
(72) In the PC construction of the present design method, the prestressing tendon shows a behavior within the resilient deformation up to a large stress, and makes an attempt to restore to the original point. Energy at the time of the earthquake is absorbed by the expansion of the prestressing tendon within the resilient deformation by an internally existing function, that is, the internal energy accumulated in the construction itself. Vibration control effect of the PC construction makes the shaking width significantly smaller than the RC construction. At the time of the maximum earthquake, in which the load exceeds the design value, a damper effect is produced, in which the joint portion opens, the beam rotates on the cogging, the state becomes partial prestress, and energy is absorbed by expansion of the prestressing tendon in the vicinity of the binding joint portion, where the bond is broken. After the earthquake has ended, the property is shown, in which the prestressing tendon are restored to the original state as the resilient member, and the binding joint portion closes the opening by the restoration force of the PC construction, and the construction is restored to be the original state.
(73) As described above, in the present design method, the amount of the prestressing tendons, which are the secondary cables, arranged in the great beam and penetrating through the panel zone and a tension force to be applied to the prestressing tendons are adjusted adequately, the juncture state between the beam and the column is controlled, and thereby the predetermined earthquake load value is set to a load corresponding to the earthquake with a seismic intensity 6 lower (up to an inter-story deflection angle of 1/150).
(74) The internal energy accumulated in the concrete member by the prestress provided in advance is used as a resisting force, and the member and the joint portion are designed to be in a state of full prestress. This prevents all construction members from being damaged with the present design method, even at the time of the earthquake when the RC constructions and the SRC constructions constructed by the conventional design method are significantly subjected to plastic deformation (an inter-story deflection angle of 1/100 or larger), the members are damaged and destructed, and restoration after the earthquake is almost impossible.
(75) The design is made so that the member remains in the state of full prestress, and the joint portion becomes in the state of partial prestress, when occurs the maximum earthquake with a seismic intensity 6 upper or greater (an inter-story deflection angle of 1/150 to 1/100). In addition, even when occurs the maximum earthquake corresponding to a seismic intensity 7 (an inter-story deflection angle from 1/100 to 1/50), the PC constructions of the present design method is slightly damaged only at part of the joint portion. Thus, the panel zone, the beam, and the column can be maintained in a state of no damage.
(76) The PC seismic isolation construction, which is a combination of the present design method and the seismic isolation construction method, has higher rigidity than the construction where the superstructure is the S structure, and can restrain the vibrations to be smaller. Since the PC construction itself has the vibration control effect by the restoration force, a vibration control damper need not be used with the seismic isolation apparatus. Therefore, the cost can be significantly reduced, in comparison with the construction where the superstructure is the RC structure or the SRC structure.
(77) The concept and the basic design condition of the present design method have been described. A rational change is possible according to the various design conditions of the building without departing from the drift of the present design method.
(78) For example, the design value of the inter-story deflection angle is an approximate value to be referenced as a guide depending on the scale of the earthquake (seismic intensity). In a practical design, it is preferably determined by rational adjustments depending on the design conditions, such as the scale, shape, and height of the building, and the conditions of the ground. Instead of using the inter-story deflection angle as a design value of deformation, a member deformation angle, or a rotational angle (an angle formed between the beam end and the column surface) may be used. In this case, these values may be properly set in accordance with the designing drift of the present design method.
(79) The strength Fc of the high-strength concrete used in the present design method is not smaller than 40 N/mm.sup.2, and preferably not smaller than 50 N/mm.sup.2.
(80) In addition, the prestressing tendon is the same as conventionally used. Detailed design of the respective PC members, while the description is omitted, can be performed in a similar way as conventional design.
(81) Illustration of the concept and the image is models expressing the design idea and the basic concept, and is expressed in a simple manner.
(82) An earthquake resisting design method on the basis of a PC binding articulation construction method according to the present invention is an earthquake resisting design method for the PC construction. The PC construction is a building having a rigid frame structure, having a plurality of floors, and having a foundation, a column, and a beam. The column and the beam are high-strength precast prestressed concrete members. A cogging is provided on the column. The beam is placed on the cogging. A binding joint portion is provided therebetween. A secondary cable is provided on the beam, and penetrates through a panel zone (column-beam junction). The secondary cable integrally joins the column and the beam integrally by binding juncture. The earthquake resisting design method includes: controlling a tensioning force of a prestressing tendon as the secondary cable in a binding junction (binding joint portion) between the column and the beam; thereby providing a first stage linear resilient design where a juncture state remains full prestress, and any constructions are not allowed to be damaged, up to a predetermined earthquake load design value; and providing a second stage linear resilient design, where the binding junction between the column and the beam becomes in a juncture state of partial prestress, the binding joint opens or separates and allows rotation, a bond between the prestressing tendon and a grout is broken within a required length in vicinity of the binding joint, the prestressing tendon comes out, the amount of expansion of the prestressing tendon increases, and thereby the prestressing tendon absorbs earthquake energy, while a tensile force applied to the prestressing tendon hardly increases, the prestressing tendon remains within the linear resilient area, and primary construction members (the column, the beam, and the panel zone) are not allowed to be damaged, when encountering a maximum earthquake exceeding the predetermined earthquake load design value, and a non-linear resilient design for the PC construction is achieved, which is separated to two stages, which are the first stage and the second stage. Therefore, in the first stage, the construction itself is resiliently deformed so that all of the construction members are prevented from being damaged, and the state of full prestress is maintained, and thereby the building is in good conditions and can be used continuously without losing functions as the building after the earthquake disaster. And in the second stage, even when the maximum earthquake occurs exceeding the predetermined design value, the joint portion opens and is lightly damaged only partly, and thereby the panel zone, the beam, and the column can be protected to a non-damaged state. Thus, the method can be applied widely to the buildings having the PC constructions.