HOMOGENIZER WITH A BACK FLUSHING STRUCTURE
20250170537 ยท 2025-05-29
Inventors
Cpc classification
B01F35/2202
PERFORMING OPERATIONS; TRANSPORTING
B01F23/413
PERFORMING OPERATIONS; TRANSPORTING
B01F35/71805
PERFORMING OPERATIONS; TRANSPORTING
B01F25/44
PERFORMING OPERATIONS; TRANSPORTING
International classification
B01F25/44
PERFORMING OPERATIONS; TRANSPORTING
Abstract
Provided is a homogenizer with a back flushing structure. A homogenizer for homogenizing a raw material comprises a first guiding block 13a for guiding the raw material to flow with an operation of a plunger 12; a first flow controlling valve 14a connected to the first guiding block 14a; an inflow regulating unit 15a connected to the first flow controlling valve 14a; at least one nano cell block for homogenizing the raw material being inputted through the inflow regulating unit 15a; a discharge regulating unit 15b for regulating a discharging of the homogenized raw material discharged from the nano cell block 16a, 16b; a second guiding block 13b installed between the plunger 12 and the first guiding block 13a; a second flow controlling valve 14b for connecting the second guiding block 13b to the discharge regulating unit 15b; and a heat exchanger 18 connected to the discharge regulating unit.
Claims
1. A homogenizer for homogenizing a raw material, comprising: a first guiding block for guiding the raw material to flow with an operation of a plunger; a first flow controlling valve connected to the first guiding block; an inflow regulating unit connected to the first flow controlling valve; at least one nano cell block for homogenizing the raw material being inputted through the inflow regulating unit; a discharge regulating unit for regulating a discharge of the homogenized raw material discharged from the nano cell block; a second guiding block installed between the plunger and the first guiding block; a second flow controlling valve for connecting the second guiding block to the discharge regulating unit; and a heat exchanger connected to the discharge regulating unit.
2. The homogenizer according to the claim 1, wherein the homogenizer further comprises a detecting unit for detecting a pressure of the nano cell block and the raw material flows through the second flow controlling valve based on a pressure information detected by the detecting unit.
3. The homogenizer according to the claim 1, wherein the homogenizer further comprises a pressure variation calculating module for calculating a pressure variation of the nano cell block; and a back flushing controlling module for switching a flowing direction of the raw material.
4. The homogenizer according to claim 1, wherein an operation of the plunger becomes a proportional control.
5. The homogenizer according to claim 1, each at least one nano cell block comprises at least two nano cells.
6. The homogenizer according to claim 1, the homogenizer further comprises an ultrasonic unit installed at the heat exchanger.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0011]
[0012]
[0013]
[0014]
[0015]
[0016]
DETAILED DESCRIPTION OF EXEMPLARY EMBODIMENTS
[0017] Exemplary embodiments of the present invention will be described herein below with reference to the accompanying drawings.
[0018]
[0019] Referring
[0020] The raw material may consist of a solute and a solvent or a dispersoid and a dispersive medium, and the raw material may be inputted through an inputting unit. When the raw material is inputted within the homogenizer, the plunger 12 may be operated by a pressuring means such as a motor or a pump to deliver the raw material to the homogenizer through a delivering pipe. The raw material can be delivered along the delivering pipe to the first guiding block 13a by the operation of the plunger 12. The first guiding block 13a may have a function to guide a flow of the raw material properly and to check a flow condition of the raw material. The raw material may flow from the first guiding block 13a to the first flow controlling valve 14a, and an amount of the flowing material may be controlled by the first flow controlling valve 14a. Thereby, the amount of the raw material delivered to the input controlling unit 15a may be controlled.
[0021] The raw material may flow from the input controlling unit 15a to the nano cell block 16a, 16b, and a homogenizing process of the raw material may be performed at the nano cell block 16a, 16b. At least one nano cell block 16a, 16b may be arranged, and the raw material may be homogenized at the nano cell block 16a, 16b by a sheer force to be applied to the raw material, an impact to a wall of the nano cell block 16a, 16b, an occurrence of a vortex and a cavitation phenomenon. For example, two nano cell blocks 16a, 16b may be connected in parallel, thereby when one nano cell block is in a condition of being inoperative, the other nano cell block can be utilized for homogenizing. The raw material homogenized in the nano cell block 16a, 16b may flow to the discharge controlling unit 15b, and the discharge controlling unit 15b may control a flow amount of the raw material homogenized in the nano cell block 16a, 16b, and maintain a temperature of the homogenized raw material. Such raw material may flow from the discharge controlling unit to the heat exchanger 18 for stabilizing.
[0022] The heat exchanger 18 may comprise a staying block 181 for controlling the temperature of the raw material and for delivering the raw material to the heat exchanger 18. The dispersoid included in the raw material may be adhered within the nano cell block 16a, 16b in a course of homogenizing, and a clogging phenomenon in the flowing passage formed within the nano cell block 16a, 16b may occur due to this. When the clogging phenomenon occurs, the flowing pressure may be lowered significantly compared with the applied pressure. Due to this, it is difficult to homogenize the raw material efficiently in the nano cell block 16a, 16b.
[0023] According to one embodiment of the present invention, the second guiding block 13b and the second flow controlling valve 14b may be installed in order to prevent the clogging phenomenon. The second guiding block 13b may be installed between the plunger 12 and the flow controlling valve 13a, and the second flow controlling valve 14b may be installed at a flowing passage connecting the second guiding block 13b to the discharge controlling unit 15b. The second guiding block 13b may have a function to switch the flowing passage of the raw material, and for example, the raw material is blocked from flowing to the first guiding block 13a by being pressurized by the plunger 12, and the raw material may flow to the discharge controlling unit 15b through the second flow controlling valve 14b. The input controlling unit 15a and the discharge controlling unit 15b may have a function to switch the flowing passage of the raw material. The raw material flowing to the discharge controlling unit 15b through the second guiding block 13b and through the second flow controlling valve 14b may flow to the input controlling unit 15a through the nano cell block 16a, 16b. And then, the raw material may be discharged to the outside through the reverse flow block 19.
[0024] The clogging phenomenon of the nano cell block 16a, 16b may be solved by generating a reverse flow. A pressure of the nano cell block 16a, 16b may be detected by a pressure detecting unit 17 in order to check whether or not a clogging phenomenon occurs, and the pressure information may be transmitted to the controlling module 11. The controlling module 11 may compare the detected pressure with the applied pressure to determine whether or not the clogging phenomenon at the nano cell block 16a, 16b occurs. When a clogging phenomenon occurs at the nano cell block 16a, 16b, the flow to the first guiding block 13a may be blocked and the first flow controlling valve 14b may be closed. And the second flow controlling valve 14b may be opened as the flow passage may be switched, and the raw material may flow to the reverse flow block 19 for discharging as the flow direction changes. The induction of the reverse flow may be performed in various ways, not limited to.
[0025]
[0026] Referring to
[0027] The pressure variation of the nano cell block 16 over time may be calculated by the pressure variation calculating module 25, and if the pressure variation is out of a predetermined range, it may be determined whether the clogging phenomenon has occurred. The measured pressure is out of the predetermined range compared with the applied pressure and a drop pressure condition continues for a predetermined period of time, then it may be determined that the clogging phenomenon has occurred. When it is determined that the clogging phenomenon has occurred, a back flushing process may be initiated by the back flushing controlling module. And the clogging state may be solved by the back flushing process. The back flushing process may be performed in various ways, not limited to.
[0028]
[0029] Referring to
[0030] The pressure of the nano cell block may be measured in real time by the pressure measuring module 35, and if the measured pressure value may be different from the predetermined pressure value, then the offset value may be calculated by the offset calculating module 37 for adjusting the pressure value to the predetermined pressure value. The offset process of the pressure setting module 31 according to the offset value calculation may be performed in various ways, not limited to.
[0031]
[0032] Referring to
[0033] The third flowing passage 45 may extend along a longitudinal centering line of the second nano cell 40b, and the raw material flowing the third flowing passage 45 may flow to a discharging block 47. A discharge guiding passage 46 connected to the third flowing passage 45 may be formed at the discharging block 47, and a cross sectional size of the discharge guiding passage 46 may increase along an extending direction. The discharge guiding passage 46 may be connected to a discharging passage 48. A width and depth of each flowing gap 42a, 42b, 44a, 44b may become 50 to 150 m, preferably 60 to 85 m, not limited to. A cross sectional size of each flowing gap 42a, 42b, 42c, 42d may increase gradually along the extending direction, and may have a curved shape, not limited to.
[0034]
[0035] Referring to
[0036] When the ultrasonic wave unit 55a is installed at the cover of the housing 51, an ultrasonic wave transferring member 551 may be coupled to the ultrasonic wave unit 55a for applying the ultrasonic wave to the homogenous solution flowing within the housing 51. When the ultrasonic wave unit 55c is placed under the housing 51, an ultrasonic wave transferring plate 511 may be installed under the housing 51. A plurality of vibrating elements may be placed at the transferring plate 511, and the ultrasonic wave may be guided in a predetermined direction by the vibrating elements. The ultrasonic wave unit 55a, 55b, 55c may be arranged at various places of the heat exchanger 18 to apply the ultrasonic wave to the homogeneous solution flowing along the heat exchanging tube 52. And the ultrasonic wave unit 55a, 55b, 55c may have a proper structure to apply the ultrasonic wave to the homogeneous solution.
[0037]
[0038] Referring to
[0039] At step P64, in case of no difference of the pressure between the measured pressure and the applied pressure, the pressure of nano cell block may be measured. On the contrary, if the difference of pressure occurs, then it is determined that the difference may be offset. At step P65, if the difference is within the compensable range, then the offset may be calculated to input into the controlling valve P66. On the contrary, if the difference is out of the compensable range, the back flushing process may be initiated P68. The process of back flushing P68 may be performed automatically by setting a back flushing initiating condition. For example, an applying pressure or a setting pressure may be determined, and a back flushing initiating pressure may be set. The determined pressure for homogenizing process may be determined and applied to the nano cell block, and the pressure of the nano cell block may be measured in the course of homogenizing by a pressure gauge. A pressure difference calculating module may be installed for calculating the difference between the applied pressure and the measured pressure. If the pressure difference is greater than the back flushing initiating pressure, then the back flushing process may be initiated automatically. And the back flushing process may be performed for a determined time. The homogenizer may be operated in various ways, not limited to.