A riser assembly for construction of riser apertures in concrete floors comprises a frame member with a channel forming a shutter. A joist spanning the riser aperture is connected to the channel with a fixing which can slide axially within the channel when connected to the joist. A method of constructing the riser aperture is also disclosed, permitting the adjustment of the position of the joist by sliding the joist axially along the channel after the riser aperture is formed. Upper and lower walls of the channel converge to form a dovetail, which anchors the channel along its length within the settable material forming the floor around the riser, and also helps to retain the fixing within the channel.
Claims
1. A riser assembly for the construction of a riser aperture in a cast floor, the riser assembly comprising: a frame member adapted to exclude settable material from the riser aperture, the frame member comprising a channel having an axis and a channel opening, the channel comprising an outer wall connected to upper and lower channel walls wherein the upper and lower channel walls extend between the outer wall and the channel opening; a joist adapted to span at least a part of the riser aperture; and a fixing adapted to connect the joist to the channel, wherein the fixing is adapted to slide axially within the channel when connected to the joist.
2. A riser assembly as claimed in claim 1, wherein first outer ends of the upper and lower channel walls are connected to the outer wall, and second inner ends of the upper and lower walls are spaced from the outer wall and the first ends, and wherein the spacing between the first ends of the upper and lower channel walls is greater than the spacing between the second ends of the upper and lower walls.
3. A riser assembly as claimed in claim 1, wherein the upper and lower walls at least partially converge as they extend from the outer wall forming non-parallel convergent sections of the upper and lower channel walls.
4. A riser assembly as claimed in claim 1, wherein the cross-section of the upper and lower walls and the outer wall has the form of a dovetail along the length of the channel.
5. A riser assembly as claimed in claim 1, wherein the frame member includes upper and lower shutters connected to the channel, wherein the upper and lower shutters are in a common plane with the channel opening.
6. A riser assembly as claimed in claim 1, wherein the channel has lips extending between the upper and lower channel walls and the channel opening, and wherein the lips are in a common plane with the channel opening.
7. A riser assembly as claimed in claim 1, wherein the fixing is selectively lockable in the channel.
8. A riser assembly as claimed in claim 7 wherein the fixing can be inserted into the channel in a first configuration, and while in the channel can then shift to a second configuration in which the fixing is locked in the channel.
9. A riser assembly as claimed in claim 8, wherein the fixing comprises an asymmetric locking member which can be rotated between the first and second configurations.
10. A riser assembly as claimed in claim 7, wherein the fixing comprises at least one outer wall arranged at the same angle as an inner surface of at least one of the upper and lower channel walls, such that the at least one outer wall of the fixing engages the inner surface of the at least one of the upper and lower channel walls when the fixing is locked in the channel in the second configuration.
11. A riser assembly as claimed in claim 1, wherein convergent sections of the upper and lower channel walls are straight.
12. A riser assembly as claimed in claim 1, wherein the upper and lower channel walls make an acute angle with the outer wall of the channel.
13. A riser assembly as claimed in claim 1, wherein the angle between the outer wall and the upper channel wall is the same as the angle between the outer wall and the lower channel wall.
14. A riser assembly as claimed in claim 1, wherein the joist spans between parallel sides of the riser aperture, and wherein at least one end of the joist is connected to the channel in at least one frame member by the fixing so that it is slidable relative to the channel at least at one end of the joist.
15. A riser assembly as claimed in claim 1, having at least first and second joists, wherein one end of the first joist is connected to the frame member and the other end of the first joist is connected to the second joist.
16. A riser assembly as claimed in claim 1, wherein the joist is formed from a composite material comprising a fibre and a settable material.
17. A riser assembly as claimed in claim 1, wherein at least one frame member is incorporated in a slip-formed wall which forms a part of the boundary of the riser aperture.
18. A riser assembly as claimed in claim 17, including a bracket supporting a service conduit passing through the riser aperture wherein the bracket connects into the channel of the frame member supported on the slip-formed wall.
19. A method of constructing a riser aperture in a floor, the method comprising surrounding at least a part of the riser aperture with a frame member adapted to exclude settable material from the riser aperture, the frame member comprising a channel having an axis and a channel opening, the channel comprising an outer wall connected to upper and lower channel walls, wherein the upper and lower channel walls extend between the outer wall and the channel opening; connecting a joist across the riser aperture by connecting the joist into the channel opening by at least one fixing, wherein the fixing is slidable within the channel when connected to the joist; and adjusting the position of the joist by sliding the joist axially along the channel.
20. A method as claimed in claim 19, wherein after the step of adjusting the position of the joist by sliding the joist axially along the channel, the position of the fixing in the channel is locked by tightening the fixing when the joist is in the desired location relative to the axis of the channel.
21. A method as claimed in claim 19, wherein the channel opening is accessible from the riser aperture, and wherein the outer wall of the channel is cast in the settable material forming the floor surrounding the riser aperture.
22. A method as claimed in claim 19, wherein at least one frame member is formed in a slip-formed wall, which forms a part of the boundary of the riser aperture.
23. A method as claimed in claim 19, wherein the at least one frame member is fixed in position on the slip-formed wall by ties connecting it to metal reinforcing elements prior to slip forming the slip-formed wall.
24. A method as claimed in claim 19, wherein the riser assembly comprises upper and lower shutters connected to the channel, wherein the upper and lower shutters incorporate upper and lower horizontal walls each having an array of perforations, and wherein the method includes admitting concrete into the spaces between the channel and the upper and lower shutters.
25. A method as claimed in claim 19, including supporting a service conduit passing through the riser aperture with a bracket which connects into the channel and is slidable therein.
26. A method as claimed in claim 19, including constructing a wall above the joist, wherein the joist and the wall are at least partially in the same vertical plane and wherein the joist supports the wall.
27. A method as claimed in claim 19, including connecting the joist to the channel with more than one bracket at one end of the joist.
28. A method as claimed in claim 19, including connecting at least one frame member across the riser aperture by a fixing permitting sliding of the frame member relative to the channel when the two are connected.
29. A method as claimed in claim 28, including connecting first and second frame members across the riser aperture by a respective fixing on each frame member permitting sliding of the frame member relative to the channel when the two are connected; adjusting the relative positions of the first and second frame members by sliding one of the first and second frame members axially along the channel to form a space between the first and second frame members; and casting a settable material into the space between the first and second frame members.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0028] In the accompanying drawings:
[0029]
[0030]
[0031]
[0032]
[0033]
[0034]
[0035]
[0036]
[0037]
[0038]
[0039]
[0040]
[0041]
[0042]
[0043]
[0044]
[0045]
[0046]
DESCRIPTION
[0047] Referring now to the drawings, a riser aperture 1 provides a conduit extending vertically through a concrete floor 2. The riser aperture 1 is formed when the floor 2 is cast, by excluding the setting concrete from the area forming the riser aperture 1, using a riser assembly 5. The riser assembly 5 comprises a frame member 10 surrounding the riser aperture 1 The frame member 10 comprises upper and lower shutters 11, 12 connected to a channel 15 at an inner wall of the riser aperture 1.
[0048] The channel 15 (see
[0049] The inner wall of the channel 15 has a channel opening 16 (see
[0050] At the inner wall of the riser aperture, the upper and lower shutters 11, 12 take the form of L-shaped steel plates in this example and are connected to the channel 15, with the longer of the two limbs of each plate connected in a common vertical plane to the inner wall of the channel 15 and the shorter of the two limbs extending horizontally e.g. across the upper and lower surface of the floor 2, usefully containing the concrete while it is setting and excluding it from the riser aperture 1.
[0051] The channel 15 and the shutters 11, 12 can optionally be formed from metal, such as steel, and can optionally be welded (e.g. spot welded) together.
[0052] At least one joist 20 spans across at least a part of the riser aperture 1. In this example, each of the four joists in
[0053] A bolt 27b passes through the channel plate 25c and the channel opening 16, and engages an asymmetric channel nut 27n which is disposed inside the channel opening 16 and is optionally urged against the inner surface of the channel opening 16 by a spring 27s held in compression between the nut 27n and the inner surface of the outer wall 150. The nut 27n has a long axis, and can be received in the channel opening when the long axis of the nut 27n is aligned with the axis of the channel 15, but is retained in the channel when the long axis of the nut 27n is not aligned with the axis of the channel opening 16, and so the nut 27n can be selectively locked in the channel 15 depending on the relative orientation of the nut 27n and the channel opening 16. The nut 27n and bolt 27b together provide a fixing 27 cooperating with the bracket 25 that connects the joist to the channel 15 through the channel opening 16 so that the joist 20 is slidable. When the nut is tightened on the bolt and the bracket is fixed in position, the joist 20 is fixed relative to the channel, but when the nut 27n is loosened slightly on the bolt 27b, the fixing 27 permits sliding movement of the bracket 25 and joist 20 along the axis of the channel 15 while still connected to the channel, thereby permitting sliding adjustment of the horizontal position of the joist 20 relative to the channel 15 when the two are loosely attached by the fixing 27. Once the joist 20 is in the desired position along the axis of the channel 15, the nut 27n and its bolt 27b can be tightened again to fix the joist 20 in position. The nut 27n has at least one section of outer wall that is shaped to be complementary to the inner surface of at least one of the upper and lower walls of the channel. For example, where the upper and lower walls of the channel converge at, say, 80, a section of outer wall of the nut 27n can be formed at the same angle, so that as the nut 27n rotates into contact with the inner surface of the upper or lower wall of the channel, the outer wall of the nut 27n and inner surface of the channel are contiguous along at least a part (and optionally the whole) of the length of the outer wall of the nut 27n, which can help to lock the nut 27n more securely in position. When the joist 20 is fixed onto the channel 15 by the fixing 27, rotation of the joist 20 is resisted by the tab 25t which extends into the channel opening 16.
[0054] The joists 20 support a floor formed by a grating 30. The grating 30 and joists 20 and optionally other structural members such as beams extending across the riser aperture (e.g. between the frame members 10) can optionally be formed from a composite material such as a fibre-reinforced material like GRP, which can be formed by extrusion or pultrusion and can be easily drilled and/or cut to size, and bolted in place.
[0055] Should the desired route of a particular service conduit through the riser aperture 1 coincide with the existing position of a joist 20, that joist 20 can simply be loosened (optionally from above the riser aperture 1) by raising a floor panel of grating 30, loosening the fixing 27, and sliding the joist 20 laterally to a new position within the riser aperture 1, out of the path of the service conduit, after which the joist 20 can then be fixed in position again by tensioning the fixing 27. Minor deviations of the joists away from regularly spaced intervals between the frame members 10 need not affect the overall structural integrity of the riser assembly because the joists 20 can be engineered to take the load within tolerance even if they are not spaced at regular intervals, and if desired, for heavier loads, additional joists 20 can be added on each side of the service conduit after it passes through the riser aperture 1 if additional reinforcement of the floor grating 30 is required. This can be accomplished from above the riser assembly 5 simply by lifting a panel of grating 30.
[0056]
[0057]
[0058] As previously described, the joists 20a, 20b are connected to the frame members 210a, 210b, 210c, by at least one slidable fixing, permitting sliding movement of the joists 220 220a, 220b within the riser aperture 201. This permits adjustment of the relative positions of the joists 220a, 220b to accommodate service conduits as they are offered to the riser aperture 201, as described above.
[0059] An optional service fixing bracket 28 can be connected into the channel 215 to permit the attachment and support of any particularly heavy service conduits. This is especially useful when the bracket 28 is hung on the frame member 210c connected to the wall W, since the weight of the heavy service conduit can be supported by the wall W. However, the bracket 28 can optionally be used on other frame members 10 or 10a at different sides of the riser aperture 1, 101, 201 etc.
[0060]
[0061] In the riser assembly 315 spacing first and second channels 315 apart from one another in the same plane and (in this example) in parallel relationship enables the formation of a rectangular beam between them from settable material such as concrete, which can be poured into a shuttered area formed between the two channels 315 and cast in place, thereby spanning across the riser aperture to divide it. In the
[0062]
[0063] In the riser assembly 405, a beam B with a conventional I-shaped cross section supported on either end by brackets 425 connected into a frame member 410 having a channel 415 and upper and lower shuttering plates 411, 412 as previously described, so that the beam B is slidable parallel to the axis of the channel 415. The beam B provides a support for a wall W, permitting the wall to span across the riser opening 401. This variation uses the considerable strength of the channel 415 as a fixing method and means that a long riser can be installed spanning over a number of different horizontal partitions of the building, and one or more dividing walls between the rooms can be formed over the riser aperture as the project progresses, i.e. after the riser opening has been formed and the floors surrounding it poured, and even allows the location of the beam B to be adjusted once in situ. This is especially useful if the precise position of the internal walls was uncertain at the time of initial design and/or casting in of the riser assembly 405, since the position of the wall W relative to the riser opening can be varied relatively easily by sliding the bean B into the desired position along the channel 415 and tightening the fixings connecting the brackets 425 into the channel 415 before construction of the wall W.