LIQUEFIED NATURAL GAS PRODUCTION FACILITY ON GRAVITY-BASED STRUCTURES
20250198696 ยท 2025-06-19
Assignee
Inventors
- Leonid Viktorovich MIKHELSON (Moscow, RU)
- Valeriy Nikolaevich RETIVOV (Moscow, RU)
- Sergey Gennadyevich SOLOVYEV (Novyy Urengoy, RU)
Cpc classification
F25J1/0269
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F25J1/0212
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F25J1/0022
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F25J2220/66
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
International classification
F25J1/02
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Abstract
A liquefied natural gas (LNG) production facility includes gravity-based structures (GBSs) with process lines for liquefying natural gas. A GBS contains: tanks for each component of a mixed refrigerant, wherein a GBS process line includes a fractionating apparatus for mixed refrigerant component production from a broad fraction of light hydrocarbons; a stabilized gas condensate (SGC) storage tank; and a berth for offloading LNG and SGC into tankers. Each GBS contains an LNG storage tank. One tank per mixed refrigerant component from each GBS is connected by pipe to systems for preparing and compressing all process line refrigerants, thus forming a common component feed system. The SGC storage tank is connected by pipes to condensate-stabilizing apparatus for all process lines, thus forming a common system for storing and offloading SGC. The LNG storage tanks are interconnected by pipes, forming a common system for storing and offloading LNG.
Claims
1. A liquefied natural gas (LNG) production complex comprising at least two gravity-based structures (GBS), each accommodating a natural gas liquefaction production line using a mixed refrigerant, including raw gas reception and treatment installations, a gas condensate stabilization installation, gas dehydration and mercury removal installations, a wide fraction of light hydrocarbons (WFLH) extraction installation, a refrigerant treatment and compression system, and a liquefaction installation, with at least one GBS production line incorporating a fractionation installation to generate mixed refrigerant components from WFLH, with at least one respective GBS having at least one storage tank for each mixed refrigerant component, with each GBS having at least one LNG storage tank, with at least one GBS having at least one stable gas condensate (SGC) storage tank, with at least one GBS having a jetty for LNG and SGC offloading, wherein at least one of each tank for each mixed refrigerant component has pipeline connections to the refrigerant treatment and compressions systems of each production line to form a single mixed refrigerant components replenishment system, at least one SGC storage tank has a pipeline connection to condensate stabilization installations of each production line to form a single SGC storage and offloading system, and the LNG storage tanks have a pipeline interconnection to form a single LNG storage and offloading system.
2. The complex according to claim 1, comprising two GBS, with the said fractionation installation being installed on one, or each, of the two production lines, and at least one tank for each mixed refrigerant component being installed in one, or each, of the two GBS.
3. The complex according to claim 1, comprising at least three GBS, with the said fractionation installations being installed on at least two production lines, and at least one of each tank for each mixed refrigerant component being installed in at least two respective GBS.
4. The complex according to claim 1, comprising two GBS, with at least one SGC storage tank being installed in one, or each of the two GBS.
5. The complex according to claim 1, comprising at least three GBS, with at least one SGC storage tank being installed in at least two GBS.
6. The complex according to claim 1, comprising at least three GBS, with the LNG and SGC offloading jetties being available at least on two GBS.
7. The complex according to claim 1, wherein each production line comprises a nitrogen system, including an air separation installation, a nitrogen storage tank, and a nitrogen vaporizer, with one of the production lines also having a backup air separation installation, and the nitrogen systems having a pipeline interconnection to form a single nitrogen supply system.
8. The complex according to claim 1, wherein each production line comprises air compressors installations, with two of the production lines having a backup air compressors installation, and the air compressors installations having a pipeline interconnection to form a single compressed air supply system.
9. The complex according to claim 1, wherein each production line comprises an air dryers installation, with two of the production lines having a backup air dryers installation, and the air dryers installations having a pipeline interconnection to form a single dry air system.
10. The complex according to claim 1, wherein each GBS accommodates a power plant, with all the power plants having a cable interconnection to form a single power supply system, each power plant having gas turbine generators (GTGs), and two of the power plants each having a backup GTG.
Description
LIST OF DRAWINGS
[0025]
[0026]
[0027]
[0028]
[0029]
[0030]
[0031]
[0032]
[0033]
[0034]
[0035]
EXAMPLES OF IMPLEMENTATION OF THE INVENTION
[0036] The liquefied natural gas (LNG) production complex on gravity-based structures (GBS) is a combination of process, engineering and auxiliary equipment for production, storage and offloading of LNG and SGC. The complex may comprise two or more production lines on gravity-based structures (GBS).
[0037] The drawings depict a sample complex comprising three production lines 1, 2, 3, each on dedicated GBS 4, 5, 6 (
[0038] On the shore near production lines 1-3, high-pressure flare 10 and general economies 11 are installed to be shared by the entire complex (
[0039] Each production line 1-3 is a topside (modularized process equipment) on GBS 4-6 (
[0040] The main process installations on either side of a GBS, as well as power plant 43, emergency diesel generators 44, nitrogen system installation 45, air compressors installations 46 and air dryers installations 47 have pipeline, cable tray and bridge connection via interconnecting modules 39-42.
[0041] GBS 4-6 are three-dimensional structures made from reinforced concrete, which function is a storage for extracted and processed raw gas, as well as for auxiliary substances and materials. They underlie the topsides (production lines 1-3) and are designed to be installed on seabed of a water body with the help of their own weight. GBS central part 12 is a rectangular prism with top slab 13 (
[0042] On sides of central part 12 along its perimeter, the GBS has protruding part 14 with vertical external walls. GBS central part 12 and protruding part 14 share base slab 15, and protruding part 14 is lower than central part 12.
[0043] GBS central part 12 is broken down into compartments with vertical longitudinal and transverse walls 16. Some of the compartments, e.g. compartments 17 and 18, are used for product (LNG and SGC) storage, while other compartments, e.g. compartments 19, 20 and 21, are used for ballast water. GBS protruding part 14 is broken down with vertical walls that are perpendicular to its external walls into compartments 20 along the GBS perimeter, which are also included in the ballast system.
[0044] GBS top slab 13 has reinforced-concrete supports 24, on which the topside modules are installed.
[0045] GBS 4-6 can stay afloat during water transportation to the site of the integrated production complex and can withstand ice impact in ice conditions. Changing the condition of GBS 4-6 from floating to stationary at the site of installation on the foundation 22 is ensured by flooding ballast compartments 19, 20, 21 with water.
[0046] To prevent scouring of the bed under GBS 4-6 and the bed of the water body, seabed reinforcement 23 such as gabions or other similar devices may be placed on the water bed around GBS 4-6 (
[0047] The technological process of the GBS LNG production complex has no fundamental differences from mixed refrigerant-based process technologies, which are used at onshore plants. Each process production line for the liquefaction of natural gas with the use of mixed refrigerant contains inlet facilities installation 28 which includes equipment for receipt and treatment of raw gas, as well as gas condensate stabilization. Raw gas and condensate from the field are piped via overpass 9 to inlet facilities installation 28, in which raw gas reception, pressure control, liquid condensate (hydrocarbons and water) separation, carbon dioxide, hydrogen sulphide, methanol, and other impurities removal from the raw gas, and gas condensate stabilization occur.
[0048] Stabilized gas condensate (SGC) is sent to a storage tank with the capacity of approx. 75,000 m.sup.3 (
[0049] SGC storage and offloading system (
[0050] Treated raw gas is sent to dehydration installation 29 and mercury removal installation 30 sequentially, where mercury, moisture, and remaining methanol are removed from the raw gas before it is sent to wide fraction of light hydrocarbons (WFLH) extraction installation 31. At WFLH extraction installation 31, ethane, propane, butane, and NGL fractions are extracted from the treated gas before it is sent for liquefaction.
[0051] At least one production line has WFLH fractionation installation 32. The ethane, propane, and butane produced at said installation are used for the purposes of mixed refrigerant components replenishment. Mixed refrigerant components replenishment system 48 is common for the whole complex. Refrigerant components may be pumped between the production lines through onshore pipelines. If a complex has two GBS and two production lines, the fractionation installation may be placed on either of the production lines or on both of them. If a complex consists of at least three production lines, it will suffice to place fractionation installations on at least two of them. In this example fractionation installations are installed on the first and second production lines 1 and 2 (
[0052] To store mixed refrigerant components in at least one GBS in case of at least three GBSin at least two GBS, and in this example in the first and second GBS 4 and 5, separate tanks 27 are provided, at least one for each mixed refrigerant component, used for mixed refrigerant components replenishment at all three production lines 1-3, including at the production line 3 which does not have a fractionation installation and mixed refrigerant components storage tanks (
[0053] Treated gas is sent to liquefaction installation 33 where three coil-wound heat exchangers are installed one after another, which are used to cool the gas with subsequent throttling and generation of liquefied fraction (LNG) and boil-off gas. Three mixed refrigerants with different composition, which are mixtures of nitrogen, methane, ethane, propane, and butane, are used for gas cooling in the heat exchangers. The liquefied gas is sent to LNG storage tanks 25 accommodated inside each GBS 4-6. LNG storage tanks 25 have a pipeline interconnection to form a single LNG storage and offloading system. The LNG storage and offloading system (
[0054] Each GBS 4-6 accommodates at least one, or preferably two, tanks 25 for storage of LNG with capacity of 115,000 m.sup.3 each. Thus, the total capacity of tanks 25 within the production complex amounts to approximately 690,000 m.sup.3. Membrane tanks are used for LNG storage. In this case, tank 25 consisting of a steel membrane made of stainless steel or invar (FeNi alloy) separated from concrete structure by an insulation layer is installed inside concrete compartment 17 (
[0055] Tanks for storage of ethane, which is a mixed refrigerant component, have similar membrane structure but smaller capacity. GBS 4 and 5 each have one ethane tank with capacity of approximately 1,200 m.sup.3 each (
[0056] Self-supported tanks installed in GBS 4 and 5 compartments are used for other mixed refrigerant components-butane and propane. Said two GBS 4 and 5 each has one tank for storage of butane with the capacity of 280 m.sup.3 each, and one tank for the storage of propane with capacity of 280 m.sup.3 each (
[0057] Tanks 27 for each mixed refrigerant component are located within a GBS as close as possible to the relevant process installations where these components are used, allowing to optimize the lengths and masses of pipelines, electrical heat tracing, and insulation.
[0058] Refrigerant is treated and compressed at mixed refrigerant compressor installations 34 and 35 (
[0059] Each installation has two compressors on one shaft and on one frame. Each such pair of compressors is driven by one gas turbine drive, which reduces the number of gas turbine drives. All drives have the same capacity and are completely unified, which simplifies their operation and repairs.
[0060] Ethane, propane, and butane extracted from WFLH at fractionation installations 32 and stored in tanks 27 for replenishment at GBS 1 and 2 are used to produce the refrigerant. Methane replenishment is done using treated raw gas and boil-off gas. Nitrogen for refrigerant replenishment is produced at comprehensive nitrogen system installation 45, which includes air separation installations 49 with air purification and dehydration systems, liquid nitrogen storage tanks 50, and liquid nitrogen vaporizers 51 (
[0061] Boil-off gas generated in liquefaction installation 33, LNG storage tanks 25, and also in the gas carrier's cargo tanks during offloading is sent to boil-off gas compressors installation 36 for boil-off gas compression and distribution. Boil-off gas is partially used for the treatment at fuel gas installation 37, which is primarily consumed by gas turbines in power plant and mixed refrigerant compressors installations.
[0062] Power supply system is common for the whole production complex (
[0063] Emergency diesel generators 44 serve as a standby power source. Since power plants 43 across the three production lines are incorporated into a single power supply system with the help of cables running through overpass 9, N+2 power generation sparing arrangement is enabled.
[0064] A similar sparing principle is used for the air compressors and air dryers, for which the air supply systems across the three production lines are interconnected.
[0065] On production lines 1 and 2, air compressors installations 46 are installed in a 350% arrangement (two in operation, one on standby), whereas air compressor installations 46 of production line 3 are installed in a 250% arrangement (
[0066] Air dryers installations 47 are installed on each production line, with two of them also having backup air dryers installations. On production lines 1 and 2, these installations are installed in a 350% arrangement (two in operation, one on standby), whereas the air dryers installations are installed on the production line 3 in a 250% arrangement (
[0067] LNG is offloaded into tankers for transporting liquefied gas via jetties 7 and 8, which are only installed on certain production lines, for instance on production lines 1 and 2 and GBS 4 and 5 (
[0068] Offloading jetties 7, 8 are structurally integrated into GBS 4, 5 and the topside. Fenders and a technological platform with loading arms as well as other marine and process equipment enabling LNG and SGC offloading are installed on protruding part 14 on the berthing side of the GBS. Mooring equipment for tanker berthing is installed on the GBS berthing side. The water area near jetty 7, 8 may have seabed reinforcement 23 protecting the bottom soil from scouring by ships propellers (
[0069] Production lines 1-3 are interconnected by cables and pipelines running on overpass 9 and the quayside. Same overpass 9 is used to connect the production complex to the field and other onshore facilities.
LIST OF NUMBERS IN DRAWINGS
[0070] 1. Production line (GBS topside) [0071] 2. Production line (GBS topside) [0072] 3. Production line (GBS topside) [0073] 4. GBS [0074] 5. GBS [0075] 6. GBS [0076] 7. Jetty for tankers [0077] 8. Jetty for tankers [0078] 9. Interconnecting overpass [0079] 10. High-pressure flare [0080] 11. Objects of general economy [0081] 12. GBS central part [0082] 13. Top slab of the GBS central part [0083] 14. GBS protruding part [0084] 15. GBS base slab [0085] 16. GBS vertical wall [0086] 17. LNG storage compartment [0087] 18. SGC storage compartment [0088] 19. Inner ballast compartments [0089] 20. Outer ballast compartments [0090] 21. Inner ballast compartments under the intermediate support slab of the LNG storage tank [0091] 22. GBS underbase foundation [0092] 23. Seabed reinforcement [0093] 24. Topside support [0094] 25. LNG storage tank [0095] 26. Support slab for LNG storage tank [0096] 27. Mixed refrigerant components storage tanks [0097] 28. Inlet facilities installation [0098] 29. Gas dehydration installation [0099] 30. Mercury removal installation [0100] 31. WFLH extraction installation [0101] 32. Fractionation installation [0102] 33. Gas liquefaction installation [0103] 34. Mixed refrigerant compressors installation (line A) [0104] 35. Mixed refrigerant compressors installation (line B) [0105] 36. Boil-off gas compressors installation [0106] 37. Fuel gas installation [0107] 38. Heating medium system installation [0108] 39. 1st interconnecting module [0109] 40. 2nd interconnecting module [0110] 41. 3rd interconnecting module [0111] 42. 4th interconnecting module [0112] 43. Power plant [0113] 44. Emergency diesel generators [0114] 45. Nitrogen systems installation [0115] 46. Air compressors installations [0116] 47. Air dryers installations [0117] 48. Mixed refrigerant components replenishment system [0118] 49. Air separation installation [0119] 50. Nitrogen storage tank [0120] 51. Nitrogen vaporizer [0121] 52. Gas turbine generator [0122] 53. Quayside [0123] 54. Seabed [0124] 55. Water level