Abstract
A plant monitoring method using exergy efficiency is provided. The plant monitoring method includes detecting data associated with chemical exergy and physical exergy of each apparatus or subsystem and obtaining a chemical exergy value and a physical exergy value of each apparatus or subsystem, calculating an exergy efficiency value of each apparatus or subsystem on the basis of the detected data, and identifying a maintenance target which refers to an apparatus or subsystem that needs to be improved in efficiency on the basis of data obtained through the calculating of the exergy efficiency value.
Claims
1. A method of monitoring an ultra filtration/reverse-osmosis (UF/RO) water plant in which two or more UF/RO membranes are provided, the method comprising: detecting, repeatedly, exergy data associated with chemical exergy and physical exergy of each UF/RO membrane, wherein the exergy data is averaged over a predetermined period of time and the predetermined period of time is determined according to a temperature, humidity, precipitation, wind speed, and season in an area in which the two or more UF/RO membranes are installed; obtaining a chemical exergy value and a physical exergy value of each UF/RO membrane on the basis of the exergy data; calculating an exergy efficiency value of each UF/RO membrane on the basis of the exergy data, wherein the exergy efficiency value of each UF/RO membrane is expressed in terms of a value within a range of 0 to 1, a value within a range of 0 to 10, or a value within a range of 0 to 100; identifying an inefficient UF/RO membrane that needs to be improved in efficiency on the basis of data obtained through the calculating of the exergy efficiency value, wherein the determining of the inefficient UF/RO membrane comprises: detecting the inefficient UF/RO membrane by checking if the exergy efficiency value of each UF/RO membrane is out of a predetermined range, checking a maintenance priority of the two or more UF/RO membranes, and ordering the inefficient UF/RO membrane according to the maintenance priority; calculating a maintenance time at which the efficiency of the inefficient UF/RO membrane is expected to be lower than a predetermined efficiency using an operation trend curve derived on the basis of the exergy efficiency value; and in response to determining of the maintenance time replacing the inefficient UF/RO membrane.
2. The method according to claim 1, further comprising: performing again each of the detecting of the exergy data, the calculating of the exergy efficiency value, the identifying of the inefficient UF/RO membrane, and the calculating of the maintenance time after the replacing of the inefficient UF/RO membrane.
3. The method according to claim 1, further comprising: outputting a plant diagnosis result to notify a plant operator of the identified inefficient UF/RO membrane and sending a result of the calculated maintenance time at which the inefficient UF/RO membrane is to be replaced to the plant operator.
4. The method according to claim 1, wherein the chemical exergy value is calculated by Equation 1, the physical exergy value is calculated by Equation 2, and a total exergy value is calculated by Equation 3,
5. The method according to claim 1, wherein the chemical exergy value is calculated by Equation 4, the physical exergy value is calculated by Equation 5, and a standard chemical exergy value of a component k is calculated by Equation 6,
E.sup.CH=x.sub.ke.sub.k+Cx.sub.k ln x.sub.kEquation 4
E.sup.PH=(UU.sub.0)+p.sub.0(VV.sub.0)SEquation 5
e.sub.k.sup.CH=C ln x.sub.k.sup.eEquation 6 where U and V are internal energy and volume, respectively, a subscript of 0 represents a reference environment, x.sub.k is a molar fraction value of the component k, x.sub.k.sup.e is a molar fraction value of the component k in the reference environment, C is calculated based on a gas constant, and S is calculated based on entropy of the subsystem.
6. The method according to claim 5, wherein the exergy efficiency value is obtained by adding the chemical exergy value and the physical exergy value, and the chemical exergy value includes a mixing exergy value.
7. The method according to claim 1, wherein in the calculating of the exergy efficiency value, if there is a stream for which electric and chemical energy is used or a stream from which electric and chemical energy is generated, the exergy efficiency value is calculated taking into account data associated with the stream.
8. The method according to claim 1, wherein the calculating of the maintenance time comprises: storing sorted data sorted by date and time; deriving the operation trend curve associated with operation efficiencies of each UF/RQ membrane on the basis of the stored sorted data; and deriving a maintenance time and a maintenance cycle on which each UF/RO membrane needs to be replaced on the basis of the derived operation trend curve.
9. The method according to claim 1, wherein the detecting exergy data, the calculating of the exergy efficiency value, and the identifying of the inefficient UF/RO membrane, and the calculating of the maintenance time are periodically performed on a predetermined cycle.
10. A method of monitoring an ultra filtration/reverse osmosis (UF/RO) water plant in which two or more UF/RO membranes are provided, the method comprising: detecting, repeatedly, exergy data associated with chemical exergy and physical exergy of each UF/RO membrane, wherein the exergy data is averaged over a predetermined period of time and the predetermined period of time is determined according to a temperature, humidity, precipitation, wind speed, and season in an area in which the two or more UF/RO membranes are installed; obtaining a chemical exergy value and a physical exergy value of each UF/RO membrane on the basis of the exergy data; calculating an exergy efficiency value of each UF/RO membrane on the basis of the exergy data, wherein the exergy efficiency value of each UF/RO membrane is expressed in terms of a value within a range of 0 to 1, a value within a range of 0 to 10, or a value within a range of 0 to 100; identifying an inefficient UF/RO membrane that needs to be improved in efficiency on the basis of data obtained through the calculating of the exergy efficiency value, wherein the determining of the inefficient UF/RO membrane comprises: detecting the inefficient UF/RO membrane by checking if the exergy efficiency value of each UF/RO membrane is out of a predetermined range, checking a maintenance priority of the two or more UF/RO membranes, and ordering the inefficient UF/RO membrane according to the maintenance priority; calculating a maintenance time at which each appar subsystem needs the inefficient UF/RO membrane is to be replaced on the basis of the data obtained through the calculating of the exergy efficiency value; and performing again each of the detecting of the exergy data, the calculating of the exergy efficiency value, the identifying of the inefficient UF/RO membrane, and the calculating of the maintenance time after replacing the inefficient UF/RO membrane.
11. The method according to claim 10, further comprising: outputting a plant diagnosis result to notify a plant operator of the identified inefficient UF/RO membrane and sending a result of the calculated maintenance time at which the inefficient UF/RO membrane is to be replaced to the plant operator.
12. The method according to claim 10, wherein the exergy efficiency value is obtained by adding the chemical exergy value and the physical exergy value, and the chemical exergy value includes a mixing exergy value.
13. The method according to claim 10, wherein in the calculating of the exergy efficiency value, if there is a stream for which electric and chemical energy is used or a stream from which electric and chemical energy is generated, the exergy efficiency value is calculated taking into account data associated with the stream.
14. The method according to claim 10, wherein the calculating of the maintenance time comprises: storing sorted data sorted by date and time; deriving an operation trend curve associated with operation efficiencies of the two or more UF/RO membranes on the basis of the stored sorted data; and deriving a maintenance time and a maintenance cycle on which each UF/RO membrane apparatus of subsystem needs to be maintained replaced on the basis of the derived operation trend curve.
15. The method according to claim 10, wherein the detecting of the exergy data, the calculating of the exergy efficiency value, the identifying of the inefficient UF/RO membrane, and the calculating of the maintenance time are periodically performed on a predetermined cycle.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
DETAILED DESCRIPTION
(12) Various modifications and various embodiments will be described in detail with reference to the accompanying drawings so that those skilled in the art can easily carry out the disclosure. It should be understood, however, that the various embodiments are not for limiting the scope of the disclosure to the specific embodiment, but they should be interpreted to include all modifications, equivalents, and alternatives of the embodiments included within the spirit and scope disclosed herein.
(13) The terminology used herein is for the purpose of describing specific embodiments only and is not intended to limit the scope of the disclosure. The singular expressions a, an, and the are intended to include the plural expressions as well, unless the context clearly indicates otherwise. When an element is referred to as being on another element, it can be directly on the other element or intervening elements may be present therebetween.
(14) In the disclosure, the terms such as comprise, include, have/has should be construed as designating that there are such features, regions, integers, steps, operations, elements, components, and/or combinations thereof, not to exclude the presence or possibility of adding of one or more of other features, regions, integers, steps, operations, elements, components, and/or combinations thereof.
(15) Further, terms such as first, second, and so on may be used to describe a variety of elements, but the elements should not be limited by these terms. The terms are used simply to distinguish one element from other elements. The use of such ordinal numbers should not be construed as limiting the meaning of the term. For example, the components associated with such an ordinal number should not be limited in the order of use, placement order, or the like. If necessary, each ordinal number may be used interchangeably.
(16)
(17) Referring to
(18) The data detection step S110 is an operation of detecting data related to a chemical exergy and a physical exergy from each apparatus and each subsystem. Here, a chemical exergy value E.sup.CH and a physical exergy value E.sup.PH for each apparatus and each subsystem may be obtained on the basis of the detected data.
(19) The data detection step S110 is preferably repeatedly performed on a regular cycle. The data collected through the data detection step may be averaged over a predetermined period of time and resulting values may be recorded as data in a recording medium. The recorded data may be used in subsequent steps. The period of time over which the data is averaged may vary depending on apparatus or subsystem. Also, it may vary depending on environmental conditions. For example, the period of time may be appropriately set according to a temperature, humidity, precipitation, snowfall, wind speed, and season in the area in which the apparatus or the subsystem is installed.
(20) The exergy efficiency value calculation step S120 is an operation of calculating the exergy efficiency values .sub. of respective apparatuses and subsystems on the basis of the detected data.
(21)
(22) Referring to
(23)
(24) In these equations, v is a flow velocity value, g is a gravitational acceleration value, l is a level value, h is a specific enthalpy value, s is a specific entropy value, y is a specific mass fraction value, and is a specific chemical potential value.
(25) In some cases, the chemical exergy value E.sup.CH may be calculated by Equation 4, the physical exergy value E.sup.PH may be calculated by Equation 5, and a standard chemical exergy value e.sub.k.sup.CH of a component k may be calculated by Equation 6.
E.sup.CH=x.sub.ke.sub.k.sup.CH+{dot over (R)}T.sub.0x.sub.k ln x.sub.kEquation 4
E.sup.PH=(UU.sub.0)+p.sub.0(VV.sub.0)T.sub.0(SS.sub.0)Equation 5
e.sub.k.sup.CH={dot over (R)}T.sub.0 ln x.sup.e.sub.kEquation 6
(26) In these equations, U, V, and S are internal energy of each system, volume, and entropy, respectively, a superscript of 0 denotes a reference environment, the component x.sub.k is a molar fraction value of a component k, {dot over (R)} is a gas constant, and x.sup.e.sub.k is a mole fraction value of the component k in the reference environment.
(27) In this case, the exergy efficiency value .sub. is a sum of the chemical exergy value E.sup.CH and the physical exergy value E.sup.PH, and the chemical exergy value E.sup.CH preferably includes a mixing exergy value.
(28)
(29) Referring to
(30)
(31) Referring to
(32)
(33) Referring to
(34) The maintenance target identification step S130 refers to an operation of identifying an apparatus or subsystem that needs to be improved in efficiency on the basis of the data acquired through the exergy efficiency value calculation step 120.
(35) The maintenance target identification step S130 may include first, second, and third sub-steps S131, S132, and S133.
(36) The first sub-step S131 of the maintenance target identification step S130 is an operation of detecting an apparatus or subsystem having a data value that is out of a predetermined normal range and of determining the detected apparatus or subsystem as an apparatus or subsystem that needs to be improved in efficiency. The apparatus or subsystem that needs to be improved in efficiency will be referred to as maintenance target. The second sub-step S132 of the maintenance target identification step S130 is an operation of checking for the maintenance priority of each apparatus and each subsystem. The third sub-step S133 of the maintenance target identification step S130 is an operation of ordering the apparatuses or subsystems that are determined as the maintenance targets in the first sub-step S131 according to the priorities confirmed in the second sub-step S132.
(37) Through the sub-steps S131, S132, and S133 of the maintenance target identification step S130, it is possible to effectively manage each of the apparatuses or subsystems that need to be improved according to the predetermined maintenance priority order.
(38) The maintenance time calculation step S140 refers to an operation of calculating a time at which each apparatus or subsystem is to be maintained or improved on the basis of the data obtained through the exergy efficiency value calculation step 120.
(39) The maintenance target identification step S140 may include fourth, fifth, and sixth sub-steps S141, S142, and S143.
(40) The maintenance time calculation step S140 refers to an operation of estimating a time at which the efficiency of each apparatus or subsystem is expected to be lower than a predetermined efficiency on the basis of each of the exergy efficiency values of various factors, which are derived from data accumulated through the maintenance target identification step 130, thereby determining a time and a cycle on which overall maintenance of each apparatus or system needs to be performed.
(41) The fourth sub-step S141 of the maintenance time calculation step S140 refers to an operation of storing data sorted by date and time. The fifth sub-step S142 of the maintenance time calculation step S140 is an operation of deriving an operation trend curve associated with the operation efficiency of each apparatus or subsystem on the basis of the data acquired in the fourth sub-step S141. The sixth sub-step S143 of the maintenance time calculation step S140 refers to an operation of deriving the maintenance time and the maintenance cycle on which each apparatus or subsystem needs to be maintained on the basis of the results of the fifth sub-step S142.
(42) Through the fourth to sixth sub-steps S141, S142, and S143 of the maintenance time calculation step S140, it is possible to accurately determine the time and cycle on which each apparatus or subsystem needs to be maintained, thereby maximizing the overall operation efficiency of the plant and dramatically reducing the cost of maintenance of the plant.
(43) Depending on conditions, in the plant monitoring method S100 according to an exemplary embodiment, the data detection step S110, the exergy efficiency value calculation step S120, and the maintenance target identification step 130 may be performed again after maintenance for the apparatuses or subsystems determined in the previous maintenance target identification step 130 is performed (operation S150).
(44) In this case, the operation status of each apparatus or subsystem can be continuously monitored.
(45) The plant monitoring method S100 may further include a plant diagnosis result output step S160. The plant diagnosis result output step S160 refers to an operation of notifying a plant operator of the apparatus or subsystem identified in the maintenance target identification step S130 and the calculation results of the maintenance time calculation step S140.
(46)
(47) Referring to
(48) As can be seen from
(49) As described above, because the plant monitoring method according to the exemplary embodiment includes the data detection step, the exergy efficiency value calculation step, the maintenance target identification step, and the maintenance time calculation, the plant monitoring method has advantages of solving problems with conventional technologies, being capable of checking the status of each apparatus or subsystem constituting a plant, and accurately determining the maintenance time and cycle for each apparatus or subsystem.
(50) Meanwhile, various methods according to an exemplary embodiment described above can be implemented in the form of a readable program through various computer means and recorded in a computer-readable recording medium. Herein, the recording medium can include program commands, data files, data structures, etc. alone or in combination thereof. The program commands to be recorded on the recording medium can be those specially designed and constructed for the present disclosure or can also be those known and available to those skilled in the art of computer software. For example, the recording medium can be magnetic media such as hard disks, floppy disks, and magnetic tapes, optical media such as CD-ROMs and DVDs, magneto-optical media such as floptical disks, and hardware devices specially configured to store and execute the program commands such as ROMs, RAMs, and flash memory. Examples of the program commands can include not only machine language wires such as those produced by a compiler but also high-level language wires that can be executed by a computer by using an interpreter, etc. This hardware device can be configured to operate as one or more software modules in order to perform the operation of the present disclosure, and vice versa.
(51) While exemplary embodiments have been described with reference to the accompanying drawings, it is to be understood by those skilled in the art that various modifications in form and details may be made therein without departing from the sprit and scope as defined by the appended claims. Therefore, the description of the exemplary embodiments should be construed in a descriptive sense and not to limit the scope of the claims, and many alternatives, modifications, and variations will be apparent to those skilled in the art.