CONSTRUCTION METHOD OF DIGITAL TWIN FOR STRUCTURE PERFORMANCE OF INTELLIGENT EXCAVATOR
20230115586 ยท 2023-04-13
Inventors
- Xueguan SONG (Dalian, Liaoning, CN)
- Xiaonan LAI (Dalian, Liaoning, CN)
- Yanan ZOU (Dalian, Liaoning, CN)
- Xin WANG (Dalian, Liaoning, CN)
- Xiwang HE (Dalian, Liaoning, CN)
- Tianci ZHANG (Dalian, Liaoning, CN)
- Tao FU (Dalian, Liaoning, CN)
- Wei SUN (Dalian, Liaoning, CN)
Cpc classification
Y02P90/02
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
G05D1/0094
PHYSICS
G06F30/23
PHYSICS
E02F9/264
FIXED CONSTRUCTIONS
International classification
Abstract
A construction method of digital twin for structure performance of an intelligent excavator. Through the finite element analysis on key parts in the process of the intelligent excavator, the relevant structural mechanics performance is obtained; The important operating states of the key parts of the intelligent excavator in the excavation process are collected, and the key operating data are obtained through data processing and calculation; sensor data and an artificial intelligence algorithm are fused, and the structure performance of the parts of the intelligent excavator under multiple unknown working conditions is predicated by using a prediction model; and finally, the performance data information is modeled and rendered by computer graphics technology, to obtain a digital twin of the structure performance display of the intelligent excavator is obtained, thereby realizing digital twin mapping of the performance information on key parts of the intelligent excavator in the excavation process.
Claims
1. A construction method of a digital twin for structure performance of an intelligent excavator, wherein the method is realized based on the combination of a digital twin system with a physical geometry module, a communication module, an algorithm module and a real-time virtual display module, comprising the following steps: in a first step, for the intelligent excavator, constructing a physical entity part of the digital twin system via the physical geometry module, wherein the physical geometry module contains a sensing unit, a control unit, a drive unit, and an action realization unit; specifically: firstly, collecting a working environment of the intelligent excavator in real time; Through a three-dimensional (3D) scanner in the sensing unit, realizing the three-dimensional solid model building of an excavated material pile, to facilitate the real-time observation of an excavating operation progress; Through the statics analysis on each key part of the intelligent excavator, determining the key factors affecting the structure performance of the parts of the intelligent excavator; extracting the input variables of operation working conditions of the excavator in the excavation process and performance information on a demand solution; arranging corresponding industrial sensors on the key parts to collect real-time operation working condition information; secondly, planning the excavation action according to the concrete shape of the excavated material pile; inputting the corresponding motion instruction into a single chip microcomputer of the control unit, wherein the motion instruction plans the travel of a stepping motor and a rotary encoder in the drive unit, and the related parts in the action realization unit can be controlled to carry out the excavating operation according to the specified excavation tracks; Finally, realizing the monitoring of the three-dimensional space position and motion cooperation relationship of the entity model of each key part of the intelligent excavator in the excavating operation process; and providing data information for the model building in the subsequent real-time monitoring display module; in a second step, inputting the real-time operation working condition information on the key parts collected by the industrial sensor in the above physical geometry module into the communication module, and classifying and distributing the real-time data collected by the industrial sensor through the communication module; wherein the intelligent excavator is equipped with an upper industrial personal computer with data storage, data processing and wireless communication functions, connecting the sensing unit, the control unit and the drive unit in the physical geometry module with the upper industrial personal computer through a USB interface in a wired manner for storing the historical operating data and the real-time data collected through the industrial sensor into the upper industrial personal computer; wirelessly connecting with the upper industrial personal computer, reading the above data and processing, and transmitting the processed data to different terminals; in a third step, establishing the correlation between the actual operation working conditions and the internal structure performance information on parts; firstly, selecting a training set and a test set required by a construction algorithm, to build a deep neural network model and test the precision of the deep neural network model respectively; using the input working condition information determined by the static analysis in the physical geometry module as an input variable; uniformly selecting an input working condition set representing the whole design space, and solving the structural mechanics information corresponding to the input working condition set by a finite element method to be used as an output variable; building the deep neural network using the training set, and constructing the correlation between the actual operation working conditions and the structural mechanics performance of the parts; testing the precision of the deep neural network model using the selected training set, and selecting a determination coefficient R2 as a model precision test index, to ensure the accuracy of the built model; in a fourth step, rapidly calculating the internal performance information on the parts according to the real-time operation working conditions transmitted by the communication module; On the basis of the deep neural network model in the third step, collecting the operation working condition information on the intelligent excavator in real time by using the industrial sensors arranged on the key parts, which is stored by the upper industrial personal computer arranged in the intelligent excavator through the communication module; at the PC terminal, communicating with the upper industrial personal computer in a wireless connection, through data cleaning and classification, taking the processed data as input, calculating by the deep neural network model, and solving the structural mechanics performance of the intelligent excavator under the current operation working conditions; connecting the data with the real-time monitoring display module by using a Web Socket communication protocol; in a fifth step, conducting the three-dimensional rendering display on the performance information through the real-time monitoring display module; selecting a browser as a monitoring display platform, and constructing a virtual three-dimensional scenario, to realize the intuitive and high-fidelity twin mapping of the structure performance of the intelligent excavator; Through a browser rendering engine, conducting the three-dimensional rendering display, specifically: firstly, importing the three-dimensional model of the parts into the constructed virtual three-dimensional scenario in a GLTF format, and using the three-dimensional space positions of the parts in the physical geometry module and the information on the motion cooperation relationship among the parts to construct the initial three-dimensional display, thereby realizing the motion synchronization between a virtual three-dimensional model and a real physical model; secondly, displaying the structure performance information on the key parts, importing the model of the key parts in a tetrahedral form, and calculating the real-time performance information on the parts on a tetrahedral node through the deep neural network model of the algorithm module, to display the change to the structure performance in a three-dimensional cloud image form; and finally, realizing the UI interface planning of the real-time monitoring display module, and monitoring operating limit positions of the parts in real time, thereby realizing timely warning and preventing accidents; and moreover, for the drawing of excavation tracks in the excavation process of the intelligent excavator, realizing the virtual visualization excavating.
Description
DESCRIPTION OF DRAWINGS
[0018]
[0019]
[0020]
[0021]
[0022]
[0023]
[0024] In the figures: 1 rotary body, 2 A-shaped frame, 3 large arm, 4 gear, 5 head sheave, 6 bucket.
DETAILED DESCRIPTION
[0025] The technical solution of the present invention is further described below in detail in combination with the drawings and the specific embodiment which is described to only explain the present invention but not to limit the present invention.
[0026] The present invention builds a digital twin for structure performance of an intelligent excavator. Referring to
[0027] Referring to
[0028] The specific embodiments of the present invention will be further described below through the embodiments.
[0029] The establishment for the digital twin of the intelligent excavator is specifically taken as an example for illustration.
[0030] Taking the intelligent excavator as an object instance, referring to
[0031] The communication module of the intelligent excavator is completed around the upper industrial personal computer installed in the excavator. Referring to
[0032] Referring to
[0033] To sum up, by the related calculation information on the above physical geometry module and the algorithm module, the real-time virtual display module of the digital twin is built through data communication transmission in the communication module. In order to visually display the performance information of the intelligent excavator, a digital twin performance display platform is built by computer graphics technology. Referring to
[0034] Although the present invention is disclosed above through preferred embodiments, the above preferred embodiments are not used to limit the present invention. Any of those skilled in the art may make possible amendments and modifications to the above technical content of the present invention using the above disclosed method and technical contents without departing from the spirit and scope of the present invention. Thus, any simple amendment, equivalent change and modification made to the above embodiments according to the technical essence of the present invention without departing from the content of the technical solution of the present invention shall belong to the scope of the technical solutions of the present invention.
[0035] This description is merely the example of the implementation forms of the inventive concept. The protection scope of the present invention shall not be limited to the specific forms described in the embodiments, but shall also involve the equivalent technical means that can be contemplated by those skilled in the art according to the inventive concept.