HIGH-VOLTAGE TRIGGERED PULSECLOSER WITH CRITICAL RECLOSING TIME ESTIMATION
20230111124 · 2023-04-13
Assignee
Inventors
- Edgar Casale (Lewis Center, OH, US)
- Michael G. Ennis (Evanston, IL, US)
- Yoav Sharon (Evanston, IL)
- William Yadusky (Franklin, WI, US)
Cpc classification
H02H7/06
ELECTRICITY
H02J3/001
ELECTRICITY
G01R31/086
PHYSICS
International classification
H02H7/06
ELECTRICITY
G01R31/08
PHYSICS
Abstract
A system and method for determining the optimal time to perform a pulse test to determine the presence of a fault after a switch opens to clear the fault to prevent generator instability. The method includes detecting the fault, opening a switch to clear the fault, determining an optimal time for performing the pulse test for determining the continued presence of the fault based on predetermined system data and parameters after the switch is opened so as to prevent the pulse test from occurring too early that could cause generator instability, and performing the pulse test at the optimal time to determine if the fault is still present. Determining the optimal time can use available system data and information, such as a priori knowledge or real-time behaviour. If the fault is not present, then the method determines a desired time to perform a reclose operation.
Claims
1. A method for testing for the continued presence of a fault in a power system to prevent generator instability, the method comprising: detecting the fault; opening a switch to clear the fault; determining an optimal time for performing a pulse test for determining the continued presence of the fault based on predetermined system data and parameters after the switch is opened so as to prevent the pulse test from occurring too early that could cause generator instability; performing the pulse test at the optimal time to determine if the fault is still present; and performing a reclose operation at a desired time if the fault is not present.
2. The method according to claim 1 wherein determining an optimal time for performing a pulse test includes making pulse testing time decisions based on a priori knowledge of system behavior.
3. The method according to claim 2 wherein determining an optimal time for performing a pulse test includes estimating remote generator rotor angles, bus voltage angles, real and reactive power flows and frequency from predetermined system parameters and relationships.
4. The method according to claim 1 wherein determining an optimal time for performing a pulse test includes making pulse testing time decisions in real time.
5. The method according to claim 4 wherein determining an optimal time for performing a pulse test includes detecting remote generator rotor angles, bus voltage angles, real and reactive power flows and frequency.
6. The method according to claim 1 further comprising preventing the reclose operation by the switch from occurring if the pulse test indicates that the fault is still present.
7. The method according to claim 1 wherein the pulse test is performed by a triggered vacuum gap (TVG) device.
8. The method according to claim 1 wherein the power system is a high-voltage transmission power system.
9. A method for testing for the continued presence of a fault in a high-voltage transmission power system to prevent generator instability, the method comprising: detecting the fault; opening a switch to clear the fault; determining an optimal time for performing a pulse test for determining the continued presence of the fault based on predetermined system data and parameters after the switch is opened so as to prevent the pulse test from occurring too early that could cause generator instability; performing the pulse test USING a triggered vacuum gap (TVG) device at the optimal time to determine if the fault is still present; preventing a reclosing operation by the switch from occurring if the pulse test indicates that the fault is still present and allowing the reclosing operation to occur by the switch if the pulse test indicates that the fault is no longer present.
10. The method according to claim 9 wherein determining an optimal time for performing a pulse test includes making pulse testing time decisions based on a priori knowledge of system behavior including estimating remote generator rotor angles, bus voltage angles, real and reactive power flows and frequency from predetermined system parameters and relationships.
11. The method according to claim 9 wherein determining an optimal time for performing a pulse test includes making pulse testing time decisions in real time including detecting remote generator rotor angles, bus voltage angles, real and reactive power flows and frequency.
12. A system for testing for the continued presence of a fault in a power system to prevent generator instability, the system comprising: means for detecting the fault; means for opening a switch to clear the fault; means for determining an optimal time for performing a pulse test for determining the continued presence of the fault based on predetermined system data and parameters after the switch is opened so as to prevent the pulse test from occurring too early that could cause generator instability; means for performing the pulse test at the optimal time to determine if the fault is still present; and means for performing a reclose operation at a desired time if the fault is not present.
13. The system according to claim 12 wherein the means for determining an optimal time for performing a pulse test makes pulse testing time decisions based on a priori knowledge of system behavior.
14. The system according to claim 12 wherein the means for determining an optimal time for performing a pulse test estimates remote generator rotor angles, bus voltage angles, real and reactive power flows and frequency from predetermined system parameters and relationships.
15. The system according to claim 12 wherein the means for determining an optimal time for performing a pulse test makes pulse testing time decisions in real time.
16. The system according to claim 12 wherein the means for determining an optimal time for performing a pulse test detects remote generator rotor angles, bus voltage angles, real and reactive power flows and frequency.
17. The system according to claim 12 further comprising means for preventing the reclose operation by the switch from occurring if the pulse test indicates that the fault is still present.
18. The system according to claim 12 wherein the pulse test is performed by a triggered vacuum gap (TVG) device.
19. The system according to claim 12 wherein the power system is a high-voltage transmission power system.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0016]
[0017]
[0018]
[0019]
[0020]
[0021]
[0022]
[0023]
[0024]
DETAILED DESCRIPTION OF THE EMBODIMENTS
[0025] The following discussion of the embodiments of the disclosure directed to a system and method for determining the optimal time to perform a pulse test to determine the presence of a fault in a circuit after a switch opens to clear the fault to prevent generator instability and then determine a desired time to re-energize the circuit if the fault is not present is merely exemplary in nature, and is in no way intended to limit the disclosure or its applications or uses.
[0026] This disclosure proposes a system and method for determining the optimal time to pulse test in anticipation of reclosing a switch that previously opened to clear a fault based on the real-time behaviour of other network elements, such as loads, generators and protection schemes. The method ensures that the pulse testing does not re-ignite a fault arc, either due to the persistence of a durable fault-causing element, such as a tree branch, or due to ionized air in the vicinity of faulted conductors, does not de-stabilize spinning generators, minimizes automatic load-shedding, and helps maintain distributed generation online.
[0027] The system employs a pulse-closing/reclosing device that ascertains the present and historical behavior of the local network circuit where it is installed, and is situationally aware of its own participation in clearing or switching events. The critical pulse testing time, however, may depend on the operational status of a larger network than the pulse-closing/reclosing device can ascertain with its own local sensors and controls. Consequently, the critical pulse testing time estimator relies on either pre-configuration of the pulse-closing/reclosing device with a priori data about the larger system behavior under various contingencies, and how those contingencies are reflected in the pulse-closing/reclosing device’s local circuit behavior, which the pulse-closing/reclosing device monitors itself, and/or fast communication of system parameters from across a wide area, such as generator rotor angles, phasors, real and reactive power flows (magnitude and direction), and frequency to a lesser extent unless network stability relies on non-spinning generation. Also, the rate-of-change or trajectory of these system parameters provides predictive timers to the critical pulse testing interval estimator to calculate how much time remains for a reclosing attempt to be effective at all for preventing instability. The discussion below assumes that substation communications infrastructure exists with sufficient bandwidth and data rates required to exchange system-wide measurements and control/status information to each reclosing device.
[0028] If the pulse-closing/reclosing device is pre-configured to make pulse testing timing decisions based on a priori knowledge of the larger system behavior based on its own local sensors, then it monitors its local network and infers the stability considerations for the remote areas of the network. That is, the pulse-closing/reclosing device estimates remote generator rotor angles, bus voltage angles, real and reactive power flows (magnitude and direction), and frequency based on pre-calculated relationships between its local network behavior and remote areas of the network.
[0029] In the case where real-time system data is available both locally and remotely, then the pulse-closing/reclosing device is configured to rely on the fast exchange of remote system parameters, such as generator rotor angles, bus voltage angles, real and reactive power flows (magnitude and direction), and frequency, such as are available from phasor measurement units already widely deployed on power networks. The measured rate-of-change of these system parameters start count-down timers to estimate how much time remains for a pulse testing attempt to be effective at all for preventing instability, i.e., the minimum of these timers, updated in real-time, sets the duration of the critical pulse testing interval.
[0030] Once the pulse-testing during the critical pulse-testing interval has indicated satisfactory conditions to reclose, then reclosing is enabled to occur within the critical interval. Other permissives may also be applied to either reinforce or to override enabling of the reclose operation depending on desired system operation apart from stability concerns. The satisfactory conditions for reclosing after the pulse test include the fault is no longer present, the duration of the critical reclose interval has not been exceeded, and the observed response of real-time system parameters, whether local or remote or both, to the previous pulse test indicates that restoring the system to its pre-fault state by reclosing would not further disrupt stability.
[0031]
[0032] A voltage sensor 48 is coupled to the lines 12 and 14 at the line-side of the device 20 and a voltage sensor 50 is coupled to the lines 14 and 16 at the line-side of the device 20 to provide voltage measurements on the lines 12, 14 and 16. A voltage monitor 52 receives voltage measurements from the sensors 48 and 50. A current sensor 54 provides current measurements on the line 12, a current sensor 56 provides current measurements on the line 14 and a current sensor 58 provides current measurements on the line 16. A current monitor 60 receives the current measurements from the sensors 54, 56 and 58. This configuration of voltage monitoring uses line-to-line voltage measurements from the sensors 48 and 50. In an alternate embodiment, the voltage measurements may be line-to-ground measurements requiring three voltage sensors. A signal processor 62 receives voltage and current signals from the monitors 52 and 60, processes the signals and provides the processed signals to a fault detection and response logic controller 64 that commands the actuator control 40 and the trigger control 42 to control the switches 24, 30 and 36 and the TVG devices 26, 32 and 38 consistent with the discussion herein. The signal processor 62 is in communications with a communications device 66 to receive voltage and current signals, status signals, etc. from other components in the network.
[0033] The TVG devices 26, 32 and 38 can be any TVG device suitable for the purposes discussed herein.
[0034] A pulse-triggering circuit 94 produces a sufficiently high-voltage/low-current pulse across the trigger gap 86 to initiate the plasma arc, which is then sustained for several hundred microseconds thereafter by a lower-voltage/higher-current pulse. In exemplary embodiments, the duration of the initial higher-voltage/lower-current pulse is a few microseconds and the duration of the lower-voltage/higher-current pulse is a few hundred microseconds. The geometry of the arrangement between the triggering electrode and its target surface is such that the initial pulse may be focused on a very small area on the electrode 82 so that the power density of the trigger pulse on the electrode surface is magnified and the electrical trigger energy transferred to the electrode leads to almost instantaneous vaporization of electrode material and transition of vapor into a dense plasma cloud 96 that expands towards the electrode 74 as a plasma plume and leads to electrical breakdown of the gap 86 and creation of a vacuum arc between the electrodes 82 and 84. Gap breakdown occurs based on the magnitude of the voltage differential between the electrodes 82 and 84 after the plasma cloud 96 is created. The electrode material may be chosen based on its triggering ability, i.e., its ablation ability under laser pulses, in conjunction with its vacuum arc interruption ability and dielectric strength in vacuum.
[0035] The following discussion provides additional analysis for determining the optimal time to perform a fast the pulse test without creating generator instability.
[0036]
where M is the angular momentum of the generator, δ is the angle between the rotor and stator of the generator, and ΔP is the change in power transfer capacity as a result of a fault.
[0037] When the fault occurs, the generator 18 accelerates from its steady state angle δ.sub.0 to angle δ.sub.1 at which point the fault is cleared. The generator 18 continues to slip until the energy gained in area 106 is absorbed in area 108, coming to the limit of its excursion at angle δ.sub.2, which is the equal area criterion, where the areas 106 and 108 are equal. Further analysis yields the critical clearing time that keeps angle δ.sub.1 at a value that can be compensated by the reconfigured system without leading to instability. Just as permitting clearing times to extend to their maximum will maximize the excursion of the generator rotor angle, so reducing clearing times below the critical value will lower the generator’s excursion.
[0038]
[0039] As system inertia falls, the swing equation leads to the conclusion that critical clearing times must also fall. However, forcing faster clearing times by reviewing protection and control practices could limit the effect of faults, and restoring un-faulted lines faster can permit the system to heal itself more rapidly.
[0040]
[0041]
[0042]
[0043] The foregoing discussion discloses and describes merely exemplary embodiments of the present disclosure. One skilled in the art will readily recognize from such discussion and from the accompanying drawings and claims that various changes, modifications and variations can be made therein without departing from the spirit and scope of the disclosure as defined in the following claims.