Internal and external coupling shear resistance locking control system and monitoring method of tunnel surrounding rocks
12492636 · 2025-12-09
Assignee
Inventors
- Dongdong Chen (Beijing, CN)
- Shuaishuai YUE (Beijing, CN)
- Shengrong XIE (Beijing, CN)
- Jun ZOU (Beijing, CN)
- Wenzhe GU (Beijing, CN)
- Yiquan WU (Beijing, CN)
- Lei ZHU (Beijing, CN)
- Chunyang TIAN (Beijing, CN)
- Sen YANG (Beijing, CN)
- Shikun XING (Beijing, CN)
- Hao PAN (Beijing, CN)
Cpc classification
International classification
Abstract
An internal and external coupling shear resistance locking control system and monitoring method of tunnel surrounding rocks, comprises an internal shear resistance and monitoring system of tunnel surrounding rocks, an external shear resistance and monitoring system of tunnel surrounding rocks, a relative shear displacement monitoring system of the tunnel walls and the roof and floor layers, and an anchor agent installation system; holes are expanded in the anchor cable drilling holes passing through coal-rock interface areas of the coal walls and roof and floor rock layers to form shear misalignment tolerance cavities; monitoring pressure values of measuring bags and liquid discharge in the shear misalignment tolerance cavities to determine shear deformations of the shear misalignment tolerance cavities, monitoring forces on anchor cables, compensating pull rods and shear resistance steel strips, and adjusting the shear resistance of the anchor cable and steel belt through the compensation rod structure.
Claims
1. An internal and external coupling shear resistance locking control system of tunnel surrounding rocks, the internal and external coupling shear resistance locking control system comprising: an internal shear resistance and monitoring system of tunnel surrounding rocks, an external shear resistance and monitoring system of tunnel surrounding rocks, a relative shear displacement monitoring system of tunnel walls and roof and floor layers, and an anchor agent installation system; wherein the internal shear resistance and monitoring system of tunnel surrounding rocks comprises a plurality of rows of shear misalignment tolerance cavities obliquely passing through transition zones between coal seams of the tunnel walls and roof rock layers or floor rock layers; both ends of the shear misalignment tolerance cavities are connected to anchor cable drilling holes; orifices of the anchor cable drilling holes are set at the tunnel walls; the shear misalignment tolerance cavities are installed with a shear misalignment partition monitoring system or filled with compressible elastic expansion materials; the internal shear resistance and monitoring system of tunnel surrounding rocks further comprises an elastic expansion material filling system for filling compressible elastic expansion materials; the elastic expansion material filling system comprises filling conduits for conveying the compressible elastic expansion materials; outlets of the filling conduits are located in the shear misalignment tolerance cavities; inlets of the filling conduits extend out of the anchor cable drilling holes and are located in the tunnel; and the filling conduits are connected to the anchor cables in the anchor cable drilling holes through elastic fixing belts; the shear misalignment partition monitoring system comprises shear misalignment extrusion partition measuring bags; the shear misalignment extrusion partition measuring bags are arranged in the shear misalignment tolerance cavities; the shear misalignment extrusion partition measuring bags comprise four symmetrical cavities and anchor channel holes for passing the anchor cables; constraint positioning belts are arranged at the anchor channel holes; each of the four symmetrical cavities is connected to independent conduits; inlets of the independent conduits extend out of the anchor cable drilling holes and are located in the tunnel; the independent conduits are connected to the anchor cables in the anchor cable drilling holes through elastic fixing belts; slots are arranged on the elastic fixing belts; the independent conduits are clamped in the slots; and at least one pressure gauge and at least one adjustable resistance flowmeter are arranged at the inlet of each of the independent conduits; the external shear resistance and monitoring system of tunnel surrounding rocks comprises shear resistance pallet structures, shear resistance steel strips, compensating pull rod structures, dynamometers, pressure gauges, and extrusion gauges; the shear resistance pallet structures are arranged at the orifices of the anchor cable drilling holes; and the shear resistance pallet structures are connected to the tunnel walls through the shear resistance steel strips, and the shear resistance pallet structures are connected to the compensating pull rod structures; middle parts of the shear resistance steel strips are provided with anchor holes, the shear resistance pallet structures comprise end shear resistant pallets, middle shear resistant pallets and transfer pallets; steel strip limit blocks are provided on both upper and lower parts of the shear resistance steel strips; end anchor holes and conduit channels for the independent conduits or the filling conduits to pass through are provided on the end shear resistant pallets; middle anchor holes are provided on the middle shear resistant pallets; transition zones between lower bottom surfaces and side surfaces of the end shear resistant pallets and the middle shear resistant pallets are arc shear zones; and pallet limit blocks are provided on the end shear resistant pallets; the transfer pallets are arranged on the end shear resistant pallets; circular anchor holes for passage of the anchor cables and the conduit channels for passage of the conduits or the filling conduits are provided on the transfer pallets; coupling spherical recesses are provided on the circular anchor holes; and the circular anchor holes are aligned with the end anchor holes; the compensating pull rod structures comprise middle compensating pull rods; anchor holes are provided in middle portions of the middle compensating pull rods; the anchor holes are aligned with middle anchor cable holes; both ends of the middle compensating pull rods are connected to end compensating pull rods through two-way locking nuts; the end compensating pull rods are connected to the transfer pallets through threads or hooks; the dynamometers for monitoring tensions of the middle compensating pull rods and the end compensating pull rods are provided on the compensating pull rod structures; the pressure gauges are configured for monitoring support extrusion pressures of the anchor cables vertically on the tunnel walls and are installed between the end shear resistance pallets and the transfer pallets; and the extrusion gauges are installed on contact sides of the steel strip limit blocks and the end shear resistance pallets; the relative shear displacement monitoring system of the tunnel walls and the roof and floor layers comprises two systems with the same structure: a relative shear displacement monitoring system of the tunnel walls and roof layers and a relative shear displacement monitoring system of the tunnel walls and floor layers; the relative shear displacement monitoring system of the tunnel walls and the roof and floor layers comprises shear misalignment measuring ruler rods; the shear misalignment measuring ruler rods are set on surfaces of the roof rock layers or the floor rock layers of the tunnel; one end of each of the shear misalignment measuring ruler rods are connected to top rock layers or bottom rock layers through embedded positioning anchor bolts, and another end of each of the shear misalignment measuring ruler rods are connected to the top rock layers or the bottom rock layers through pressure-releasing anchor bolts with pressure-releasing springs; inner slide grooves are provided in the shear misalignment measuring ruler rods; slide rods are provided in the inner slide grooves; the slide rods are connected to the inner slide grooves through ball bearings; telescopic reference rods are connected to bottom end portions of the slide rods; and indicator needles are connected to the telescopic reference rods; and the anchor agent installation system comprises a guide system and push protection tubes for passing anchor agents through the shear misalignment tolerance cavities; the guide system comprises guide clamping covers; guide clamping tubes are arranged in inner sides of the guide clamping covers; the guide clamping tubes are embeddedly connected with the push protection tubes; cover surfaces of the guide clamping covers are arc surfaces; a plurality of centering wings are provided on the cover surfaces of the guide clamping covers; unidirectional elastic clamping wings are provided on ends of the centering wings; the unidirectional elastic clamping wings comprises telescopic springs and clamping needles; ends of the clamping needles are hinged to the centering wings; the clamping needles are connected to the centering wings through the telescopic springs; top ends of the guide clamping covers are connected to guide double half balls through guide rods; and the guide double half balls are rotatably connected to the guide rods through rotating shafts.
2. A monitoring method for the internal and external coupling shear resistance locking control system of tunnel surrounding rocks of claim 1, the anchor cables comprising upper anchor cables and lower anchor cables, the anchor agents comprising upper anchor agents and lower anchor agents, the guide clamping tubes comprising upper guide clamping tubes and lower guide clamping tubes, the guide clamping covers comprising upper guide clamping covers and lower guide clamping covers, the push protection tubes comprising upper push protection tubes and lower push protection tubes, the guide rods comprising upper guide rods and lower guide rods, the guide double half balls comprising upper guide double half balls and lower guide double half balls, the guide system comprising an upper guide system and a lower guide system, the method comprising a first monitoring method using the shear misalignment extrusion partition measuring bags and a second monitoring method using compressible elastic expansion materials; wherein the first monitoring method comprises the following steps: step 1: forming anchor cable drilling holes in middle portions of the tunnel and installing the anchor cables into the anchor cable drilling holes; step 2: forming anchor cable drilling holes on upper sides of the tunnel walls to designed depths, and using hydraulic jet expansion or mechanical expansion equipment to expand the anchor cable drilling holes formed on the upper sides of the tunnel walls in the transition zones between the coal seams of the tunnel walls and the floor rock layers to form the shear misalignment tolerance cavities; wherein both ends of the shear misalignment tolerance cavities gradually narrows outwards; step 3: installing the upper anchor cables in the anchor cable drilling holes on the upper sides of the tunnel walls; connecting the supper anchor agents in series to inner sides of the upper guide clamping covers; setting the upper guide clamping tubes and the upper anchor agents inside the upper push protection tubes; installing the upper guide rods and the upper guide double half balls; pushing the upper anchor agents and the upper guide system to bottom portions of the anchor cable drilling holes on the upper sides of the tunnel walls through the upper push protection tubes, and then withdrawing the upper push protection tubes; step 4: before installing the anchor cables when forming the anchor cable drilling holes on the upper sides of the tunnel walls, fixing the shear misalignment extrusion partition measuring bags on the anchor cables; fixing the guide rods with the elastic fixing belts; after installing the anchor cables to the bottom portions of the anchor cable drilling holes on the upper sides of the tunnel walls, the shear misalignment extrusion partition measuring bags are located in the shear misalignment tolerance cavities; step 5: forming anchor cable drilling holes on lower sides of the tunnel walls to designed depths, and using hydraulic jet expansion or mechanical expansion equipment to expand the anchor cable drilling holes in the transition zones between the coal seams of the tunnel walls and the floor rock layers to form the shear misalignment tolerance cavities; step 6: installing the lower anchor cables in the anchor cable drilling holes on the lower sides of the tunnel walls; connecting the lower anchor agents in series to inner sides of the lower guide clamping covers; setting the lower guide clamping tubes and the lower anchor agents inside the lower push protection tubes; installing the lower guide rods and the lower guide double half balls; pushing the lower anchor agents and the lower guide system to bottom portions of the anchor cable drilling holes on the lower sides of the tunnel walls through the lower push protection tubes, and then withdrawing the lower push protection tubes; step 7: before installing the anchor cables when forming the anchor cable drilling holes on the lower sides of the tunnel walls, fixing the shear misalignment extrusion partition measuring bags on the anchor cables; fixing the guide rods with the elastic fixing belts; after installing the anchor cables to the bottom portions of the anchor cable drilling holes on the lower sides of the tunnel walls, the shear misalignment extrusion partition measuring bags are located in the shear misalignment tolerance cavities; step 8: at the orifices of the anchor cable drilling holes on the upper walls and the anchor cable drilling holes on the lower walls, installing the shear resistance steel strips, the extrusion gauges, the middle shear resistant pallets, the end shear resistance pallets, the pressure gauges, the transfer pallets, the anchor cables, the compensating pull rod structures, the dynamometers, and the adjustable resistance flowmeters in sequence; step 9: after tightening the compensating pull rod structures through the two-way locking nuts to make exposed anchor cable bodies parallel to axes of the anchor cable drilling holes, applying preload forces to the anchor cables to designed values; step 10: filling the shear misalignment extrusion partition measuring bags with liquid; step 11: installing the monitoring system for the shear displacement between the tunnel walls and the top layers at the intersections of the tunnel walls and top rock layers, and installing the monitoring system for the shear displacement between the tunnel walls and the floor layers at the intersections of the tunnel walls and the floor rock layers; and step 12: monitoring pressure values and liquid discharge volumes of the shear misalignment extrusion partition measuring bags, and determining shear and extrusion deformations of the shear misalignment tolerance cavities inside the surrounding rocks; monitoring changes in values of the pressure gauges of the anchor cables, changes in values of the dynamometers of the compensating pull rods, changes in numerical values of the extrusion gauges of the steel strip limit blocks, the shear displacement of the roof and floor layers relative to coal walls, evaluating the relative displacement of the tunnel walls and the roof rock layers and floor rock layers, and adjusting tension values of the compensating pull rods to reduce values of the extrusion gauges.
3. A monitoring method for the internal and external coupling shear resistance locking control system of tunnel surrounding rocks of claim 1, the anchor cables comprising upper anchor cables and lower anchor cables, the anchor agents comprising upper anchor agents and lower anchor agents, the guide clamping tubes comprising upper guide clamping tubes and lower guide clamping tubes, the guide clamping covers comprising upper guide clamping covers and lower guide clamping covers, the push protection tubes comprising upper push protection tubes and lower push protection tubes, the guide rods comprising upper guide rods and lower guide rods, the guide double half balls comprising upper guide double half balls and lower guide double half balls, the guide system comprising an upper guide system and a lower guide system, the monitoring method comprising the following steps: step 1: forming anchor cable drilling holes in middle portions of the tunnel and installing the anchor cables into the anchor cable drilling holes; step 2: forming anchor cable drilling holes on upper sides of the tunnel walls to designed depths, and using hydraulic jet expansion or mechanical expansion equipment to expand the anchor cable drilling holes formed on the upper sides of the tunnel walls in the transition zones between the coal seams of the tunnel walls and the floor rock layers to form the shear misalignment tolerance cavities; wherein both ends of the shear misalignment tolerance cavities gradually narrows outwards; step 3: installing the upper anchor cables in the anchor cable drilling holes on the upper sides of the tunnel walls; connecting the upper anchor agents in series to inner sides of the upper guide clamping covers; setting the upper guide clamping tubes and the upper anchor agents inside the upper push protection tubes; installing the upper guide rods and the upper guide double half balls; pushing the upper anchor agents and the upper guide system to bottom portions of the anchor cable drilling holes on the upper sides of the tunnel walls through the upper push protection tubes, and then withdrawing the upper push protection tubes; step 4: before installing the anchor cables when forming the anchor cable drilling holes on the upper sides of the tunnel walls, fixing the filling conduits to anchor cable bodies through the elastic fixing belts; wherein the outlets of the filling conduits are in the shear misalignment tolerance cavities; after installing the anchor cables, filling the compressible elastic expansion materials into the shear misalignment tolerance cavities through the filling conduits; step 5: forming the anchor cable drilling holes on lower sides of the tunnel walls to designed depths, and using hydraulic jet expansion or mechanical expansion equipment to expand the anchor cable drilling holes in the transition zones between the coal seams of the tunnel walls and the floor rock layers to form the shear misalignment tolerance cavities; step 6: installing the anchor cables in the anchor cable drilling holes on the lower sides of the tunnel walls; connecting the lower anchor agents in series to inner sides of the lower guide clamping covers; setting the lower guide clamping tubes and the lower anchor agents inside the lower push protection tubes; installing the lower guide rods and the lower guide double half balls; pushing the lower anchor agents and the lower guide system to bottom portions of the anchor cable drilling holes on the lower sides of the tunnel walls through the lower push protection tubes, and then withdrawing the lower push protection tubes; step 7: before installing the anchor cables when forming the anchor cable drilling holes on the lower sides of the tunnel walls, fixing the filling conduits to the anchor cable bodies through the elastic fixing belts; wherein the outlets of the filling conduits are in the shear misalignment tolerance cavities; after installing the anchor cables, filling the compressible elastic expansion materials into the shear misalignment tolerance cavities through the filling conduits; step 8: at-the orifices of the upper anchor cable drilling holes and the lower anchor cable drilling holes, installing the shear resistance steel strips, the extrusion gauges, the middle shear resistant pallets, the end shear resistance pallets, the pressure gauges, the transfer pallets, the anchor cables, the compensating pull rod structures, the dynamometers and the adjustable resistance flowmeters in sequence; step 9: after tightening the compensating pull rod structures through the two-way locking nuts to make exposed anchor cable bodies parallel to axes of the anchor cable drilling holes, applying preload forces to the anchor cables to designed values; step 10: filling the shear misalignment extrusion partition measuring bags with liquid; step 11: monitoring changes in values of the pressure gauges of the anchor cables, changes in values of the dynamometers of the compensating pull rod structures, changes in numerical values of the extrusion gauges of the steel strip limit blocks, the shear displacement of the roof and floor layers relative to coal walls, evaluating the relative displacement of the tunnel walls and the roof and floor layers, and adjusting tension values of the compensating pull rods to reduce values of the extrusion gauges.
Description
DESCRIPTION OF DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
(16)
(17)
(18)
(19)
(20)
(21)
(22)
DESCRIPTION OF REFERENCE NUMERALS
(23) 1, shear misalignment tolerance cavities; 2, anchor cable drilling holes; 3, tunnel; 4, anchor cable; 5, anchor; 6, top rock layer; 7, floor rock layer; 8, coal seam; 9, tunnel wall; 10, shear misalignment extrusion partition measuring bags; 11, conduit; 12, connector; 13, anchor channel hole; 14, constraint positioning belts; 15, elastic fixing belt; 16, slot; 17, end shear resistance pallet; 18, middle shear resistance pallet; 19, end anchor hole; 20, middle anchor holes; 21, pallet limit block; 22, arc shear resistance zone; 23, shear resistance steel strips; 24, steel strip limit block; 25, long anchor cable holes; 26, transfer pallet; 27, circular anchor hole; 28, conduit hole; 29, coupling spherical recess; 30, middle compensating pull rod; 31, two-way locking nut; 32, end compensating pull rod; 33, shear misalignment measuring ruler rod; 34, embedded positioning anchor bolt; 35, pressure-releasing spring; 36, pressure-releasing anchor bolt; 37, slide rod; 38, indicator needle; 39, telescopic reference rod; 40, ball bearing; 41, push protection tube; 42, guide clamping cover; 43, guide rod; 44, guide double half ball; 45, rotating shaft; 46, clamping tube; 47, centering wing; 48, one-way elastic clamping wing; 49, telescopic spring; 50, clamping needle; 51, anchor agent; 52, compensating pull rod structure; 53, adjustable resistance flowmeter; 54, pressure gauge; 55, filling conduit; 56, conduit channel; 57, long anchor hole; 58, dynamometer; 59, pressure gauge; 60, extrusion gauge; and 61, elastic expansion material.
EMBODIMENTS
(24) In order to make the disclosed purpose, technical solutions and advantages of the embodiments of the present invention more clear, the embodiments of the present invention will be further described in detail with the attached drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the embodiments of the present invention, and are not used to limit the embodiments of the present invention. Based on the embodiments in the present application, all other embodiments obtained by those of ordinary skill in the art without creative work belong to the protective scope in the present application. Examples of the embodiments are illustrated in the attached drawings, in which the same or similar reference numerals indicate the same or similar elements or elements having the same or similar functions throughout.
(25) It should be noted that the terms comprising and having and any variations thereof are intended to cover non-exclusive inclusion, for example, processes, methods, systems, products, or servers comprising a series of steps or units are not necessarily limited to comprising those steps or units explicitly listed, but may comprise other steps or units not explicitly listed or inherent to these processes, methods, products, or devices.
(26) Similar reference numerals and letters denote similar items in the attached drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
(27) In the description of the present invention, it should be noted that the terms upper, lower, inside, outside, etc. indicate directions or positional relationships based on the directions or positional relationships shown in the attached drawings, or are directions or positional relationships in which the inventive product is usually placed when in use. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the devices or elements referred to must have specific directions, be constructed and operated in specific directions, and therefore should not be understood as limitations on the present invention.
(28) in the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms arranged, installed, and connected should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
Embodiment 1
(29) The internal and external coupling shear resistance locking control system of tunnel 3 surrounding rocks in the present invention comprises an internal shear resistance and monitoring system of tunnel surrounding rocks and, an external shear resistance and monitoring system of tunnel surrounding rocks, a relative shear displacement monitoring system of the tunnel walls 9 and the roof and floor layers, and an anchor agent 51 installation system that can pass through the shear misalignment tolerance cavities 1;
(30) The internal shear resistance and monitoring system of tunnel surrounding rocks comprises a plurality of rows of shear misalignment tolerance cavities 1 obliquely passing through coal seams 8 of tunnel walls 9; a shear misalignment partition monitoring system inside the tunnel 3 surrounding rocks, and a compressible elastic expansion material filling system; as shown in
(31) The elastic expansion material filling system comprises filling conduits 55 and elastic fixing belts 15 for fixing the filling conduits 55; the filling conduits 55 are connected with the anchor cables 4 in the anchor cable drilling holes 2 through the elastic fixing belts 15; outlets of the filling conduits 55 are located in the shear misalignment tolerance cavities 1; after the anchor cables 4 are installed, the compressible elastic expansion materials 61 are filled into the shear misalignment tolerance cavities 1 through the filling conduits 55 to fill the whole shear misalignment tolerance cavities 1.
(32) The internal shear misalignment partition monitoring system comprises shear misalignment extrusion partition measuring bags 10, conduits 11, adjustable resistance flowmeters 53, elastic fixing belts 15 and pressure gauges 54. As shown in
(33) The external shear resistance and monitoring system of tunnel surrounding rocks comprise shear resistance pallet structure; shear resistance pallet structure are arranged at orifice of the anchor cable drilling holes 2, and are connected to the tunnel walls 9 through shear resistance steel strips 23, and are connected to the compensating pull rod structures 52. The shear resistance pallet structures comprise end shear resistance pallets 17, middle shear resistance pallets 18, and transfer pallets 26; and the transfer pallets 26 are arranged on the end shear resistance pallets 17. As shown in
(34) From the tunnel walls 9 to space of the tunnel 3, the shear resistance steel strips 23, the end shear resistance pallets 17, the middle shear resistance pallets 18, the transfer pallets 26, the middle compensating pull rods 30, the two-way locking nuts 31, the end compensating pull rods 32, anchors 5, anchor cables 4, dynamometers 58, pressure gauges 59 and extrusion gauges 60 are coupled to form the external shear resistance and the monitoring system of tunnel surrounding rocks; and the external shear resistance and the monitoring system of tunnel surrounding rocks and the internal shear resistance and the monitoring system of tunnel surrounding rocks jointly realize the internal and external coupling shear resistance locking control of tunnel 3 surrounding rocks.
(35) As shown in
(36) Monitored forces F.sub.L: the dynamometers 58 are provided on the compensating pull rod structures 52 for monitoring pulling forces of the compensating pull rod structures 52, and the forces are assumed to be F.sub.L; the forces F.sub.L are used to balance a portion of the component forces of the obliquely arranged anchor cables 4 along the tunnel walls 9 (parallel to the tunnel walls 9).
(37) Monitored forces F.sub.M: the pressure gauges 59 are installed between the end shear resistance pallets 17 and the transfer pallets 26 to monitor supporting extrusion pressures of the anchor cables 4 vertically on the tunnel walls 9, and the forces are assumed to be F.sub.M;
(38) Monitored forces F.sub.G: extrusion gauges 60 are installed at contact surfaces between the steel strip limit blocks 24 and the end resistance shear pallets 17 for monitoring forces transmitted by the anchor cables 4 obliquely arranged along the tunnel walls 9 to the shear resistance steel strips 23 along the tunnel walls 9, and the forces are assumed to be F.sub.G; the forces F.sub.G can prevent the anchor cable 4 bodies from tearing the long anchor cable holes 25 on the shear resistance steel strips 23 and preventing the anchor cable 4 bodies from being sheared by the long anchor cable holes 25 on the shear resistance steel strips 23; and
(39) Friction resistances f.sub.c: friction resistances between the end shear resistance pallets 17 and the shear resistance steel strips 23 and the surrounding rocks are f.sub.c; and f.sub.c can also balance a portion of the component forces of the anchor cables 4 obliquely arranged along the tunnel walls 9 of the tunnel 3.
(40) The anchor cables 4 bodies in the orifices of the anchor cable drilling holes 2 are subjected to complex forces and are easily broken and failed due to influence of combined tensile and shear stresses. Therefore, it is necessary to prevent the anchor cables 4 from strongly squeezing the surrounding rocks of the orifices of the anchor cable drilling holes 2, and at the same time prevent the anchor cables 4 bodies and the shear resistance steel strips 23 from strongly squeezing and shearing each other, and also prevent the anchor cables 4 from being subjected to excessive eccentric loads due to uneven force transmissions of the anchor cables 4 and the anchors 5, which reduces the support effects. This requires the compensating pull rod structures 52 to balance the external shear resistance system of the surrounding rocks of the tunnel 3 to play a key active role.
(41) (1) When
(42)
the compensating pull rod structures 52 completely bear the forces component of the anchor cables 4 obliquely arranged along the tunnel walls 9; in this case, the anchor cables 4 are in relatively good stress conditions and are not affected by the shear;
(43) (2) When
(44)
and F.sub.G=0, namely
(45)
pulling forces F.sub.L of the compensating pull rod structures 52, and friction resistances f.sub.c between the end shear resistance pallets 17 and the shear resistance steel strips 23 and the tunnel walls 9 completely bear the forces component of the anchor cables 4 obliquely arranged along the tunnel walls 9; in this case, the anchor cables 4 are in relatively good stress conditions and are basically not affected by the shear;
(46) (3) When
(47)
and F.sub.G>0, namely
(48)
pulling forces F.sub.L of the compensating pull rod structures 52, friction resistances f.sub.c and the forces F.sub.G of the shear resistance steel strips 23 along the tunnel walls 9 jointly bear the forces component of the anchor cables 4 obliquely arranged along the tunnel walls 9; in this case, to prevent F.sub.G from being too large, the forces Fi are actively adjusted and increased by the compensating pull rod structures 52, thereby reducing F.sub.G; the forces F.sub.L is used to balance the forces component of the anchor cables 4 obliquely arranged along the tunnel walls 9 to prevent the shear resistance steel strips 23 from being damaged due to excessive tensions; and it is best to adjust the forces F.sub.G to smaller values or zero.
(49) As shown in
(50) The relative shear displacement monitoring system of the tunnel walls 9 and floor layers and the relative shear displacement monitoring system of the tunnel walls 9 and top layers have the same structure and the main difference is installation positions. The shear misalignment measuring ruler rods 33 are attached to surfaces of the floor rock layer 7 of the tunnel 3, and axes of the shear misalignment measuring ruler rods 33 are arranged perpendicular to the tunnel walls 9; ends of the shear misalignment measuring ruler rods 33 close to the coal walls are fixed to the floor rock layers 7 of the tunnel 3 by the embedded positioning anchors 34, and the other ends of the shear misalignment measuring ruler rods 33 are fixed to the floor rock layers 6 of the tunnel 3 by the pressure-releasing anchor bolts 36 with the pressure-releasing springs 35; and the pressure-releasing springs 35 enable the shear misalignment measuring ruler rods 33 to have a certain ability to adapt to deformations of the floor layers of the tunnel 3.
(51) As shown in
(52) An internal and external coupling shear resistance locking monitoring method of tunnel 3 surrounding rocks in the present invention, comprising a first monitoring method using the shear misalignment extrusion partition measuring bags 10 and a second monitoring method using compressible elastic expansion materials 61; and as shown in
(53) Step 1: Carrying out the anchor cable drilling holes 2 in middle portions of the tunnel 3 according to conventional methods and installing the anchor cables 4 into the anchor cable drilling holes 2.
(54) Step 2: Carrying out the anchor cable drilling holes 2 on upper sides of the tunnel walls to designed depths; upward inclination angles of the anchor cable drilling holes 2 on upper sides of the tunnel walls should be 10-30 degrees and the anchor cable drilling holes 2 should pass through the coal-rock interface areas between the walls and the roof layers not less than 3 m; then using high-pressure hydraulic jet expansion or mechanical expansion equipment to expand the anchor cable drilling holes 2 in the transition zones between the coal seams of the tunnel walls and the floor rock layers to form the shear misalignment tolerance cavities 1; diameters of the shear misalignment tolerance cavities 1 should be 10-20 cm, and lengths of the shear misalignment tolerance cavities 1 should be 10-50 cm; and both ends of the shear misalignment tolerance cavities gradually narrows outwards.
(55) Step 3: Through the anchoring agent installation system, connecting the anchoring agents 51 in series to the inner sides of the guide clamping covers 42; setting the clamping tubes 46 and anchoring agents 51 inside the push protection tubes 41; then installing the guide rods 43 and the guide double half balls 44; pushing the anchoring agents 51 and the guide system to bottom portions of the anchor cable drilling holes 2 through the push protection tubes 41, and then withdrawing the push protection tubes 41.
(56) Step 4: Before installing the anchor cables when carrying out the anchor cable drilling holes on the upper sides of the tunnel walls, fixing the shear misalignment extrusion partition measuring bags 10 on the anchor cables 4 according to the designed lengths; fixing the conduits 11 with elastic fixing belts 15; and after installing the anchor cables 4 to the bottom portions of the anchor cable drilling holes 2, the shear misalignment extrusion partition measuring bags 10 should be located in the shear misalignment tolerance cavities 1.
(57) Step 5: Carrying out the anchor cable drilling holes 2 on lower sides of the tunnel walls to the coal-rock interface areas; using the high-pressure hydraulic jet expansion or mechanical expansion equipment to expand the anchor cable drilling holes 2 in the transition zones between the coal seams of the tunnel walls and the floor rock layers to form the shear misalignment tolerance cavities 1; the diameters of the shear misalignment tolerance cavities 1 should be 10-20 cm, and the lengths of the shear misalignment tolerance cavities 1 should be 10-50 cm; and both ends of the shear misalignment tolerance cavities gradually narrows outwards; downward inclination angles of the anchor cables 4 on lower sides of the tunnel walls should be 10-30 degrees; then carrying out the anchor cable drilling holes 2 to the designed depths; and the anchor cable drilling holes 2 should pass through the coal-rock interface areas between the coal walls and the floor layers not less than 3 m.
(58) Step 6: Installing the anchoring agents 51 according to Step 3.
(59) Step 7: Installing the shear misalignment extrusion partition measuring bags 10 and the anchor cables 4 according to Step 4.
(60) Step 8: Installing the shear resistance steel strips 23, the extrusion gauges 60, the middle shear resistant pallets 18, the end shear resistance pallets 17, the pressure gauges 59, the transfer pallets 26, the anchors 5, the compensating pull rod structures 52, the dynamometers 58, the pressure gauges 54 and the adjustable resistance flowmeters 53 in sequence.
(61) Step 9: After tightening the compensating pull rods through the two-way locking nuts 31 to make exposed anchor cable 4 bodies parallel to axes of the anchor cable drilling holes 2, applying preload forces to the anchor cables 4 to designed values.
(62) Step 10, Filling the shear misalignment extrusion partition measuring bags 10 with liquid; and after being filled with liquid, the shear misalignment extrusion partition measuring bags 10 can fill the shear misalignment tolerance cavities 1.
(63) Step 11: Installing the monitoring system for the shear displacement between the tunnel walls 9 and the top layers and the monitoring system for the shear displacement between the tunnel walls and the floor layers respectively at the intersections of the tunnel walls and the top and floor rock layers of the tunnel 3.
(64) Step 12: Monitoring pressure values of the shear misalignment extrusion partition measuring bags 10 and liquid discharge volumes, and determining shear and extrusion deformations of the shear misalignment tolerance cavities 1 inside the surrounding rocks; monitoring changes in values of the pressure gauges of the anchor cables 4, changes in values of the dynamometers of the compensating pull rods 58, changes in numerical values of the extrusion gauges 59 of the steel strip limit blocks 24, analyzing shear conditions of the anchor cables 4 inside the surrounding rocks, and comparing relationship between values of
(65)
and (F.sub.L+F.sub.G); when the forces F.sub.G are too large, it is necessary to tighten the two-way locking nuts 31 to increase the compensating pulling forces Fz of the compensating pull rod structure 52, thereby reducing F.sub.G to reduce burdens on the shear resistance steel strips 23, avoid the anchor cables 4 being affected by shearing of the shear resistance steel strips 23, and avoid the anchor cables 4 being affected by squeezing and shearing of the surrounding rocks at the orifices of the anchor cable drilling holes 2.
(66) As shown in
(67) It is not necessary to install the shear misalignment extrusion partition measuring bags 10 in all of the shear misalignment tolerance cavities 1 of the entire tunnel 3, so when geological conditions do not change much, it is advisable to install a group of the shear misalignment extrusion partition measuring bags 10 for every 10 to 20 rows of the anchor cables 4, so as to evaluate the deformations of the shear misalignment tolerance cavities 1 in the areas; when the geological conditions change greatly, it is advisable to install a group of the shear misalignment extrusion partition measuring bags 10 for every 5 to 10 rows of the anchor cables 4, so as to evaluate the deformations of the shear misalignment tolerance cavities 1 in the areas. Step 1: Same as Step 1 of the implementation method; Step 2: Same as Step 2 of the implementation method; Step 3: Same as Step 3 of the implementation method; Step 4: Before installing the anchor cables 4, the filling conduits 55 are fixed to the anchor cable 4 bodies through the elastic fixing belts 15; the outlets of the filling conduits 55 are in the shear misalignment tolerance cavities 1; after the anchor cables 4 are installed, the compressible elastic expansion materials 61 are filled into the shear misalignment tolerance cavities 1 through the filling conduits 55 to fill the entire shear misalignment tolerance cavities 1; Step 5: Same as Step 5 of the implementation method; Step 7: Installing the anchor cables 4 in the anchor cable drilling holes 2 and fill in the compressible elastic expansion materials 61 according to Step 4; Step 8: Same as Step 1 of the implementation method; Step 9: Same as Step 2 of the implementation method; Step 10: Same as Step 3 of the implementation method; Step 11: The same as step 12 of the implementation method; but there is no need to monitor pressure values and liquid discharge situation of the shear misalignment extrusion partition measuring bags 10.
Embodiment 2
(68) The Embodiment 2 is almost the same as Embodiment 1; the difference is that the method of the present invention is used with internal pressure relief of the tunnel walls 9, that is, a set of internal pressure relief cavities is implemented inside the tunnel walls 9, 3 to 10 meters away from bottom portions of the anchor cable holes 4; as a part of external anchors of the tunnel 3, the method of the present invention forms a coupling control system of external anchoring and internal pressure relief of the tunnel walls for controlling the deformations of the surrounding rocks.
(69) Therefore, the present invention adopts the above-mentioned internal and external coupling shear resistance locking control system and the monitoring method of tunnel 3 surrounding rocks, which solves the problem of easy breakage and failure of the anchor cables 4 when the anchor cables 4 are arranged obliquely on the tunnel walls 9 inside and outside the surrounding rocks, and realizes internal and external coupling shear resistance locking control and monitoring of the tunnel 3 surrounding rocks, which has very broad and important promotion and application value.
(70) Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit them. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that they can still modify or replace the technical solutions of the present invention with equivalents, and these modifications or equivalent replacements cannot cause the modified technical solutions to deviate from the spirit and scope of the technical solutions of the present invention.