CCR BENEFICIAL USE STRUCTURE FOR A PUMPED STORAGE FACILITY USING IN-SITU COAL COMBUSTION RESIDUALS WITH ENGINEERING MEASURES
20260022527 ยท 2026-01-22
Inventors
Cpc classification
International classification
Abstract
Beneficial use structures are disclosed that include coal combustion residuals (CCR) mixed with liquids and other materials to form a structural material, and adapted to be compacted for use in the formation of the beneficial use structure. Various structures having beneficial uses are described including a pumped hydroelectric facility. A method of constructing an impoundment includes: consolidating and compacting at least a portion of coal combustion residual (CCR) of a CCR installation; constructing an impoundment for water storage at least partially on top of the CCR installation; and applying engineering measures to the impoundment. An impoundment for water storage includes a berm and a barrier and applied engineering measures. The impoundment is constructed using at least a portion of coal combustion residual (CCR) of a pre-existing CCR installation.
Claims
1. A method, comprising: consolidating and compacting at least a portion of coal combustion residual (CCR) of a CCR installation; constructing an impoundment for water storage at least partially on top of the CCR installation; and applying engineering measures to the impoundment.
2. The method of claim 1, wherein the CCR installation comprises a non-elevated base.
3. The method of claim 1, wherein the CCR installation comprises an elevated base.
4. The method in claim 1, wherein the CCR installation is pre-existing, and wherein the impoundment is at a lowest elevation of the pre-existing CCR installation.
5. The method in claim 1, wherein applying engineering measures to the impoundment comprises applying an encapsulation.
6. The method in claim 5, wherein the encapsulation comprises a bio-geopolymer.
7. The method in claim 1, wherein applying engineering measures at least partially eliminates post-closure release of liquids as run-off to the ground or surface waters or to the atmosphere.
8. The method in claim 1, wherein applying engineering measures to the impoundment comprises providing a barrier.
9. The method in claim 8, wherein the barrier comprises a bio-geopolymer.
10. The method in claim 1, further comprising dewatering the CCR installation.
11. The method in claim 1, wherein the impoundment comprises CCR.
12. The method in claim 1, wherein constructing an impoundment comprises constructing a berm.
13. The method in claim 1, wherein the berm comprises CCR.
14. An impoundment for water storage comprising: at least one of a berm and a barrier; and engineering measures applied to the at least one of a berm and a barrier, wherein the at least one of a berm and a barrier comprises, and is constructed at least in part using, at least a portion of coal combustion residual (CCR) of a pre-existing CCR installation.
15. The impoundment in claim 14, wherein the impoundment is at a lowest elevation of the pre-existing CCR installation.
16. The impoundment in claim 14, further comprising a cover over at least part of the at least one of a berm and a barrier.
17. The impoundment in claim 16, wherein further comprising water stored above the cover.
18. The impoundment in claim 14, wherein the engineering measures comprise a bio-geopolymer.
19. A hydroelectric facility comprising: an impoundment for water storage comprising at least one of a berm and a barrier, and engineering measures applied to the at least one of a berm and a barrier; and a hydroelectric generator in fluid communication between the impoundment for electrical power production, wherein the at least one of a berm and a barrier comprises, and is constructed at least in part using, coal combustion residual (CCR) of a pre-existing CCR installation.
20. The hydroelectric facility in claim 19, wherein the engineering measures at least partially eliminate release of water stored in the impoundment as run-off to the ground or surface waters or to the atmosphere.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0033]
[0034]
[0035]
[0036]
[0037]
[0038]
[0039]
[0040]
[0041]
[0042]
[0043]
[0044]
[0045]
[0046]
[0047]
[0048]
[0049]
[0050]
[0051]
[0052]
[0053]
DETAILED DESCRIPTION OF PREFERRED EMBODIMENTS
[0054] More specifically, the present invention relates to utilization and construction of containment structures and mine reclamation projects using specialty design mixes made from encapsulated CCRs and other industrial byproduct materials. The mix designs described in this application have application in load bearing, improved/encapsulation, roller-compacted concrete (RCC) and carbon capture flowable fill materials. All of the mix designs have been developed so that the US EPA guidelines for beneficial use of industrial non-hazardous materials are achieved or exceeded. In addition, to mix designs that safely and effectively contain potential contaminants in CCRs and other industrial byproduct materials, this invention provides guidelines for ensuring beneficial use through encapsulation and mitigation of the leaching potential of harmful contaminants. This is accomplished by following the Final CCR Rule, Apr. 17, 2015, and the US EPA Methodology for Evaluating Beneficial Uses of Industrial Non-Hazardous Secondary Materials, April 2016 [2, 3] and applicable standard guides from American Society of Test Materials E-50 Committee. This invention achieves the four criteria for beneficial use as defined by the US EPA: (1) The CCR must provide a functional benefit; (2) The CCR must substitute for the use of a virgin material, conserving natural resources that would otherwise need to be obtained through practices such as extraction; (3) the use of CCR must meet relevant product specifications, regulatory standards or design standards when available, and when such standards are not available, CCR is not used in excess quantities; and (4) the proposed application is an encapsulated use of CCR as defined by the US EPA Final CCR Rule.
[0055] In order to achieve suitable encapsulation of CCRs and other deleterious materials, the mix design and applications for this invention follows the required US EPA requirements. Specifically encapsulated beneficial uses are those where the material is bound in a solid matrix that minimizes mobilization of heavy metals and other deleterious constituents into the surrounding environment. Examples of encapsulated uses include, but are not limited to: aggregate in concrete; a replacement for or raw material used in production of, cementitious components in concrete or bricks; filler in plastics, rubber and similar products; and raw material in the manufacture of a product such as wallboard.
[0056] One of the key aspects of this invention is the practical application of US EPA methodologies for verifying protection of the environment and the required characteristics to qualify as a beneficial use as defined by the US EPA Final CCR Rule. Following this Rule, will pre-qualify or pre-screen the uses identified in this patent by identifying the limiting factors that would influence the scoping, siting and impact analysis for the CCR material or site under consideration. This is accomplished by pre-testing (i.e. using the LEAF test methods of SW-846) the CCR material so that the leaching characteristics are controlled or mitigated. This pre-project testing and evaluation for this invention is expected to include: [0057] (1) verification that deleterious substances and/or metals in the materials are bound in a solid material or solid-like material; [0058] (2) site-specific scoping and site selection is appropriate from the US EPA impact analysis perspective, and [0059] (3) offering guidelines for site characterization that are consistent with approved US EPA methodologies such that mobilization of deleterious constituents to the surrounding environment is controlled and/or eliminated.
[0060] Since mortar materials used in load bearing walls, RCC dams and mine reclamation projects can require the use of aggregates to obtain sufficient strength, this invention includes and incorporates the use of fine sand and coarse aggregates developed from CCR, and other industrial byproducts, or commercially available aggregates. The invention includes offering design guidelines and installation methods so that the aggregates, products and containment structures are considered encapsulated products either by pre-testing or by following US EPA methodologies. This method includes developing mix designs that achieve the three primary characteristics of strength, durability, and reduced permeability and leaching potential.
[0061] The design features for this invention are unique because they will be tested and applied not only for resistance to weathering and providing adequate strength, but also for protection of the environment. This application of the principle of durability is outlined in documents provided by the US EPA on the use and application of the LEAF protocol for site assessment, evaluation of materials and design. In addition to strength, the materials in the mix designs for this invention will minimize or prevent the leaching and migration of deleterious constituents from the CCRs and/or industrial byproduct materials into the surrounding environment.
[0062] The invention recognizes that pre-existing patents may exist for lightweight aggregates and other application of CCR materials in the fields of road, dam and building construction. The disclosure of this application provides an integrated approach that utilizes existing technology and industry-recognized methods in novel ways for improving concrete material to maximize the beneficial use of CCR and other industrial byproduct materials while providing an innovative approach for the use of CCR materials.
[0063] Each year in the United States over one hundred million tons of coal combustion ash is generated and must be used or disposed of in some manner. Approximately half of the ash is now disposed of by on-site landfilling. However, some small part of the ash is used as a component in building materials mainly cast-in-place concrete or concrete pavement roadways. (See American Coal Ash Association (ACAA) Coal Combustion Product (CCP) Production & Use Survey Report, 2013 and 2015)
[0064] Other potential uses for fly ash and other CCRs have been surveyed by the ACAA and include structural fills, roadway embankments, mine reclamation, underground mine backfilling, and as a cement replacement-concrete, agriculture uses, and many others. The physical and chemical composition and characteristics of coal combustion fly ash and other CCRs can vary depending upon the type of coal that is burned and the type of combustion equipment and the conditions of combustion. The most common types of coal ash are class F fly-ash (ASTM C-618-15, Class F; finely divided residue produced from burning anthracite or bituminous coal); fluidized bed combustion (FBC) ash (produced from burning coal with limestone in a fluidized bed combustion furnace); and class C fly ash ASTM Designation No. C618-15, a finely divided residue produced from burning lignite or sub-bituminous coal and having a lime content that is typically higher than 10%). More complete descriptions of the types, properties and composition of various types of coal combustion ash have been provided in, for example, Material and Research Society Proceedings, Volumes 43, 113, 136 and 178.
[0065] One use of CCR disclosed in this application is for load-bearing walls, and walls made from mortar mixes with a high CCR content. Load-bearing walls and concrete members are proposed utilizing general guidelines established in technical articles by Ohio State University, the US Bureau of Reclamation for RCC Dams, and the National Precast Concrete Association. Elevated percentages of coal fly ash as a cement replacement is known to increase the workability, decrease the water/cement ratio, and increase durability of the concrete mix (Coal Combustion Products Utilization Handbook, WE Energies, 2013). Typical percentages of Type F or Type C coal fly ash as a portion of the cement range from 15 to 30 percent for moderate replacement and 30 to 50 percent for high replacement in precast structures. For cast in place load bearing walls, the CCR or fly ash replacement percentage can be increased to 50 to 70 percent depending on the requirements for early strength of the concrete or mortar mix and the need to control cracking caused by hydration of the cementitious materials.
[0066] The compressive strength of the different mix designs utilizing fly ash range from 3,000 to 4,000 psi for load bearing walls depending on the percentages of aggregate, fly ash, water and cement that are used. As disclosed in this application, the percentage of CCR content for load bearing walls would be dependent on the thickness of the load bearing wall, the surcharge load applied to the wall and the width and length of the bearing surface of pre-cast concrete members. Some embedment of steel and/or a special keyway locking structure may be required depending on the lateral forces developed from the geotechnical global slope stability evaluation. These products and methods relating to load bearing structures will require verification that the mix design, structural design, and site-specific application will be required to meet the three primary performance criteria of strength, durability and reduction in permeability/leaching potential.
[0067] Another proposed use of CCR's as disclosed allows the use of CCRs as the main component of RCC dams for containment of compacted CCRs and/or as the buttress for a large CCR structural fill project.
[0068] The United States Bureau of Reclamation (USBR) Manual entitled Roller-Compacted Concrete Design and Construction Considerations for Hydraulic Structures, 2005 indicates an acceptable percentage of coal fly ash and other CCRs for this type of application as high as 50 to 70 percent. The elevated percentage of CCRs as compared to Portland cement is possible because the CCRs serve as both a cement material replacement and a fine aggregate material. A higher percentage of fly ash can result in reduced strength. Accordingly, a limiting factor may be the load bearing capabilities of the CCR and RCC structure when evaluated using conventional geotechnical design and slope stability evaluation methods.
[0069] When this invention or method is used as an RCC containment wall that supports water and/or a surcharge load of fly ash or backfill material, a complete geotechnical investigation including foundation design and global slope stability analysis will need to be conducted so that the RCC design and site-specific-application will meet the three primary performance criteria of strength, durability and reduction in permeability/leaching potential.
[0070] A third application according to the disclosure of this application includes the use of encapsulated CCRs in a specialty mix design that can function as the aggregate and cementitious component for the construction of a stable mine reclamation material. The use of CCRs in mine reclamation has been well documented in design guidelines and numerous case studies by State agencies and the US Office of Surface Mining Reclamation and Enforcement (OSMRE). This method will address many of the concerns and consideration in previous OSMRE documents by pre-testing and pre-design to verify strength, durability and reduction in permeability and leaching potential of deleterious constituents from CCRs.
[0071] The dual purpose of the encapsulated flowable fill material made of CCRs with a predetermined percentage of cement and/or lime and specialty additives enables the material to be used to: [0072] (1) reclaim mine with a mix that provides adequate strength to support unstable areas; [0073] (2) provide a balanced mix that has suitable flow characteristics for top down or injection installation to bridge unstable areas of the mine while maintaining sufficient durability to reduce the potential for acid mine drainage; [0074] (3) has a low enough permeability to provide reduced leaching potential and to contain deleterious constituents in the solidified, encapsulated mix, and [0075] (4) if required to provide a sufficient open-graded or air entrained cementitious material that is a stable matrix for carbon capture.
[0076] Typical percentages of coal fly ash and other CCRs for the mine reclamation application would range from 70 to 90 percent depending on the pozzolanic activity of the coal fly ash and design requirement for the mine reclamation. When a method according to this disclosure is used for above ground or below ground mine reclamation, the mix design and site-specific methods will be required to address applicable State mine reclamation guidelines and the requirements of the Surface Mining Control and Reclamation Act of 1977.
[0077] The novel approach of this invention is to create contaminant structures to create a renewable energy storage area while providing remediation of an industrial material that is required to meet strict regulatory requirements.
[0078] The mix designs for the three uses outlined above involve high replacement percentages of cement with CCRs, and a reduction in the amount of water required by increasing the percentage of coal fly ash and other CCRs that are utilized. The use of coal fly ash in concrete and mortar mix designs is an established and effective approach that has been well understood for many years and documented in numerous industry papers. Recent developments using very high percentages of coal fly ash and other CCRs in concrete and mortar mix design have indicated that strength is increased and workability is improved with increasing amounts of coal fly ash to reduce the required amount of manufactured Portland cement. The amount of coal fly ash used in a mix design is dependent on the strength and workability requirements that must be tested on a project and site-specific basis.
[0079] Containing and/or encapsulating heavy metals and other deleterious constituents in structures or materials a component of the novel approach of this invention is recommended by the US EPA when structures with high percentages CCRs or coal fly ash are applied in the natural environment. The leaching potential of heavy metals from concrete and/or cementitious structures are best measured by performing a series of leaching potential tests according to the Leaching Environmental Assessment Framework (LEAF) developed by Vanderbilt University for the US EPA. For purposes of this invention, the concrete or mortar mix designs will be developed to provide adequate containment as determined by an acceptable reduction in the leaching potential of heavy metals as determined by the LEAF protocol and applicable sections of US EPA SW-846.
[0080] For development of this invention and its application in loading bearing walls or structures, the following mix design parameters are provided using the design principles from the US Bureau of Reclamation, Ohio State University. The mix designs for this invention are unique because they achieve a balance of the three primary characteristics of strength, durability and reduced permeability/leaching potential.
[0081] The use of coal fly ash and other CCRs in the concrete mix is designed achieve strength, workability, durability, reduction in permeability and containment of CCRs to provide an energy storage system. The United States Bureau of Reclamation (USBR) has developed guidelines for the use of coal fly ash in RCC dams and the process for optimizing the percentage of coal fly ash in RCC mix designs. Notable case studies by the USBR at the Upper Stillwater Dam, in 1987 indicated high durability, low permeability RCC mix design using fly ash to cement replacement percentage as high as 68 percent. The USBR Manual Roller Compacted Concrete Design and Construction Considerations for Hydraulic Structures provides guidelines for developing RCC mix proportions that optimize the use of coal fly and performance of the structures based on: [0082] (a) compressive strength and elastic properties, [0083] (b) cement plus pozzolan content and cement to pozzolan ratio, [0084] (c) thermal properties; and [0085] (d) durability.
[0086] With regard to the use of RCC dam mix designs for this invention, the novel approach includes optimizing the mix design to provide containment, encapsulation and prevention of leaching of heavy metals and other deleterious constituents to the natural environment. For the RCC dam mix design used by this invention, determining the durability and leaching potential of the aggregate used in the RCC dam containment structure will also be required. This will be accomplished by testing hardened specimens of the RCC mix for leaching potential and raising or lowering the amount of coal fly ash and cement content to achieve a mix that has the required compressive strength and reduction in the leaching potential of heavy metals and other deleterious constituents to the natural environment. The RCC mix design for this invention is unique because it achieves a balance of the three primary characteristics of strength, durability and reduced permeability/leaching potential.
[0087] Because the quality of the fly ash can vary depending on location and method of combustion, the strength, durability and reduced permeability of the mix designs will be verified by testing prior to final design or application. Since the construction of RCC dam structures for containment of water and CCR requires development and use of quality control procedures in the field, application of the novel features of this disclosure will also include development and use of mix designs that utilize hydrophobic chemicals such as organosilanes and other permeability reducing additives. The use and optimization of these materials and additives for controlling leaching potential from CCRs and coal fly ash materials used in structural fills and mine reclamation has been established by previous research. Preserving Structural Fill and Mine Reclamation as Acceptable Beneficial Reuse of CCRs, Hardin and Daniels, 2011. Recognizing that the cementitious qualities of coal fly ash and other CCRs vary, project specific RCC mix designs must be developed to optimize strength and ensure adequate containment of heavy metals and other deleterious constituents. The following tables from USBR literature are incorporated as part of the technical basis for RCC dam mix designs for this invention. It is recognized that additional testing will be required to provide the combination of strength, durability and reduction in leaching potential that is one of the novel components of this invention.
[0088] The State of Pennsylvania from 1970 to 2000 implemented several innovative mine reclamation projects that utilized a wide variety of coal ash and other industrial byproducts. Since 1982, the Pennsylvania Department of Environmental Protection (PADEP) has administered an extensive coal mine reclamation plan that has provided guidelines for mine stabilization using fly ash stabilized with cement, lime and a variety of industrial byproduct materials. Many of these guidelines are available through the U.S. Office of Surface Mining Reclamation and Enforcement (OSMRE). The focus of many of these guidelines is to safely stabilize a coal mine with flowable mix designs that can be placed from the surface.
[0089] This invention provides a coordinated use of the mine reclamation mix designs available from the OSMRE in conjunction with improvement measures that create some porosity, while maintaining adequate long-term stability and encapsulation. This is accomplished by utilizing chemical additives that work with the inherent properties of coal fly ash, while maintaining the cementitious and pozzolanic properties of cement. This invention will require testing and validation of mine reclamation stabilization (OSMRE methods), carbon absorption potential (CREAT system, patented by Dr. S. Chen in China), and the encapsulation as measured by the US EPA Leachability Environmental Assessment Framework (LEAF) protocol. The test methods developed as part of the CREAT system are already being used effectively in other parts of the world, and this invention will allow application of these methods for carbon capture utilizing large volumes of CCRs in a manner that meets the requirements of the US EPA. The mix design for this invention is unique because it achieves a balance of the three primary characteristics of strength, durability and reduced permeability/leaching potential.
[0090] The properties necessary to cost-effectively stabilize coal mines, absorb CO2 and encapsulate metals are all enhanced by a mix of fly ash, lime and/or cement. The percentages of each additive depend on the unique properties of the coal fly ash and the site-specific characteristics present at the mine that is reclaimed. This invention utilizes existing technologies with an optimized or specially designed mix of fly ash and cement to create the required performance. The US EPA Methodology for Evaluating Beneficial Uses of Industrial Non-Hazardous Secondary Materials, April 2016, provides a framework for applying these technologies in a manner that enhances environmental protection and ensures beneficial use of industrial byproduct materials.
[0091] According to one embodiment of the invention, the structural material is adapted for use as a load-bearing wall, and is comprised of between approximately 25 and 50 percent CCR, 25 and 50 percent water and 25 and 14 percent cement.
[0092] According to another embodiment of the invention, the structural material is adapted for use as a roller-compacted cement/CCR mixture, and includes between approximately 50 and 75 percent CCR, 25 and 50 percent cement and a minor percent of additives.
[0093] According to another embodiment of the invention, the structural material is adapted for use for mine reclamation encapsulation and carbon sequestration and includes between approximately 50 and 63 percent CCR, 22 and 9 percent cement and 21 and 37 percent water.
[0094] According to another embodiment of the invention, the beneficial use structure is a survival bunker, and includes an interior volume defined by sloped sidewalls and a planar top that together define a truncated pyramid structure, and having blast-deflecting characteristics defined by a solid volume thickness of the sloped sidewalls and planar top. The solid volume thickness of the bunker is constructed of a coal combustion residue (CCR)-based material. A base is provided on which the sloped sidewalls and planar top are constructed, and a plurality of survival living areas in the interior volume of the bunker are provided on the base and reached by respective entrance/exit tunnels formed through the CCR-based material. Air intake and exhaust plenums extend between the survival living areas and outside the bunker to maintain appropriate oxygen levels in the bunker, and at least one multi-fuel generator is provided for providing electric current to the survival living areas, including at least one fuel supply facility for supplying fuel to the generator.
[0095] According to another embodiment of the invention, a water storage stepwell is provided and is defined by a vertical shaft within an area of the bunker and adapted to accumulate water from any source for use by bunker occupants. The planar top of the bunker is sloped towards the stepwell to promote drainage of water accumulating on the top of the bunker. The stepwell includes an array of narrow steps along one side of the stepwell that permit entry into the stepwell and allow access to the entire stepwell.
[0096] According to another embodiment of the invention, the stepwell includes a drain at a bottom of the stepwell that is adapted to deliver water under gravitational pressure to a generator to generate electricity.
[0097] According to another embodiment of the invention, the beneficial use structure is a compost pit, and includes an interior volume defining a solid volume thickness of the composting pit constructed of CCR-based material. A predetermined number of compost pits are embedded within the interior volume, each having a top opening, solid sidewalls and a bottom, and sized to receive a predetermined quantity of compostable material. Each compost pit has at least one drain in the bottom that connect to drain conduits that permit controlled drainage as required to maintain proper moisture and temperature of the material being composted. At least one air pump is provided and is adapted to force air under pressure into the compost pits through an air conduit.
[0098] According to another embodiment of the invention, a ramp constructed of CCR is provided for allowing access by containers to the compost pits from a position below the top opening.
[0099] According to another embodiment of the invention, the CCR is a material selected from the group of materials consisting of roller compacted CCR, poured-in-place concrete or a composite of roller compacted CCR and concrete.
[0100] According to another embodiment of the invention, the beneficial use structure is a pumped water storage reservoir that includes a base constructed of compacted CCR to increase the height of the storage facility to a predetermined amount above surrounding terrain and thereby provide for greater stored potential hydro energy. A water storage impoundment is constructed on the base from a material selected from the group of materials consisting of at least one layer of roller-compacted concrete or strengthened CCR. Drains are positioned in a bottom of the impoundment and conduits are connected for water flow from the drains. At least one hydroelectric pump/generator is connected to the conduits for receiving water outflow from the impoundment to generate electricity for use during peak use periods to supplement electricity generated by conventional electric utility generators and in low utilization periods to pump water into the impoundment through the drains.
[0101] According to another embodiment of the invention, the beneficial use structure is a compressed air energy storage facility that includes a housing constructed of CCR and a mixture of binding materials that bind the CCR into a stable, airtight matrix. A plurality of storage containers are provided for receiving and storing a gas in a compressed state. At least one compressor is provided for compressing the gas and delivering the gas to the horizontal and vertical storage containers through feed pipes.
[0102] According to another embodiment of the invention, the beneficial use structure is a carbon sequestration/mineral carbonation facility that includes a containment enclosure including a base having tapered walls constructed of strengthened CCR in a mixture with materials that fill interstices between the CCR particles with material that is stable and does not permit leakage of sequestered material from the facility. A plurality of sequestration beds are positioned within the enclosure, and a two stage filter section is provided that includes a first stage with a relatively coarse filtration material and a second filter section with a relatively fine filtration material adapted to provide a progressive filtration effect across a large surface area to remove particulates and gas components of pressurized coal plant emissions that are injected into the containment enclosure through supply conduits. Vents communicate with the sequestration beds to allow filtered gases to be vented from the sequestration beds.
[0103] According to another embodiment of the invention, the beneficial use structure is a pumped hydroelectric facility adapted for use with a lock system of a waterway and includes a base constructed of compacted CCR and positioned on a terrain for increasing the elevation of the hydroelectric facility about the lock system of the waterway. A water impoundment having raised walls constructed of a material is provided and selected from the group consisting of compacted concrete and compacted low leaching and low permeability strengthened CCR. A lock filling piping system is provided that interconnects the water impoundment with the lock system of the waterway for increasing the fill rate of the lock system to permit an increased rate of transit of vessels through the lock system. Intake pipes are positioned upstream of the lock system for receiving water from the waterway, and a hydroelectric generator/pump facility is provided for receiving water from the intake pipes and generating electricity from movement of the water from the intakes pipes through the hydroelectric generator/pump facility.
[0104] According to another embodiment of the invention, the hydroelectric generator/pump facility is connected to impoundment fill piping for receiving water from the waterway and pumping the water into the impoundment for storage and use for increasing the fill rate of the lock system.
[0105] Referring now to the drawings, a survival bunker 10 with stepwell according to one preferred embodiment of the invention is illustrated in
[0106] The solid volume of the bunker 10 is formed of CCR-based materials according to the examples provided in this application. The bunker 10 is supported on a base 16, which will typically comprise the existing ground. The bunker 10 includes survival condominiums 18 and 20, which are comprised of a predetermined number of living areas. The condominiums 18 and 20 are reached by respective entrance/exit tunnels 22, 24 formed through the CCR material. Exits 26, 28 provide alternative emergency exits from the condominiums 18 and 20 if one or both of the entrance/exit tunnels 22, 24 are blocked or otherwise unavailable.
[0107] Primary air intake and exhaust plenums 30, 32 maintain appropriate oxygen levels in the bunker 10 and vent carbon dioxide, combustion gases and other air contaminants. Fuel storage tanks 22 and 34 provide fuel to the enclosure 10 to operate all fuel-consuming equipment and are capable of storing and feeding multiple types of fuel, as required. The bunker 10 includes multi-fuel generators for providing electric current to all electrical equipment. In addition, external electric current can be supplied by suitable conduits and transmission equipment exterior to the bunker 10.
[0108] The bunker 10 includes a water storage stepwell 34 that can be used to accumulate water from any source for use by the bunker occupants. The top surface 36 of the bunker 10 is sloped towards the stepwell 34 to promote drainage of water accumulating on the top surface 36 of the bunker 10. The stepwell 34 includes a vertical shaft from which water is drawn and the surrounding inclined subterranean passageways, chambers and steps, which provide access to the stepwell 34. Stepwells are known from antiquity in other contexts and are typically formed by a zig-zag array of narrow steps 38 along one side of the stepwell 34 that permit entry into the stepwell 34 and allow access to the entire stepwell 34 without the use of ladders or conventional, wide stair steps. Sec https://en.wikipedia.org/wiki/Stepwell #Details.
[0109] The stepwell 34 may include a waterproof entrance/exit 40 from the condominium 20 into the stepwell 34. The stepwell 34 includes an overflow drain 42. In addition, the stepwell 34 may be used to generate electricity by allowing water to flow out of the bottom of the stepwell 34 through an outflow conduit 44 into a turbine generator 46 which generates electricity and then exits the generator 46 through a generator drain 48.
[0110] Preferably, the bunker 10 is covered by an overburden of either soil or a synthetic material, which may have a camouflage appearance. The overall shape of the bunker 10 may be contoured to correspond to surrounding topographical features. Of course, dimensions of the bunker 10 are variable within a wide range. The CCR constituents and relevant strength and density values for the load-bearing structures of
[0111] Referring now to
[0112] Each compost pit 54 has one or more drains 56 in the bottom that connect to drain conduits 58 that are controlled by valves (not shown) that permit controlled drainage as required to maintain proper moisture and temperature of the material being composted. Air pumps 60 force air under pressure to the compost pits through air conduits 62 that force air under pressure into the bottom of the compost pits 54 through vents 64 and convey the air to suitable biofilters. Preferably, the compost pits 54 are covered by respective airtight removable tops 66. See
[0113] The compost pits 54 are accessed, for example, by a ramp 70,
[0114] Referring now to
[0115] A water storage impoundment 84 is constructed on the base 82, having its own angle of repose which may be the same, or different than that of the base 82. The walls 85 of impoundment 84 are formed of roller-compacted concrete or strengthened CCR, or multiple layers of each of these materials. While the impoundment 84 may be filled from the top, either by inflow from rivers, water supply conduits and/or rainfall, the preferable utility is achieved by utilizing the construction as a pump/storage system. As shown in
[0116] Because of the status of CCR as a waste product that is easily shaped and compacted, it can be used to construct bases and similar structures having a wide range of sizes and shapes that can be conformed to size and space requirements of the surrounding land. The relevant strength and density values for the base 82 of
[0117] Referring to
[0118] The CCR constituents and relevant strength and density values for the load-bearing structures of
[0119]
[0120] These filtration sections 148 and 150 provide a progressive filtration effect across a vastly large surface area, removing particulates and gas components of pressurized coal plant emissions that are injected into the containment enclosure 142 through supply conduits 152. The emissions flow from the second filtration section 150 and pass under pressure into sequestration sections 154 that are comprised of fly ash, sorbents and catalysts for enabling carbon-based gases such as carbon monoxide and carbon dioxide to be sequestered over a long period of time.
[0121] Filtered gases are vented from the sequestration sections 154 through vents 156. When the sequestration beds 144 are exhausted and require removal and replacement, the doors 146 are removed and the contents of the sequestration beds removed and replaced. The strengthened CCR enables a containment enclosure 142 of indeterminate size to be inexpensively constructed utilizing a waste material to achieve a beneficial effect. The vertical height of the sequestration beds may be varied as necessary to accommodate the overall height of the containment enclosure 142.
[0122] Another facility 170 for capturing and sequestering carbon-based materials is shown in
[0123] The containment enclosure 172 is constructed of strengthened CCR rendered airtight with the addition of a mixture of other materials that bind the CCR into a stable, airtight matrix. The mixture may include materials according to a formulation that fills the interstices between the CCR particles with material that is stable and does not permit the passage of a gas at or below a specified pressure. See Table 1. The enclosure 172 includes spaced-apart arrays of structural components 174 formed of CCR reinforced with steel or other components. The interior volume of the enclosure 172 is filled with carbon capture materials 176, which may be aggregates of various sizes together with catalyst materials. Carbon-based emissions are conveyed to the enclosure 172 through conduits 178 that feed the emissions under pressure to the carbon capture materials 176 at spaced-apart intervals along its length. Filtered gases suitable for release into the environment are discharged through stacks 180. As shown in
[0124] As is shown in
[0125] Referring now to
[0126] Locks and dams located on the major navigable river waterways in the United States are widely known to be in desperate need of repair and or replacement. A large number of coal-fired power plants are located directly adjacent to or nearby these navigable waters. Many of the locks and dams in the United States were built in the 1930s or before, and the original design life of most locks and dams when they were constructed was 50 years. The current and historical lack of infrastructure funding to repair and/or replace these locks and dams, and lack of maintenance and repair causes delays in river traffic in location such as the Ohio River near Pittsburgh, PA due to repairs taking place on its locks and dams. Unless these problems are solved, situations of this type will become progressively worse. There is a demand for repair and replacement of existing locks and dams on the nation's river systems, to increase capacity, timeliness and efficiency of cargo traffic that can be solved in large measure by using CCR as a means of cost-effectively maintaining and repairing riverine structures.
[0127] As shown in
[0128] As is best shown in
[0129] When a vessel passes through a lock on, for example, the Mississippi River south of Illinois, it takes approximately 1 hour and 30 minutes to raise the vessel once the lock gates are closed when it is traveling from the downstream side of the lock to the upstream side. With a vessel on the Ohio River, it takes approximately 45 minutes once the lock gates are closed to raise the vessel when traveling from the downstream side of the lock and dam to the upstream side.
[0130]
[0131] A key ancillary feature is the ability of the impoundment 194 to supply water to power the hydroelectric generator 208 with an intake structure to create the energy to pump water from the river to the water storage facility. As shown in the drawings, water from the impoundment 194 can be discharged through the piping system 202 that interconnects through valves, not shown, with the run of the river intake/penstock water intake piping structure 204 to feed the hydroelectric generator 208 and thereby produce electricity. During periods of low electricity usage, water from upstream of the lock 198, can be taken from the river by the run of the river intake/penstock water intake piping structure 204 and delivered to the generator 208. This water can be used to either generate electricity for the electric grid, or used to power a pump that pumps water from the river through a conduit 212 up into the impoundment 194 for use during peak electricity demand periods.
[0132] Thus, energy from off-site renewable sources such as wind and/or solar, the hydroelectric system described above, or conventional coal, or natural gas electrical power sources can be used to pump water into the impoundment for storage until needed for production of power at times as required during peak demand.
[0133] The CCR constituents and relevant strength and density values for the load-bearing structures of
[0134] The more flowable mixes should have less cracking and lower permeability. Less compressive strength, lower cement content of a mix in general makes a more ductile mix that has less potential for cracking. It will allow the CCR mix to act like a liner and a structural component.
[0135] Having these different types of mix designs, brackets and expands the range of uses and provides flexibility in the design. The CCR mix that would be used on a specific project will be verified by leachability, compressive strength and durability testing during the design phase of each project.
[0136] According to one embodiment, disclosed herein is a beneficial use structure, including coal combustion residuals (CCR) mixed with water and a binder to form a structural material, and adapted to be compacted for use in the formation of the beneficial use structure. In some examples, the beneficial use structure is a pumped water storage reservoir, including: (a) a base constructed of compacted CCR to increase the height of the storage facility to a predetermined amount above surrounding terrain and thereby provide for greater stored potential hydro energy; (b) a water storage impoundment constructed on the base and constructed from a material selected from the group of materials consisting of at least one layer of roller-compacted concrete or strengthened CCR; (c) drains positioned in a bottom of the impoundment; (d) conduits connected for water flow from the drains; and (c) at least one hydroelectric pump/generator connected to the conduits for receiving water outflow from the impoundment to generate electricity for use during peak use periods to supplement electricity generated by conventional electric utility generators and in low utilization periods to pump water into the impoundment through the drains. Further, in some examples, the beneficial use structure is a pumped hydroelectric facility adapted for use with a lock system of a waterway, including: (a) a base constructed of compacted CCR and positioned on a terrain for increasing the elevation of the hydroelectric facility about the lock system of the waterway; (b) a water impoundment having raised walls constructed of a material selected from the group consisting of compacted concrete and compacted low leaching and low permeability strengthened CCR; (c) a lock filling piping system that interconnects the water impoundment with the lock system of the waterway for increasing the fill rate of the lock system to permit an increased rate of transit of vessels through the lock system; (d) intake pipes positioned upstream of the lock system for receiving water from the waterway; and (e) a hydroelectric generator/pump facility for receiving water from the intake pipes and generating electricity from movement of the water from the intakes pipes through the hydroelectric generator/pump facility. In one particular example, the hydroelectric generator/pump facility is connected to impoundment fill piping for receiving water from the waterway and pumping the water into the impoundment for storage and use for increasing the fill rate of the lock system.
[0137] In some examples, the structural material is adapted for use as a load-bearing wall, and is comprised of between approximately 25 and 50 percent CCR, 25 and 50 percent water and 25 and 14 percent cement. In some examples, the structural material is adapted for use as a roller-compacted cement/CCR mixture, and is comprised of between approximately 50 and 75 percent CCR, 25 and 50 percent cement and a minor percent of additives. In some examples, the CCR is a material selected from the group of materials consisting of roller compacted CCR, poured-in-place concrete or a composite of roller compacted CCR and concrete. In some examples, the beneficial use structure is a compressed air energy storage facility, including: (a) a housing constructed of CCR and a mixture of binding materials that bind the CCR into a stable, airtight matrix, (b) a plurality of storage containers for receiving and storing a gas in a compressed state; and (c) at least one compressor to compress the gas and to deliver the gas to the horizontal and vertical storage containers through feed pipes.
TABLE-US-00001 TABLE 1 Load Bearing Wall -- CCR Specialty Mix Designs Target Fly Sand Water- Compressive Water Cement Fly Ash Ash to or Fine Course Cement/ Mix Design -- Strength Density Content Content Content Cement Aggregate Aggregate Fly Ash Application
(psi)
(lb/ft3)
(lb/yd3)
(lb/yd3)
(lb/yd3)
Percent
(lb/yd3)
(lb/yd3)
Ratio
Load Bearing -- 3,500
144.1
166
135
290
68.2%
2100
1200
0.39
Bottom Ash Aggr
Load Bearing -- 4,000
147.0
170
135
135
50.0%
1230
2300
0.63
Standard Mix
Load Bearing -- 1,200
118.9
300
100
300
75.0%
2500
10
0.75
Flowable Mix
TABLE-US-00002 TABLE 2 Encapsulated RCC Dam -- CCR Specialty Mix Designs Bottom Target FGD or Fly Ash, Sand Percentage Water- Compressive Water Cement Fly Ash Ash to or Fine Course of Catalyst Cement/ Mix Design Strength Density Content Content Content Cement Aggregate Aggregate or Fly Ash Application
(psi)
(lb/ft3)
(lb/yd3)
(lb/yd3)
(lb/yd3)
Percent
(lb/yd3)
(lb/yd3)
Additives
Ratio
USBR Upper 4,000
147.0
166
134
291
68.5%
1,148
2,231
3.0%
0.39
Stillwater Dam
USBR Upper 4,000
148.4
150
159
349
68.7%
1,171
2,178
3.0%
0.30
Stillwater Dam
RCC Dam - 3,500
144.1
166
135
290
68.2%
2,100
1,200
3.0%
0.39
High Fly Ash Mix
RCC Dam - 4,000
147.0
170
135
135
50.0%
1,230
2,300
3.0%
0.63
Standard Mix
Load Bearing -- 1,200
118.9
300
100
300
75.0%
2,500
10
3.0%
0.75
Flowable Mix
TABLE-US-00003 TABLE 3 Encapsulated Mine Reclamation and Carbon Sequestration - CCR Specialty Mix Designs Target Bottom Sand Water- Compressive Water Cement FGD or Fly Fly Ash or Fine Course Percentage Comment/ Mix Design Strength Density Content Content Ash Content to Cement Aggregate Aggregate of Catalyst Fly Ash Application (psi) (lb/ft3) (lb/yd3) (lb/yd3) (lb/yd3) Percent (lb/yd3) (lb/yd3) or Additive Ratio PA -- OSM Field Less than 153.0 800 282 1900 87.1% 1,148 0 3.0% 0.37 Office - 1980 to 1997 500 psi PA -- OSM Field Less than 129.5 458 340 1375 80.2% 1,323 0 3.0% 0.27 Higher Strength Mix 1,000 psi Mine Reclamation 3,000 144.5 166 135 300 69.0% 2,100 1,200 3.0% 0.38 Aggregate Mix Mine Reclamation 1,200 129.6 300 100 400 80.0% 2,500 200 3.0% 0.6 Carbon Capture Note: 1) PA OSM. To be Verified from other sources and 2) Propietary additives developed by Dr. S. Chen provide encapsulation of carbon and metals.
[0138] Disclosed herein is a novel use of CCR in the construction of a CCR beneficial use structure, related to the construction of a CCR pond for a pumped-storage hydro facility, which is distinct from existing CCR technology. In response to a 2018 ruling by the United States Court of Appeals for the District of Columbia Circuit, the Environmental Protection Agency (EPA) classified unlined coal residual units, which were interpreted as being units that do not have composite liner preventing leakage into the soil as open dumps. As a result, such locations were required to initiate closure by Apr. 11, 2021. See Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals from Electric Utilities; A Holistic Approach to Closure Part A: Deadline to Initiate Closure, 85 Fed. Reg. 53516, 53517 (Aug. 8, 2020). Electrical Utilities petitioned to leave CCR in place, put a synthetic liner over the CCR and leave the CCR in contact with ground water. The EPA provided an exemption to the requirement to close by Apr. 11, 2021 if the owner/operator could establish (1) that [n]o alternative disposal capacity is available on or off-site of the facility, and (2) that the owner or operator remains in compliance with all of the other requirements of the coal residuals regulations. 40 C.F.R. 257.103(a)(1)(i),(iii). Those facilities that received an extension, however, were not allowed to operate beyond Oct. 15, 2024. Id. 257.103(f)(1)(vi),(vii). Despite applications for an extension, some facilities were denied an extension. In some cases, one of the reasons the extension was not granted was because the extension applications did not discuss any engineering measures taken to ensure that the groundwater had been removed from the unit prior to the start of installing the final cover system, as required by 40 C.F.R. 257.102(d)(2)(i). Given the potential for groundwater to infiltrate the coal residual unit and for coal residuals to dissolve in the water and migrate out of the unit, the EPA determined that the requirement to demonstrate how those units had been closed in a manner that would [c]ontrol, minimize or eliminate, to the maximum extent feasible, post-closure infiltration of liquids into the waste and releases of [coal residuals], leachate, or contaminated run-off to the ground or surface waters or to the atmosphere had not been satisfied. 40C.F.R. 257.102(d)(1)(i).
[0139] On Jun. 28, 2024 the UNITED STATES COURT OF APPEALS for the District of Columbia issued a court ruling in Electric Energy, Inc. v. EPA, No. 22-1056 (D.C. Cir. 2024) directly concerning the federal CCR rule. The court reviewed rules under which the EPA may require [operators] to implement engineering measures designed to interrupt any contact between the groundwater and coal residuals in the relevant unit and that a 2015 Rule requires unit operators closing surface impoundments with waste in place to eliminate free liquidsliquids that readily separate from the solid portion of a waste under ambient temperature and pressure, 40 C.F.R. 257.53from the impoundment before installing the final cover system. Id. 257.102(d)(2)(i). Specifically, the 2015 Rule, was interpreted such that operators cannot close their surface impoundments with groundwater leaching in and out of the unit and mixing with the coal residuals. EPA's proposed action contemplates enforcing those closure standards by requiring the unit's operator to discuss the engineering measures taken before installation of the cover system to ensure that the groundwater had been removed from the unit, and to describe the steps taken to control water and waste flow in and out of the surface impoundment. Electric Energy, Inc. v. EPA at 15. The court determined that the mandate in section 257.102(d)(1) that units control, minimize or eliminate . . . post-closure infiltration of liquids into the waste appears in a set of requirements applicable to the closure of the coal residual unit as a whole. 40 C.F.R. 257.102(d)(1)(i). Further the court held that the EPA did not amend the 2015 Rule when it asserted that a self-supporting concrete settling tank system is a coal residual surface impoundment within the meaning of 40 C.F.R. 257.53. Section 257.53 defines a surface impoundment as a natural topographic depression, man-made excavation, or diked area, which is designed to hold an accumulation of [coal residuals] and liquids. 40 C.F.R. 257.53 Electric Energy, Inc. v. EPA at 18. Further, the court held that unit operators could not close surface impoundments with coal residuals saturated in groundwater. Id. at 23. The EPA considers groundwater to be a liquid under the existing regulation and that a closed, unlined impoundment, where the [coal residual] remains in groundwater several feet deep did not meet the requirements of 257.102(d). Id. at 25. As a result of these holdings, the unit's operator will be required to discuss the engineering measures taken before installation of a cover system in order to ensure that the groundwater had been removed from the unit. Further, the unit's operator must describe the steps taken to control water and waste flow in and out of the surface impoundment. By taking these steps to demonstrate the engineering measures taken to ensure groundwater had been removed from the unit and steps to control water and waste flow into and out of the surface impoundment, this would enable the CCR ponds to be closed and the CCR to be left in place while in contact with ground water. The CCR can be dewatered and still be in contact with groundwater and/or remain under the water table. The engineering measures provide a barrier to meet the requirements.
[0140] The 2015 Rule dictates how coal residual units must close when the site is deemed an open dump. A unit owner may close the site either by leaving the [coal residuals] in place and installing a final cover system designed to minimize infiltration and erosion, or by remov[ing] the coal residuals and decontaminat[ing] the unit. 40 C.F.R. 257.102(a), (d)(3). When the unit owner opts to close with coal residuals in place, the 2015 Rule imposes two requirements that are particularly relevant to these petitions. First, the Rule mandates that, at a minimum, the unit close in a manner that will (a) [c]ontrol, minimize or eliminate, to the maximum extent feasible, post-closure infiltration of liquids into the waste; (b) control, minimize, or eliminate releases of [coal residuals], leachate, or contaminated run-off to the ground or surface waters or to the atmosphere; and (c) [p]reclude the probability of future impoundment of water, sediment, or slurry in the unit. Id. 257.102(d)(1)(i)-(ii). Second, the Rule dictates that, before installing the final cover system over the unit, [f]ree liquids must be eliminated by removing liquid wastes or solidifying the remaining wastes and waste residues. Id. 257.102(d)(2)(i). The 2015 Rule, standing on its own, makes clear that operators cannot close their surface impoundments with groundwater leaching in and out of the unit and mixing with the coal residuals. However, if the unit's operator demonstrates the engineering measures taken before installation of the cover system to ensure that the groundwater had been removed from the unit, and describes the steps taken to control water and waste flow in and out of the surface impoundment, then the operators could close with the residuals in place.
[0141] Various mix designs, such as a biogeopolymer-uses a biomass produced oil with minerals mixed with CCR, Geopolymer-a mixture of alkaline liquid blended with high silica and aluminum CCR to form a non-Portland cement, lime (can optionally be added to speed curing and decrease leachability) and Microbially Induced Calcite Precipitation MICP/bio-cement (a mixture of microbes and nutrients to form Calcium Carbonate/Calcites) may be used to encapsulate CCR in-situ. Cement, lime, boiler slag, bentonite, organo silanes, concrete with waterproof admixtures, and other materials and/or additives may be used for encapsulation of in situ CCR. In another process, encapsulation installation methods can include cutter soil mixing, paddle wheel soil mixing, pressure injection and/or other commercially available processes, separately or in combination, to encapsulate CCR in-situ. Other existing mix designs are also possible.
[0142] Disclosed herein is an embodiment in which CCR ponds can be consolidated if necessary, compacted if necessary, and de-watered to the optimum water content for in-situ encapsulation methods. In some instances, existing installation sites, such as those depicted by FIG. 17 of U.S. Provisional Patent Application No. 63/673,244, incorporated herein by reference, may have ponds that vary in size, but such locations are typically over 100 acres in size, with some that are even larger than 500 acres in size. These ponds can be at various depths of water and CCR, which can vary greatly from site to site. Some ponds appear dry but at certain depth they are in the ground water.
[0143] Different mix designs, including but not limited to those described above, can be used in different portions of the CCR pond, depending on structural strength requirements, leachability requirements and permeability requirements for each area of the CCR pond and the CCR beneficial use structure to be constructed. One possible engineering method is to use a mix-design and encapsulation method that encapsulates the bottom, sides and top of a CCR pond and leaves unencapsulated (or a different type of mix design) CCR in the mass center core.
[0144] The disclosed systems are distinct from the systems disclosed by U.S. Pat. No. 10,301,223, which is incorporated herein by reference. As shown in
[0145] A power house 214B is operatively connected to the pump/generator 216A to convey power to and from a utility grid 216C. For example, the hydroelectric pump/generator 216A can receive water outflow from the upper impoundment 214A to generate and supply electricity to the grid 216C for use during peak use periods, to supplement electricity generated by conventional electric utility generators of the grid, and in low utilization periods to pump water resupplying the upper impoundment 214A through the conduit 214C.
[0146] The facility is illustrated as including also solar power collectors 216D and wind driven generators 216E, each operatively connected to the power house 216B and pump/generator 216A. The power output of the solar power collectors 216D and wind driven generators 216E can supplement the grid and to power resupply of the upper impoundment 214A.
[0147]
[0148]
[0149]
[0150] As stated in the specification above, many different types of materials can be used to encapsulate and solidify the CCR material, and to construct barriers for the bottom, sides and top, all of which, to varying degrees, will decrease the hydraulic conductivity, increase the compressive strength, and solidify the CCR minimizing its leachability.
[0151] In at least one embodiment, a reservoir 260 is constructed partially over existing CCR 262 and partially over existing soil 264 as in
[0152] According to one embodiment of the invention, the water impoundment is constructed on top of CCR with engineering measures implemented to reduce contamination of the existing CCR on the water impoundment. A judicial decision regarding disposal or repurposing of CCR defines engineering measures as actions aimed to control, minimize or eliminate to the maximum extent feasible. A non-limiting example of an engineering measure to reduce contamination of the CCR on the water impoundment would be to place a synthetic liner on the existing CCR installation before construction of the water impoundment. In this embodiment, the water impoundment can have any elevation relative to the surrounding areas.
[0153] According to another embodiment of the invention, water is removed from an existing water impoundment installation constructed from at least partly CCR. The remaining CCR is then consolidated and compacted. Using engineering measures, a new water impoundment is constructed on top of the consolidated and compacted CCR. The new water impoundment can be constructed from many different types of materials including CCR.
[0154] In one embodiment, a method is described to dewater, consolidate and compact an existing CCR pond installation, using engineering measures to meet the current court ruling and construct a lower pond on top of the CCR non-elevated base (or slightly elevated base). In some designs, the reservoir could be within the CCR impoundment at a lower elevation than is currently existing. The water impoundment on top of the CCR lower pond base could be constructed from many different types of materials-most commonly strengthen CCR or Roller Compacted Concrete.
[0155] According to another body of this invention, a geothermal energy system can be constructed using piping placed inside of the water impoundment or inside of the mass of CCR. In some embodiments, the piping can be in both the impoundment water and the CCR mass. The piping can be vertical or horizontal and can be continuous or in section for ease in repair in maintenance.
[0156] A number of structures utilizing CCR as a structural component with other components are described above. Various details of the invention may be changed without departing from its scope. Furthermore, the foregoing description of the preferred embodiments of the invention and the best mode for practicing the invention are provided for the purpose of illustration only and not for the purpose of limitation.