METHOD FOR INTEGRAL PROFILE CONTROL AND PLUGGING OF WATER ENCROACHMENT AND STEAM CHANNELING OF HEAVY OIL RESERVOIR WITH EDGE AND BOTTOM WATER
20220316305 · 2022-10-06
Inventors
Cpc classification
International classification
Abstract
Disclosed is a method for performing integral plugging control on water invasion and steam channeling of an edge-bottom water heavy oil reservoir. The method for performing integral plugging control on water invasion and steam channeling of an edge-bottom water heavy oil reservoir comprises the following steps: (1) selecting an oil reservoir; (2) arranging a huff-puff well; (3) performing steam huff-puff development; and (4) performing integral plugging control. An integral plugging control technology is used for the method, a high-strength nitrogen foam system is injected by means of well rows at different positions in the oil reservoir, and effective plugging walls are formed at different positions from the edge-bottom water to reduce water invasion and steam channeling.
Claims
1. A method for integral profile control and plugging of water encroachment and steam channeling of a heavy oil reservoir with edge and bottom water, comprising the following steps: (i) selecting an oil reservoir: roughly screening an appropriate oil reservoir according to the following conditions: the oil reservoir is a heavy oil reservoir with edge and bottom water, the viscosity of stock tank oil at 50° C. is less than 100000 mPa s, a buried depth of the oil reservoir is less than 1000 m, an effective thickness is greater than 5 m, an initial oil bearing saturation is greater than 0.5, a penetration rate is greater than 200 mD, and a volume ratio of a water body to an oil layer is less than 500; (ii) arranging huff-puff wells: drilling the huff-puff wells in the oil layer according to a row-well pattern, wherein the huff-puff wells are vertical or horizontal wells; determining the number of well rows according to an area of the oil reservoir, wherein at least 3 columns of huff-puff well rows are arranged in the oil layer, a distance between two adjacent columns of well rows is 100-150 m, and a distance between two adjacent huff-puff wells in each column of well rows is 100-150 m; one column of well rows close to water body is a first line of well rows, followed by a second line of well rows and a third line of well rows, and so on, and a distance between the first line of well rows and the water body is greater than 150 m; (iii) developing through cyclic steam stimulation: firstly beginning a first cycle of cyclic steam stimulation, wherein a steam injection volume for the first line of well rows is 1000-1200 t, a steam injection volume for the second line of well rows is 1500-1800 t, and a steam injection volume for the third line of well rows is 2000-2200 t; after the steam injection, soaking the wells for 3-5 days, and after the soaking, opening the wells for production, wherein a ratio of a fluid output of the first line of well rows to a cold water equivalent volume of the injected steam is less than 5; a ratio of a fluid output of the second line of well rows to a cold water equivalent volume of the injected steam is less than 10; a ratio of a fluid output of the third line of well rows to a cold water equivalent volume of the injected steam is less than 20; and huff-puff parameters of a next cycle are consistent with those of the first cycle; (iv) carrying out the integral profile control and plugging: with the increase of huff-puff cycles, the formation pressure drops gradually, water encroachment and steam channeling occur, an integral profile control and plugging technology is adopted, and specific operations are as follows: (a) after a moisture content of the first line of well rows is greater than 90%, injecting a high-intensity nitrogen foam system at the same time of a steam injection phase of the first line of well rows, reducing a cyclic steam injection volume of the first line of well rows to 800-1000 t, injecting nitrogen with the steam in a whole process, wherein an injection volume is calculated according to a gas-to-liquid ratio of foam formed downhole of 2:1; and after soaking the wells for 3-5 days, carrying out oil recovery; (b) injecting a nitrogen foam system at the same time of steam injection of the second line of well rows, wherein a concentration of a foaming agent is 0.5%; a steam injection volume of the second line of well rows is 1500-1800 t; injecting the nitrogen with the steam in the whole process, wherein a nitrogen injection volume is calculated according to a gas-to-liquid ratio of the foam formed downhole of 3:1; and after the steam injection is finished, increasing well soaking time to 5-6 days, and then opening the wells for production; and (c) injecting the nitrogen foam system at the same time of the steam injection of the third line of well rows, wherein the concentration of the foaming agent is 0.5%; a steam injection volume of the third line of well rows is 1500-2500 t; injecting the nitrogen with the steam in the whole process, wherein the nitrogen injection volume is calculated according to a gas-to-liquid ratio of the foam formed downhole of 4:1; and after the steam injection is finished, increasing the well soaking time to 6-8 days, and then opening the wells for production.
2. The method for integral profile control and plugging of water encroachment and steam channeling of the heavy oil reservoir with edge and bottom water according to claim 1, characterized in that the high-intensity nitrogen foam system in the step (4) adopts a solid particle reinforced foam system or a high-temperature resistant gel foam system.
3. The method for integral profile control and plugging of water encroachment and steam channeling of the heavy oil reservoir with edge and bottom water according to claim 2, characterized in that a concentration of solid particles in the solid particle reinforced foam system is 0.5%-1%, and the concentration of the foaming agent is 0.5%.
4. The method for integral profile control and plugging of water encroachment and steam channeling of the heavy oil reservoir with edge and bottom water according to claim 3, characterized in that the solid particles in the solid particle reinforced foam system adopt coal ash, clay particles or nano particles.
5. The method for integral profile control and plugging of water encroachment and steam channeling of the heavy oil reservoir with edge and bottom water according to claim 2, characterized in that the high-temperature resistant gel foam system comprises a high-temperature resistant gel plugging agent injected into a stratum and nitrogen foam injected at the same time of cyclic steam stimulation.
6. The method for integral profile control and plugging of water encroachment and steam channeling of the heavy oil reservoir with edge and bottom water according to claim 5, characterized in that the high-temperature resistant plugging agent adopts tanning extracts or temperature-sensitive gel.
7. The method for integral profile control and plugging of water encroachment and steam channeling of the heavy oil reservoir with edge and bottom water according to claim 5, characterized in that an injection amount of the high-temperature resistant gel plugging agent is 30-50 t.
8. The method for integral profile control and plugging of water encroachment and steam channeling of the heavy oil reservoir with edge and bottom water according to claim 5, characterized in that the concentration of the foaming agent in the high-temperature resistant gel foam system is 0.5%.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0024]
[0025]
[0026]
DETAILED DESCRIPTION OF THE EMBODIMENTS
[0027] The present disclosure is described in detail below in combination with embodiments.
Embodiment 1
[0028] A method for integral profile control and plugging of water encroachment and steam channeling of a heavy oil reservoir with edge and bottom water includes the following steps: [0029] (1) An oil reservoir is selected: a block is a heavy oil reservoir with edge and bottom water, an oil containing area is 6.0 km.sup.2, a viscosity of stock tank oil at 50° C. is 3983 mPa s, a buried depth of the oil reservoir is 940 m, an effective thickness is 7 m, an initial oil bearing saturation is 0.65, a penetration rate is 2520 mD, and a volume ratio of a water body to an oil layer is 350; [0030] (2) Huff-puff wells are arranged: the huff-puff wells are drilled in the oil layer according to a row-well pattern, the huff-puff wells are horizontal wells; the number of well rows is determined according to an area of the oil reservoir; 3 columns of huff-puff well rows are arranged in the oil layer; as shown in
[0033] The method adopts the integral profile control and plugging technology, specific operations of which are as follows: [0034] 1) After two huff-puff cycles of the first line of well rows (#1, #2 and #3), the moisture content is increased to 92% from preliminary 35%, and at the time, the water body completely encroaches into the first line of wells; in a steam injection phase of the third cycle of cyclic steam stimulation of the first line of well rows, a high-temperature resistant gel foam system is injected at the same time; and the high-temperature resistant gel foam system includes a high-temperature resistant gel plugging agent injected firstly into a formation and nitrogen foam injected at the same time of the cyclic steam stimulation. The high-temperature resistant gel plugging agent adopts tanning extracts. An injection amount of the high-temperature resistant gel plugging agent is 30 t; the nitrogen foam is injected at the same time of the steam injection; and a concentration of the foaming agent is 0.5%. A periodic steam injection volume of the first line of well rows is reduced to 800 t, the nitrogen is injected with the steam in the whole process, the injection volume is calculated according to a gas-to-liquid ratio of foam formed downhole of 2:1, and the calculated nitrogen injection volume is 96000 m.sup.3; then after the wells are soaked for 5 days, oil recovery is carried out; and when a ratio of fluid output of the first line of well rows to a cold water equivalent volume of the injected steam is 5, the wells are shut in, that is, the fluid output of the first line of wells is 4000 m.sup.3. The injected high-intensity nitrogen foam system may form high-intensity plugging walls in the first line of well rows; the high-intensity plugging walls may slow down the encroachment of the water body; and at the same time, the steam injection volume is reduced, so that the re-communication between the steam and the edge and bottom water can be prevented to avoid forming a water encroachment channel, as shown in
[0037] Through the integral profile control and plugging technology, the average daily oil yield is increased by 27 t/d, the average moisture content is reduced by 10.2%, the periodic oil-steam ratio is increased by 0.08, and a good effect for controlling the water encroachment and steam channeling is achieved.
Comparative Example 1
[0038] With the increase of the huff-puff cycles, the formation pressure drops gradually, and the water encroachment and steam channeling occur, so that the high-pressure edge and bottom water may encroach into the oil layer, the steam injected into the first line of well rows (#1, #2 and #3) that are closest to the water body is easily communicated with the edge and bottom water to form a water encroachment channel, which may result in rapid increase of the moisture content of the first line of well rows. After 2 huff-puff cycles of the first line of well rows (#1, #2 and #3), the average moisture content is increased to 92% from the preliminary 35%, and at the time, the water completely encroaches into the first line of wells; and after 2 huff-puff cycles of the second line of well rows (#4, #5 and #6), the average moisture content is increased to 75% from the preliminary 21%, and the second line of well rows is also affected by the encroachment of the edge and bottom water. Other steps are the same as those in the embodiment. The comparative example differs from the embodiment in that the local profile control and plugging is adopted for wells with serious water encroachment and steam channeling in the block, which is specifically as follows: the moisture content of #2 well in the first line of well rows reaches up to 94%, nitrogen foam profile control and plugging is implemented for the well, the nitrogen injection volume is 50000 m.sup.3, and the steam injection volume is 1200 t; and the well soaking time is 3 days. However, after the production, the moisture content of the well still reaches up to 92%, and the moisture is not reduced, which indicates that if it is impossible to make overall layout and set conditions for integral profile control and regulation according to a specific situation of the well rows at different positions in the reservoir, it is impossible to form effective plugging walls at different positions away from the edge and bottom water only through the local profile control and plugging of the nitrogen foam, so that the encroachment of the edge and bottom water cannot be controlled effectively.