SLIP-ON SWELLABLE PACKER FOR OPENHOLE GRAVEL PACK COMPLETIONS
20230108380 · 2023-04-06
Inventors
Cpc classification
International classification
Abstract
A gravel packing system includes a show assembly including a washdown shoe at an end of the shoe assembly and a blank section uphole of the washdown shoe, a base pipe having an upper base pipe joint and a lower base pipe joint coupled at a base pipe joint connection, a screen disposed around the base pipe, wherein the lower base pipe joint is uphole of and adjacent to the blank section of the shoe assembly, and a swellable packer installed around the blank section of the shoe assembly. The shoe assembly, the swellable packer, the base pipe, and the screen are disposed in an uncased section of the wellbore.
Claims
1. A gravel packing system deployed in a wellbore having cased and uncased sections, the gravel packing system comprising: a shoe assembly comprising a washdown shoe at an end of the shoe assembly and a blank section uphole of the washdown shoe; a base pipe having an upper base pipe joint and a lower base pipe joint coupled at a base pipe joint connection; a screen disposed around the base pipe, wherein the lower base pipe joint is uphole of and adjacent to the blank section of the shoe assembly; and a swellable packer installed around the blank section of the shoe assembly, wherein the shoe assembly, the swellable packer, the base pipe, and the screen are disposed in the uncased section of the wellbore.
2. The gravel packing system of claim 1, further comprising: a gravel pack packer; and a formation isolation device disposed in the cased section of the wellbore.
3. The gravel packing system of claim 1, wherein the blank section of the shoe assembly provides a box end for a pin end of the lower base pipe joint.
4. The gravel packing system of claim 1, wherein the base pipe is perforated.
5. The gravel packing system of claim 1, wherein the swellable packer is configured to slip onto the blank section of the shoe assembly.
6. A method comprising: installing a swellable packer in a gravel packing system, the gravel packing system comprising: a shoe assembly comprising a washdown shoe at an end of the shoe assembly and a blank section above the washdown shoe; a base pipe having an upper base pipe joint and a lower base pipe joint coupled at a base pipe joint connection; and a screen disposed around the base pipe, wherein the lower base pipe joint is above and adjacent to the blank section of the shoe assembly, and wherein the swellable packer is installed around the blank section of the shoe assembly; deploying the gravel packing system in a wellbore such that the shoe assembly, the swellable packer, the base pipe, and the screen are disposed in an uncased section of the wellbore; swelling the swellable packer until the swellable packer contacts a wall of the wellbore in the uncased section; starting a gravel packing operation using the gravel packing system; and starting a production operation after the gravel packing operation is completed.
7. The method of claim 6, wherein the step of swelling the swellable packer starts during the deploying step.
8. The method of claim 6, wherein the step of swelling the swellable packer occurs during the gravel packing step.
9. The method of claim 6, wherein the gravel packing system further comprises: a gravel pack packer; and a formation isolation device disposed in a cased section of the wellbore, the method further comprising: setting the gravel pack packer before the starting the gravel packing operation step.
10. The method of claim 6, wherein the blank section of the shoe assembly provides a box end for a pin end of the lower base pipe joint.
11. The method of claim 6, wherein the base pipe is perforated.
12. The method of claim 6, wherein the installing step comprises slipping on the swellable packer around the blank section of the shoe assembly.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0010] Certain embodiments of the disclosure will hereafter be described with reference to the accompanying drawings, wherein like reference numerals denote like elements. It should be understood, however, that the accompanying figures illustrate the various implementations described herein and are not meant to limit the scope of various technologies described herein, and:
[0011]
[0012]
[0013]
DETAILED DESCRIPTION
[0014] In the following description, numerous details are set forth to provide an understanding of some embodiments of the present disclosure. However, it will be understood by those of ordinary skill in the art that the system and/or methodology may be practiced without these details and that numerous variations or modifications from the described embodiments may be possible.
[0015] In the specification and appended claims: the terms “up” and “down,” “upper” and “lower,” “upwardly” and “downwardly,” “upstream” and “downstream,” “uphole” and “downhole,” “above” and “below,” “top” and “bottom,” “left” and “right,” and other like terms indicating relative positions above or below a given point or element are used in this description to more clearly describe some embodiments of the disclosure.
[0016] The present disclosure generally relates to tools to complete subterranean wells. More specifically, one or more embodiments of the present disclosure relate to apparatus and methods used in gravel packing operations.
[0017] Referring now to
[0018] Still referring to
[0019] Referring now to
[0020] Referring now to
[0021] Still referring to
[0022] Still referring to
[0023] Still referring to
[0024] As also shown in
[0025] Still referring to
[0026] A method according to one or more embodiments of the present disclosure includes installing a swellable packer 30 around the blank section 24 of the shoe assembly 22 of the gravel packing system 10. In one or more embodiments of the present disclosure, installing the swellable packer 30 includes slipping on the swellable packer 30 around the blank 24 of the shoe assembly 22.
[0027] After the swellable packer 30 is pre-installed in the method according to one or more embodiments of the present disclosure, the gravel packing system 10 is deployed in the wellbore 12 such that the shoe assembly 22, the swellable packer 30, the base pipe 19, and the sand control screen 18 are disposed in an openhole, uncased section 15 of the wellbore 12. The method according to one or more embodiments of the present disclosure further includes swelling the swellable packer 30 until the swellable packer 30 contacts a wall of the wellbore 12 in the uncased section 15, forming a seal. The method according to one or more embodiments of the present disclosure further includes setting the gravel pack packer 32 against the casing 13 in the cased section of the wellbore 12 and starting a gravel packing operation using the gravel packing system 10. In one or more embodiments of the present disclosure, the swellable packer 30 starts swelling during the deployment of the gravel packing system 10 into the wellbore 12. In other embodiments of the present disclosure, the swellable packer 30 starts swelling during the gravel packing operation. The method according to one or more embodiments of the present disclosure further includes starting a production operation after the gravel packing operation is completed.
[0028] Although a few embodiments of the disclosure have been described in detail above, those of ordinary skill in the art will readily appreciate that many modifications are possible without materially departing from the teachings of this disclosure. Accordingly, such modifications are intended to be included within the scope of this disclosure as defined in the claims.