Method to requalify die after storage
12590797 ยท 2026-03-31
Assignee
Inventors
Cpc classification
G01B11/00
PHYSICS
G01B9/00
PHYSICS
International classification
G01B11/00
PHYSICS
G01B9/00
PHYSICS
Abstract
A method of requalifying a die after storage under this disclosure could be said to include the steps of running production parts on a die, stopping production for a period of time, taking a pre-storage 3D scan of the die, storing the die for a period of time, taking a post storage 3D scan of the die, comparing the post storage 3D scan information to the pre-storage 3D scan information, and requalifying the die for use in production should the post storage 3D scan be found to be sufficiently close to the pre-storage 3D scan.
Claims
1. A method of requalifying a die after storage comprising the steps of: running production parts on a die; stopping production for a period of time; taking a pre-storage 3D scan of the die; storing the die for a period of time; taking a post storage 3D scan of the die; comparing the post storage 3D scan information to the pre-storage 3D scan information; and requalifying the die for use in production should the post storage 3D scan be found to be sufficiently close to the pre-storage 3D scan.
2. The method as set forth in claim 1, wherein the die is used to form a component after requalification.
3. The method as set forth in claim 2, wherein the component has an airfoil.
4. The method as set forth in claim 3, wherein the pre-storage and post storage 3D scans utilize structured light scanning.
5. The method as set forth in claim 4, wherein if the period of time is not greater than a minimum then the post storage steps are not performed.
6. The method as set forth in claim 5, wherein prior to the post storage 3D scan, the die is cleaned.
7. The method as set forth in claim 5, wherein the minimum period of time is at least one year.
8. The method as set forth in claim 7, wherein the minimum period of time is at least two years.
9. The method as set forth in claim 8, wherein the die is a cast metal die, and the cavity receives a supply of molten metal when operating in production.
10. The method as set forth in claim 1, wherein the 3D scans of pre-storage and post storage utilize structured light scanning.
11. The method as set forth in claim 10, wherein if the period of time is not greater than a minimum then the post storage steps are not performed.
12. The method as set forth in claim 11, wherein prior to the post storage 3D scan, the die is cleaned.
13. The method as set forth in claim 12, wherein the minimum period of time is at least one year.
14. The method as set forth in claim 13, wherein the minimum period of time is at least two years.
15. The method as set forth in claim 13, wherein the die is a cast metal die, and the cavity receives a supply of molten metal when operating in production.
16. The method as set forth in claim 1, wherein if the period of time is not greater than a minimum then the post storage steps are not performed.
17. The method as set forth in claim 16, wherein the minimum period of time is at least one year.
18. The method as set forth in claim 17, wherein prior to the post storage 3D scan, the die is cleaned.
19. The method as set forth in claim 1, wherein prior to the post storage 3D scan, the die is cleaned.
20. The method as set forth in claim 1, wherein the die is a cast metal die, and the cavity receives a supply of molten metal when operating in production.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
DETAILED DESCRIPTION
(7)
(8) One component which may be formed by such a die is shown in
(9) As well known, airfoils are complex structures, and have demanding dimensional challenges in forming the desired structure. For this reasons, dies to form an airfoil are subject to intense qualification tests before being utilized to make production airfoils.
(10) In the prior art, and before a die is utilized in production, it must first be certified.
(11) In one common method of certification, the die is built, and then utilized to produce what is called a qualification lot. As an example, this may be on the order of two dozen components, or more. Those produced components are then inspected and compared to desired dimensions, etc. It is only after this inspection has been passed that the die would be moved toward production. In the prior art, this qualification was performed not only for an initial die, but for all subsequent dies made to be similar to an initial or master die.
(12)
(13) A qualification lot is produced at step 44.
(14) A traditional inspection is then performed on the qualification lot at step 46. The results, or the layout, are evaluated at step 48.
(15) At step 50, a decision is made whether to accept the layout. If not, the die is reworked at step 52, and the flow chart returns downstream of step 40.
(16) If the layout is accepted at step 50 then, the die is certified at step 60 and is used in production at step 62.
(17) As mentioned above, the qualification of the die is a very time consuming process. The method of this disclosure will shorten the requalification purpose for a die which has been out of use and stored for a minimum period of time. Currently dies must be recertified if they have been stored for greater than two years, as an example.
(18) If the period of time is not greater than a minimum then the requalification steps need not be performed.
(19) Thus, as shown in
(20)
(21) The die may then be stored at step 114. At some subsequent point a decision may be made to restart production of the part from the die at step 116.
(22) Assuming the die has been stored for a minimum period of time it will need to be requalified. In the prior art, the
(23) At step 118 the die is taken out of storage. A post storage 3D scan of the die is performed at step 120. The post storage 3D scan will be done with the exact same angle, photos, etc. from the pre-storage die scan.
(24) Prior to the post storage 3D scan, the die is cleaned.
(25) At step 122 the scanned information from the pre and post storages scans are compared to each other to requalify the die. A before and after 3D scan overlay comparison of the concave side of the tool. A map 150 in
(26) In one embodiment, the pre storage 3D scan is provided with the best fit overlay to the post storage 3D scan. The evidence which is looked at may be in the form of a simple product of the die thickness across both die halves and at each die cavity end. These inspections will determine the die functionality has not changed.
(27) If the die is requalified after this step 122 then the die is used in production again at step 124.
(28) A method of requalifying a die after storage under this disclosure could be said to include the steps of running production parts on a die, stopping production for a period of time, taking a pre-storage 3D scan of the die, storing the die for a period of time, taking a post storage 3D scan of the die, comparing the post storage 3D scan information to the pre-storage 3D scan information, and requalifying the die for use in production should the post storage 3D scan be found to be sufficiently close to the pre-storage 3D scan.
(29) In another embodiment according to the previous embodiment, the die is used to form a component after being requalified.
(30) In another embodiment according to any of the previous embodiments, the component has an airfoil.
(31) In another embodiment according to any of the previous embodiments, the pre-storage and post storage 3D scans utilize structured light scanning.
(32) In another embodiment according to any of the previous embodiments, if the period of time is not greater than a minimum then the post storage steps are not performed.
(33) In another embodiment according to any of the previous embodiments, prior to the post storage 3D scan, the die is cleaned.
(34) In another embodiment according to any of the previous embodiments, the minimum period of time is at least one year.
(35) In another embodiment according to any of the previous embodiments, the minimum period of time is at least two years.
(36) In another embodiment according to any of the previous embodiments, the die is a cast metal die, and the cavity receives a supply of molten metal when operating in production.
(37) In another embodiment according to any of the previous embodiments, the 3D scans of pre-storage and post storage utilize structured light scanning.
(38) In another embodiment according to any of the previous embodiments, if the period of time is not greater than a minimum then the post storage steps are not performed.
(39) In another embodiment according to any of the previous embodiments, prior to the post storage 3D scan, the die is cleaned.
(40) In another embodiment according to any of the previous embodiments, the minimum period of time is at least one year.
(41) In another embodiment according to any of the previous embodiments, the minimum period of time is at least two years.
(42) In another embodiment according to any of the previous embodiments, the die is a cast metal die, and the cavity receives a supply of molten metal when operating in production.
(43) In another embodiment according to any of the previous embodiments, if the period of time is not greater than a minimum then the post storage steps are not performed.
(44) In another embodiment according to any of the previous embodiments, the minimum period of time is at least one year.
(45) In another embodiment according to any of the previous embodiments, prior to the post storage 3D scan, the die is cleaned.
(46) In another embodiment according to any of the previous embodiments, prior to the post storage 3D scan, the die is cleaned.
(47) In another embodiment according to any of the previous embodiments, the die is a cast metal die, and the cavity receives a supply of molten metal when operating in production.
(48) Although embodiments have been disclosed, a worker of skill in this art would recognize that modifications would come within the scope of this disclosure. For that reason, the following claims should be studied to determine the true scope and content.