HYBRID GENERATOR SYSTEM
20260100577 ยท 2026-04-09
Inventors
Cpc classification
H02J7/875
ELECTRICITY
H02J3/0012
ELECTRICITY
H02J3/18
ELECTRICITY
International classification
H02J3/00
ELECTRICITY
H02J3/18
ELECTRICITY
Abstract
Provided is a customer-sited hybrid generator system that coordinates a bidirectional inverter, an energy storage battery, an engine-driven generator, an optional renewable source, a controllable load bank, and an isolation switch under a supervisory controller, to supply facility loads and interact with a power grid. The controller enables multiple modes, including surge support during normal operation, under-frequency export from the battery with generator takeover, over-frequency import to charge the battery, and distributed curtailment using a resistive load thermally coupled to a liquid cooling loop. Electrically driven pumps and fans, a radiator, and a three-way valve route coolant among power electronics, engine, and curtailment loops. During a grid outage, the system may connect the generator directly to a facility bus, while isolating the inverter so the battery-backed inverter can provide parallel hybrid surge. The system interfaces with utility or VPP dispatch and supports either 50 Hz or 60 Hz interconnection.
Claims
1. A hybrid generator system associated with an alternating-current power grid and a facility load; comprising: an inverter associated with the power grid and to a battery; a generator electrically associated with the inverter; a renewable power source electrically associated with the inverter; an isolation switch configured to disconnect a facility from the power grid during a power outage; an isolation load associated with the isolation switch and the power grid; a system controller in communication with the inverter, the generator, the battery, the isolation switch, the auxiliary load, and the renewable power source; wherein, during a grid under-frequency event, the system controller commands the inverter to export power to the grid from the battery; and wherein, during a grid over-frequency condition or a negative-price interval, the system controller commands the inverter to draw power from the grid to charge the battery, and when battery capacity to draw power is exceeded or a curtailment threshold is met, the system controller commands the inverter to connect the auxiliary load to consume surplus power.
2. The system of claim 1, wherein the system controller starts the generator before the battery reaches a depletion threshold and commands the inverter to export power from the generator to the grid while maintaining the facility load.
3. The system of claim 1, wherein the battery is operated at partial state of charge to provide bidirectional primary frequency response.
4. The system of claim 1, wherein the system controller is configured to respond to commands or telemetry with a grid authority or virtual power plant platform.
5. The system of claim 1, wherein the renewable power source comprises a photovoltaic array, a wind turbine, or an AC power source connected to the inverter.
6. The system of claim 1, wherein the inverter regulates real and reactive power independently according to a decrease or setpoint received from the system controller.
7. The system of claim 1, wherein the auxiliary load is configured as a resistive heating element thermally coupled to a liquid cooling loop.
8. The system of claim 1, wherein the system controller operates a surge-support mode wherein the inverter augments grid power to provide short duration surge power.
9. The system of claim 1, further comprising at least one resistive element embedded in or thermally coupled to a liquid cooling circuit that is configured to cool the inverter, the liquid cooling circuit having a three-way valve that selectively routes coolant among a generator loop, a power-electronics loop, and a load-bank loop; and wherein radiator fans and coolant pumps are electrically driven and speed-controlled according to temperatures of the generator, the inverter, and the load bank.
10. A method of operating a hybrid generator system including an inverter connected to a facility alternating-current (AC) bus, a battery connected to a direct-current (DC) port of the inverter, a generator selectively connectable to the AC bus, an on-site renewable power source connected to the inverter, a controllable load bank, an isolation switch between the AC bus and a power grid, and a controller in communication with each component, the method comprising: in a first mode of use, during normal grid operation, maintaining the battery at a partial state of charge while the inverter operates in synchronism with the power grid to supply facility loads and to augment grid power during transient load surges without starting the generator; in a second mode of use, during a grid under-frequency event, exporting power from at least the battery through the inverter to the grid and, when the event persists beyond the battery's capacity, starting the generator and continuing export of power to the grid while supplying facility loads; in a third mode of use, during a grid outage, opening the isolation switch to isolate a facility and initially supplying facility loads from the battery through the inverter, then starting the generator to provide longer-duration support and optionally to recharge the battery; in a fourth mode of use, during a grid over-frequency condition or other excess-generation event, importing power from the grid to charge the battery through the inverter and, when battery capacity to absorb power is exceeded, connecting the controllable load bank to the inverter to consume surplus power; in a fifth mode of use, during a grid outage that requires surge power beyond generator capacity, synchronizing the inverter with the generator and connecting the generator directly to the facility AC bus while the inverter draws power from the battery in parallel with the generator for a duration limited by the battery's capacity; and controlling transitions among the modes according to sensed grid and facility conditions and commands received from a grid authority.
11. A method of operating a hybrid generator system; comprising; synchronizing an inverter with a power grid; maintaining a battery associated with the inverter at partial state of charge; detecting a grid under-frequency event; exporting power to the grid from the battery via the inverter; starting an engine-driven generator and continuing power export to the grid; and upon a grid outage, opening an isolation switch and supplying facility loads from the battery via the inverter until a generator assumes a longer-duration operation.
12. The method of claim 11, further comprising commanding the inverter to provide reactive power per a setpoint while exporting real power.
13. The method of claim 11, further comprising receiving a dispatch signal from a grid authority or virtual power plant and adjusting export setpoints accordingly.
14. The method of claim 11, wherein the inverter supplements grid power to support a facility surge load during normal grid operation.
15. The method of claim 11, wherein the generator simultaneously powers the inverter and recharges the battery.
16. The method of claim 11, further comprising transitioning to independent operation and resynchronizing to the grid upon restoration.
17. The method of claim 11, wherein power export continues until a price cap or duration limit is met.
18. The method of claim 11, wherein a renewable power source supplies the inverter during normal operation power export or independent operation.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0037] The accompanying drawings, which are incorporated in and constitute a part of the specification, illustrate embodiments of the invention and together with the general description of the invention given above and the detailed description of the drawings given below, serve to explain the principles of these inventions.
[0038]
[0039]
[0040]
[0041]
[0042]
[0043]
[0044]
[0045]
[0046]
[0047]
[0048]
[0049]
[0050]
[0051]
[0052]
[0053]
[0054]
[0055] The following component list and associated numbering found in the drawings is provided to assist in the understanding of one embodiment of the present invention:
TABLE-US-00001 Reference No. Component 1 Hybrid Generator System 2 AC power grid 6 Utility meter 10 On-site power system 14 Facility loads 18 Bidirectional inverter 22 Battery 26 Generator 30 Renewable source 34 System controller 38 Load bank 42 Load bank switch 50 Grid Control Authority 54 Isolation switch 60 Generator-bus switch 68 Second bidirectional inverter 100 Hybrid Generator System 118 Inverter 122 Battery subsystem 126 Prime mover 170 Liquid cooling system
[0056] It should be understood that the drawings are not necessarily to scale. In certain instances, details that are not necessary for an understanding of the invention or that render other details difficult to perceive may have been omitted. It should be understood, of course, that the invention is not necessarily limited to the particular embodiments illustrated herein.
DETAILED DESCRIPTION
[0057] Referring now to
[0058]
[0059] The system 1 of one embodiment of the present invention employs an inverter 18, which may be a bi-directional power converter, and connected to the power grid 2, the facility loads 14, a battery 22, a generator 26, and a power generating source 30. The renewable on-site power generating source 30 can be one or more photovoltaic panels, wind turbines, etc. Although the inverter 18 is shown with only one non-grid direct current (DC) connected port, the inverter 18 could have more than one non-grid port, or one or more non-grid AC ports. In operation, the inverter 18 is energized and synchronized with the power grid 2. The inverter 18 is configured to comply with relevant technical standards (i.e., IEEE 1547, UL 1741, etc.) that enable exporting of power from the Hybrid Generator System 1 to the power grid 2. The inverter 18 could be implemented as a monolithic unit or comprising multiple modules working together. The inverter also could be of either non-isolated or galvanically isolated design.
[0060] The system battery 22 is connected to a DC port of inverter 18 such that it can be either recharged or discharged. When operated at partial state of charge (PSOC), the battery would be capable of instantaneously delivering current to, or accepting current, from inverter 18.
[0061] The on-site power generator 26 employs a prime mover such as a gaseous or diesel-fueled reciprocating engine, gas turbine, or hydro-electric turbine capable of dispatch in response to either manual or automated command a system controller 34.
[0062] An on-site load bank 38 may be configured to dissipate electrical energy capable of consuming AC from the grid 2. The load bank 38 is also configured to consume AC from the inverter 18 and/or the generator 26 as a test load for the battery 22, the inverter 18, and/or the engine. Although the schematic shows an electric resistance element, any load that consumes electrical power is intended. The electric resistance load is connected to the grid/inverter AC bus via switch 42. The switch 42 response either manually or automatically as commanded from the system controller 34 to either isolate the load bank number 38 from, or connected to load bank 38, to the inverter 18. The switch 42 either connects or disconnects the load bank 38 the power supplied by the inverter 18.
[0063] In one embodiment the load bank 38 is at least one electrical heating element either embedded in, or in thermal connection with, the engine's liquid cooling system, wherein the engine's radiator and could be reused to dissipate excess energy into the liquid cooling system at lower cost than a dedicated load bank heat dissipation system.
[0064] The system controller 34 is in communication with all elements on the grid and on-site power sides of the system. The controller 34 responds to changing conditions in the grid 2, changing conditions in the on-site power system 1, and to commands from a grid control authority. The grid control authority 50 may be any entity, e.g., power utility company, Independent System Operator (ISO), Virtual Power Plant (VPP), etc., with the authority and means to remotely control the dispatch of distributed energy resources (DER) to either generate electric power or curtail excess generation.
[0065] In isolation switch 54 is provided and designed to isolate the on-site power system 1 from the grid 2. The normal position of this switch 54 is closed, wherein the inverter 18 is connected to the grid 2 to, thus, connect the on-site power system 1 to the grid 2. During blackout, however, the on-site power system 1 must immediately disconnect from the grid 2 for practical, safety, and standards compliance reasons.
[0066]
[0067]
[0068]
[0069] The inverter 18 is capable of providing either real or reactive power, as determined by the system controller 34 or the grid control authority. When under-frequency events last longer than the battery's capacity, the generator 26 would start before the battery is fully discharged. A building management system (not shown) may simultaneously reduce low-priority facility loads, such as air conditioning, to maximize the proportion of power exported from the on-site power system to the grid 2.
[0070]
[0071]
[0072]
[0073]
[0074]
[0075]
[0076] With reference to
[0077] There are shortcomings with respect to the arrangement shown in
[0078] The embodiment shown in
[0079]
[0080] An energy conversion assembly is also provided that includes at least one alternator or generator, to convert mechanical energy from the engine into electrical energy, and associated inverter assemblies. The mechanical to electrical conversion assembly of one embodiment includes an engine-driven alternator that creates alternating current (AC). The AC may be rectified to create a DC bus to which on-site renewable generation resources (not shown) may be connected to the system. Alternatively, the engine could drive a DC generator.
[0081] Embodiments of the present invention also employ at least one inverter 300 to convert cither AC or DC electrical energy from either the battery or the electrical conversion assembly's AC or DC output into regulated 50 or 60 Hz AC that is synchronized to power grid frequency.
[0082] A liquid cooling system 400 is used to cool power electronics (e.g., the inverter), engine cooling, and cooling the distributed curtailment load bank (only in use when the engine is not running), which will be described in further detail below. The cooling system may be similar to a conventional internal combustion engine (ICE) system, with water pump(s), radiator, water hoses, etc. The system differs from a conventional ICE cooling system, however, in that there are three different types of cooling demands imposed on the radiator and liquid pump system. In one embodiment, all three of these cooling demands would not be simultaneous:
[0083] When the inverter 300 and battery 200 are operational, before engine start, the cooling system 400 only needs to cool the system power electronics. When the engine 100 is running the cooling system must cool both power electronics and engine. When the distributed curtailment function is operational, the cooling system 400 cools an electric load bank, with only modest demand for cooling by the power electronics. The engine would not be operational during distributed curtailment and would, thus, add no heat to the engine cooling system. Either a single or two stacked radiators could be used, similar to the stacking of vehicle air conditioner radiators ahead of the ICE radiator. When a single radiator is used, a three-way cooling valve is added to the system to support a cooling loop for the curtailment, a cooling loop for power electronics when the engine is running (thermostat open), and a cooling loop for power electronics when the engine is not running (thermostat closed).
[0084] Pump(s) move coolant through the cooling system and fan(s) to move air through the radiator. The electrically driven coolant pumps and fan motors could be either fixed speed or variable speed to reduce energy consumption and noise. As with vehicle operated electric cooling fans, operation would be governed by a control system driven by sensors of power electronics, engine and load bank function and/or temperature. In some embodiments, the electrical cooling fan may be in addition to an engine driven cooling fan.
[0085]
[0086] It is thus a goal of one embodiment of the present invention to address increased dynamic load problems often occurring at datacenters where GPU loads used for AI processing cause power quality issues both inside the facility and for the utility power grid. Here, stacked on top of the power buffer (as described below) is UPS functionality, ideally located at the medium voltage entrance, to provide buffering for peak power shaving and back-up power during grid outages. Furthermore, this system can provide four quadrant grid support for power quality issues such as low or high frequency and positive and negative reactive power.
[0087]
[0088] One advantage of the contemplated system is that its buffering capability also functions as an uninterruptible power supply (UPS), eliminating the need for separate UPS units within the data center and, thereby, freeing valuable floor space. Moreover, because the system performs both UPS and buffering functions, it eliminates the need for additional buffering equipment located closer to the GPUs (for example, within server racks). This centralized, dual-function design is more energy-efficient than alternative solutions that require additional power-conversion steps. Energy efficiency is a key priority for data-center operators and engineers. Further, the system is positioned at the medium-voltage entrance to the data center. Centralized systems at this level are easier to manage and less costly than deploying large numbers of small buffering devices distributed throughout the data center.
[0089] One of skill in the art will appreciate that the battery charging aspects described in the patents referred to above can be incorporated into the systems disclosed herein. For example, the systems disclosed herein may be associated with a battery-life-extension charging system, comprising: a monitoring component configured to measure a direct current (DC) output current delivered by the charging system to a battery, wherein the DC output current is a function of an existing charge status of the battery; a timing component; and a charge control system in communication with the monitoring component and the timing component, the charge control system configured for: obtaining at least one of a time measurement from the timing component and a charge measurement from the monitoring component; based on the at least one of the time measurement and the charge measurement, determining at least one of a time to complete the charge mode cycle and a charge to complete a charge mode cycle, each tailored to achieve a desired charge status of the battery; and based on at least one of the determined time and the determined charge to complete the charge mode cycle, transitioning to a select one of a number of DC output voltage settings until the determined time to complete the determined charge mode cycle has passed or the charge to complete the charge mode cycle has been provided, wherein the DC output voltage settings include at least an eco-float output voltage setting, a refresh output voltage setting, and a boost output voltage setting.
[0090] In operation, the charging system obtains a charge measurement associated with a battery via a monitoring component of a battery charger, the charge measurement reflecting a direct current (DC) output current delivered by the battery charger to the battery; obtains a time measurement associated with the battery via a timing component of the battery charger; transmits at least one of the charge measurement and the time measurement to a battery charge control system of the battery charger; determines, by the battery charge control system and based on at least one of the charge measurement and the time measurement, at least one of a charge to complete a charge mode cycle and a time to complete the charge mode cycle, the charge mode cycle is tailored to achieve a desired charge status of the battery; and selectively regulates, by a voltage regulator in communication with the battery charge control system, a DC output voltage of the battery charger to one of a number of pre-set DC output voltages until the time to complete the charge mode cycle has passed or the charge to complete the charge mode cycle has been provided, the pre-set DC output voltages comprising an eco-float output voltage, a refresh output voltage, and a boost output voltage.
[0091] In another embodiment, the battery charging system is configured to selectively transfer current from a charger to at least one interconnected battery and comprises at least a monitoring component configured to measure: an existing charge status of the at least one interconnected battery, a direct current (DC) output current delivered by the charger to at least one interconnected battery, wherein the DC output current is a function of the existing charge status of the at least one interconnected battery, and a temperature of the at least one interconnected battery; a control system in communication with the monitoring component and a timing component, the control system configured to initiate charging of the at least one interconnected battery based on a first temperature of the at least one interconnected battery, wherein the control system obtains a time measurement from the timing component and/or a charge measurement from the monitoring component; wherein based on the time measurement and/or the charge measurement, defining at least one of a time to complete a charge mode cycle and a charge required to complete a charge mode cycle that are tailored to achieve a desired charge status of the at least one interconnected battery; based on at least one of a determined time and a determined charge to complete the charge mode cycle, transitioning to a select one of a number of DC output voltage settings until the determined time to complete a determined charge mode cycle has passed or the charge to complete the charge mode cycle has been provided, wherein the DC output voltage settings include a boost output voltage setting, a float output voltage setting, and an eco-float output voltage setting; wherein the eco-float output voltage setting is associated with a voltage less than the float output voltage setting and nominally higher than an open-circuit voltage of the at least one interconnected battery, with a near zero charge current provided to the at least one interconnected battery to maintain the at least one interconnected battery at a partial charge state, while allowing the at least one interconnected battery to support an external load; wherein the float output voltage setting comprises a transition from the boost output voltage setting to the eco-float output voltage setting in a series of incremental voltage changes; and wherein the charger will cease delivering current to the at least one interconnected battery if the at least one interconnected battery reaches a second temperature that is greater than the first temperature.
[0092] In this example, the charging system obtains a charge measurement associated with a battery via a monitoring component of a battery charger, the charge measurement reflecting a direct current DC output current delivered by the battery charger to the battery; obtains a time measurement associated with the battery via a timing component of the battery charger; obtains a battery temperature measurement; transmits at least one of the charge measurement, the time measurement, and the battery temperature measurement to a battery charge control system of the battery charger; initiates battery charge, wherein the battery charge control system directs the battery charger to direct current to the battery; determines, by the battery charge control system and based on at least one of the charge measurement, the time measurement, and the battery temperature measurement, a charge to complete a charge mode cycle and/or a time to complete the charge mode cycle, the charge mode cycle being tailored to achieve a desired charge status of the battery; selectively regulates, by a voltage regulator in communication with the battery charge control system, a DC output voltage of the battery charger to one of a number of pre-set DC output voltages until the time to complete the charge mode cycle has passed or the charge to complete the charge mode cycle has been provided, the pre-set DC output voltages comprising a boost output voltage setting, a float voltage output setting, and an eco-float output voltage setting; wherein the eco-float output voltage setting is associated with a voltage less than the float voltage output setting and nominally higher than an open-circuit voltage of the battery, with a near zero charge current provided to the battery to maintain the battery at a partial charge state, while allowing the battery to support an external load; and wherein the float output voltage setting comprises a transition from the boost output voltage setting to the eco-float output voltage setting in a series of incremental voltage changes; and ceases battery charging if the battery temperature measurement indicates a battery temperature above a predetermined maximum temperature.
[0093] Exemplary characteristics of embodiments of the present invention have been described. However, to avoid unnecessarily obscuring embodiments of the present invention, the preceding description may omit several known apparatus, methods, systems, structures, and/or devices one of ordinary skill in the art would understand are commonly included with the embodiments of the present invention. Such omissions are not to be construed as a limitation of the scope of the claimed invention. Specific details are set forth to provide an understanding of some embodiments of the present invention. It should, however, be appreciated that embodiments of the present invention may be practiced in a variety of ways beyond the specific detail set forth herein.
[0094] Modifications and alterations of the various embodiments of the present invention described herein will occur to those skilled in the art. It is to be expressly understood that such modifications and alterations are within the scope and spirit of the present invention, as set forth in the following claims. Further, it is to be understood that the invention(s) described herein is not limited in its application to the details of construction and the arrangement of components set forth in the preceding description or illustrated in the drawings. That is, the embodiments of the invention described herein are capable of being practiced or of being conducted in numerous ways. The scope of the various embodiments described herein is indicated by the following claims rather than by the foregoing description. And all changes which come within the meaning and range of equivalency of the claims are to be embraced within their scope. It is intended to obtain rights which include alternative embodiments to the extent permitted, including alternate, interchangeable and/or equivalent structures, functions, ranges or steps to those claimed, whether or not such alternate, interchangeable and/or equivalent structures, functions, ranges or steps are disclosed herein, and without intending to publicly dedicate any patentable subject matter.
[0095] It should be noted that all features, elements, components, functions, and steps described with respect to any embodiment provided herein are intended to be freely combinable and substitutable with those from any other embodiment, or with the concepts disclosed in the patents or applications incorporated by reference herein. If a certain feature, element, component, function, or step is described with respect to only one embodiment, then it should be understood that that feature, element, component, function, or step can be used with every other embodiment described herein unless explicitly stated otherwise. This paragraph therefore serves as antecedent basis and written support for the introduction of claims, at any time, that combine features, elements, components, functions, and steps from different embodiments, or that substitute features, elements, components, functions, and steps from one embodiment with those of another, even if the following description does not explicitly state, in a particular instance, that such combinations or substitutions are possible. It is explicitly acknowledged that express recitation of every possible combination and substitution is overly burdensome, especially given that the permissibility of each and every such combination and substitution will be readily recognized by those of ordinary skill in the art.
[0096] The foregoing disclosure is not intended to limit the invention to the form or forms disclosed herein. In the foregoing Detailed Description, for example, various features of the invention are grouped together in one or more embodiments for the purpose of streamlining the disclosure. This method of disclosure is not to be interpreted as reflecting an intention that the claimed inventions require more features than expressly recited. Rather, as the following claims reflect, inventive aspects lie in less than all features of a single foregoing disclosed embodiment. Thus, the following claims are hereby incorporated into this Detailed Description, with each claim standing on its own as a separate preferred embodiment of the invention. Further, the embodiments of the present invention described herein include components, methods, processes, systems, and/or apparatus substantially as depicted and described herein, including various sub-combinations and subsets thereof. Accordingly, one of skill in the art will appreciate that it would be possible to provide for some features of the embodiments of the present invention without providing others. Stated differently, any one or more aspects, features, elements, means, or embodiments as disclosed herein may be combined with any one or more other aspects, features, elements, means, or embodiments as disclosed herein.