LOAD WEIGHING AT THE LIFTING HOOK
20170369286 · 2017-12-28
Inventors
Cpc classification
B66C23/66
PERFORMING OPERATIONS; TRANSPORTING
B66C1/40
PERFORMING OPERATIONS; TRANSPORTING
International classification
B66C1/40
PERFORMING OPERATIONS; TRANSPORTING
B66C13/16
PERFORMING OPERATIONS; TRANSPORTING
Abstract
The invention relates to an apparatus for weighing the hook load of a crane, wherein different measurement accuracies can be set at the apparatus, comprising at least one measurement device, at least one retaining pin, and at least one coupling section. The invention is additionally directed to a hook block and to a crane having a corresponding apparatus.
Claims
1. An apparatus for weighing the hook load of a crane, wherein different measurement accuracies can be set at the apparatus, comprising at least one measurement device (2), at least one retaining pin (3), and at least one coupling section (4), the apparatus is provided between a boom and the hook (1) of a crane, the retaining pin (3) and/or the measurement device (2) can be positioned at least at two different positions at the coupling section (4), and the positions are in particular horizontally spaced apart from one another.
2. An apparatus in accordance with claim 1, wherein the retaining pin (3) and/or the measurement device (2) is/are continuously adjustable between at least two positions.
3. An apparatus in accordance with claim 1, wherein at least two measurement devices (2) are provided positioned asymmetrically at the coupling section (4).
4. An apparatus in accordance with claim 1, wherein the measurement device (2) and the retaining pin (3) transmit the load of the hook (1) at least partially to the crane.
5. An apparatus in accordance with claim 1, wherein the apparatus is provided at a hook block and/or is coupled to the boom of the crane, in particular to the roller set of the boom head.
6. An apparatus in accordance with claim 1, wherein the measurement device (2) is secured against overload, in particular by using at least one pin.
7. An apparatus in accordance with claim 1, wherein an energy supply is provided at the apparatus.
8. An apparatus in accordance with claim 1, wherein the apparatus is adapted for a cable-less transmission of measurement signals between the measurement device (2) and a control unit.
9. A hook block or a boom head having at least one apparatus for load weighing in accordance with claim 1.
10. A crane having at least one apparatus for load weighing in accordance with claim 1.
11. An apparatus in accordance with claim 2, wherein at least two measurement devices (2) are provided positioned asymmetrically at the coupling section (4).
12. An apparatus in accordance with claim 11, wherein the measurement device (2) and the retaining pin (3) transmit the load of the hook (1) at least partially to the crane.
13. An apparatus in accordance with claim 3, wherein the measurement device (2) and the retaining pin (3) transmit the load of the hook (1) at least partially to the crane.
14. An apparatus in accordance with claim 2, wherein the measurement device (2) and the retaining pin (3) transmit the load of the hook (1) at least partially to the crane.
15. An apparatus in accordance with claim 14, wherein the apparatus is provided at a hook block and/or is coupled to the boom of the crane, in particular to the roller set of the boom head.
16. An apparatus in accordance with claim 13, wherein the apparatus is provided at a hook block and/or is coupled to the boom of the crane, in particular to the roller set of the boom head.
17. An apparatus in accordance with claim 12, wherein the apparatus is provided at a hook block and/or is coupled to the boom of the crane, in particular to the roller set of the boom head.
18. An apparatus in accordance with claim 11, wherein the apparatus is provided at a hook block and/or is coupled to the boom of the crane, in particular to the roller set of the boom head.
19. An apparatus in accordance with claim 4, wherein the apparatus is provided at a hook block and/or is coupled to the boom of the crane, in particular to the roller set of the boom head.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Further details and advantages of the invention will be explained with reference to the embodiment shown by way of example in the Figures. There are shown:
[0016]
[0017]
[0018]
[0019]
[0020]
[0021]
DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0022]
[0023] The retaining pin 3 is thus installed in the first retaining position 1 shown in
[0024] If only a small load is lifted, the retaining pin 3 can be installed in the second retaining position 1′ shown in
[0025] The energy supply of the apparatus or of the measurement device 2 can take place, for example, via a rechargeable battery, with said rechargeable battery for example being able to be provided in an additional ballast plate at the block. It is alternatively or additionally also conceivable to provide solar cells laterally at the block, for example. They can be used, for example, as a charging apparatus for an energy store that supplies the sensors and, optionally, other units of the apparatus with energy. It is also conceivable that the solar cells are the only power source of the apparatus, in particular when the apparatus is only used as an additional device. If the additional device fails, the load weighing know per se via the guying forces is used.
[0026] It is also conceivable that a correspondingly dimensioned wind wheel is provided at the block or at another part of the crane as a charging apparatus for charging an energy store. The wind wheel can again also be provided as the only power source when the apparatus is only used as an additional device. It is additionally or alternatively also conceivable to provide an energy supply of the apparatus within a rope pulley of the hook block, wherein the rotational movement of the rope pulley is used for driving a dynamo during a lifting or lowering procedure. Such a generator can in this respect, as also the previously named energy sources, as a charging apparatus for an energy store and/or as the only power source of the apparatus when the apparatus is only used as an additional device.
[0027] The energy supply of the apparatus can furthermore take place via a corresponding power cable that is provided by a crane drive of the crane or by a power source of the crane via its boom to the hook block or to the region of the crane in which the apparatus in accordance with the invention is attached. If the apparatus is in this respect configured as a part of the hook block, the hoist rope of the crane can also serve as a power cable for the energy supply. It is conceivable in a further possible embodiment that a power unit is additionally or alternatively provided at the hook block that supplies the apparatus with electrical energy.
[0028] A wireless LAN connection can be provided between the measurement device 2 and the control unit for a data transfer between the measurement device 2 and a control unit that is configured for evaluating the measurement data and for a corresponding control/regulation of the crane. Alternatively or additionally, links via Bluetooth, Zigbee or also via the hoist rope are conceivable. The hoist rope can in this respect be used as a signal conductor between the control unit and the measurement device.
[0029] An optical transmission of data between the measurement device and the control unit is also conceivable, with an infrared connection being able to be present, for example, between the components. Provision can furthermore additionally or alternatively be made to provide a data transmission cable between the control unit and the apparatus in accordance with the invention.
[0030] Sensors can furthermore be provided in the region of the retaining position 1, 1′ that are configured to determine whether there is a retaining pin 3 or not in the respective retaining position. The corresponding data can be transmitted to the control unit of the crane via a data link. The control unit can thus detect the position in which a retaining pin 3 is plugged and can determine the lever relationship present at the apparatus. If a lever relationship for the more exact measurement range is activated by means of the retaining pin 3, with the retaining pin 3 being able to be plugged into retaining positions 1, the maximum payload of the crane can simultaneously be limited by the control unit. If the measurement range for large loads is activated in that the retaining pin 3 is plugged into retaining position 1′, the limit is canceled again. The measured value of the measurement pin 2 is converted using the lever factor thus determined in accordance with the equation
FB=F×L2/(L1+L2)
from which the load F applied to the hook 10 results. The load weighing thus carried out can now be used for improving another used load weighing method that may be present. In this respect, as soon as a rechargeable battery is flat or if the energy supply is interrupted and/or if the radio transmission of the measured values fails or if other disturbances occur, the load weighing can take place solely via the other load weighing method. It is also conceivable also to use the preset load weighing for the primary load weighing, e.g. with a 2-hook operation.
[0031]
[0032] As shown in
[0033] The function of the elongate hole 6 results from
[0034] When the hook 10 hits the ground, it experiences a force as shown in
[0035] Provision can also be made that an overload protection is provided at the measurement device 2, with the measurement device 2 being able to be configured as the measurement sleeve in which an additional pin is located or which is coupled to an additional pin in another manner that takes up the force acting on the sleeve in a case of overload. Such a combination of a measurement device 2 with a bolt can correspond to the retaining pin 3.
[0036] Since the weight of the hook block is part of the load that is lifted by the crane, an unladen weight of the hook block or a weight of the hook block without an additional load weight can be communicated to the control or to the control unit in addition to the value measured by the measurement device 2. This unladen weight can optionally not be measured via the measurement system and is added to the load output by the measurement device 2 as an offset.
[0037] The apparatus can also be modified such that additional weights can, for example, be detected at the hook block by the measurement device 2 or by the measurement pin. It must be determined for this purpose whether the same mass or the same additional weight is added at both sides of the hook block.
[0038] This can take place by using two measurement devices 2 or two measurement pins at a respective one side of the hook block, whereby the possibility of failure of the measurement device 2 is also reduced. This is indicated in
[0039] An angle transmitter can also be provided by means of which it can be recognized whether the hook block is hanging at an incline due to a different weight at different regions of the hook block. If an inclined position is determined, this would result in a shutdown of the crane or an interruption of the crane operation or of the weighing procedure since the measurement accuracy of the measurement device 2 can no longer be observed. After such a shutdown, only the unreeling of the hoist winch would, for example, be permitted, with the hook block being able to be placed on the ground and the additional weights being able to correspondingly balanced.
[0040] A transponder apparatus by means of which the additional weights at the hook block can be reported can be also be used to measure the additional weights. The offset weight of the hook block could thus be determined or made known. A switch solution is also conceivable for measuring the additional weights, wherein each additional weight actuates a corresponding switching contact as soon as the additional weight is pinned or connected to the hook block. An input of the additional weight in the crane software is furthermore likewise conceivable, with a crane operator inputting the mass of the equipped hook block or of the additional weight via a keyboard or another interface. The problem, however, exists here of erroneous inputs or of misuse by the operating personnel.
[0041] On a use of two blocks having the measurement device in accordance with the invention, as is shown in
[0042] If in this respect a hook block is operated with two or more winches, unwanted inclined positions of the hook block can occur. This can take place automatically by means of an angle transmitter. The controller can then directly unreel a winch and thus compensate the inclined position. The angle transmitter can, for example, be connected directly to the hook block control or to the control unit of the crane. Alternatively or additionally, the inclined position can also be determined by means of the hook block having the described measurement device and via an uneven load distribution on the use of two asymmetrically arranged measurement apparatus 2 or measuring pins, such as has been described above.