Thermal reduction through activity based thermal targeting to enhance heating system efficiency
09851111 · 2017-12-26
Assignee
Inventors
- Richard A. Lyons (Madison, CT, US)
- Christopher L. Murray (West Haven, CT)
- William Montgomery (Madison, CT, US)
- Robert Schiller (Niantic, CT, US)
- Timothy Van Leeuwen (Naugatuck, CT, US)
Cpc classification
F24D3/087
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F24H15/175
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F24D3/02
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F24H15/486
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F24D19/1009
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F24H15/215
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F24D2220/042
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F24D19/1066
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F24H15/36
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F24H15/219
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F24H15/269
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
International classification
F23N1/08
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F24D19/10
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Abstract
Thermal targeting technology is used to continuously adjust boiler target temperature to the minimum necessary to satisfy the required heating load. Responsive to and initiated by a first call for heat, boiler target temperature is reduced by a predetermined amount upon or subsequent to the call for heat. Once the boiler temperature reaches this new target, a call timer is activated. If demand for heat is satisfied before a time set point is reached, the system ceases providing additional heat energy until the next heat demand. Responsive to and initiated by a next call for heat, the boiler target temperature is again reduced by the predetermined amount upon or subsequent to this next call for heat. Each time the heat demand is satisfied within the predetermined time interval, the boiler target temperature is reduced. If heat demand is not satisfied, a thermal boost is provided at set time intervals until the call for heat is removed.
Claims
1. A method of improving efficiency of a boiler heating system including adjusting boiler target temperature during heating system operation, said method comprising: reducing said boiler target temperature a predetermined amount, ΔT.sub.reduce, to a reduced target temperature, such that said reducing is responsive to and initiated by a call for heat, and occurs upon or subsequent to said call for heat; running said heating system at said reduced target temperature; if said call for heat is satisfied while running heating system at said reduced target temperature: measuring time from a point at which said call for heat is satisfied; and reducing said boiler target temperature said predetermined amount, ΔT.sub.reduce, each time a predetermined set time interval, t.sub.set, is reached without a subsequent call for heat.
2. The method of claim 1 including, if after a predetermined set time interval, t.sub.set, said call for heat is unsatisfied at said reduced target temperature, increasing said boiler target temperature a predetermined amount, ΔT.sub.boost, and running said heating system at said increased target temperature.
3. The method of claim 2 including, if said call for heat remains unsatisfied after said boiler target temperature has been raised said predetermined amount, ΔT.sub.boost, for said predetermined set time interval, t.sub.set, measured from said increased target temperature: increasing said boiler target temperature said predetermined amount, ΔT.sub.boost, each time said predetermined set time interval, t.sub.set, is reached without having satisfied said call for heat; and running said heating system at the increased target temperature.
4. The method of claim 3 including, once said call for heat is satisfied, reducing said boiler target temperature said predetermined temperature amount, ΔT.sub.reduce, such that said reducing is responsive to and initiated by a subsequent call for heat, and occurs upon or subsequent to said subsequent call for heat.
5. The method of claim 1 wherein said reducing said boiler target temperature said predetermined temperature amount, ΔT.sub.reduce, is calculated based on a constant value, a sliding scale, or a predetermined function.
6. The method of claim 1 wherein said predetermined set time interval, t.sub.set2, is calculated based on a constant value, a sliding scale, or a predetermined function.
7. The method of claim 2 wherein said predetermined set time interval, t.sub.set, is calculated based on a constant value, a sliding scale, or a predetermined function.
8. The method of claim 2 wherein said predetermined set time interval t.sub.set is equal to said predetermined set time interval t.sub.set2.
9. The method of claim 2 wherein temperature increase value ΔT.sub.boost is calculated based on a constant value, a sliding scale, or a predetermined function.
10. The method of claim 2 including monitoring a duty cycle of calls for heat such that if the duty cycle exceeds a predetermined value, said predetermined set time interval, t.sub.set, is continued, disregarding interruptions in heat calls.
11. A method of improving efficiency of a boiler heating system including adjusting boiler target temperature during heating system operation, said method comprising: reducing said boiler target temperature a predetermined amount, ΔT.sub.reduce, to a reduced target temperature, such that said reducing is responsive to and initiated by a call for heat, and occurs upon or subsequent to said call for heat; running said heating system at said reduced target temperature; if after a predetermined set time interval, t.sub.set, said call for heat is unsatisfied at said reduced target temperature, increasing said boiler target temperature a predetermined amount, ΔT.sub.boost, and running said heating system at said increased target temperature; and monitoring said duty cycle in a rolling measurement.
12. The method of claim 11 wherein said monitoring includes measuring said duty cycle over a period of one (1) hour in multiple time segments.
13. A method of improving efficiency of a boiler heating system for heating a structure, said boiler heating system comprising: a burner; a controller in communication with said burner for adjusting boiler target temperature; a first temperature measurement device for measuring said boiler heating system temperature, said first temperature measurement device in communication with said controller; a second temperature measurement device for measuring temperature of said structure, said second temperature measurement device in communication with said controller; said method comprising: adjusting said boiler target temperature during heating system operation, by reducing said target temperature a predetermined amount to a reduced target temperature, ΔT.sub.reduce, such that said reducing is responsive to and initiated by a call for heat, and occurs upon or subsequent to said call for heat, said call for heat triggered by said second temperature measurement device communicating with said controller; running said heating system at said reduced target temperature by having said controller communicate with and activate a circulator or said burner; if said call for heat is satisfied while running said heating system at said reduced target temperature: measuring elapsed time from a time at which a call for heat was satisfied; and reducing said boiler target temperature a predetermined amount, ΔT.sub.reduce, each time a first predetermined set time interval is reached without a subsequent call for heat; if said call for heat is unsatisfied while running said heating system at said reduced target temperature: measuring elapsed time from a time when said target temperature was met; and increasing said boiler target temperature a predetermined amount, ΔT.sub.boost, after said elapsed time equals to or exceeds a second predetermined set time interval; and running said heating system at said increased target temperature.
14. The method of claim 13 including, if said call for heat remains unsatisfied after said boiler target temperature has been raised said predetermined amount, ΔT.sub.boost, at said second predetermined set time interval measured from said previous increase in target temperature: increasing said target temperature said predetermined amount, ΔT.sub.boost, each time said second predetermined set time interval is reached without having satisfied said call for heat; and running said heating system at the increased target temperature.
15. The method of claim 14 including, once said call for heat is satisfied, reducing said boiler target temperature said predetermined temperature amount, ΔT.sub.reduce, such that said reducing is responsive to and initiated by a subsequent call for heat, and occurs upon or subsequent to said subsequent call for heat.
16. A method of improving the efficiency of a heating system comprising: setting a predetermined target temperature for an energy transfer medium within a boiler in said heating system; measuring a dynamic temperature of said energy transfer medium within said boiler as a function of time; responsive to and initiated by a demand for heat for a zoned space within a structure heated by said heating system: reducing said target temperature a predetermined amount upon or subsequent to said demand for heat; circulating said energy transfer medium through said heating system to at least one heat exchanger within said zoned space at said reduced target temperature; initiating a timer when said dynamic temperature of said energy transfer medium is approximately equal to said predetermined target temperature; if said demand for heat is satisfied while running said heating system at said reduced target temperature: measuring elapsed time from a point at which said call for heat is satisfied; and reducing said target temperature said predetermined amount, each time a first predetermined set time interval is reached without a subsequent call for heat.
17. The method of claim 16 including, if said call for heat is unsatisfied while running said heating system at said reduced target temperature: measuring elapsed time from when said dynamic temperature of said energy transfer medium is approximately equal to said reduced target temperature; sending a firing signal to a burner within said heating system if said dynamic temperature of said energy transfer medium within said boiler is less than said predetermined target temperature within a predetermined differential temperature limit for said energy transfer medium; increasing said target temperature a predetermined amount, ΔT.sub.boost, after said elapsed time equals to or exceeds a second predetermined set time interval; and running said heating system at said increased target temperature.
18. A method of improving the efficiency of a heating system comprising: setting a predetermined temperature for a zoned space within a structure heated by said heating system; setting a predetermined target temperature for an energy transfer medium within a boiler in said heating system; measuring a dynamic temperature of said energy transfer medium within said boiler as a function of time; measuring a dynamic temperature of said zoned space as a function of time; triggering a call for heat upon a comparison of said temperature of said zoned space to said predetermined temperature for said zoned space, such that if said comparison is greater than a predetermined temperature difference said call for heat is initiated; responsive to and initiated by said call for heat: reducing said predetermined target temperature by a temperature reduction factor upon or subsequent to said call for heat; circulating said energy transfer medium through said heating system to at least one heat exchanger within said zoned space; and sending a firing signal to a burner within said heating system if said dynamic temperature of said energy transfer medium within said boiler is, within a predetermined differential temperature range, less than said predetermined target temperature minus said temperature reduction factor; initiating a timer when said dynamic temperature of said energy transfer medium is approximately equal to said predetermined target temperature minus said temperature reduction factor for said energy transfer medium; if said call for heat is satisfied within a first set time interval: reducing current target temperature by said temperature reduction factor, and continuing to reduce the current target temperature by said temperature reduction factor each time said first set time interval has elapsed without a subsequent call for heat.
19. The method of claim 18 including, if said call for heat is not satisfied within a second set time interval: providing a thermal boost to said energy transfer medium by raising said dynamic temperature of said energy transfer medium by a temperature increase factor; resetting said predetermined target temperature to a level approximately equal to the sum of said predetermined target temperature minus said temperature reduction factor plus said temperature increase factor; and continuing to increase current target temperature by said temperature increase factor each time said second set time interval has elapsed without satisfying said call for heat.
20. The method of claim 19 including setting target temperature maximum and minimum levels such that temperature reductions and temperature increases do not exceed heating system operational limits.
21. A method of improving efficiency of a boiler heating system including the steps of: providing a thermal reduction to the energy transfer medium within said boiler responsive to and initiated by a demand for heat to said heating system, or when said demand for heat remains satisfied after a predetermined period of time, said thermal reduction comprising: decreasing a target temperature of said energy transfer medium within said boiler a first predetermined temperature interval upon or subsequent to said demand for heat; and resetting said target temperature to the sum of a previous target temperature minus said first predetermined temperature interval; providing a system shut-off if said energy transfer medium exceeds a predetermined safety value; and combining said thermal reduction with low water cut-off protection for limiting said boiler heating system operation if said energy transfer medium volume is below a predetermined level, or with a boiler temperature limiting option, or a combination thereof.
22. The method of claim 21 including decreasing said predetermined target temperature by a second temperature interval, said decreasing responsive to or initiated by a second or subsequent call for heat, and upon or subsequent to said second or said subsequent call for heat, or whenever a specified time has elapsed before said second or subsequent call for heat is initiated.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1) The features of the invention believed to be novel and the elements characteristic of the invention are set forth with particularity in the appended claims. The figures are for illustration purposes only and are not drawn to scale. The invention itself, however, both as to organization and method of operation, may best be understood by reference to the detailed description which follows taken in conjunction with the accompanying drawings in which:
(2)
(3)
(4)
DESCRIPTION OF THE PREFERRED EMBODIMENT(S)
(5) In describing the preferred embodiment of the present invention, reference will be made herein to
(6) A heating system is designed to provide a near constant room temperature inside a dwelling regardless of outdoor temperature fluctuations. As the outdoor temperature drops, the rate at which the dwelling loses heat increases. Conversely, when the outdoor temperature increases, the dwelling is able to retain heat longer. For example, when the temperature of a room within a structure falls below a predetermined set point, e.g., 66°, the thermostat switches ON and activates the heating system to heat and circulate the energy transfer medium through conduits to a heat exchanger within the room, such as a radiator. This generally causes the temperature within the room to rise, although such factors as outside air temperature, thermal insulation, and heat exchanger efficiency play important roles in the time-rate-of-change of the temperature of the room. When the room temperature reaches a predetermined level, e.g., 68°, the thermostat switches OFF, deactivating the heating system. Heat then begins once again to dissipate from the room at a rate dependent upon the thermal insulation and outside environment temperature.
(7) As the outdoor temperature declines and the heat loss of the dwelling increases, the heating system typically requires more time to satisfy the heat demand. As a result, thermostat calls increase in duration, and especially so in situations where there is inadequate thermal insulation or diminished heat exchanger capacity or efficiency. As outdoor temperatures rise, the heating system is able to satisfy the heat demand more quickly. Thus, in warmer environs, the thermostat calls are shorter in duration and spaced further apart. These scenarios and external factors make it difficult to adjust the temperature of the energy transfer medium within the boiler to an optimum level.
(8) The present invention utilizes thermal targeting technology to continually adjust the boiler temperature to the minimum necessary to achieve the required heating load.
(9) Referring to
(10) In the present invention, controller 14 establishes a boiler target temperature, T.sub.target, for the energy transfer medium within boiler 10, and upon a call or demand for heat, circulator 25 is activated, and burner 12 is fired until the target temperature is reached. The target temperature is derived from the previous heating cycle target temperature. The present invention reduces the previous heating cycle target temperature in a manner that is responsive to and initiated by a call for heat, and upon or subsequent to the call for heat, establishing a lower target temperature, T.sub.target. Although this thermal reduction of the boiler target temperature appears contrary to the application of the heating system upon a demand for heat, it provides the salient efficiency enhancement of the present invention.
(11) The controller 14 maintains the energy transfer medium temperature within a differential range, ΔT.sub.diff, about the newly set target temperature, such that the boiler temperature remains in the range of T.sub.target±ΔT.sub.diff. Preferably, there will be a sliding scale for a differential off the target temperature, although constant differential temperature values may certainly be accommodated. The differential temperatures based on a sliding scale are preferably dependent upon the absolute value of the target temperature in order to avoid a situation where the boiler target temperature is held at too low of a temperature. In this manner, as the target temperature is initially reduced with each call, each lower target temperature value will be associated with a smaller amount of differential or deviation. Thus, ΔT.sub.diff will be lower in absolute value when associated with lower boiler target temperatures, and higher in absolute value when associated with higher boiler target temperatures.
(12) Responsive to and initiated by a demand for heat, controller 14 is programmed to set the boiler target temperature lower, upon or subsequent to the demand for heat, which provides a thermal reduction to the previous target temperature of the energy transfer medium within boiler 10 by a temperature, ΔT. Thus, the new boiler target temperature becomes the previous boiler target temperature minus the thermal reduction temperature: T.sub.target(new)=T.sub.target(old)−ΔT.sub.reduce. Based on this new temperature value, the differential or variance is then applied to give the boiler target temperature an operating range: T.sub.target(new)±ΔT.sub.diff. A call timer is initiated once the energy transfer medium reaches the newly reduced target temperature. If the demand for heat is satisfied within a predetermined set time interval, t.sub.set, responsive to and initiated by the next call for heat, the previous target temperature is again reduced, upon or subsequent to the call for heat, while the system attempts to meet the new heat demand within the time interval t.sub.set. If the demand for heat is not satisfied when the call timer reaches the predetermined set time interval, t.sub.set, the boiler target temperature is increased in temperature a predetermined amount, which is referred to as a thermal boost, ΔT.sub.boost. Preferably, the thermal boost is in a constant temperature interval, although it may be in any predetermined interval predicated upon other system characteristics and environmental conditions, and could be represented by a function rather than a constant. In this manner, the new target temperature becomes T.sub.target+ΔT.sub.boost, where T.sub.target represents the previously reduced target temperature value based on the initial thermal reduction algorithm.
(13) In a preferred embodiment, the logic control circuitry would evaluate and adjust the target temperature (T.sub.target) of the energy transfer medium at a set time interval, for example, at t.sub.set=20 minutes, although as previously discussed, other set time intervals may be preferred, and can be accommodated for different heating system configurations and structure considerations. Predetermined temperature selections may also be based on overlapping calls for heat in a multi-zoned structure. It is envisioned that an operator may adjust or preselect the set time using preselected time intervals such that, for example, t.sub.set may be selected by the operator from a range of values where t.sub.set=10, 15, 20, 25, 30, 35, 40, or 45 minutes, or t.sub.set may be represented analytically as a function of time or temperature.
(14) If, upon thermal reduction of the target temperature pursuant to the method of the present invention, the demand for heat is satisfied within the set time period, t.sub.set, then there is an immediate energy savings insomuch as the boiler target temperature is repeatedly lowered with each call for heat satisfied within the set time period, t.sub.set, but in each case is still able to accommodate the demand for heat. If, however, the demand for heat is not satisfied within a given time period, t.sub.set, the temperature of the energy transfer medium in the boiler, T, is considered to be insufficiently low. Burner 12 is ordered to fire, and the energy transfer medium within boiler 10 is heated to a higher target temperature, increased by the thermal boost: T=T.sub.target+ΔT.sub.boost. In one embodiment, ΔT.sub.boost is set at a predetermined amount, such as ten degrees (10° F.), above the initial energy transfer medium temperature setting, T.sub.target, although this predetermined amount may be represented by other constant values, or other functional relationships, and the invention is not limited to a single value. This cycle is repeated until the heat demand is satisfied.
(15) Heat efficiency gains are significantly realized when the heating system is subjected to different outside environments. When the outside environment warms, the heating system does not have to work as hard to provide heat energy to the structure, since heat dissipation from the structure is considerably reduced. The boiler target temperature could conceivably be running too hot for delivering the amount of heat energy necessary to maintain consistent heat in a slowly dissipating structure. In this scenario, the thermal reduction feature of the present invention governs the enhanced efficiency algorithm.
(16) The boiler target temperature will be initially reduced responsive to and initiated by a call for heat, and upon or subsequent to the call for heat, by a predetermined amount, such that T.sub.target=−ΔT.sub.reduce. If the demand for heat is satisfied before the t.sub.set point is reached, the system ceases providing additional heat energy until the next heat demand. Responsive to and initiated by the next call for heat, and upon or subsequent to this next call for heat, the boiler target temperature is again reduced by the predetermined amount, ΔT.sub.reduce, and the new target temperature is again represented as T.sub.target=(T.sub.initial−ΔT.sub.reduce)−ΔT.sub.reduce=T.sub.initial−2ΔT.sub.reduce. Each time the heat demand is satisfied, the boiler target temperature is reduced responsive to and initiated by the next call for heat, and upon or subsequent to the next call for heat. Under this scenario the thermal reduction algorithm may be generally represented in the following manner:
T.sub.target=(T.sub.initial−N.sub.r*ΔT.sub.reduce) where, T.sub.initial=initial or previous boiler target temperature ΔT.sub.reduce=temperature reduction factor; and N.sub.r=number of thermal reductions;
(17) Once the energy transfer medium reaches the target level, a call timer is activated and t.sub.set is monitored. If the demand for heat is not satisfied within time period t.sub.set, a thermal boost is performed. An analytical representation of the thermal boost scenario is determined in the following manner. Once it is understood that the heat demand is not satisfied after the predetermined time interval, t.sub.set, a first thermal boost is administered. Upon thermal boost, the call timer is reset. Subsequent thermal boosts are then administered at each time interval t.sub.set until the heat demand is met or a system temperature limit is achieved. Under this scenario, this portion of the system algorithm representing boiler target temperature may be expressed as follows:
T.sub.target=[(T.sub.initial−ΔT.sub.reduce)+(N.sub.b*ΔT.sub.boost)] where, T.sub.initial=initial or previous boiler target temperature; ΔT.sub.reduce=temperature reduction factor; ΔT.sub.boost=temperature boost factor; and N.sub.b=number of thermal boosts
(18) Thus, in situations where the heat demand cannot be satisfied within a set time interval, the boiler target temperature which was initially reduced by a temperature ΔT.sub.reduce, is then raised by a temperature ΔT.sub.boost. For each subsequent time interval, t.sub.set, for which the demand for heat remains unsatisfied, a subsequent thermal boost is performed. The temperature increase is preferably the same increase established for the first thermal boost interval, although any temperature increase algorithm may be adopted, and the present invention is not limited to a single or constant temperature increase. For example, the subsequent temperature increases may follow a decreasing exponential function in relation to the thermal dissipation realized by the space being heated.
(19) As an illustrative example in a warm environ, where the outside temperature is rapidly rising, and assuming an initial boiler target temperature of 165° F., a thermal reduction temperature of 5° F., and a thermal boost temperature of 10° F., a first call for heat would reduce the boiler target temperature such that T.sub.target=165° F.−5° F.=160° F. [T.sub.target=T.sub.initial−ΔT.sub.reduce]. After a set time, t.sub.set, due to the warm outside environment or slow heat dissipation from the structure, the demand for heat is presumably satisfied. Responsive to and initiated by the next call for heat, and upon or subsequent to this next call for heat, a new target temperature is set based upon another thermal reduction: T.sub.target=160° F.−5° F.=155° F. [T.sub.target=T.sub.initial−2*ΔT.sub.reduce]. Continuing with this logic, if prior to another set time period, t.sub.set, the demand for heat is again satisfied, the new boiler target temperature responsive to or initiated by the next call for heat will be adjusted for another reduction upon or subsequent to this next call for heat: 155° F.−5° F.=150° F. [T.sub.target=T.sub.initial−3*ΔT.sub.reduce]. In each instance, the target temperatures are set and the new boiler target temperature operating range is T.sub.target±ΔT.sub.diff.
(20) As an illustrative example of the second scenario, in a cold environ where the outside temperature is rapidly falling, assuming an initial boiler target temperature of 165° F., a thermal reduction temperature of 5° F., and a thermal boost temperature of 10° F., a first call for heat would reduce the boiler target temperature such that T.sub.target=165° F.−5° F.=160° F. [=T.sub.initial−ΔT.sub.reduce]. Assuming that after a set time, t.sub.set, due to the cold outside environment, the demand for heat is still not satisfied, a new target temperature is set based on a thermal boost: T.sub.target=160° F.+10° F.=170° F. [=T.sub.target(previous)+ΔT.sub.boost]. Continuing with this logic, after another set time period, t.sub.set, assuming the demand for heat is still not met, the new boiler target temperature is adjusted by another thermal boost: T.sub.target=170° F.+10° F.=180° F. [=(T.sub.initial−ΔT.sub.reduce)+N.sub.b*ΔT.sub.boost]. In each instance, the target temperatures are set and the new boiler target temperature operating range is T.sub.target±ΔT.sub.diff.
(21) This cycle is repeated if the demand for heat remains unsatisfied or until the energy transfer medium's temperature reaches a predetermined system maximum, which is typically based upon operational safety considerations.
(22) An additional efficiency measure, which may be used in conjunction with the above stated thermal reduction algorithm, is to decrease the boiler target temperature whenever a second predetermined time interval t.sub.set2 has been realized without any call or demand for heat. For instance, if there has not been a call for heat within thirty minutes (t.sub.set2=30 minutes), the control circuitry would decrease the target temperature of the energy transfer medium within the boiler by a predetermined value ΔT.sub.reduce2.
(23)
(24) At this time, t.sub.call, the heat efficiency algorithm of the present invention is initiated. Responsive to and initiated by a call for heat, the boiler target temperature is reduced by a predetermined amount, ΔT.sub.reduce, upon or subsequent to this call for heat. In this illustrative example, the thermal reduction is responsive to and initiated by the call for heat, and applied immediately upon the call for heat; but the present invention is not limited to the particular time when the thermal reduction is made, and in fact, the thermal reduction may be performed any time from immediately at the onset of the call for heat to a time subsequent thereto. The burner and circulator are turned on, and the temperature within the boiler is brought up to this reduced target temperature within a predefined differential value. Once the boiler is at target temperature the burner is turned off and a new time clock starts measuring time interval t.sub.set during thermostat activation, and the system continues to run until the heat demand is satisfied or t.sub.set reaches a predetermined value. In this first instance, the system is shown satisfying the heat demand before t.sub.set reaches its predetermined limit, and the thermostat call is turned OFF at time t.sub.1.
(25) At a later time t.sub.2, the system still does not require another call for heat. If the time between t.sub.2 and t.sub.1 is greater than or equal to a predetermined set interval t.sub.set2 for thermostat deactivation, which monitors the time between calls for heat, the boiler target temperature is again reduced at time t.sub.2. Since the outside environment continues to warm during this time period, it is anticipated that there will be fewer calls for heat, and the reduction in boiler target temperature provides an efficiency enhancement. Following the logic shown by the chart, a second time interval of t.sub.set2 is reached at time t.sub.3, such that t.sub.3−t.sub.2=t.sub.set2, where the boiler target temperature is again reduced. Again, the thermal reduction algorithm of the present invention is lowering the boiler target temperature at each opportunity in order to enhance the heating system efficiency.
(26) At time t.sub.4, which is the start of section 50c, the outside environment is shown cooling off with decreasing temperature, and there is a second call for heat; thermostat activation 46 is ON. Under the current thermal reduction algorithm, the first action would be to lower the boiler target temperature by an amount ΔT.sub.reduce; however, at this temperature point in the system operation a predetermined target minimum limit has been met. Consequently, the boiler target temperature remains at this low point and the heating system attempts to satisfy the call for heat. As shown at time t.sub.5, the heat demand remains unsatisfied. In this example, the difference between t.sub.5 and t.sub.4 is the predetermined set interval t.sub.set, such that t.sub.5−t.sub.4=t.sub.set, which means the heating system has been unable to adequately heat the structure during the time interval t.sub.set at this boiler target temperature limit. Thus, a thermal boost is employed at time t.sub.5. The thermal boost raises the boiler target temperature, and a new time clock is reset while the heating system continues to provide heat. A short time later, t.sub.6, the demand for heat is shown to have been satisfied. The boiler target temperature remains at the boosted temperature and a new time clock starts for measuring the next t.sub.set2 interval.
(27) At this stage, the outside environment and the room temperature are shown in section 50d as cooling off. Once again a time interval t.sub.set2 is shown being met at time t.sub.7, such that t.sub.7−t.sub.6=t.sub.set2, without having a call for heat. The thermal reduction algorithm is employed at t.sub.7 and the boiler target temperature is decreased by an amount ΔT.sub.reduce. As shown, the outside environment decreases in temperature, the room temperature decreases as well, and by time t.sub.8, the third thermostat call is activated. The system employs the thermal reduction algorithm and reduces the boiler target temperature by an amount ΔT.sub.reduce. The heating system runs at this temperature until t.sub.9, where t.sub.9−t.sub.8=t.sub.set, and the call for heat remains active. At this point, a thermal boost is initiated and the heating system runs at this increased boiler temperature.
(28)
(29) This cycle repeats with obvious increases in the amount of thermal reductions to the boiler target temperature during times of warmer outside temperatures, and increases in the amount of thermal boosts to the boiler target temperature during times of cooler outside temperatures.
(30) An additional measure is implemented within the thermal boost scheme of the present invention, which is the added monitoring of the system's duty cycle. If the duty cycle of the thermostat exceeds a given value, such as ninety percent (90%), the thermostat interruptions will be treated as a continuous call by the present invention's thermal targeting functions. The duty cycle is preferably monitored in a rolling measurement, for example, over a one hour period in one minute time intervals. Added duty cycle monitoring allows the heating system to check itself under dynamic conditions where temperature reductions would not be desirable or would result in the system's inability to provide adequate heat. For example, if the duty cycle is ninety percent (90%), there is probably no need to bring down the temperature as the system normally would do in a less aggressive duty cycle mode. Thermal boosting continues until the duty cycle decreases, or the system's operational temperature limit is reached.
(31) The present invention may be utilized in tandem with other protective features and options associated with boiler operation. For example, low water cut-off and boiler temperature limiting options may be employed concurrently with the present invention, and may be operated or controlled by controller 14.
(32) Salient features of the present invention include the systematic operation of decreasing incrementally the temperature of the boiler target temperature and the energy transfer medium within the boiler in order to save energy during operation. Preferred variable thermal reductions at predetermined time intervals, and thermal boosts, or a combination thereof are employed to achieve greater thermal efficiency of the heating system.
(33) While the present invention has been particularly described, in conjunction with a specific preferred embodiment, it is evident that many alternatives, modifications and variations will be apparent to those skilled in the art in light of the foregoing description.
(34) It is therefore contemplated that the appended claims will embrace any such alternatives, modifications and variations as falling within the true scope and spirit of the present invention.