Neutralization of Reactive Metal Condensate in Additive Manufacturing
20170361377 · 2017-12-21
Inventors
Cpc classification
B22F10/32
PERFORMING OPERATIONS; TRANSPORTING
B33Y10/00
PERFORMING OPERATIONS; TRANSPORTING
B22F10/28
PERFORMING OPERATIONS; TRANSPORTING
B33Y30/00
PERFORMING OPERATIONS; TRANSPORTING
B33Y40/00
PERFORMING OPERATIONS; TRANSPORTING
B33Y40/20
PERFORMING OPERATIONS; TRANSPORTING
Y02P10/25
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
International classification
B22F3/105
PERFORMING OPERATIONS; TRANSPORTING
B33Y40/00
PERFORMING OPERATIONS; TRANSPORTING
B33Y10/00
PERFORMING OPERATIONS; TRANSPORTING
B33Y30/00
PERFORMING OPERATIONS; TRANSPORTING
Abstract
An additive manufacturing system with a build chamber has a halide vessel that generates a halide gas and a dissociation chamber with a filament. Metal condensate is contacted with the halide gas to form a gaseous metal halide compound. The gaseous metal halide compound is decomposed to deposit metal on the filament. In an example, titanium reacts with gaseous iodine to form gaseous titanium tetraiodide.
Claims
1. An additive manufacturing system comprising: a build chamber; a laser source configured to direct a laser beam into the build chamber thereby forming metal condensate in the build chamber; a halide vessel connected to the build chamber, wherein the halide vessel includes a halide gas source; and a dissociation chamber connected to the halide vessel, wherein the dissociation chamber includes a filament.
2. The additive manufacturing system of claim 1, wherein the halide gas source is configured to generate a gaseous halide from a solid halide material.
3. The additive manufacturing system of claim 2, wherein the gaseous halide is I.sub.2.
4. The additive manufacturing system of claim 1, wherein the filament is fabricated of tungsten.
5. The additive manufacturing system of claim 1, wherein the halide vessel is downstream of the build chamber and the dissociation chamber is downstream of the halide vessel.
6. The additive manufacturing system of claim 5, further comprising a filter downstream of the build chamber in parallel with the halide vessel and the dissociation chamber.
7. The additive manufacturing system of claim 1, wherein the halide vessel includes a heating system.
8. A method comprising: directing a laser beam into a build chamber of an additive manufacturing system thereby forming metal condensate; contacting the metal condensate with a gaseous halide to form a gaseous metal halide compound; transporting the gaseous metal halide compound to a filament; decomposing the gaseous metal halide compound in the presence of the filament; and depositing a metal of the gaseous metal halide on the filament.
9. The method of claim 8, wherein the metal condensate comprises titanium.
10. The method of claim 8, wherein the gaseous halide comprises I.sub.2.
11. The method of claim 8, wherein the gaseous metal compound comprises TiI.sub.4.
12. The method of claim 8, further comprising heating a solid halide material to generate the gaseous halide.
13. The method of claim 8, further comprising transporting the gaseous halide from the filament to a filter or the build chamber.
14. The method of claim 8, further comprising transporting the gaseous halide to a halide vessel and solidifying the gaseous halide into a solid halide material.
15. The method of claim 8, further comprising replacing the filament.
16. A method of removing particles from the surface of a component comprising: directing a laser beam into a build chamber of an additive manufacturing system to form a component; and contacting the component with a gaseous halide thereby removing particles from a surface of the component.
17. The method of claim 16, wherein the particles comprise powder particles.
18. The method of claim 17, wherein the powder particles are partially-fused to the surface.
19. The method of claim 16, wherein the contacting occurs at least one of during the directing or after the directing.
20. The method of claim 16, wherein the contacting occurs in at least one of the build chamber or a cleaning chamber separate from the build chamber.
21. An additive manufacturing system comprising: a build chamber; a laser source configured to direct a laser beam into the build chamber thereby forming metal condensate in the build chamber; a halide vessel connected to the build chamber, wherein the halide vessel includes a halide gas source; a dissociation chamber connected to the halide vessel, wherein the dissociation chamber includes a filament; and a cleaning chamber connected to the dissociation chamber and halide vessel.
22. An additive manufacturing system comprising: a build chamber; a laser source configured to direct a laser beam into the build chamber thereby forming metal condensate in the build chamber; and a cleaning booth comprising: a cleaning chamber; a halide vessel connected to the cleaning chamber, wherein the halide vessel includes a halide gas source; and a dissociation chamber connected to the halide vessel, wherein the dissociation chamber includes a filament.
Description
DESCRIPTION OF THE DRAWINGS
[0011] For a fuller understanding of the nature and objects of the invention, reference should be made to the following detailed description taken in conjunction with the accompanying drawings, in which:
[0012]
[0013]
[0014]
[0015]
[0016]
[0017]
[0018]
[0019]
DETAILED DESCRIPTION OF THE INVENTION
[0020] Although claimed subject matter will be described in terms of certain embodiments, other embodiments, including embodiments that do not provide all of the benefits and features set forth herein, are also within the scope of this invention.
[0021] Various structural, logical, process step, and electronic changes may be made without departing from the scope of the invention. Accordingly, the scope of the invention is defined only by reference to the appended claims.
[0022]
[0023] The gaseous halide that is formed is contacted with the metal condensate. While titanium is specifically disclosed as the metal condensate, aluminum, vanadium, or other metals also may be used. This causes a reaction in step 121. A gaseous metal halide compound is formed in step 122. A filament is used to separate the metal from the halide and reverse the reaction in step 123. The gaseous halide is then cooled and solidifies in step 124.
[0024] For example, the solid halide may be a solid material containing iodine. The I(s) can be vaporized by raising its temperature above, for example, approximately 150° C. The pressure in the AM system also may be reduced. Solid titanium condensate reacts with the I.sub.2(g) to form TiI.sub.4(g) using the following reaction:
Ti(s)+2I.sub.2(g).fwdarw.TiI.sub.4(g)
[0025] The filament may be controlled to approximately 1400° C. to separate the TiI.sub.4(g) using the following reaction:
TiI.sub.4(g).fwdarw.Ti(s)+2I.sub.2(g)
[0026] When cooled, the I.sub.2(g) will solidify into the I(s). For example, the I.sub.2(g) may be cooled below 150° C. to form I(s). During solidification, the pressure in the AM system may be increased.
[0027] The particular halide or gaseous halide species can be selected based on, for example, the metal in the condensate, the AM process parameters, the component being manufactured, or the desired condensate removal level. Instead of I.sub.2, other halides like F.sub.2, Br.sub.2, or Cl.sub.2 may be used. A mixture of different halides or one or more halides with other gaseous species also may be used. The temperature to melt the solid halide material, condense the gaseous halide material, dissociate the gaseous metal halide compound, heat components in the AM system, or cool components in the AM system may vary based on the vaporization temperature and condensation temperature of the halide, halides, or gas mixture that is used.
[0028]
[0029] The build chamber 201, where the AM process occurs, is upstream of the filter 202 and circulating fan 204. The build chamber 201 may use, for example, a laser beam or electron beam. Between the build chamber 201 and the filter 202 are valves V1 and V4. Between the build chamber 201 and the circulating fan 204 are valves V1 and V2.
[0030] Downstream of the circulating fan 204 is the halide vessel 205 and dissociation chamber 206. The dissociation chamber 206 and filter 202 are connected to the build chamber 201 through valve V3 and fan 203.
[0031] The halide vessel 205 is connected to the build chamber 201 and has a halide gas source that is configured to generate a gaseous halide. The halide vessel 205 includes a heating system to raise the temperature of and vaporize a solid halide material. This generates a gaseous halide, such as I.sub.2.
[0032] The dissociation chamber 206 has a replaceable filament, which may be fabricated of tungsten or other materials. The filament in the dissociation chamber 206 may be placed in a flowpath of the gaseous halide or gaseous metal halide compound.
[0033] The embodiment of
[0034] To clean the build chamber 201, either all valves V1, V2, V3, and V4 in
[0035] When the filter 202 is sufficiently cleaned and condensate has been deposited on the filament in the dissociation chamber 206, the halide gas is transported back to the halide vessel 205 to be solidified. The solid halide material can remain in solid form until needed for another cleaning cycle. Other parts of the AM system 200 may be kept at an elevated temperature to prevent or reduce solidification other than in the halide vessel 205.
[0036] The filament in the dissociation chamber 206, which may be a tungsten filament, is periodically replaced. The used filament may be discarded. In the example of titanium condensate, the titanium metal adheres to the filament and is inert in the presence of oxygen. Thus, the filament is safe to handle and dispose of normally.
[0037]
[0038] The build chamber 401, where the AM process occurs, may use, for example, a laser beam or electron beam. The build chamber 401 is upstream of the filter 402 and circulating fan 404. Between the build chamber 401 and the filter 402 is valve V1. Between the build chamber 401 and the circulating fan 404 is valve V2.
[0039] Downstream of the circulating fan 404 is the halide vessel 405 and dissociation chamber 406. The dissociation chamber 406 and filter 402 are connected to the build chamber 401 through valve V3 and fan 403. The halide vessel 405 may be similar to the halide vessel 205 of
[0040] Downstream of the dissociation chamber 406 between this dissociation chamber 406 and the valve V3 is a heater 407. The gaseous halide may need to remain hot (such as ≧350° C.) in order for the titanium iodide reaction to occur. The heater 407 helps maintain the gaseous halide at this temperature.
[0041] The heater 407 also may be attached to or disposed in the build chamber 401. Gaseous halide leaving the halide vessel 405 is hot. If the pipes in the AM system 400 are lagged the gaseous halide will remain hot. The build chamber 401 may include the heater 407 to maintain the gaseous halide at the desired temperature.
[0042] The embodiment of
[0043]
[0044] The build chamber 601, where the AM process occurs, may use, for example, a laser beam or electron beam. The build chamber 601 is upstream of the filter 602 and circulating fan 604. Downstream of the filter 602 are valves V1, V2, and V3. V1 is between the filter 602 and the fan 603. V2 is between the filter 602 and circulating fan 604. V3 is between the heater 607 and the fan 603.
[0045] Downstream of the circulating fan 604 is the halide vessel 605 and dissociation chamber 606. The halide vessel 605 may be similar to the halide vessel 205 of
[0046] The embodiment of
[0047] The halide vessel can be located upstream or downstream of the build chamber. In an alternate embodiment, the halide vessel is located upstream of the build chamber and the dissociation chamber is located downstream of the build chamber. Of course, other designs are possible.
[0048] The circuit illustrated in
[0049] The gaseous halide may circulate in the build chamber 201, 401, or 601 during the build process or in between steps of the build process. The effect on the component being manufactured or the powder in the build chamber 201, 401, or 601 may be negligible, may be controlled, or may be compensated for.
[0050] In yet another embodiment, electrostatic or other methods known to those skilled in the art may be used to cause the metal halide compound or condensate to converge on a heated wire, such as the filament in the dissociation chamber 206, 406, or 606.
[0051] Condensate that did not react with the gaseous halide may still melt in the dissociation chamber 206, 406, or 606 and form a deposit after the molten metal cools.
[0052] The cleaning process disclosed herein may be separate from the build process in the build chamber 201, 401, or 601. The cleaning process also may be used during the build process in the build chamber 201, 401, or 601 if the impact to the component being manufactured is negligible, controlled, or compensated for.
[0053] The cleaning process disclosed herein may be a closed cycle or an open cycle. An open cycle may be possible depending on the nature of the halide and reaction products.
[0054] Components manufactured using an AM process may have a surface with partially-fused or loose powder particles on it. These particles become detached during assembly and use, and may cause subsequent problems during component operation. Such particles may be small and may be of large relative surface area. For example, these particles may be approximately 15 μm to 45 μm in dimension. When exposed to the gaseous halide, the particles may be consumed in a reaction and removed from the component. The surface of the component may be rendered free of the loose or partially-attached particles without subsequent bead blasting, HF treatments, or other particle removal steps. Thus, this cleaning process also can be used during or as an additional step to the AM process to clean the component being manufactured.
[0055] In an alternate embodiment, a separate cleaning chamber is located in the AM system. This cleaning chamber may be connected to the dissociation chamber and halide vessel. Additional valves and gas lines are used to flow the halide gas to this cleaning chamber. A finished or incomplete part may be moved from the build chamber to the cleaning chamber to remove particles. Instead of a cleaning chamber connected to the AM system, a separate standalone cleaning booth with a dissociation chamber and halide vessel also may be used.
[0056] The safety of an AM process is improved using embodiments disclosed herein due to elimination or reduction of dangerous condensate. Personnel may not need to handle filters contaminated with condensate or clean contaminated build chambers. Manufacturing costs are lowered due to the elimination of hazardous waste materials. The build chamber and transparent window will remain cleaner for a longer period, which will enable longer build times, improve system uptime, and reduce the necessary preventative maintenance. The laser optics will remain cleaner for a longer period, which will provide improved laser beam quality and improved product quality, fidelity, and consistency. Parts produced using the AM process may be cleaner or have fewer undesired particles attached to surfaces. These benefits can be provided without impacting the quality of the components being manufactured using the AM process.
[0057] The following are sample claims that are presented for illustrative purposes and are not intended to be limiting.