Abstract
A source-network coordination type direct-current (DC) circuit breaker based on pre-charged capacitors for an MMC based DC grid is provided. The MMC based DC grid is provided with four converter stations, each having two converters, which are in loop connection through a double-loop DC overhead line. Two ends of each DC line connecting the converters are separately equipped with DC circuit breakers for isolating a fault of the DC line. An MMC active voltage adjusting control strategy is matched with pre-charged capacitor voltage in the self-adaptive mode to provide a beneficial breaking condition for a quick mechanical switch branch, so that the fault line is effectively cut off.
Claims
1. A source-network coordination type direct-current (DC) circuit breaker based on pre-charged capacitors for a modular multilevel converters (MMC) based DC grid, wherein the MMC based DC grid is provided with four converter stations, each having two converters; the converters of the four converter stations are in loop connection through a double-loop DC overhead line; two ends of each DC line connecting the converters are separately equipped with the source-network coordination type DC circuit breakers based on pre-charged capacitors which are matched with an MMC active voltage adjusting control strategy in a self-adaptive mode to clear an isolating fault while the DC line has the fault; wherein a topological structure of the source-network coordination type DC circuit breaker based on pre-charged capacitors comprises: a through-current branch, wherein the through-current branch comprises a quick mechanical switch (Si) and an insulated gate bipolar transistor (IGBT) switching transistor group (Qi) which are sequentially connected in series, and another end of the quick mechanical switch (Si) is connected to a DC bus; a pre-charged capacitor branch, wherein the pre-charged capacitor branch comprises a pre-charged capacitor group (Ci), a diode valve group (Di), a thyristor valve group (Ti) and an energy consumption resistor (Ri); ends, which are connected to one another in parallel, of the diode valve group (Di), the thyristor valve group (Ti) and the energy consumption resistor (Ri) are connected to a rear end of the IGBT switching transistor group (Qi), and the other ends thereof are connected to one end of the pre-charged capacitor group (Ci) in series while the other end of the pre-charged capacitor group (Ci) is grounded; and a current-limiting inductor branch, wherein the current-limiting inductor branch comprises a current-limiting inductor (Li), one end of the current-limiting inductor (Li) is connected to a node between the through-current branch and the pre-charged capacitor branch while the other end thereof is connected to the DC line.
2. The source-network coordination type DC circuit breaker based on pre-charged capacitors for the MMC based DC grid according to claim 1, wherein the MCC active voltage adjusting control strategy is implemented by an active voltage adjusting controller; during a normal operation, the active voltage adjusting controller is not in use and a voltage adjusting coefficient k is kept as 1; while a fault occurs, the active voltage adjusting controller is in use and the voltage adjusting coefficient k as output is reduced within a range from 0 to 1, so that voltage at a DC side outlet of the converter is equal to voltage of the pre-charged capacitor group of the circuit breaker on the fault line, and thus, voltage at the two ends of the quick mechanical switch (S.sub.1) is clamped momentarily to provide a breaking condition for the quick mechanical switch (S.sub.1).
3. The source-network coordination type DC circuit breaker based on pre-charged capacitors for the MMC based DC grid according to claim 1, wherein when a DC fault occurs, k.sub.flt is taken as a voltage adjusting coefficient for reducing a total number of submodules of phases to k.sub.fltN.sub.ref in a nearest electric level approaching and adjusting process, thereby realizing adjusting of voltage at a DC side outlet of the converter.
4. The source-network coordination type DC circuit breaker based on pre-charged capacitors for the MMC based DC grid according to claim 1, wherein when the DC grid normally operates, the pre-charged capacitor group (C.sub.1) needs to charge to a DC rated voltage, so that output voltage is reduced by adjusting the number of submodules in use of the converter to match with voltage of the pre-charged capacitor group (C.sub.1) in a self-adaptive mode at a fault isolating stage, thereby momentarily clamping voltage at the two ends of the quick mechanical switch to provide a breaking condition for the quick mechanical switch (S.sub.1).
5. The source-network coordination type DC circuit breaker based on pre-charged capacitors for the MMC based DC grid according to claim 1, wherein when the DC grid has a fault, attenuation speeds of the voltage of the pre-charged capacitor group C.sub.1 are different under different transition resistances; a voltage adjusting coefficient (k) is mutually matched with different transition resistances to adjust a cut-off number of submodules in the self-adaptive mode, thereby simultaneously coping with a metal short-circuit fault and a high-resistance short-circuit.
6. The source-network coordination type DC circuit breaker based on pre-charged capacitors for the MMC based DC grid according to claim 1, wherein when the DC grids has a fault, the fault is cleared by the following steps: when the fault occurs at a to moment, the converter discharges to a fault point, and the pre-charged capacitor group (C.sub.1) on the fault line discharges to the fault point through the diode valve group (D.sub.1) and the pre-charged capacitor group (C.sub.1, where i=2, 3) on a non-fault line discharges to the fault point through the diode valve group (D.sub.1, where i=2, 3), so that fault current rises and the current-limiting inductor (L.sub.1) limits a rise rate of short-circuit current; when a fault is detected at a t.sub.1 moment, an MMC active voltage adjusting control is immediately put in use, so that voltage is matched with a pre-charged capacitor voltage (u.sub.C1), voltage at a DC side outlet of the converter is equal to the pre-charged capacitor voltage (u.sub.C1) by adjusting the number of submodules in the self-adaptive mode, and the thyristor valve group (T.sub.i, where i=2, 3) on the non-fault line is triggered to make preparation for power flow transfer in a process of cutting off the through-current branch on the fault line; through delay for a certain time, the IGBT switching transistor group (Q.sub.1) on the through-flow branch is switched off at a t.sub.2 moment to cut off current on the through-flow branch, so that preparation is made for quick arc-free breaking of the quick mechanical switch (S.sub.1); and after the IGBT switching transistor group (Q.sub.1) is switched off, preliminary isolation of the fault line is realized; the quick mechanical switch S.sub.1 is broken at a t.sub.3 moment while the number of submodules of the converter does not restore to a normal switching status; the pre-charged capacitor group (C.sub.i, where i=2, 3) on the non-fault line stops discharging for stabilizing DC bus voltage (u.sub.MMC(t)) unchanged before the quick mechanical switch S.sub.1 is completely broken; the quick mechanical switch S.sub.1 is completely broken at a t.sub.4 moment to realize physical isolation of the fault line while the MCC active voltage adjusting control is released and the number of the submodules of the converter restores to the normal switching status; the pre-charged capacitor group (C.sub.i, where i=2, 3) on the non-fault line is recharged by the converter, is finally restored by oscillation and is stabilized at a DC rated voltage; when the voltage of the pre-charged capacitor group (C.sub.i, where i=2, 3) on the non-fault line is stabilized, a trigger signal to the thyristor valve group (T.sub.1, where i=2, 3) on the non-fault line is stopped; and meanwhile, a fault loop forms a two-order oscillation circuit, current is oscillated and has follow-current consumption on a branch on which the energy consumption resistor (R.sub.1) is located, and the fault is cleared after energy consumption is ended.
Description
BRIEF DESCRIPTION OF FIGURES
(1)
(2)
(3)
(4)
(5)
(6)
(7)
DETAILED DESCRIPTION OF PREFERRED EMBODIMENTS
(8) The technical solutions of the invention will be described in detail in conjunction with the embodiments and accompanying drawings as follows.
(9) A low-voltage and zero-current breaking condition is provided for the quick mechanical switch through source-network coordination in a mode of combining a source-side MMC active voltage adjusting control strategy with a topological structure of a network-side circuit breaker, thereby realizing effective cut-off of the fault line, reducing influences of fault current on a converter station, avoiding breakdown of bus voltage and guaranteeing normal operation of the non-fault line.
(10)
(11) The source-network coordination type hybrid DC circuit breaker based on a pre-charged capacitor, namely a topological structure of a network-side circuit breaker is mounted on each DC outgoing line of the corresponding converter station; taking line 1 as an example, as shown in
(12) When a fault occurs, the attenuation speed of pre-charged capacitor voltage is different under different transition resistances, and the voltage adjusting coefficient is mutually matched with the different transition resistances to adjust the cut-off number of the submodules in the self-adaptive mode, so that a metal short-circuit fault and a high-resistance short-circuit are simultaneously coped.
(13) It should be noted that in a specific design, components and parts in each valve group can be connected properly in series or parallel according to different application scenarios to match with system needs.
(14) In the invention, the active voltage adjusting control strategy of the source-side converter is as follows: during the DC fault period, the total number of submodules in use of each phase Is reduced to kNref (k being the voltage adjusting coefficient which represents a proportion of submodules in use, k≤1) in a nearest electric level approaching and adjusting process, thereby realizing MMC active voltage adjusting. A control block diagram is as shown in
(15) The active voltage adjusting control strategy of the source-side converter MMC is designed by the active voltage adjusting controller as shown in
(16) In the invention, an equivalent circuit of the MCC converter adopting active voltage adjusting control is as shown in
(17) Output current idc of the MCC converter adopting active voltage adjusting control includes three phases, namely U.sub.a, U.sub.b and U.sub.b; each phase includes an upper bridge arm and a lower bridge arm; each of the upper bridge arm and the lower bridge arm includes KN same submodules SM1-N and bridge arm inductances L.sub.arm connected in series, where the bridge arm resistance Rarm, the bridge arm inductances L.sub.arm and the bridge arm resistance Rarm are connected to N same submodules SM1-N in series. Connecting points of bridge arm resistances Rarm of the upper bridge arm and the lower bridge arm of each phase are connected to the three phases, namely U.sub.a, U.sub.b and U.sub.c. After active voltage adjusting control is adopted, output voltage at the DC side of the converter station is as follows:
(18)
(19) When a fault occurs, the output voltage u.sub.MMC at the DC side of the converter is equal to pre-charged capacitor voltage u.sub.C1 in a self-adaptive mode through an MMC station end active voltage adjusting control strategy,
(20)
(21) according to the formula (2), the voltage adjusting coefficient k.sub.flt of the MMC during a fault period satisfies the following formula:
(22)
(23) It can be seen from the formula (3) that in the active voltage adjusting controller as shown in
(24) The working principle of the DC circuit breaker is described by taking the short-circuit fault on the line 1 as an example.
(25) As shown in
(26)
Where, U.sub.dc is DC rated voltage.
(27) Obviously, the energy consumption resistor R.sub.1 in the circuit breaker affects the size of the pre-charging current i.sub.C, and therefore, the parameters of the energy consumption resistor R.sub.1 can be designed for effectively controlling charging current, thereby avoiding greater influences on system power flow.
(28) When the line 1 has a fault (at a moment to), the current of the line is quickly increased;
(29) 1) a fault isolating stage (stage 1)
(30) Before the system detects the t.sub.1 moment at which the short-circuit faults occurs, the MMC converter discharges to the fault point, and the pre-charged capacitor group C.sub.1 on the fault line discharges to the fault point through the diode valve group D.sub.1 and a pre-charged capacitor group C.sub.i on the non-fault line discharges to the fault point through a diode valve group D.sub.i (i=2, 3), so that the conduction loop is shown in
(31)
Where, R.sub.g is transition resistance, and β.sub.1 and β.sub.2 are separately as follows:
(32)
(33) It can be known from the formulas (5) and (6) that i.sub.k(t) and u.sub.C1(t) are affected by current-limiting inductor and pre-charged capacitor:
(34) a) along with increase of current-limiting inductor L.sub.1 of the circuit breaker, discharge current of pre-charged capacitor in a fault cut-off process can be effectively reduced;
(35) b) the pre-charged capacitor on the fault line and the pre-charged capacitor on the non-fault line are connected in parallel, so that an equivalent capacitance is increased,
(36) and a decrease rate of pre-charged capacitor voltage can be reduced to certain extent, and thus, voltage of the grid is prevented from greater fluctuation; and
(37) c) similarly, if there are many outgoing lines of the DC bus, size of the pre-charged capacitor can be correspondingly reduced, and thus, the size and the cost of the circuit breaker are favorably reduced.
(38) 2) A Fault Isolating Stage (Stage 2)
(39) when a fault is detected at a t.sub.1 moment, MMC converter is immediately put in use for active voltage adjusting control, so that the voltage is matched with the pre-charged capacitor voltage, and thus, voltage at the DC side outlet of the converter is equal to the pre-charged capacitor voltage C.sub.1 by adjusting the number of sub modules in the self-adaptive mode, and the thyristor valve group T.sub.i (i=2, 3) on the non-fault line is triggered to make preparation for power flow transfer in a process of cutting off the through-current branch of the fault line;
(40) through delay for a certain time, the IGBT switching transistor group Q.sub.1 on the through-flow branch is switched off at a t.sub.2 moment to cut off current on the through-flow branch, so that preparation is made for quick arc-free breaking of the quick mechanical switch S.sub.1. The conduction loop is as shown in
(41)
(42) U.sub.0 is bus voltage of the converter at the t.sub.2 moment, and expressions β.sub.1, β.sub.2 and U.sub.0 are separately as follows:
(43)
(44) After the IGBT switching transistor group Q.sub.1 is switched off, preliminary isolation of the fault line is realized, and the quick mechanical switch S.sub.1 starts to break at a t.sub.3 moment. While the number of submodules of the converter does not restore to a normal switching status, the pre-charged capacitor on the non-fault line stops discharging for stabilizing DC bus voltage u.sub.MMC(t) unchanged before the quick mechanical switch S.sub.1 is completely broken, and u.sub.MMC(t) is as follows:
u.sub.MMC(t)=U.sub.0, t.sub.2<t≤t.sub.4 (13)
(45) Voltage u.sub.T(t) at the two ends of the through-flow branch is a difference between DC bus voltage u.sub.MMC(t) and pre-charged capacitor voltage u.sub.C1(t), with an expression as follows:
u.sub.T=u.sub.MMC−u.sub.C1(t), t.sub.3<t≤t.sub.4 (14)
(46) When the pre-charged capacitance value is relatively great, voltage drop is slow, and maximum voltage u.sub.Tmax at the IGBT switch tube of the through-flow branch is small; when the pre-charged capacitance value is small, capacitance drop is quick, and maximum voltage u.sub.Tmax at the IGBT switch tube of the through-flow branch is great. That is to say, the greater the capacitance value, the lower the voltage withstand requirements of the IGBT switch tube; the smaller the capacitance value, the higher the voltage withstand requirements of the IGBT switch tube. If the voltage-resistance level of the IGBT switch tube needs to increase, number of the IGBT switch tubes connected in series needs to increase, which affects on-off action consistency and increases line on-state loss, and therefore, it is crucial to design a reasonable pre-charged capacitance value.
(47) 3) An Energy Consumption Stage (Stage 3)
(48) Through delay for certain time, the quick mechanical switch S.sub.1 is completely broken at a t.sub.4 moment to realize physical isolation of the fault line while active voltage adjusting control is released and the number of the submodules of the converter restores to the normal switching status. The pre-charged capacitor group C.sub.1 (i=2, 3) on the non-fault line is recharged by the converter, is finally restored by oscillation and is stabilized at the DC rated voltage. When the voltage of the pre-charged capacitor group on the non-fault line is stabilized, a trigger signal to the pre-charged capacitor group C.sub.i (i=2, 3) on the non-fault line is stopped; and meanwhile, a fault loop forms a two-order oscillation circuit, current is oscillated and has follow-current consumption on a branch on which the energy consumption resistor R.sub.1 is located, and the conduction loop is as shown in
(49) In practical application, the pre-charged capacitor on the fault line and the pre-charged capacitor on the non-fault line are connected in parallel to discharge, and therefore, the pre-charge capacitance value can be properly reduced while outgoing lines of the DC bus are more. In addition, the voltage drop time of the pre-charged capacitor during the fault period is shortened and the capacitance value also can be properly reduced along with improvement in technical level of the quick mechanical switch and reduction in action time. The two factors are beneficial for reducing the cost of the circuit breaker and reducing the size of the circuit breaker. In practical application, the pre-charged capacitor on the fault line and the pre-charged capacitor on the non-fault line are connected in parallel to discharge, and therefore, the pre-charged capacitance value can be properly reduced while outgoing lines of the DC bus are more. Requirements on a capacitor beside the line can be reduced along with improvement in development level of the quick mechanical switch and reduction of action time, and therefore, the cost and the size of the circuit breaker are favorably reduced.
(50) It needs to be noted that in the invention, the pre-charged capacitor is a high-voltage capacitor which has DC rated voltage after being charged during a normal operation period of the system. The pre-charged capacitor is matched with the MMC converter active voltage adjusting control strategy during the fault period, so that the DC outlet voltage of the converter is equal to the voltage of the pre-charged capacitor in the self-adaptive mode to provide a beneficial condition for breaking the through-current branch.
(51) During the fault period, number of the submodules is reduced after the MMC is switched to the active voltage adjusting control, so that alternating-current outlet voltage thereof is reduced. It is necessary to reasonably design a parameter selecting principle of voltage adjusting control according to strength of an alternating-current system connected to the converter station.
(52) To reduce influences on the alternating-current system while adjusting voltage at the DC side, a minimum value on the voltage adjusting coefficient k.sub.flt is limited according to the strength of the alternating-current system connected to the converter station, where the minimum value is met by selecting the pre-charged capacitance value. It can be known from the formula (3) that the equivalent inductance and the equivalent resistance of the converter are given values, and therefore, only the voltage of the pre-charged capacitor can be adjusted; the drop speed of the voltage of the pre-charged capacitor is associated with the size of the capacitance value, and therefore, the minimum value of the voltage adjusting coefficient can be met by adjusting the size of the capacitance value of the pre-charged capacitor.
(53) If the minimum value allowed of the voltage adjusting coefficient during the fault period is k.sub.min according to the strength of the alternating-current system connected to the converter station, DC voltage at the outlet of the corresponding converter is as follows:
(54)
(55) It can be known from the formula (13) that the DC voltage at the side outlet of the MMC converter when the adjusting voltage adjusting control exits is U.sub.0, and therefore, the valuing range of the capacitance value of the pre-charged capacitor is determined based on the formula (16).
U.sub.0>u.sub.MMC_min (16)
(56)
(57) The greater the voltage adjusting coefficient k.sub.flt during the fault period, the smaller the influence on the alternating-current system, and the size of the capacitance value of the pre-charged capacitor can be reasonably selected according to the strength of the alternating-current system.
(58) In the invention, the energy consumption resistor R.sub.1 is an energy consumption element in the circuit breaker, which is used to consume residual energy of the pre-charged capacitor and the current-limiting inductor on the fault line after fault isolation. The size of the energy consumption resistor determines the duration of residual energy release; after the quick mechanical switch is completely broken, the fault loop is a two-order oscillating circuit; at critical damping, the duration for consuming the residual energy is shortest, and the size of the energy consumption resistor R.sub.1 is determined based on the formula (17).
(59)
(60) When the system normally operates, the energy consumption resistor R.sub.1 also achieves the effect of limiting the size of pre-charged current, and therefore, the size of the energy consumption resistor can be designed according to a practical condition. The voltage of the IGBT switch tube valve group on the through-current branch is small, and therefore, a number of IGBT switch tubes connected in series is small. If the maximum voltage on the IGBT switch tube valve group on the through-current branch during the fault period is U.sub.IGBT_max, the breaking ability required is I.sub.IGBT_max. If withstand voltage of single IGBT switch tube is U.sub.IGBT and the maximum withstand voltage is I.sub.IGBT, the number of IGBT switch tube components needed is as follows:
(61)
(62) In a high-voltage application occasion, the pre-charged capacitor branch of the circuit breaker needs to withstand DC rated voltage, and therefore, a certain number of switch components need to connect in the thyristor valve group and the diode tube valve group in the pre-charged capacitor branch in series. In addition, if the system requires higher breaking ability, each valve group needs to equip with switch components in parallel to meet the requirements.
(63) If the maximum voltage on the thyristor valve group T.sub.1 during the fault period is U.sub.T1_max, the maximum current flowing through is I.sub.T1_max, withstand voltage of single required is I.sub.SCR, the number of switch components needed for the thyristor valve group is as follows:
(64)
(65) If the maximum reverse voltage drop of the diode valve group D.sub.1 during the fault period is U.sub.D1_max, the maximum breakover current is D1_max, the reverse withstand voltage of single diode is U.sub.R, the maximum withstand current is I.sub.F, the number of switch components needed for the diode valve group is as follow
(66)
(67) The invention discloses a source-network coordination type DC circuit breaker based on pre-charged capacitors for an MMC based DC grid. A low-voltage and zero-current breaking condition is provided for the quick mechanical switch in a mode of coordinating a source-side MMC active voltage adjusting control strategy with pre-charged capacitor voltage in a self-adaptive mode, thereby realizing effective cut-off of the fault line, reducing influences of fault current on a converter station in the presence of a pre-charged capacitor, avoiding breakdown of bus voltage and guaranteeing normal operation of the non-fault line. The circuit breaker disclosed by the prevent invention has greater economic benefits for a complex grid in in which single converter station bus is connected to a plurality of outgoing lines.
(68) The above are embodiments of the invention, which are not intended to limit the system and the method disclosed by the invention. Therefore, the protection scope of the invention is subject to the protection scope in claims.
(69) All obvious modifications and variations made by a person skilled in the art on forms and details without departing from the spirit and scope of the invention shall fall within the scope of the invention.