Abstract
The present invention provides a method for tackling the repelling of hammering during pipe pile driving, which is of simply structure and can be carried out easily. The technical scheme of the present invention comprises: When repelling of hammering occurs in the process of piling through a sand layer, drill holes downwardly around and/or inside the pipe pile, and jet high-pressure water to the sand layer below to cut and disturb the sand layer, which consequently decreases the soil resistance to the pipe pile and increases the driveability. The present invention is applied to geotechnical engineering.
Claims
1. A method for tackling repelling of hammering during pipe pile driving, comprising: drilling holes downwardly around and/or inside the pipe pile (1) until a drill head reaches a sand layer (3) when the repelling of hammering occurs in the process of piling through the sand layer (3); jetting high-pressure water from a plurality of drill holes (2) to cut and disturb the sand layer (3) to decrease the soil resistance to the pipe pile (1); and cease drilling and jetting until the drill head reaches a depth of 0.5-1.0 m below the sand layer (31); wherein the high-pressure water is jetted when the plurality of drill holes arranged around the pipe pile (1) shaft reaches a depth of 0.5-1.0 m above the sand layer (31).
2. The method of claim 1, wherein the drilling and jetting cease until the drill head reaches a depth of 3D below a tip of the pipe pile; the D is the diameter of the pipe pile (1).
3. The method of claim 1, wherein the high-pressure water is jetted when the plurality of drill holes arranged around the pipe pile (1) reaches 0.5-1.0 m above the sand layer (31); keep drilling and jetting until the drill head reaches the depth 3D below the pipe pile (1) tip; drilling holes inside the pipe pile (1) to 0.5-1.0 m above the sand layer (32), and start jetting high-pressure water; keep drilling and jetting until the drill head reach the depth 3D below the pipe pile (1) tip; the D is the diameter of the pipe pile (1).
4. The method of claim 1, wherein drill holes around the pipe pile (1) to 0.5-1.0 m above the sand layer (31), and start jetting high-pressure water, keep drilling and jetting until the drill head reach the depth 3D below the pipe pile (1) tip, removing both the soil inside the pipe pile (1) and the soil in the region from the pipe pile (1) tip to the depth 3D below the pipe pile (1) tip; the D is the diameter of the pipe pile (1).
5. The method of claim 1, wherein a water pressure from the plurality of drill holes (2) is controlled in a range of 1˜25 MPa.
6. The method of claim 1, wherein a diameter of the plurality of drill holes (2) is 76˜108 mm.
7. The method of claim 1, wherein more than four drill holes (2) are arranged around the pipe pile (1) shaft to fully disturb the sand layer (31); and more than five drill holes (2) are arranged inside the pipe pile (1) to fully disturb the sand layer (32).
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0011] FIG. 1 is a schematic structural view in embodiment 1.
[0012] FIG. 2 is a schematic plan view of device layout in embodiment 1.
[0013] FIG. 3 is a schematic structural view in embodiment 2.
[0014] FIG. 4 is a schematic plan view of device layout in embodiment 2.
[0015] FIG. 5 is a schematic structural view in embodiment 3.
[0016] FIG. 6 is a schematic plan view of device layout in embodiment 3.
[0017] FIG. 7 is a schematic structural view in embodiment 4.
[0018] FIG. 8 is a schematic plan view of device layout in embodiment 4.
[0019] FIG. 9 is a schematic structural view in embodiment 5.
DETAILED DESCRIPTION OF THE INVENTION
[0020] Embodiment 1: as shown in FIG. 1 and FIG. 2, if the repelling of hammering occurs when driving a pipe pile 1 into a sand layer 31, four or more drilling holes 2 are arranged around the pipe pile 1 shaft, depending on the diameter of the pipe pile 1. The diameter of the drilling holes 2 is in the range of 76˜108 mm. Firstly, Drilling holes around the pipe pile 1 to 0.5-1.0 m above the sand layer 31, and then start jetting high-pressure water. Keep drilling and jetting until the drill head reach 0.5-1 m below the bottom of the sand layer 31. Construction equipment for jet grouting are used for hole drilling and water jetting with the pressure of the water or gas-water mixture controlled in a range of 1˜25 MPa. Through jetting the high-pressure water or gas-water mixture, the disturbed region 4 of the sand layer 31 is developed and consequently the friction resistance from the sand layer 31 is reduced. Thus the pipe pile 1 can be re-driven to the preset depth.
[0021] Embodiment 2: as shown in FIG. 3 and FIG. 4, if the repelling of hammering occurs when driving a pipe pile 1 to the sand layer 32 beneath the pile tip, five or more drilling holes 2 are arranged inside the pipe pile 1 shaft, depending on the diameter of the pipe pile 1. The diameter of the drilling holes 2 is in the range of 76˜108 mm. Firstly, drilling holes inside the pipe pile 1 to 0.5-1.0 m above the sand layer 32, and then start jetting high-pressure water or gas-water mixture. Keep drilling and jetting until the drill head reach a depth of 3D below pile tip, and D is the diameter of the pipe pile. Construction equipments for jet grouting are used for hole drilling and water jetting, with the pressure of the water or gas-water mixture controlled in a range of 1˜25 MPa. Through jetting the high-pressure water or gas-water mixture, the disturbed region 4 of the sand layer 32 is developed and consequently the tip resistance from the sand layer 32 is reduced. Thus the pipe pile 1 can be re-driven to the preset depth.
[0022] Embodiment 3: as shown in FIG. 5 and FIG. 6, if the repelling of hammering occurs when drive a pipe pile 1 to the sand layer 3, more than 4 drilling holes 2 are arranged around the outside and more than 5 drilling holes 2 are arranged inside the pipe pile 1 respectively, depending on the diameter of the pipe pile 1. The diameter of the drilling holes 2 is in the range of 76˜108 mm. Firstly, drilling holes around the pipe pile 1 to 0.5-1.0 m above the sand layer 31, and then start jetting high-pressure water or gas-water mixture. Keep drilling and jetting until the drill head reach the depth 3D below the pile tip. Meanwhile, drill holes 2 inside the pipe pile 1 to 0.5-1.0 m above the sand layer 32, and start jetting high-pressure water or gas-water mixture. Keep drilling and jetting until the drill head reach the depth 3D below the pile tip. Construction equipments for jet grouting are used for hole drilling and water jetting, with the pressure of the water or gas-water mixture controlled in a range of 1˜25 MPa. Through jetting the high-pressure water or gas-water mixture, the disturbed region 4 of the sand layer is developed and consequently both the friction and tip resistance from the sand layer are reduced. Thus the pipe pile 1 can be re-driven to the preset depth.
[0023] Embodiment 4: as shown in FIG. 7 and FIG. 8, if the repelling of hammering occurs when driving a pipe pile 1 to the sand layer 32, 4 or more holes 2 are placed around the pipe pile 1, depending on the diameter of the pipe pile 1. The diameter of the drilling holes 2 is in the range of 76˜108 mm. Firstly, drilling holes around the pipe pile 1 to 0.5-1.0 m above the sand layer 31, and then start jetting high-pressure water or gas-water mixture. Keep drilling and jetting until the drill head reach the depth 3D below the pile tip. Meanwhile remove all the soil inside the pipe pile. Construction equipments for jet grouting are used for hole drilling and water jetting, with the pressure of the water or gas-water mixture is controlled in a range of 1˜25 MPa. Through jetting the high-pressure water or gas-water mixture, the disturbed region 4 of the sand layer is developed and consequently both the friction resistance from the sand layer 3 is reduced. Furthermore removing all the soil inside the pipe pile contributes to the elimination of the friction resistance inside the pipe pile and the decreasing of the tip resistance from the sand layer 32 beneath the pile tip. Thus the pipe pile 1 can be re-driven to the preset depth.
[0024] Embodiment 5: as shown in FIG. 9, if the repelling of hammering occurs when driving a pipe pile 1 to the sand layer 32, remove the soil both inside the pipe pile 1 and in the region from the pile tip to the depth 3D below the pile tip to eliminate the friction resistance inside the pipe pile 1 and decrease the tip resistance from the sand layer 32. Thus the pipe pile 1 can be re-driven to the preset depth.